OWNERSHIP COST
OF
CONSTRUCTION PLANT & EQUIPMENT

Kumar Gyanendra Mohan
www.constructionmechanizer.com
Introduction
 Construction equipment is one of the
biggest investments carried by
construction industry.
 Knowledge about owning cost and
operating cost is must before equipment
mobilization.
 Also, monitoring of actual operating and
owning cost of equipment on regular
basis is necessary for optimum
profitability.
www.constructionmechanizer.com
Introduction
 Owning cost and operating cost of
equipment has significant impact on
profitability of work executed.
 Owning and operating cost, need to be
calculated based on the financial
investment terms and condition,
depreciation method and operating
condition of equipment.
 OEM recommendation can be considered
for calculating owning and operating cost.
www.constructionmechanizer.com
Introduction
 Ownership and operating costs of
work need to be calculated based
on
1. units of work production per hour (ton/hr or
cum3/hr etc),
2. cost per hour (Rs./hr etc), or
3. unit cost (Rs./ton or Rs./cum)

 Establishing
the
unit
cost
is
especially useful as it can compare
dissimilar machines.
www.constructionmechanizer.com
Introduction
 The
ownership
costs
of
construction plant & equipment
can be categorized into
1.Fixed cost,
2.Variable cost, and
3.Employee cost
www.constructionmechanizer.com
Fixed Cost
Fixed costs are those which can be
predetermined as accumulating with
the passage of time, rather than with
the rate of work.
We need to pay these costs
regardless of weather the equipment
is used or not.
www.constructionmechanizer.com
Fixed Cost
 Commonly included in fixed costs
are
1.equipment depreciation,
2.interest on investment,
3.taxes,
4.storage and protection, and
5.insurance.

 Fixed costs of equipment are the
result of procurement and vanish
when it is sold.
www.constructionmechanizer.com
Variable Cost
 Variable costs incurred only when the machine
is put to work. These costs include the
1.costs of fuel,
2.lubricants,
3.wear parts,
4.equipment maintenance and repairs.
 Operating cost depends largely on the way
machine is operated (operator skill).
 Proper maintenance also play’s vital role in
operating cost.
www.constructionmechanizer.com
Employee Cost
 Employee
costs
are
those
costs
associated with employing people for
 operation,
 maintenance, and
 supervision.
 employee cost includes:
 direct wages,
 food contributions,
 transport,
 social costs,
 health and retirement, incentive.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
A. Purchase price (inc. options,
delivery & set up costs). Often these
are the cost known with certainty.
B. Wear parts cost: It cost of wear parts,
tires, tracks or ground engaging tool.
Wear parts, tires, tracks or ground
engaging tool are operating costs.

www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
C. Economic Life: This is the period over
which the equipment can be operated at an
acceptable operating cost and productivity.
The economic life is generally measured in
terms of years, hours, or kilometers.
D. Ownership period: The intended period
of the machine to be utilized by owner.
This can be based on economic life or
physical life, or a compromise of the two.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
E. Residual value: The future market
value of the machine - discounted back
to a present value. Estimate of realizable
value for disposal of equipment.
F. Depreciation Time: The intended
period of the machine over which
depreciation is divided. This can be
based on economic life or physical life,
or a compromise of the two.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
G. Annual depreciation cost: This is
calculated by deducting the residual value
from the purchase price and dividing the
remaining amount by the no. of years the
machine is to be kept or any other
depreciation method selected by owner.
H. Interest rate: Interest rate is used to
work out the cost of capital. (Can vary
depending on whether own funds are used
or borrowings).
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
I. Interest Cost: Calculation of interest
cost based on average annual value.
J. Machine tax: Many equipment owners
must pay taxes or some type of usage
tax on equipment.
K. Machine tax cost: Taxes can be
calculated by either using the estimated
tax rate multiplied by the actual value of
the equipment or by multiplying the tax
rate by the average annual investment.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
L. Insurance costs (annual): Most private
equipment owners will have one or more
insurance policies against damage, fire,
and other destructive events.
M. Storage and Protection Cost: Costs for
equipment storage and off-duty protection
are fixed costs, largely independent of the
hours of use. Costs of storage and
protection must be spread over the total
hours of equipment use.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
N. Fuel cost (e.g. Rs. per liter): Assume the
present cost of fuel - as it can vary wildly over
the lifetime of a machine and is almost
impossible to predict accurately.
O. Fuel consumption per hour: Based on
engine power, application, environment,
operator skill/commitment, machine design,
load factor.
P. Cost of Major Overhaul: It is major overhaul
cost of equipment. It is depend on usages,
operator skill, working condition etc.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
Q. Life time of Major Overhaul: It is
lifetime of major overhaul, usually
expressed in year, hour, and kilometer. It
is depend on usages, operator skill,
working condition etc.
R. Planned maintenance cost: It is planned
regular maintenance to prevent failure,
preventive maintenance including material,
maintenance manpower, travel time and
mileage. It is depend on usages, operator
skill, working condition etc.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
S. Life time of planned maintenance: It
is lifetime of planned maintenance,
usually expressed in year, hour, and
kilometer. It is depend on usages,
operator skill, working condition etc.
T. Cost of Wear Parts: It is major wear
parts of equipment. It is depend on
usages, operator skill, working condition
etc.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
U. Life time of Wear Parts: It is lifetime of
wear parts, usually expressed in year, hour,
and kilometer. It is depend on usages,
operator skill, working condition etc.
V. Lubricants: These include engine oil,
transmission oil, final drive oil, grease and
filters. The replacement interval varies with
the type of equipment, environmental working
condition (temperature), the design of the
equipment and the level of maintenance. This
is based on OEM recommendation.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
W. Lubricant Interval: This is to be
calculated based on OEM recommendation.
X. Lubricant Cost: This is cost of lubricant
per litre.
Y. Operator Cost: It is operator salary
including facility as per method of
employment.
Z. Operating Hours: It is planned operating
hours of equipment on annual basis.
www.constructionmechanizer.com
Calculation of
Ownership Cost & Operating Cost

.

www.constructionmechanizer.com
Calculation of
Ownership Cost & Operating Cost

.

www.constructionmechanizer.com
Calculation of
Ownership Cost & Operating Cost

.

www.constructionmechanizer.com
Thought of

Construction Mechanizer

www.constructionmechanizer.com
Thought of

Construction Mechanizer

www.constructionmechanizer.com
THANK YOU

Web Site: www.constructionmechanizer.com
Email: constructionmechanizer@gmail.com
info@constructionmechanizer.com

www.constructionmechanizer.com

More Related Content

What's hot

Equipment management
Equipment managementEquipment management
Equipment managementKHUSHBU SHAH
 
Job layout per
Job layout perJob layout per
Job layout perraj balar
 
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...Specifications, reports and tenders - Estimation, Costing and Valuation Engin...
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...Shanmugasundaram N
 
Construction equipments By T.Ravi Prakash
Construction equipments By T.Ravi PrakashConstruction equipments By T.Ravi Prakash
Construction equipments By T.Ravi Prakashravicivil
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTShankar Ramasamy
 
Mechanized construction
Mechanized constructionMechanized construction
Mechanized constructionsrinivas2036
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsKHUSHBU SHAH
 
Equipments used for aggregate production_Advanced Construction Technology (Se...
Equipments used for aggregate production_Advanced Construction Technology (Se...Equipments used for aggregate production_Advanced Construction Technology (Se...
Equipments used for aggregate production_Advanced Construction Technology (Se...A Makwana
 
Civil Engineering Measurment
Civil Engineering MeasurmentCivil Engineering Measurment
Civil Engineering MeasurmentSultan M Muzahir
 
Road construction equipment.pptx 2
Road construction equipment.pptx 2Road construction equipment.pptx 2
Road construction equipment.pptx 2AhmedZL
 
STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...
STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...
STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...Shabaz Khan
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture) Muhammad Aljalali
 
Tunneling & Drilling Equipments
Tunneling & Drilling EquipmentsTunneling & Drilling Equipments
Tunneling & Drilling EquipmentsRajarshi Patty
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineeringKailash Chander
 

What's hot (20)

Equipment management
Equipment managementEquipment management
Equipment management
 
Job layout per
Job layout perJob layout per
Job layout per
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipment
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...Specifications, reports and tenders - Estimation, Costing and Valuation Engin...
Specifications, reports and tenders - Estimation, Costing and Valuation Engin...
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
Construction equipments By T.Ravi Prakash
Construction equipments By T.Ravi PrakashConstruction equipments By T.Ravi Prakash
Construction equipments By T.Ravi Prakash
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
 
Mechanized construction
Mechanized constructionMechanized construction
Mechanized construction
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipments
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 
Equipments used for aggregate production_Advanced Construction Technology (Se...
Equipments used for aggregate production_Advanced Construction Technology (Se...Equipments used for aggregate production_Advanced Construction Technology (Se...
Equipments used for aggregate production_Advanced Construction Technology (Se...
 
Civil Engineering Measurment
Civil Engineering MeasurmentCivil Engineering Measurment
Civil Engineering Measurment
 
Road construction equipment.pptx 2
Road construction equipment.pptx 2Road construction equipment.pptx 2
Road construction equipment.pptx 2
 
STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...
STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...
STUDY ON CONSTRUCTION EQUIPMENT MANAGEMENT IN PAVEMENT CONSTRUCTION By Shabaz...
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture)
 
Tunneling & Drilling Equipments
Tunneling & Drilling EquipmentsTunneling & Drilling Equipments
Tunneling & Drilling Equipments
 
Ripper
RipperRipper
Ripper
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 

Viewers also liked

CIVIL ENGINEER TO ENTREPRENEUR
CIVIL ENGINEER TO ENTREPRENEURCIVIL ENGINEER TO ENTREPRENEUR
CIVIL ENGINEER TO ENTREPRENEURsvu tirupati
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Types of contract
Types of contractTypes of contract
Types of contractSweetp999
 
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017Carol Smith
 

Viewers also liked (7)

CIVIL ENGINEER TO ENTREPRENEUR
CIVIL ENGINEER TO ENTREPRENEURCIVIL ENGINEER TO ENTREPRENEUR
CIVIL ENGINEER TO ENTREPRENEUR
 
Vision of construction mechanizer
Vision of construction mechanizerVision of construction mechanizer
Vision of construction mechanizer
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Types of conract
Types of conractTypes of conract
Types of conract
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Idea[1]generation.ppt
Idea[1]generation.pptIdea[1]generation.ppt
Idea[1]generation.ppt
 
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
 

Similar to OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT

Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrcnarayanch1979
 
Operating costing m.com part 1 project
Operating costing m.com part 1 projectOperating costing m.com part 1 project
Operating costing m.com part 1 projectafukhan
 
Operation costing
Operation costingOperation costing
Operation costingKushal
 
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
POWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNISTPOWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNIST
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNISTS.Vijaya Bhaskar
 
Economic consideration
Economic considerationEconomic consideration
Economic considerationMalavika M R
 
maintenance cost,approximate estimation,unit bay method
maintenance cost,approximate estimation,unit bay methodmaintenance cost,approximate estimation,unit bay method
maintenance cost,approximate estimation,unit bay methodNithin Thomas Alex
 
Photovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenancePhotovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenanceLeonardo ENERGY
 
Lecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfhLecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfh2cd
 
Workshop Accounts Smriti Rao pdf (1).pdf
Workshop Accounts Smriti Rao pdf (1).pdfWorkshop Accounts Smriti Rao pdf (1).pdf
Workshop Accounts Smriti Rao pdf (1).pdfpoderalo
 
ENGG ppt for exam by Achala Madam.ppt
ENGG ppt for exam by Achala Madam.pptENGG ppt for exam by Achala Madam.ppt
ENGG ppt for exam by Achala Madam.pptRupeshSingh438828
 

Similar to OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT (20)

Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrc
 
Sneha
SnehaSneha
Sneha
 
Operating costing m.com part 1 project
Operating costing m.com part 1 projectOperating costing m.com part 1 project
Operating costing m.com part 1 project
 
Operation costing
Operation costingOperation costing
Operation costing
 
CH 1.pptx
CH 1.pptxCH 1.pptx
CH 1.pptx
 
Construction Equipment used in construction projects
Construction Equipment used in construction projectsConstruction Equipment used in construction projects
Construction Equipment used in construction projects
 
Unit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdfUnit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdf
 
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
POWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNISTPOWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNIST
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
 
Economic consideration
Economic considerationEconomic consideration
Economic consideration
 
Rate analysis brief
Rate analysis briefRate analysis brief
Rate analysis brief
 
maintenance cost,approximate estimation,unit bay method
maintenance cost,approximate estimation,unit bay methodmaintenance cost,approximate estimation,unit bay method
maintenance cost,approximate estimation,unit bay method
 
Depreciation 1
Depreciation 1Depreciation 1
Depreciation 1
 
Photovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenancePhotovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenance
 
Warranty
WarrantyWarranty
Warranty
 
Unit 5 or
Unit 5 orUnit 5 or
Unit 5 or
 
Cost concepts
Cost conceptsCost concepts
Cost concepts
 
Lecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfhLecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfh
 
Workshop Accounts Smriti Rao pdf (1).pdf
Workshop Accounts Smriti Rao pdf (1).pdfWorkshop Accounts Smriti Rao pdf (1).pdf
Workshop Accounts Smriti Rao pdf (1).pdf
 
Machine hour rate
Machine hour rateMachine hour rate
Machine hour rate
 
ENGG ppt for exam by Achala Madam.ppt
ENGG ppt for exam by Achala Madam.pptENGG ppt for exam by Achala Madam.ppt
ENGG ppt for exam by Achala Madam.ppt
 

Recently uploaded

8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 

Recently uploaded (20)

8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 

OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT

  • 1. OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT Kumar Gyanendra Mohan www.constructionmechanizer.com
  • 2. Introduction  Construction equipment is one of the biggest investments carried by construction industry.  Knowledge about owning cost and operating cost is must before equipment mobilization.  Also, monitoring of actual operating and owning cost of equipment on regular basis is necessary for optimum profitability. www.constructionmechanizer.com
  • 3. Introduction  Owning cost and operating cost of equipment has significant impact on profitability of work executed.  Owning and operating cost, need to be calculated based on the financial investment terms and condition, depreciation method and operating condition of equipment.  OEM recommendation can be considered for calculating owning and operating cost. www.constructionmechanizer.com
  • 4. Introduction  Ownership and operating costs of work need to be calculated based on 1. units of work production per hour (ton/hr or cum3/hr etc), 2. cost per hour (Rs./hr etc), or 3. unit cost (Rs./ton or Rs./cum)  Establishing the unit cost is especially useful as it can compare dissimilar machines. www.constructionmechanizer.com
  • 5. Introduction  The ownership costs of construction plant & equipment can be categorized into 1.Fixed cost, 2.Variable cost, and 3.Employee cost www.constructionmechanizer.com
  • 6. Fixed Cost Fixed costs are those which can be predetermined as accumulating with the passage of time, rather than with the rate of work. We need to pay these costs regardless of weather the equipment is used or not. www.constructionmechanizer.com
  • 7. Fixed Cost  Commonly included in fixed costs are 1.equipment depreciation, 2.interest on investment, 3.taxes, 4.storage and protection, and 5.insurance.  Fixed costs of equipment are the result of procurement and vanish when it is sold. www.constructionmechanizer.com
  • 8. Variable Cost  Variable costs incurred only when the machine is put to work. These costs include the 1.costs of fuel, 2.lubricants, 3.wear parts, 4.equipment maintenance and repairs.  Operating cost depends largely on the way machine is operated (operator skill).  Proper maintenance also play’s vital role in operating cost. www.constructionmechanizer.com
  • 9. Employee Cost  Employee costs are those costs associated with employing people for  operation,  maintenance, and  supervision.  employee cost includes:  direct wages,  food contributions,  transport,  social costs,  health and retirement, incentive. www.constructionmechanizer.com
  • 10. A to Z Element for calculation of Ownership Cost A. Purchase price (inc. options, delivery & set up costs). Often these are the cost known with certainty. B. Wear parts cost: It cost of wear parts, tires, tracks or ground engaging tool. Wear parts, tires, tracks or ground engaging tool are operating costs. www.constructionmechanizer.com
  • 11. A to Z Element for calculation of Ownership Cost C. Economic Life: This is the period over which the equipment can be operated at an acceptable operating cost and productivity. The economic life is generally measured in terms of years, hours, or kilometers. D. Ownership period: The intended period of the machine to be utilized by owner. This can be based on economic life or physical life, or a compromise of the two. www.constructionmechanizer.com
  • 12. A to Z Element for calculation of Ownership Cost E. Residual value: The future market value of the machine - discounted back to a present value. Estimate of realizable value for disposal of equipment. F. Depreciation Time: The intended period of the machine over which depreciation is divided. This can be based on economic life or physical life, or a compromise of the two. www.constructionmechanizer.com
  • 13. A to Z Element for calculation of Ownership Cost G. Annual depreciation cost: This is calculated by deducting the residual value from the purchase price and dividing the remaining amount by the no. of years the machine is to be kept or any other depreciation method selected by owner. H. Interest rate: Interest rate is used to work out the cost of capital. (Can vary depending on whether own funds are used or borrowings). www.constructionmechanizer.com
  • 14. A to Z Element for calculation of Ownership Cost I. Interest Cost: Calculation of interest cost based on average annual value. J. Machine tax: Many equipment owners must pay taxes or some type of usage tax on equipment. K. Machine tax cost: Taxes can be calculated by either using the estimated tax rate multiplied by the actual value of the equipment or by multiplying the tax rate by the average annual investment. www.constructionmechanizer.com
  • 15. A to Z Element for calculation of Ownership Cost L. Insurance costs (annual): Most private equipment owners will have one or more insurance policies against damage, fire, and other destructive events. M. Storage and Protection Cost: Costs for equipment storage and off-duty protection are fixed costs, largely independent of the hours of use. Costs of storage and protection must be spread over the total hours of equipment use. www.constructionmechanizer.com
  • 16. A to Z Element for calculation of Ownership Cost N. Fuel cost (e.g. Rs. per liter): Assume the present cost of fuel - as it can vary wildly over the lifetime of a machine and is almost impossible to predict accurately. O. Fuel consumption per hour: Based on engine power, application, environment, operator skill/commitment, machine design, load factor. P. Cost of Major Overhaul: It is major overhaul cost of equipment. It is depend on usages, operator skill, working condition etc. www.constructionmechanizer.com
  • 17. A to Z Element for calculation of Ownership Cost Q. Life time of Major Overhaul: It is lifetime of major overhaul, usually expressed in year, hour, and kilometer. It is depend on usages, operator skill, working condition etc. R. Planned maintenance cost: It is planned regular maintenance to prevent failure, preventive maintenance including material, maintenance manpower, travel time and mileage. It is depend on usages, operator skill, working condition etc. www.constructionmechanizer.com
  • 18. A to Z Element for calculation of Ownership Cost S. Life time of planned maintenance: It is lifetime of planned maintenance, usually expressed in year, hour, and kilometer. It is depend on usages, operator skill, working condition etc. T. Cost of Wear Parts: It is major wear parts of equipment. It is depend on usages, operator skill, working condition etc. www.constructionmechanizer.com
  • 19. A to Z Element for calculation of Ownership Cost U. Life time of Wear Parts: It is lifetime of wear parts, usually expressed in year, hour, and kilometer. It is depend on usages, operator skill, working condition etc. V. Lubricants: These include engine oil, transmission oil, final drive oil, grease and filters. The replacement interval varies with the type of equipment, environmental working condition (temperature), the design of the equipment and the level of maintenance. This is based on OEM recommendation. www.constructionmechanizer.com
  • 20. A to Z Element for calculation of Ownership Cost W. Lubricant Interval: This is to be calculated based on OEM recommendation. X. Lubricant Cost: This is cost of lubricant per litre. Y. Operator Cost: It is operator salary including facility as per method of employment. Z. Operating Hours: It is planned operating hours of equipment on annual basis. www.constructionmechanizer.com
  • 21. Calculation of Ownership Cost & Operating Cost . www.constructionmechanizer.com
  • 22. Calculation of Ownership Cost & Operating Cost . www.constructionmechanizer.com
  • 23. Calculation of Ownership Cost & Operating Cost . www.constructionmechanizer.com
  • 26. THANK YOU Web Site: www.constructionmechanizer.com Email: constructionmechanizer@gmail.com info@constructionmechanizer.com www.constructionmechanizer.com