SlideShare a Scribd company logo
1 of 34
  Overall Equipment Effectiveness   & Capacity Training
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Class Format
[object Object],[object Object],Class Purpose
What Is Overall Equipment Effectiveness? ,[object Object]
What factors influence Overall Equipment Effectiveness? ,[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],Equipment Loading Time 6 Big Losses O.E.E. in Relationship to the 6 Big Losses
[object Object],[object Object],Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) O.E.E. in Relationship to the 6 Big Losses
[object Object],[object Object],Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) 2. Set-up and Adjustment O.E.E. in Relationship to the 6 Big Losses
[object Object],[object Object],Downtime Losses Operating Time Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) 2. Set-up and Adjustment O.E.E. in Relationship to the 6 Big Losses
[object Object],[object Object],OEE Formulas  Loading Time - Downtime Loading Time Downtime Losses Operating Time 2. Setup and Adjustment Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) OPERATING RATE O.E.E. in Relationship to the 6 Big Losses
[object Object],[object Object],[object Object],[object Object],3. Idling and Minor Losses (Unrecorded Downtime) OEE Formulas  Loading Time - Downtime Loading Time Downtime Losses Operating Time 2. Setup and Adjustment Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) OPERATING RATE O.E.E. in Relationship to the 6 Big Losses
[object Object],[object Object],3. Idling and Minor Losses (Unrecorded Downtime) OEE Formulas  Loading Time - Downtime Loading Time Downtime Losses Operating Time 2. Setup and Adjustment Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) OPERATING RATE 4. Drop in Cycle Time O.E.E. in Relationship to the 6 Big Losses
[object Object],[object Object],Net Operating Time Speed Losses 3. Idling and Minor Losses (Unrecorded Downtime) OEE Formulas  Loading Time - Downtime Loading Time Downtime Losses Operating Time 2. Setup and Adjustment Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) OPERATING RATE 4. Drop in Cycle Time O.E.E. in Relationship to the 6 Big Losses
[object Object],[object Object],[object Object],Ideal Cycle Time x Output Operating Time Net Operating Time Speed Losses 3. Idling and Minor Losses (Unrecorded Downtime) OEE Formulas  Loading Time - Downtime Loading Time Downtime Losses Operating Time 2. Setup and Adjustment Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) OPERATING RATE 4. Drop in Cycle Time PERFORMANCE RATE O.E.E. in Relationship to the 6 Big Losses
[object Object],[object Object],Ideal Cycle Time x Output Operating Time Net Operating Time Speed Losses 3. Idling and Minor Losses (Unrecorded Downtime) OEE Formulas  Loading Time - Downtime Loading Time Downtime Losses Operating Time 2. Setup and Adjustment Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) OPERATING RATE 4. Drop in Cycle Time PERFORMANCE RATE 5. In-Process Scrap O.E.E. in Relationship to the 6 Big Losses
[object Object],[object Object],Ideal Cycle Time x Output Operating Time Net Operating Time Speed Losses 3. Idling and Minor Losses (Unrecorded Downtime) OEE Formulas  Loading Time - Downtime Loading Time Downtime Losses Operating Time 2. Setup and Adjustment Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) OPERATING RATE 4. Drop in Cycle Time PERFORMANCE RATE 6. Start-up Scrap 5. In-process scrap O.E.E. in Relationship to the 6 Big Losses
Quality  losses Valuable Oper. Time ,[object Object],[object Object],Ideal Cycle Time x Output Operating Time Net Operating Time Speed Losses 3. Idling and Minor Losses (Unrecorded Downtime) OEE Formulas  Loading Time - Downtime Loading Time Downtime Losses Operating Time 2. Setup and Adjustment Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) OPERATING RATE 4. Drop in Cycle Time PERFORMANCE RATE 6. Start-up Scrap 5. In-process scrap O.E.E. in Relationship to the 6 Big Losses
Quality  losses Valuable Operating Time ,[object Object],[object Object],Ideal Cycle Time x Output Operating Time Net Operating Time Speed Losses 3. Idling and Minor Losses (Unrecorded Downtime) OEE Formulas  Loading Time - Downtime Loading Time Downtime Losses Operating Time 2. Setup and Adjustment Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) OPERATING RATE 4. Drop in Cycle Time PERFORMANCE RATE 6. Start-up Scrap 5. In-process scrap Total Produced - Scrap Total Produced QUALITY RATE O.E.E. in Relationship to the 6 Big Losses
Quality  losses Valuable Operating Time O.E.E. = Availability X Performance X Quality Ideal Cycle Time x Output Operating Time Net Operating Time Speed Losses 3. Idling and Minor Losses (Unrecorded Downtime) OEE Formulas  Loading Time - Downtime Loading Time Downtime Losses Operating Time 2. Setup and Adjustment Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) OPERATING RATE 4. Drop in Cycle Time PERFORMANCE RATE 6. Start-up Scrap 5. In-process scrap Total Produced - Scrap Total Produced QUALITY RATE O.E.E. in Relationship to the 6 Big Losses
O.E.E. = Availability X Performance X Quality World  Class O.E.E. =  90%  X  95%  X  99%  =  85% O.E.E. - Goals
O.E.E. Case Study 1 1 2 3 The assembly line above has dedicated equipment and fixturing for making identical parts.  It works one 8 hr shift each day 5 days per week according to this schedule: A time study was completed for the line and the following times were observed and determined to be standard process  times for each station: Calculate O.E.E. for this line based on the following actual production data from the previous month: ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
O.E.E. Case Study 1 ,[object Object],DAILY WORK TIME = 7:00-3:30 MINUS .5 HR LUNCH = 8 HOURS OR 480 MINUTES  PLANNED BREAK = TWO 10 MINUTE BREAKS = 20 MIN WORKSHEET CALCULATION PLANNED DOWNTIME = (5 MINUTE MEETING + 10 MINUTE CLEANUP) = 15 MIN UNPLANNED DOWNTIME = (504 TOTAL MONTH / 21 WORKDAYS )= 24 MIN / DAY AVG WORKSHEET CALCULATION WORKSHEET CALCULATION OUTPUT / DAY (GOOD + SCRAP) = (6300 PCS PRODUCED/21 DAYS) =300 PCS / DAY  AVG DAILY SCRAP = (168 PCS SCRAPPED / 21 DAYS)=8 PCS / DAY STANDARD / IDEAL CYCLE TIME = 74 SEC WORKSHEET CALCULATION WORKSHEET CALCULATION WORKSHEET CALCULATION WORKSHEET CALCULATION
0 50 100 150 200 250 300 350 400 450 500 39 MIN DOWNTIME ACTUAL OPER. TIME = 421 MIN STD. TIME TO  MAKE  300  PIECES 74”/PC = 370 MIN STD TIME TO  MAKE  292  GOOD PIECES: 360 MIN 51 MIN LOST TIME OPERATING RATE 421MIN 460 MIN 91.52% PERFORMANCE RATE 370MIN 421 MIN 87.89% QUALITY RATE 292 PCS 300 PCS 97.33% 10 MIN SCRAP TIME MINUTES 480’ WORK TIME 20’  BREAKS AVAIL. OPER. TIME (LOAD TIME)= 460 MIN OVERALL EQUIPMENT  EFFECTIVENES  = X X = X X X X O.E.E. Case Study 1:  O.E.E. Graph 78.3% =
0 50 100 150 200 250 300 350 400 450 500 39 MIN DOWNTIME ACTUAL OPER. TIME = 421 MIN STD. TIME TO  MAKE  300  PIECES 74”/PC = 370 MIN STD TIME TO  MAKE  292  GOOD PIECES: 360 MIN 51 MIN LOST TIME OPERATING RATE 421MIN 460 MIN 91.52% PERFORMANCE RATE 370MIN 421 MIN 87.89% QUALITY RATE 292 PCS 300 PCS 97.33% 10 MIN SCRAP TIME MINUTES 480’ WORK TIME 20’  BREAKS AVAIL. OPER. TIME (LOAD TIME)= 460 MIN OVERALL EQUIPMENT  EFFECTIVENES  = X X = X X AVAIL. OPER. TIME (LOAD TIME)= 460 MIN STD TIME TO  MAKE  292  GOOD PIECES: 360 MIN OR: 360 MIN 460 MIN =  78.3% X X O.E.E. Case Study 1:  O.E.E. Graph 78.3% =
The paint line above is a single line painting  10 different parts.  Paint racks are spaced 3 feet apart.  Line speed is 5.5 ft/min.  Last  month the paint line ran as follows: * Same schedule format for 2nd and 3rd shift Calculate O.E.E. for this line based on last month’s production data shown below: Production Data - For common / shared equipment such as this paint line, a combined standard cycle time for the group of parts must be determined: Standard Cycle Time = (3ft/rack)/(5.5ft/min) = .545 min/rack = 32.7 sec/rack - Total days worked = 21 days - Total Downtime = 4767 min Planned = (5’meeting + 15’ cleanup)X3shiftX21days=1260’/month Unplanned = 3507 recorded for the month ( Avg =167’/day) O.E.E. Case Study 2 ,[object Object]
O.E.E. Case Study 2 ,[object Object],DAILY WORK TIME = 3 SHIFTS X 8 HOURS = 24 HOURS = 1440 MINUTES  PLANNED BREAK = (TWO 10 MIN BREAKS + 20 MIN LUNCH) X 3 SHIFT = 120 MIN WORKSHEET CALCULATION PLANNED DOWNTIME = (5 MIN MTG + 15 MIN CLEANUP)=20 MIN X 3 SHIFT=60 MIN UNPLANNED DOWNTIME = AVG 167 MIN / DAY (FROM PRODUCTION REPORT) WORKSHEET CALCULATION WORKSHEET CALCULATION OUTPUT/DAY (GOOD+SCRAP RACKS)=(29232 RACKS/21DAYS)=1392 RACKS/DAY  AVG DAILY SCRAP RACKS=(8168 RACKS SCRAPPED / 21 DAYS)=47 RACKS / DAY COMBINED STANDARD C.T.= 32.7 SEC/RACK (CALC. ON BACKGROUND SHEET) WORKSHEET CALCULATION WORKSHEET CALCULATION WORKSHEET CALCULATION WORKSHEET CALCULATION
OVERALL EQUIPMENT EFFECTIVENESS = 82.8% X 69.41% X 96.92% = 55.5 % -  OR  - (STD TIME TO PAINT 1345 GOOD RACKS)/(LOADING TIME)=(733 MIN/1320 MIN)=55.5% 0 200 400 600 800 1000 1200 1400 1600 TOTAL COMBINED DOWNTIME = 227 MIN 120’ BREAKS 1320’ LOADING TIME 334 MIN LOST TIME 26 MIN STD TIME FOR 47 SCRAP RACKS OPERATING RATE 1093 MIN 1320 MIN = 82.8% PERFORMANCE RATE 759 MIN 1093 MIN = 69.41% QUALITY RATE 1345 RACKS 1392 RACKS = 96.62% O.E.E. Case Study 2:  O.E.E. Graph STANDARD TIME TO  MAKE 1345  GOOD RACKS = 733 MIN STANDARD TIME TO  PAINT 1392  RACKS 759 MIN ACTUAL OPER. TIME 1093 MIN
O.E.E. Case Study 3 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Standard Cycle Time = (Total Standard Hours / Total Pieces) = ( 1076.1 hrs X 3600 sec/hr) / 189294 pieces = 20.5 sec/pc - Total days worked = 30 days - Total Planned Downtime = 6240 minutes / 30 days = avg 208 min/day - Total Unplanned Downtime = 9060 minutes / 30 days = avg 302 min/day - For common / shared equipment such as these molding presses with a family of tools, a combined standard cycle time must be determined: * TOTAL STD HOURS = ((C/A) X B) / 3600 A B C D E
O.E.E. Case Study 3 ,[object Object]
0 500 1000 1500 2000 2500 3000 3500 OVERALL EQUIPMENT EFFECTIVENESS = 82.3% X 91.0% X 96.2% = 72.0 % -  OR  - (STD TIME TO MOLD 6069 GOOD PIECES)/(LOADING TIME)=(2074 MIN/2880 MIN)=72.0% 2880’ LOADING TIME (Relief Style Breaks) 214 MIN LOST TIME 82 MIN STD TIME FOR 241 SCRAP PARTS OPERATING RATE 2370 MIN 2880 MIN = 82.29% PERFORMANCE RATE 2156 MIN 2370 MIN = 90.97% QUALITY RATE 6069 PCS 6310 PCS = 96.18% STANDARD TIME TO  MOLD 6069  GOOD PIECES 2074 MIN STANDARD TIME TO  MOLD 6310  PIECES 2156 MIN ACTUAL OPER. TIME 2370 MIN TOTAL COMBINED DOWNTIME = 510 MIN O.E.E. Case Study 3:  O.E.E. Graph
O.E.E.  Class Example 1 Calculations: Background: ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
O.E.E.  Class Example 1:  Answer ,[object Object],[object Object],[object Object],[object Object],[object Object],Calculations: 2 sh x 8 hr x 60 min = 960 min 960 2 x 10 min ea x 2 shift = 40 min 40 920 ,[object Object],[object Object],[object Object],[object Object],[object Object],2 sh x 10 min per shift = 20 min 20 1232 month / 22 days = 56 min 56 76 844 Background: 34221 pcs / 22 days = 1556 pcs / day 1556 934 pcs / 22 days = 43 pcs / day 43 27 .92 .83 .97 74%
S/D Approach to Capacity ,[object Object],[object Object],[object Object],[object Object],[object Object],( ) Actual Standard Hours Available to Produce
 

More Related Content

What's hot (20)

OEE
OEEOEE
OEE
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
 
Machine maintenance presentation
Machine maintenance presentationMachine maintenance presentation
Machine maintenance presentation
 
OEE CALCULATION PPT
OEE CALCULATION PPTOEE CALCULATION PPT
OEE CALCULATION PPT
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 
Top 25 lean tools
Top 25 lean toolsTop 25 lean tools
Top 25 lean tools
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Overall Equipment efficiency
Overall Equipment efficiencyOverall Equipment efficiency
Overall Equipment efficiency
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 
Kaizen forms xls
Kaizen forms xlsKaizen forms xls
Kaizen forms xls
 
SMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of DiesSMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of Dies
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Oee guide
Oee guideOee guide
Oee guide
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Basic Maintenance
Basic MaintenanceBasic Maintenance
Basic Maintenance
 
TPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARANTPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARAN
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 

Viewers also liked

Pharma Equipment - Manufacturer of Pharmaceutical Equipment and Furniture
Pharma Equipment - Manufacturer of Pharmaceutical Equipment and FurniturePharma Equipment - Manufacturer of Pharmaceutical Equipment and Furniture
Pharma Equipment - Manufacturer of Pharmaceutical Equipment and Furniturevinayak infosoft
 
TABLET COMPRESSION MACHINE
TABLET COMPRESSION MACHINETABLET COMPRESSION MACHINE
TABLET COMPRESSION MACHINESagar Savale
 
Tablet Punching Machine, Rotary Tablet Press Machine, Dies and Punches
Tablet Punching Machine, Rotary Tablet Press Machine, Dies and PunchesTablet Punching Machine, Rotary Tablet Press Machine, Dies and Punches
Tablet Punching Machine, Rotary Tablet Press Machine, Dies and Puncheslouiesmith
 
Compaction and Compression
Compaction and CompressionCompaction and Compression
Compaction and Compressionmuliksudip
 
physics of tablet compression by Avinash Hamre
physics of tablet compression by Avinash Hamrephysics of tablet compression by Avinash Hamre
physics of tablet compression by Avinash HamreGanesh Pawar
 
working of tablet punching machine
working of tablet punching machineworking of tablet punching machine
working of tablet punching machinechetan1332
 
Tablet processing problems
Tablet processing problemsTablet processing problems
Tablet processing problemsSanjay Yadav
 

Viewers also liked (9)

Calculo del O.E.E.
Calculo del O.E.E.Calculo del O.E.E.
Calculo del O.E.E.
 
Pharma Equipment - Manufacturer of Pharmaceutical Equipment and Furniture
Pharma Equipment - Manufacturer of Pharmaceutical Equipment and FurniturePharma Equipment - Manufacturer of Pharmaceutical Equipment and Furniture
Pharma Equipment - Manufacturer of Pharmaceutical Equipment and Furniture
 
Rapid mixer graqnulator
Rapid mixer graqnulatorRapid mixer graqnulator
Rapid mixer graqnulator
 
TABLET COMPRESSION MACHINE
TABLET COMPRESSION MACHINETABLET COMPRESSION MACHINE
TABLET COMPRESSION MACHINE
 
Tablet Punching Machine, Rotary Tablet Press Machine, Dies and Punches
Tablet Punching Machine, Rotary Tablet Press Machine, Dies and PunchesTablet Punching Machine, Rotary Tablet Press Machine, Dies and Punches
Tablet Punching Machine, Rotary Tablet Press Machine, Dies and Punches
 
Compaction and Compression
Compaction and CompressionCompaction and Compression
Compaction and Compression
 
physics of tablet compression by Avinash Hamre
physics of tablet compression by Avinash Hamrephysics of tablet compression by Avinash Hamre
physics of tablet compression by Avinash Hamre
 
working of tablet punching machine
working of tablet punching machineworking of tablet punching machine
working of tablet punching machine
 
Tablet processing problems
Tablet processing problemsTablet processing problems
Tablet processing problems
 

Similar to OEE

6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that lossesdrneerajbhandari
 
What are the Six Big Losses in OEE? - By DataToBiz
What are the Six Big Losses in OEE? - By DataToBizWhat are the Six Big Losses in OEE? - By DataToBiz
What are the Six Big Losses in OEE? - By DataToBizKavika Roy
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1Matthew Clemens
 
The+complete+guide+to+simple+oee
The+complete+guide+to+simple+oeeThe+complete+guide+to+simple+oee
The+complete+guide+to+simple+oeeGalland Tolentino
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenanceFELIX JONATHAN
 
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdfssuser72dffc
 
16 Major production losses.pdf
16 Major production losses.pdf16 Major production losses.pdf
16 Major production losses.pdfPTD QUYCOCTU
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityJason Corder
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityParsec_Automation_Corp
 
Maintenance
Maintenance Maintenance
Maintenance NsbmUcd
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityCorey Vodvarka
 
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docxsusanschei
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementLean Teams USA
 

Similar to OEE (20)

The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses
 
What are the Six Big Losses in OEE? - By DataToBiz
What are the Six Big Losses in OEE? - By DataToBizWhat are the Six Big Losses in OEE? - By DataToBiz
What are the Six Big Losses in OEE? - By DataToBiz
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1
 
Ofs whitepaper
Ofs whitepaperOfs whitepaper
Ofs whitepaper
 
Overall Equipment Efficiency
Overall Equipment EfficiencyOverall Equipment Efficiency
Overall Equipment Efficiency
 
The+complete+guide+to+simple+oee
The+complete+guide+to+simple+oeeThe+complete+guide+to+simple+oee
The+complete+guide+to+simple+oee
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenance
 
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
 
16 Major production losses.pdf
16 Major production losses.pdf16 Major production losses.pdf
16 Major production losses.pdf
 
The mystery of OEE
The mystery of OEEThe mystery of OEE
The mystery of OEE
 
lean & agile
lean & agilelean & agile
lean & agile
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
 
Maintenance
Maintenance Maintenance
Maintenance
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
 
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component Improvement
 

OEE

  • 1. Overall Equipment Effectiveness & Capacity Training
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19. Quality losses Valuable Operating Time O.E.E. = Availability X Performance X Quality Ideal Cycle Time x Output Operating Time Net Operating Time Speed Losses 3. Idling and Minor Losses (Unrecorded Downtime) OEE Formulas Loading Time - Downtime Loading Time Downtime Losses Operating Time 2. Setup and Adjustment Loading Time 6 Big Losses Equipment 1. Frequent Breakdowns (Recorded Downtime) OPERATING RATE 4. Drop in Cycle Time PERFORMANCE RATE 6. Start-up Scrap 5. In-process scrap Total Produced - Scrap Total Produced QUALITY RATE O.E.E. in Relationship to the 6 Big Losses
  • 20. O.E.E. = Availability X Performance X Quality World Class O.E.E. = 90% X 95% X 99% = 85% O.E.E. - Goals
  • 21.
  • 22.
  • 23. 0 50 100 150 200 250 300 350 400 450 500 39 MIN DOWNTIME ACTUAL OPER. TIME = 421 MIN STD. TIME TO MAKE 300 PIECES 74”/PC = 370 MIN STD TIME TO MAKE 292 GOOD PIECES: 360 MIN 51 MIN LOST TIME OPERATING RATE 421MIN 460 MIN 91.52% PERFORMANCE RATE 370MIN 421 MIN 87.89% QUALITY RATE 292 PCS 300 PCS 97.33% 10 MIN SCRAP TIME MINUTES 480’ WORK TIME 20’ BREAKS AVAIL. OPER. TIME (LOAD TIME)= 460 MIN OVERALL EQUIPMENT EFFECTIVENES = X X = X X X X O.E.E. Case Study 1: O.E.E. Graph 78.3% =
  • 24. 0 50 100 150 200 250 300 350 400 450 500 39 MIN DOWNTIME ACTUAL OPER. TIME = 421 MIN STD. TIME TO MAKE 300 PIECES 74”/PC = 370 MIN STD TIME TO MAKE 292 GOOD PIECES: 360 MIN 51 MIN LOST TIME OPERATING RATE 421MIN 460 MIN 91.52% PERFORMANCE RATE 370MIN 421 MIN 87.89% QUALITY RATE 292 PCS 300 PCS 97.33% 10 MIN SCRAP TIME MINUTES 480’ WORK TIME 20’ BREAKS AVAIL. OPER. TIME (LOAD TIME)= 460 MIN OVERALL EQUIPMENT EFFECTIVENES = X X = X X AVAIL. OPER. TIME (LOAD TIME)= 460 MIN STD TIME TO MAKE 292 GOOD PIECES: 360 MIN OR: 360 MIN 460 MIN = 78.3% X X O.E.E. Case Study 1: O.E.E. Graph 78.3% =
  • 25.
  • 26.
  • 27. OVERALL EQUIPMENT EFFECTIVENESS = 82.8% X 69.41% X 96.92% = 55.5 % - OR - (STD TIME TO PAINT 1345 GOOD RACKS)/(LOADING TIME)=(733 MIN/1320 MIN)=55.5% 0 200 400 600 800 1000 1200 1400 1600 TOTAL COMBINED DOWNTIME = 227 MIN 120’ BREAKS 1320’ LOADING TIME 334 MIN LOST TIME 26 MIN STD TIME FOR 47 SCRAP RACKS OPERATING RATE 1093 MIN 1320 MIN = 82.8% PERFORMANCE RATE 759 MIN 1093 MIN = 69.41% QUALITY RATE 1345 RACKS 1392 RACKS = 96.62% O.E.E. Case Study 2: O.E.E. Graph STANDARD TIME TO MAKE 1345 GOOD RACKS = 733 MIN STANDARD TIME TO PAINT 1392 RACKS 759 MIN ACTUAL OPER. TIME 1093 MIN
  • 28.
  • 29.
  • 30. 0 500 1000 1500 2000 2500 3000 3500 OVERALL EQUIPMENT EFFECTIVENESS = 82.3% X 91.0% X 96.2% = 72.0 % - OR - (STD TIME TO MOLD 6069 GOOD PIECES)/(LOADING TIME)=(2074 MIN/2880 MIN)=72.0% 2880’ LOADING TIME (Relief Style Breaks) 214 MIN LOST TIME 82 MIN STD TIME FOR 241 SCRAP PARTS OPERATING RATE 2370 MIN 2880 MIN = 82.29% PERFORMANCE RATE 2156 MIN 2370 MIN = 90.97% QUALITY RATE 6069 PCS 6310 PCS = 96.18% STANDARD TIME TO MOLD 6069 GOOD PIECES 2074 MIN STANDARD TIME TO MOLD 6310 PIECES 2156 MIN ACTUAL OPER. TIME 2370 MIN TOTAL COMBINED DOWNTIME = 510 MIN O.E.E. Case Study 3: O.E.E. Graph
  • 31.
  • 32.
  • 33.
  • 34.