• 1 Introduction
• 2 Causes of Deterioration and Durability
Aspects
• 3 Condition Survey and Non destructive evaluation
• 4 Structural Analysis and Design
• 5. Selection of Repair Materials for concrete
• 6 Rehabilitation and Retrofitting Methods.
• 7 Guidelines for Terms and conditions for repairs.
• 8 Schedule for special Items of works.
• 9 Specifications for Structural Repair work
• 10 Case Study
INTRODUCTION
• MCGM is governing organization in Mumbai Area
and concerned with development in Mumbai
jurisdiction for more than 100 yrs. In India last
50-60 years RCC structures are being used
extensively.
• All of us come across various types of structures.
Viz. Load bearing structures, Normal RCC
structures, Composite structures, Bridges,
Pumping stations, Reservoirs, Hospitals,stadium
etc.
• These structures can be considered as lifeline of city
and are created with huge investment of resources. It
is therefore essential to maintain them in functional
condition.
• Deterioration of RCC members is natural phenomenon
and we come across such structures while working for
MCGM.
• Systematic approach is required in dealing with
structures.
• Civil engineer’s first duty is to give emphasis on
durability aspect during construction as well as
maintenance.
• 1.1 Overview of Present practice and approach to problems
• Understand gap between Quality Planned and Quality achieved in
past , present.
• We do take cube test but How far its significance is taken during
progress of work how far is the co-relation maintained with such
results.
• Construction documents have specifications and instructions but
they remain on paper sometime due to lack of understanding.
• Procedures for Periodic Inspections of building and maintenance
are not followed or maintained
• Budget estimates are prepared by un-experienced engineer or
someone else.
• Buildings remain several years without any attention.
• 1.2 Rational approach to any Repairs and
Rehabilitation works.
• Identification of Cause of Deterioration
• Consequent Repairs and Rehabilitation
strategy at optimum cost
• Scientific Evaluation and Solution for
Protection-Repairs, Rehabilitation,
Strengthening and Retrofitting taking
advancement in material science (polymers).
• 1.3 Repairs Management
• Step-1 Documentation of damage.(type & extent)
• Step-2 Preparation of drawings, sketches, execution
guidelines, material specifications modalities of
payment etc..
• Step-3 Actual Execution with understanding , proper
expertise, resources for effectiveness of repairs.
2. Causes of Deterioration and durability
aspect.
• Concrete is considered as composite material that
consists essentially of binding material within which
are embedded particles or fragments of aggregates
• But in RCC, binding material is hydraulic cement and
water.
• Concrete in RCC is subject to Chemical and Physical
changes during it service life. Material remains
durable but in RCC (composite structural material )do
not prove durable due to various factors ( variations
in production, loading conditions during service life,
and subsequent attack by environmental factors.
• 2.1 Permeability of Concrete
• For durability of concrete can be related with water
tightness (void less) during production.
• Due to seasonal variations micro cracks are developed
cement paste and coarse aggregate or reinforcement
steel. Primary mechanism thus gets formed.
• With increase of penetrability of concrete access to
oxygen, CO2, acidic ions penetrate which facilitates,
physical and chemical interactions as a result of which
material undergoes cracking, spalling and loss of mass
resulting partial loss of strength and stiffness
• For good Durability it is therefore essential to
control water-cement ratio, degree of
hydration, curing, Air voids due to deficient
compaction, micro cracks due to loading and
cyclic exposure to thermal variation.
• Porosity is related to
• Capillary porosity ------ High W/C
------ Inadequate curing
Air voids ------ Improper Compaction
Micro cracks ------ Loading, weathering, initial
care, after care, Secondary
effects.
• 2.2 Aggressive deteriorating agents
• Corrosion of Reinforcing Bars due to Carbonation
(reduction of alkalinity of concrete gel ),
• ingress of chloride ( destroys passive layer around steel
reinforcement and initiates its corrosion)
• pH less than 11 ( (desired 12.6 to 13.5)
• Sulphate attack causes expansion,cracking, loss of mass
and / or disintegration.
• Alkali silica Reaction – reactions of silica in aggregates
cause reaction with hydroxyl ion causing reaction
leading to expansion,cracks, loss of strength, elasticity
and durability.
3. Condition survey and Non destructive testing
• 3.1 Objective
• It is examination of concrete for the purpose
of identifying and defining area of distress.
• Identify cause of distress and sources
• Assess: extent of distress due to corrosion,
fire, earthquake, any other reason
• Asses residual strength of structure and
inhabitability
Stages of condition survey
• Prioritize distressed elements according to
seriousness for repairs.
• a) Preliminary inspection
• b) Planning
• c)Visual Inspection
• d) Field and laboratory testing.
• A) Preliminary inspection
• History of structure from client, owner,
occupants, General public in building,
• Note records, previous repairs history and
expenses done for the same.
• All possible data and information.
• Practical restriction and safety requirements
• Extent and quantum of survey work
• Time required ( survey and execution )
• Advise immediate safety measures.
• Information gathering
• a. Period of construction
• b. Construction details (drg,arch,structural )
• c. Exposure conditions
• d. Designed and present use of structure.
• e. Previous changes in use
• f. record of structural changes if done.
• g. Record of 1st occurrence of defect.
• h. Details of repairs carried out previously.
• i. Previous reports etc.
• J. details from owner, photographs
Planning survey
• Field documents
• Plans and actual observations each room-
wise.
• Previous report , advise if any and
implementation done as per report,
• Grouping of structural elements ( external,
interior etc )
• Exposure conditions
Classification of damage.
• G1 : No distress but cosmetic repairs
• G2 : Minor repairs ( superficial repairs )
• G3 : Medium repairs ( patch repairs )
• G4 : Medium but principal repairs
• G5 : Major repairs
• Grade for Assessment of the building : Based on the inspection and
observation the distress level of the selected buildings may be
categorized
• as mentioned below:
• G1 – No distress observed
• G1 – Minor distress observed in few structural members, which can
be repaired under the advice of a structural engineer.
• G2 – Medium distress observed in few structural members, which
can be repaired / rehabilitated including strengthening with the
advice of a structural engineer
• G3 – Severe distress observed in some of the structural members,
which can be rehabilitated including strengthening with the advice
of a structural engineer.
• G4 – Severe distress is observed which could prove dangerous,
hence evacuation at an early date is required.
Visual Inspection
• Workmanship, structural serviceability, material
deterioration mechanisum
• General health( structural and non structural elements)
• Preparation of estimate / bill of quantites.
• Quantify extent of distress
• Photographic record.
• Obstructions for visual inspection to be noted.
• Understanding structural system / deviations
• Leakage , seepage due to inadequate drainage system
• Types of cracks and its pattern
• Color and texture of concrete surface (chemical attack or
disintegration by way of leaching .
Record
• Areas of high distress
• Cracks and their locations
• Excessive deflections
• Exposure conditions of various distressed areas.
• Moisture / seepage / leakages / dampness
locations.
• Abnormal vibrations in structure.
• Algae, fungus growth, trees on structure.
• Photographic record.
• Areas of immediate concern
Considerations for repairs strategy.
• Identification of cause of problem.
• Assessment and extent of damage.
• Availability space and accessibility w.r.t.
ongoing activities in building.
• propping structural members in case of major
repairs , severely damaged elements (columns
etc ).
• Safety measures to avoid mishaps.
• Non destructive Evaluation tests
• Field test Laboratory tests
• In-situ-Concrete strength
• Chemical attack
• Corrosion activity
• Fire damage
• Structural integrity and soundness
• A : In- situ-concrete test
• - rebound hammer
• - Ultrasonic pulse velocity
• - Windsor probe
• - Pull out test : Core cutting / sampling
• - Load test
• B : Chemical attack
• Carbonation test
• Chloride test
• Sulphate test
• C: Corrosion potential assessment
• Cover meter ( checking cover)
• Half cell potential
• Resistivity meter
• Permeability ( air and water )
• D: Fire damage assessment
• Thermo gravimetric analysis (TGA)
• Differential Thermal analysis (DTA)
• X-ray diffraction (XRD)
• E: Structural Integrity/ soundness
• Ultrasonic pulse velocity ( discontinuities, cracks
and depth of cracks)
• Radiography
• Impact echo test
Preparation for Hammer test
• Hammer test
• Cement type/content
• Type of aggregate
• Angle of inclination
• Member charactaristics
• Surface carbonation
• Moisture condition
Rebound test :
• Avg.Rebound value Quality of concrete
• -------------------------- ---------------------------
• > 40 Very good
• 30-40 Good
• 20-30 Fair
• <20 Poor / delaminated
• 0 Very poor
UPV test
measures pulse travel time across section
• Determine quality and homogeneity of concrete
• Assess strength / Discontinuity in cross section
• Depth of crack
• Pulse velocity Quality of concrete
• --------------------------------------------------------
• < 4 km/s Very Good /excellent
• 3.5 -4 km/s Good-very good (slight
• Porosity)
• 3 to 3.5 Satisfactory but loss of
• integrity
• < 3 km/s Poor and loss of integrity.
Chemical tests
• Carbonation test : 0.2% solution of
phenolphthalein is used as pH indicator of
concrete : Change in color to pink indicates no
carbonation whereas no change in color indicates
carbonation has taken place.
• Conclusion for testing
• Generally it is combination of various aspects
such as Lower cover to steel, Permeable concrete
, High chloride levels, Alternate wetting and
drying need be identified during inspection.
4. Structural analysis and design
• Evidence of faulty design/ construction
• Structural deterioration due to ageing
• Changed use of structure for which structure
is not designed
• New codal requirements
• Reserve strength in old structure.
• Due to ageing
• Non Consideration of reduction factor for Live
load
• Excess steel reinforcement
• Capacity determination of structural member
• For repaired building analysis and design one
has to ensure proper linkage between old and
new material used in repairs.
• Additional steel bars / fiber wrap mesh /
section enlargement / external prestressing /
steel plate bonding etc are used
Modeling structure
without
compromising stability of structure.
• Existing sizes and material properties
• Reduction of member sizes, changed end
conditions, sequence of construction
• All geometric dimensions and material
characteristics and end conditions
• Stability check
• Removal of any member  change load
distribution / exceed capacity of member->
• Increase effective length of compression member
• Understand possible load path
• Monitoring of flexural member
• Emergency supports in case of sudden deflection
DISCUSSIONS
5. Selection of repair material for
concrete
• Anology : repairing torn Garment with sound
fiber / fabric but to give similar performance
• Essential parameters for repair materials.
• Low shrinkage properties
• Requisite setting / hardening properties
• Good bond strength with existing sub-strate
• Compatible coefficient of thermal expansion
• Compatible strength and mechanical properties
with that of sub-strate
SELECTION CRITERIA
• Allow minimum movement
• Minimal or no curing requirement.
• Alkaline character
• Low air and water permiability
• Aesthetics with surroundings
• Cost effectiveness
• Durable / non degradable / UV resistant
• Non hazardous / non pollutant.
SELECTION CRITERIA
• Low shrinkage -> less crack/ access to air / water
• Setting time /hardening -> Min. time to harden
and make available space
• Workability – acceptance by labor
• Bond with sub-strate -> strength and structural
behavior criteria
• Compatible coefficient of thermal expansion
• Mechanical properties / Es (elastic modulus)
• Relative movement ->resilient and elastic
(bridges)
SELECTION CRITERIA
• Minimal or no curing
• Only epoxys do not require curing
• Alkalinity -> pH above 11.5
• Low air and water permiability –
environmental attack.
Materials for repairs
• Materials for surface preparation
• Chemical Rust removers for reinforcement.
• Passivators for protection of reinforcement,
• Bonding agents
• Structural repair material
• Non-structural repair material.
• Injection grout
• Joint sealers
• Surface coatings for protection of RCC
• Premixed cement concrete mortars
• (not preferred as drying shrinkage/ slow setting /
low workability / prolonged curing
• Cement / Rapid hardening cement / Portland slag
cement / Pozzolana cement /
• Use as per type of structure /
marine/environment etc.
• Mineral additives : Fly ash / silicafume / GGBS for
impermeability / resistance to leaching/ chloride
–sulphate attack on concrete and better crushing
strength.
• Chemical admixtures
• Retarding admixtures : compatibility aspect
• Water reducing admixtures: control shrinkage,
water permeability, percentage of capillary
pores and strength
• Polymer modified mortar :
PRODUCTS AND MANUFACURERES
• Epoxy Based injection
Grout for sealing cracks
• CICO (POXY21)
• PEDILITE ( pidgroutEG2
&3)
• KRISHNA( epco
kp/hp320 /slv
• SUNANDA (sunepoxy
368)
• Acrylic Polymer based
injection Grout
• Cico non shrink
(NSPGC)
• Emcecrete (MC
bouchem)
• Pidigrout 10M
• Roff Hygrout
• Rust remover
• Bond coat
• Shrinkage reducing
• feovert ( Krishna )
• PIDICLEAN ( PIDILITE)
• RUSTICIDE (SUNSNDA)
• Epoxy based / Acrylic
based
6. Rehabilitation and Retrofitting
• Decide likely a) service life b) Repair methos c)
repair materials.
• Repair options
• Grouting and crack repairs
• Patch repair
• Replacement of structurally weak concrete.
• Replacement of delaminated concrete
• Replacement of corroded steel reinforcement
• Cleaning and passivating reinforcement
• Concrete and corrosion protection ( Jacketing)
• Polymer modified mortar is used on hardened
concrete surface for repairing defects
• Epoxy mortar : Resin + hardener +silica sand
Attains strength in short time and is abrasion
resistant and is used when it is difficult to use
epoxy bonded concrete, depth of repairs is less
than 40mm etc.
Shotcrete : Pneumatically applied concrete or
mortar may be with fibers of steel, poly
propylene with admixtures to enhance structural
properties
Performance requirements
• Strength, serviceability and durability
• Protection of stell
• Bond with parent surface
• Dimensional stability
• Resistance to environmentally induced
damage.
• Ease of application
• Appearance.
Factors in selection of methods of
repairs
• Type and extent of repairs
• Location of distress
• Environmental exposure
• Availability of skill
• Availability of time and access for repairs
• Appearance
• Cost
Repairs stages
• Concrete removal and Surface preparation
• Fixing suitable formwork
• Bonding / passivating coat and repair
application
• ----------------------------------------------------
General Methods
• Check for reduction in dia of bars and its location from design point of view
• Check cover, prepare surface ( sand blasting) clean reinforcement , remove dust by
air blasting / low water pressure / brooming
• Apply bonding coat and repair application
a) Concrete replacement as per condition
b) Epoxy bonded concrete ( fresh concrete +resin
bond coat on hardened surface ( depth 40mm or
more) may be reinforcement / shear keys etc ,
c) Silica Fume concrete: Portland cement with silica fumes in case
High strength requirement mostly used with super plasticizers.
d) Ferro cement : Using mesh + Plasticizers +polymers for sealing pores
e) Plate Bonding : MS plates+ epoxy glue for bonding + Bolting.
f) RCC jacketing : Composite action with old and new : ensure old concrete is
good
• Foundation Rehabilitation
• a ) Shoring and underpinning
• b) Micro piling.
• Repairs and Rehabilitation strategies
• a) Reduction of load / Distress : /remove load/ replace with lightwt walls
• b) Reduce number of stories.
• c) Changing building use ( lower side)
Terms and conditions in repairs work
execution
• Safety measures / Quality assurance /
Environmental protection
• Desirable to have item rate contract
• Consultant appointment / Key personnel
• Time for repairs and Phasing of works
depending on site conditions.
• -----------------------------------------------------------
• MCGM PROCEDURE TO BE FOLLOWED
• SPECIFICATIONS for materials / execution
methods / quality / measurements
Case studies
During construction
Column damage in High Rise building
High rise Building in Worali
High Rise Building : Exposed surfaces
Unauthorized Extensions in High Rise
Building
Treatment in terrace ( individually )
External elements
Plumbing
Municipal School ( 1929 )
Laxmi Nagar Municipal school (1929)
Terrace
RCF buildings
•THANKS

More Related Content

What's hot

Design & Construction Errors- Building Maintenance and Repairs
Design & Construction Errors- Building Maintenance and Repairs Design & Construction Errors- Building Maintenance and Repairs
Design & Construction Errors- Building Maintenance and Repairs Srishti Wakhloo
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketingAditya Sanyal
 
High performance concrete ppt
High performance concrete pptHigh performance concrete ppt
High performance concrete pptGoogle
 
Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...Shanmugasundaram N
 
Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresShahrukh Niaz
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingAnkit Patel
 
Chapter 1 repair stratergies
Chapter 1 repair stratergiesChapter 1 repair stratergies
Chapter 1 repair stratergiesAnkit Patel
 
demolition techniques
demolition techniquesdemolition techniques
demolition techniquesbholu sharma
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavementBhavya Jaiswal
 
Causes & Damage Detection
Causes & Damage DetectionCauses & Damage Detection
Causes & Damage DetectionAbhay Abhale
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniquesNayana 54321
 
Techniques for various structural repair
Techniques for various  structural repairTechniques for various  structural repair
Techniques for various structural repairUdayram Patil
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildingsSimarpreet Singh
 
Causes and prevention of cracks in buildings
Causes and prevention of cracks in buildingsCauses and prevention of cracks in buildings
Causes and prevention of cracks in buildingsSUPREETH Suppi
 
Lightweight concrete
Lightweight concreteLightweight concrete
Lightweight concreteARUN KUMAR
 

What's hot (20)

Self curing-concrete-
Self curing-concrete-Self curing-concrete-
Self curing-concrete-
 
Design & Construction Errors- Building Maintenance and Repairs
Design & Construction Errors- Building Maintenance and Repairs Design & Construction Errors- Building Maintenance and Repairs
Design & Construction Errors- Building Maintenance and Repairs
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketing
 
High performance concrete ppt
High performance concrete pptHigh performance concrete ppt
High performance concrete ppt
 
Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...
 
Cracks in Buildings
Cracks in BuildingsCracks in Buildings
Cracks in Buildings
 
Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structures
 
Pre-stressed Concrete
Pre-stressed ConcretePre-stressed Concrete
Pre-stressed Concrete
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiiting
 
Chapter 1 repair stratergies
Chapter 1 repair stratergiesChapter 1 repair stratergies
Chapter 1 repair stratergies
 
demolition techniques
demolition techniquesdemolition techniques
demolition techniques
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavement
 
Causes & Damage Detection
Causes & Damage DetectionCauses & Damage Detection
Causes & Damage Detection
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniques
 
Techniques for various structural repair
Techniques for various  structural repairTechniques for various  structural repair
Techniques for various structural repair
 
Presentation1
Presentation1Presentation1
Presentation1
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Causes and prevention of cracks in buildings
Causes and prevention of cracks in buildingsCauses and prevention of cracks in buildings
Causes and prevention of cracks in buildings
 
Lightweight concrete
Lightweight concreteLightweight concrete
Lightweight concrete
 
Jacketing (RR&S)
Jacketing (RR&S)Jacketing (RR&S)
Jacketing (RR&S)
 

Viewers also liked

Ferrocement ppt
Ferrocement pptFerrocement ppt
Ferrocement pptjvaghani
 
Visual testing ,Liquid penetrant testing ,Magnetic particle testing,Radiograp...
Visual testing ,Liquid penetrant testing ,Magnetic particle testing,Radiograp...Visual testing ,Liquid penetrant testing ,Magnetic particle testing,Radiograp...
Visual testing ,Liquid penetrant testing ,Magnetic particle testing,Radiograp...nestndt
 
Assessment of fire damage and structural rectification process.
Assessment of fire damage and structural rectification process.Assessment of fire damage and structural rectification process.
Assessment of fire damage and structural rectification process.Jude Aruna Gayan
 
Textiles in earthquake prevention
Textiles in earthquake preventionTextiles in earthquake prevention
Textiles in earthquake preventionSuvin
 
enhancement of seismic resistance of structures
enhancement of seismic resistance of structuresenhancement of seismic resistance of structures
enhancement of seismic resistance of structuresBharath Reddy Bhimavarapu
 
Seismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitationSeismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitationShuvam Sarkar
 
Non destructive testing in concrete
Non destructive testing in concreteNon destructive testing in concrete
Non destructive testing in concreteHEMANT AVHAD
 
Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Abhishek Gupta
 
CE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC MembersCE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC MembersFawad Najam
 
Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting TechniquesAritra Banerjee
 

Viewers also liked (15)

Ferro cement
Ferro cementFerro cement
Ferro cement
 
Ferrocement ppt
Ferrocement pptFerrocement ppt
Ferrocement ppt
 
Ferrocement
FerrocementFerrocement
Ferrocement
 
Visual testing ,Liquid penetrant testing ,Magnetic particle testing,Radiograp...
Visual testing ,Liquid penetrant testing ,Magnetic particle testing,Radiograp...Visual testing ,Liquid penetrant testing ,Magnetic particle testing,Radiograp...
Visual testing ,Liquid penetrant testing ,Magnetic particle testing,Radiograp...
 
Assessment of fire damage and structural rectification process.
Assessment of fire damage and structural rectification process.Assessment of fire damage and structural rectification process.
Assessment of fire damage and structural rectification process.
 
NDT TESTING
NDT  TESTINGNDT  TESTING
NDT TESTING
 
Textiles in earthquake prevention
Textiles in earthquake preventionTextiles in earthquake prevention
Textiles in earthquake prevention
 
Tabs ppt
Tabs pptTabs ppt
Tabs ppt
 
enhancement of seismic resistance of structures
enhancement of seismic resistance of structuresenhancement of seismic resistance of structures
enhancement of seismic resistance of structures
 
Seismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitationSeismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitation
 
Non destructive testing in concrete
Non destructive testing in concreteNon destructive testing in concrete
Non destructive testing in concrete
 
Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 
CE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC MembersCE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC Members
 
Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting Techniques
 

Similar to Repairs and rehabilitation 2012

repairandrehabilitation-150105022737-conversion-gate02.pdf
repairandrehabilitation-150105022737-conversion-gate02.pdfrepairandrehabilitation-150105022737-conversion-gate02.pdf
repairandrehabilitation-150105022737-conversion-gate02.pdf027NaveenKumarV
 
Proposal defence slide on Analysis & Design of Multistorey
Proposal defence slide on Analysis & Design of MultistoreyProposal defence slide on Analysis & Design of Multistorey
Proposal defence slide on Analysis & Design of Multistoreylochan Shrestha
 
Maintenance and repair strategies
Maintenance and repair strategiesMaintenance and repair strategies
Maintenance and repair strategiesManikandan
 
Maintenance and repair strategies Question answers
Maintenance and repair strategies Question answersMaintenance and repair strategies Question answers
Maintenance and repair strategies Question answersRAMPRASAD KUMAWAT
 
Condition survey and non destructive evalution of concrete
Condition survey and non destructive evalution of concreteCondition survey and non destructive evalution of concrete
Condition survey and non destructive evalution of concreteAvinash Kumar Gupta
 
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...IRJET Journal
 
ASD Rehabilitation of RCC Buildings Feb 21.pptx
ASD Rehabilitation of RCC Buildings Feb 21.pptxASD Rehabilitation of RCC Buildings Feb 21.pptx
ASD Rehabilitation of RCC Buildings Feb 21.pptxDyCEPasighat
 
Struct Audit Mktg
Struct Audit MktgStruct Audit Mktg
Struct Audit Mktgstructaudit
 
REPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptxREPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptxKavinKumars19
 
Assessment and rehabilitation technique of fire damaged structures
Assessment and rehabilitation technique of fire damaged structuresAssessment and rehabilitation technique of fire damaged structures
Assessment and rehabilitation technique of fire damaged structuresMohammed Faazil
 
IRJET-Email Tracking System
IRJET-Email Tracking SystemIRJET-Email Tracking System
IRJET-Email Tracking SystemIRJET Journal
 
1.1 Introduction (1).pdf
1.1 Introduction (1).pdf1.1 Introduction (1).pdf
1.1 Introduction (1).pdfBharti Shinde
 
"Inspection and rehabilitation | Moffatt & Nichol"
"Inspection and rehabilitation | Moffatt & Nichol""Inspection and rehabilitation | Moffatt & Nichol"
"Inspection and rehabilitation | Moffatt & Nichol"KatthyLucas2100
 
A Case Study of Existing Institutional Building for Assessment and Repair (VJ...
A Case Study of Existing Institutional Building for Assessment and Repair (VJ...A Case Study of Existing Institutional Building for Assessment and Repair (VJ...
A Case Study of Existing Institutional Building for Assessment and Repair (VJ...Mayur Rahangdale
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1Natalie Ulza
 
MAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIESMAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIESSelva Prakash
 

Similar to Repairs and rehabilitation 2012 (20)

repairandrehabilitation-150105022737-conversion-gate02.pdf
repairandrehabilitation-150105022737-conversion-gate02.pdfrepairandrehabilitation-150105022737-conversion-gate02.pdf
repairandrehabilitation-150105022737-conversion-gate02.pdf
 
Proposal defence slide on Analysis & Design of Multistorey
Proposal defence slide on Analysis & Design of MultistoreyProposal defence slide on Analysis & Design of Multistorey
Proposal defence slide on Analysis & Design of Multistorey
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
 
Maintenance and repair strategies
Maintenance and repair strategiesMaintenance and repair strategies
Maintenance and repair strategies
 
Maintenance and repair strategies Question answers
Maintenance and repair strategies Question answersMaintenance and repair strategies Question answers
Maintenance and repair strategies Question answers
 
Condition survey and non destructive evalution of concrete
Condition survey and non destructive evalution of concreteCondition survey and non destructive evalution of concrete
Condition survey and non destructive evalution of concrete
 
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...
 
ASD Rehabilitation of RCC Buildings Feb 21.pptx
ASD Rehabilitation of RCC Buildings Feb 21.pptxASD Rehabilitation of RCC Buildings Feb 21.pptx
ASD Rehabilitation of RCC Buildings Feb 21.pptx
 
13324396.pptx
13324396.pptx13324396.pptx
13324396.pptx
 
Rehabilitation of structure
Rehabilitation of structureRehabilitation of structure
Rehabilitation of structure
 
Struct Audit Mktg
Struct Audit MktgStruct Audit Mktg
Struct Audit Mktg
 
REPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptxREPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptx
 
Assessment and rehabilitation technique of fire damaged structures
Assessment and rehabilitation technique of fire damaged structuresAssessment and rehabilitation technique of fire damaged structures
Assessment and rehabilitation technique of fire damaged structures
 
IRJET-Email Tracking System
IRJET-Email Tracking SystemIRJET-Email Tracking System
IRJET-Email Tracking System
 
1.1 Introduction (1).pdf
1.1 Introduction (1).pdf1.1 Introduction (1).pdf
1.1 Introduction (1).pdf
 
"Inspection and rehabilitation | Moffatt & Nichol"
"Inspection and rehabilitation | Moffatt & Nichol""Inspection and rehabilitation | Moffatt & Nichol"
"Inspection and rehabilitation | Moffatt & Nichol"
 
Maintenance of concrete structures
Maintenance of concrete structuresMaintenance of concrete structures
Maintenance of concrete structures
 
A Case Study of Existing Institutional Building for Assessment and Repair (VJ...
A Case Study of Existing Institutional Building for Assessment and Repair (VJ...A Case Study of Existing Institutional Building for Assessment and Repair (VJ...
A Case Study of Existing Institutional Building for Assessment and Repair (VJ...
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
 
MAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIESMAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIES
 

Recently uploaded

"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 

Recently uploaded (20)

"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 

Repairs and rehabilitation 2012

  • 1. REPAIRS AND REHABILITATION OF EXISTING RCC BUILDINGS 31 ST AUG.2012 C.V.KHANDEKAR M.E.(STRCT) ROORKEE EX-EXE.ENG.(MCGM) CONSULTING STRUCTURAL ENGINEER.
  • 2.
  • 3. • 1 Introduction • 2 Causes of Deterioration and Durability Aspects • 3 Condition Survey and Non destructive evaluation • 4 Structural Analysis and Design • 5. Selection of Repair Materials for concrete • 6 Rehabilitation and Retrofitting Methods. • 7 Guidelines for Terms and conditions for repairs. • 8 Schedule for special Items of works. • 9 Specifications for Structural Repair work • 10 Case Study
  • 4. INTRODUCTION • MCGM is governing organization in Mumbai Area and concerned with development in Mumbai jurisdiction for more than 100 yrs. In India last 50-60 years RCC structures are being used extensively. • All of us come across various types of structures. Viz. Load bearing structures, Normal RCC structures, Composite structures, Bridges, Pumping stations, Reservoirs, Hospitals,stadium etc.
  • 5. • These structures can be considered as lifeline of city and are created with huge investment of resources. It is therefore essential to maintain them in functional condition. • Deterioration of RCC members is natural phenomenon and we come across such structures while working for MCGM. • Systematic approach is required in dealing with structures. • Civil engineer’s first duty is to give emphasis on durability aspect during construction as well as maintenance.
  • 6. • 1.1 Overview of Present practice and approach to problems • Understand gap between Quality Planned and Quality achieved in past , present. • We do take cube test but How far its significance is taken during progress of work how far is the co-relation maintained with such results. • Construction documents have specifications and instructions but they remain on paper sometime due to lack of understanding. • Procedures for Periodic Inspections of building and maintenance are not followed or maintained • Budget estimates are prepared by un-experienced engineer or someone else. • Buildings remain several years without any attention.
  • 7. • 1.2 Rational approach to any Repairs and Rehabilitation works. • Identification of Cause of Deterioration • Consequent Repairs and Rehabilitation strategy at optimum cost • Scientific Evaluation and Solution for Protection-Repairs, Rehabilitation, Strengthening and Retrofitting taking advancement in material science (polymers).
  • 8. • 1.3 Repairs Management • Step-1 Documentation of damage.(type & extent) • Step-2 Preparation of drawings, sketches, execution guidelines, material specifications modalities of payment etc.. • Step-3 Actual Execution with understanding , proper expertise, resources for effectiveness of repairs.
  • 9. 2. Causes of Deterioration and durability aspect. • Concrete is considered as composite material that consists essentially of binding material within which are embedded particles or fragments of aggregates • But in RCC, binding material is hydraulic cement and water. • Concrete in RCC is subject to Chemical and Physical changes during it service life. Material remains durable but in RCC (composite structural material )do not prove durable due to various factors ( variations in production, loading conditions during service life, and subsequent attack by environmental factors.
  • 10. • 2.1 Permeability of Concrete • For durability of concrete can be related with water tightness (void less) during production. • Due to seasonal variations micro cracks are developed cement paste and coarse aggregate or reinforcement steel. Primary mechanism thus gets formed. • With increase of penetrability of concrete access to oxygen, CO2, acidic ions penetrate which facilitates, physical and chemical interactions as a result of which material undergoes cracking, spalling and loss of mass resulting partial loss of strength and stiffness
  • 11. • For good Durability it is therefore essential to control water-cement ratio, degree of hydration, curing, Air voids due to deficient compaction, micro cracks due to loading and cyclic exposure to thermal variation.
  • 12. • Porosity is related to • Capillary porosity ------ High W/C ------ Inadequate curing Air voids ------ Improper Compaction Micro cracks ------ Loading, weathering, initial care, after care, Secondary effects.
  • 13. • 2.2 Aggressive deteriorating agents • Corrosion of Reinforcing Bars due to Carbonation (reduction of alkalinity of concrete gel ), • ingress of chloride ( destroys passive layer around steel reinforcement and initiates its corrosion) • pH less than 11 ( (desired 12.6 to 13.5) • Sulphate attack causes expansion,cracking, loss of mass and / or disintegration. • Alkali silica Reaction – reactions of silica in aggregates cause reaction with hydroxyl ion causing reaction leading to expansion,cracks, loss of strength, elasticity and durability.
  • 14. 3. Condition survey and Non destructive testing • 3.1 Objective • It is examination of concrete for the purpose of identifying and defining area of distress. • Identify cause of distress and sources • Assess: extent of distress due to corrosion, fire, earthquake, any other reason • Asses residual strength of structure and inhabitability
  • 15. Stages of condition survey • Prioritize distressed elements according to seriousness for repairs. • a) Preliminary inspection • b) Planning • c)Visual Inspection • d) Field and laboratory testing.
  • 16. • A) Preliminary inspection • History of structure from client, owner, occupants, General public in building, • Note records, previous repairs history and expenses done for the same. • All possible data and information. • Practical restriction and safety requirements • Extent and quantum of survey work • Time required ( survey and execution ) • Advise immediate safety measures.
  • 17. • Information gathering • a. Period of construction • b. Construction details (drg,arch,structural ) • c. Exposure conditions • d. Designed and present use of structure. • e. Previous changes in use • f. record of structural changes if done. • g. Record of 1st occurrence of defect. • h. Details of repairs carried out previously. • i. Previous reports etc. • J. details from owner, photographs
  • 18. Planning survey • Field documents • Plans and actual observations each room- wise. • Previous report , advise if any and implementation done as per report, • Grouping of structural elements ( external, interior etc ) • Exposure conditions
  • 19. Classification of damage. • G1 : No distress but cosmetic repairs • G2 : Minor repairs ( superficial repairs ) • G3 : Medium repairs ( patch repairs ) • G4 : Medium but principal repairs • G5 : Major repairs
  • 20. • Grade for Assessment of the building : Based on the inspection and observation the distress level of the selected buildings may be categorized • as mentioned below: • G1 – No distress observed • G1 – Minor distress observed in few structural members, which can be repaired under the advice of a structural engineer. • G2 – Medium distress observed in few structural members, which can be repaired / rehabilitated including strengthening with the advice of a structural engineer • G3 – Severe distress observed in some of the structural members, which can be rehabilitated including strengthening with the advice of a structural engineer. • G4 – Severe distress is observed which could prove dangerous, hence evacuation at an early date is required.
  • 21. Visual Inspection • Workmanship, structural serviceability, material deterioration mechanisum • General health( structural and non structural elements) • Preparation of estimate / bill of quantites. • Quantify extent of distress • Photographic record. • Obstructions for visual inspection to be noted. • Understanding structural system / deviations • Leakage , seepage due to inadequate drainage system • Types of cracks and its pattern • Color and texture of concrete surface (chemical attack or disintegration by way of leaching .
  • 22. Record • Areas of high distress • Cracks and their locations • Excessive deflections • Exposure conditions of various distressed areas. • Moisture / seepage / leakages / dampness locations. • Abnormal vibrations in structure. • Algae, fungus growth, trees on structure. • Photographic record. • Areas of immediate concern
  • 23. Considerations for repairs strategy. • Identification of cause of problem. • Assessment and extent of damage. • Availability space and accessibility w.r.t. ongoing activities in building. • propping structural members in case of major repairs , severely damaged elements (columns etc ). • Safety measures to avoid mishaps.
  • 24. • Non destructive Evaluation tests • Field test Laboratory tests • In-situ-Concrete strength • Chemical attack • Corrosion activity • Fire damage • Structural integrity and soundness
  • 25. • A : In- situ-concrete test • - rebound hammer • - Ultrasonic pulse velocity • - Windsor probe • - Pull out test : Core cutting / sampling • - Load test
  • 26. • B : Chemical attack • Carbonation test • Chloride test • Sulphate test • C: Corrosion potential assessment • Cover meter ( checking cover) • Half cell potential • Resistivity meter • Permeability ( air and water )
  • 27. • D: Fire damage assessment • Thermo gravimetric analysis (TGA) • Differential Thermal analysis (DTA) • X-ray diffraction (XRD) • E: Structural Integrity/ soundness • Ultrasonic pulse velocity ( discontinuities, cracks and depth of cracks) • Radiography • Impact echo test
  • 29. • Hammer test • Cement type/content • Type of aggregate • Angle of inclination • Member charactaristics • Surface carbonation • Moisture condition
  • 30. Rebound test : • Avg.Rebound value Quality of concrete • -------------------------- --------------------------- • > 40 Very good • 30-40 Good • 20-30 Fair • <20 Poor / delaminated • 0 Very poor
  • 31. UPV test measures pulse travel time across section • Determine quality and homogeneity of concrete • Assess strength / Discontinuity in cross section • Depth of crack • Pulse velocity Quality of concrete • -------------------------------------------------------- • < 4 km/s Very Good /excellent • 3.5 -4 km/s Good-very good (slight • Porosity) • 3 to 3.5 Satisfactory but loss of • integrity • < 3 km/s Poor and loss of integrity.
  • 32. Chemical tests • Carbonation test : 0.2% solution of phenolphthalein is used as pH indicator of concrete : Change in color to pink indicates no carbonation whereas no change in color indicates carbonation has taken place. • Conclusion for testing • Generally it is combination of various aspects such as Lower cover to steel, Permeable concrete , High chloride levels, Alternate wetting and drying need be identified during inspection.
  • 33. 4. Structural analysis and design • Evidence of faulty design/ construction • Structural deterioration due to ageing • Changed use of structure for which structure is not designed • New codal requirements
  • 34. • Reserve strength in old structure. • Due to ageing • Non Consideration of reduction factor for Live load • Excess steel reinforcement • Capacity determination of structural member
  • 35. • For repaired building analysis and design one has to ensure proper linkage between old and new material used in repairs. • Additional steel bars / fiber wrap mesh / section enlargement / external prestressing / steel plate bonding etc are used
  • 36. Modeling structure without compromising stability of structure. • Existing sizes and material properties • Reduction of member sizes, changed end conditions, sequence of construction • All geometric dimensions and material characteristics and end conditions
  • 37. • Stability check • Removal of any member  change load distribution / exceed capacity of member-> • Increase effective length of compression member • Understand possible load path • Monitoring of flexural member • Emergency supports in case of sudden deflection
  • 39.
  • 40. 5. Selection of repair material for concrete • Anology : repairing torn Garment with sound fiber / fabric but to give similar performance • Essential parameters for repair materials. • Low shrinkage properties • Requisite setting / hardening properties • Good bond strength with existing sub-strate • Compatible coefficient of thermal expansion • Compatible strength and mechanical properties with that of sub-strate
  • 41. SELECTION CRITERIA • Allow minimum movement • Minimal or no curing requirement. • Alkaline character • Low air and water permiability • Aesthetics with surroundings • Cost effectiveness • Durable / non degradable / UV resistant • Non hazardous / non pollutant.
  • 42. SELECTION CRITERIA • Low shrinkage -> less crack/ access to air / water • Setting time /hardening -> Min. time to harden and make available space • Workability – acceptance by labor • Bond with sub-strate -> strength and structural behavior criteria • Compatible coefficient of thermal expansion • Mechanical properties / Es (elastic modulus) • Relative movement ->resilient and elastic (bridges)
  • 43. SELECTION CRITERIA • Minimal or no curing • Only epoxys do not require curing • Alkalinity -> pH above 11.5 • Low air and water permiability – environmental attack.
  • 44. Materials for repairs • Materials for surface preparation • Chemical Rust removers for reinforcement. • Passivators for protection of reinforcement, • Bonding agents • Structural repair material • Non-structural repair material. • Injection grout • Joint sealers • Surface coatings for protection of RCC
  • 45. • Premixed cement concrete mortars • (not preferred as drying shrinkage/ slow setting / low workability / prolonged curing • Cement / Rapid hardening cement / Portland slag cement / Pozzolana cement / • Use as per type of structure / marine/environment etc. • Mineral additives : Fly ash / silicafume / GGBS for impermeability / resistance to leaching/ chloride –sulphate attack on concrete and better crushing strength.
  • 46. • Chemical admixtures • Retarding admixtures : compatibility aspect • Water reducing admixtures: control shrinkage, water permeability, percentage of capillary pores and strength • Polymer modified mortar :
  • 47. PRODUCTS AND MANUFACURERES • Epoxy Based injection Grout for sealing cracks • CICO (POXY21) • PEDILITE ( pidgroutEG2 &3) • KRISHNA( epco kp/hp320 /slv • SUNANDA (sunepoxy 368)
  • 48. • Acrylic Polymer based injection Grout • Cico non shrink (NSPGC) • Emcecrete (MC bouchem) • Pidigrout 10M • Roff Hygrout
  • 49. • Rust remover • Bond coat • Shrinkage reducing • feovert ( Krishna ) • PIDICLEAN ( PIDILITE) • RUSTICIDE (SUNSNDA) • Epoxy based / Acrylic based
  • 50. 6. Rehabilitation and Retrofitting • Decide likely a) service life b) Repair methos c) repair materials. • Repair options • Grouting and crack repairs • Patch repair • Replacement of structurally weak concrete. • Replacement of delaminated concrete • Replacement of corroded steel reinforcement • Cleaning and passivating reinforcement • Concrete and corrosion protection ( Jacketing)
  • 51. • Polymer modified mortar is used on hardened concrete surface for repairing defects • Epoxy mortar : Resin + hardener +silica sand Attains strength in short time and is abrasion resistant and is used when it is difficult to use epoxy bonded concrete, depth of repairs is less than 40mm etc. Shotcrete : Pneumatically applied concrete or mortar may be with fibers of steel, poly propylene with admixtures to enhance structural properties
  • 52. Performance requirements • Strength, serviceability and durability • Protection of stell • Bond with parent surface • Dimensional stability • Resistance to environmentally induced damage. • Ease of application • Appearance.
  • 53. Factors in selection of methods of repairs • Type and extent of repairs • Location of distress • Environmental exposure • Availability of skill • Availability of time and access for repairs • Appearance • Cost
  • 54. Repairs stages • Concrete removal and Surface preparation • Fixing suitable formwork • Bonding / passivating coat and repair application • ----------------------------------------------------
  • 55. General Methods • Check for reduction in dia of bars and its location from design point of view • Check cover, prepare surface ( sand blasting) clean reinforcement , remove dust by air blasting / low water pressure / brooming • Apply bonding coat and repair application a) Concrete replacement as per condition b) Epoxy bonded concrete ( fresh concrete +resin bond coat on hardened surface ( depth 40mm or more) may be reinforcement / shear keys etc , c) Silica Fume concrete: Portland cement with silica fumes in case High strength requirement mostly used with super plasticizers. d) Ferro cement : Using mesh + Plasticizers +polymers for sealing pores e) Plate Bonding : MS plates+ epoxy glue for bonding + Bolting. f) RCC jacketing : Composite action with old and new : ensure old concrete is good
  • 56. • Foundation Rehabilitation • a ) Shoring and underpinning • b) Micro piling. • Repairs and Rehabilitation strategies • a) Reduction of load / Distress : /remove load/ replace with lightwt walls • b) Reduce number of stories. • c) Changing building use ( lower side)
  • 57. Terms and conditions in repairs work execution • Safety measures / Quality assurance / Environmental protection • Desirable to have item rate contract • Consultant appointment / Key personnel • Time for repairs and Phasing of works depending on site conditions. • ----------------------------------------------------------- • MCGM PROCEDURE TO BE FOLLOWED
  • 58. • SPECIFICATIONS for materials / execution methods / quality / measurements
  • 60.
  • 61.
  • 62.
  • 63.
  • 65. Column damage in High Rise building
  • 66. High rise Building in Worali
  • 67. High Rise Building : Exposed surfaces
  • 68. Unauthorized Extensions in High Rise Building
  • 69. Treatment in terrace ( individually )
  • 73. Laxmi Nagar Municipal school (1929)
  • 75.
  • 77.