Project Integration Management Monitoring & Controlling Processes Planning Processes Enter phase/ Start project Exit phase/ End project Initiating Processes Closing Processes Executing Processes
Project Integration Management Process and activities needed to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.
4.1 Develop Project Charter The process of developing a document that formally authorizes a project or a phase and documenting initial requirements that satisfy the stakeholder’s needs and expectations
Develop Project Charter (Input) Project are authorized by someone external to the project such as sponsor, PMO, portfolio steering committee. Project charter can be created by them or delegated to Project Manager. Statement of Work (SOW) A narrative description of products or services to be delivered by the project. The SOW references: Business need Product scope description  Strategic plan Business case ,[object Object],[object Object]
Project Selection – Economic Models You just need to understand the following concepts FP = future value r = interest rate n = number of time period Present value (PV): The value today of future cash flows Net present value (NPV): Project with positive & greater NPV value is better Internal rate of return (IRR): Project with greater IRR value is better Payback period: The number of  time periods it takes to recover your investment in the project before you start accumulating  profit. Benefit-cost ratio: compares  the benefits to the costs of different options relates to costing projects and to determining what work should be done Project with greater benefit-cost ratio value is better
Project Selection – Important Terms Economic Value Added (EVA): concerned with whether the project returns to the company more value  than it costs. Opportunity Cost: the opportunity given up by selecting one project over another Sunk Costs:  Are expended costs Should not be considered when deciding whether to continue with a troubled project. Lay of Diminishing Returns: after a certain point, adding more input/resource will not produce a proportional increase  in productivity
Project Selection – Important Terms Working Capital current assets minus current  liabilities  for an organization or amount of money the company has available to invest Depreciation Straight line depreciation The same amount of depreciation  is taken each year. Accelerated depreciation Depreciates faster  than straight line Two forms: (1) Double Declining Balance,  (2) Sum  of the Years Digits
Develop Project Charter (Tools & Techniques, Output) Expert Judgment, includes: Project Charter, includes: Project purpose or justification,  Measurable project objectives and related success criteria,  High-level requirements,  High-level project description,  High-level risks,  Summary milestone schedule,  Summary budget,  Project approval requirements Assigned project manager, responsibility, and authority level Name and authority of the sponsor or other person(s) authorizing the project charter.  ,[object Object]
Consultants
Stakeholders including customer or sponsor
Subject matter experts
PMO
Industry groups
Professional & technical association,[object Object]
Project Management Plan (Output) The strategy for managing the project and the processes in each knowledge area Covers how you will define, plan, manage, and control  the project. Also includes: Change management plan Configuration management plan Requirements management plan Process  improvement plan How to handle a problem on a project? ,[object Object],[object Object]
Change Management Plan Describes how changes will be managed and controlled. Covers for the project as whole May includes: Change control procedures (how and who)  The approval levels for authorizing changes  The creation of a change control board to approve changes A plan outlining how changes will be managed and controlled Who should attend meetings regarding changes  Tools to use to track and control changes  Each knowledge area are described in the individual management plans
Configuration Management Plan Defines how you will manage changes to the deliverables and the resulting documentation, including which organizational tools you will use
4.3 Direct & Manage Project Execution The process of performing the work defined in the project management plan to achieve the project’s objectives.
4.4 Monitor & Control Project Work The process of tracking, reviewing, and regulating the progress to meet the performance objectives defined in the project management plan.

More Related Content

What's hot

Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management - dyaksa hanindito
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guiderobsonnasc
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution ProcessC K Vishwakarma
 
Projectcontrol
ProjectcontrolProjectcontrol
ProjectcontrolRaj Sampat
 
Pmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementPmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementHisham Ali,PMP
 
Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control ChecklistAnand Subramaniam
 
Chap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterChap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterAnand Bobade
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementWaleed Elnaggar
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinarAli Zeeshan
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
PMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOKPMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOKskiltful
 
Project Management
Project ManagementProject Management
Project ManagementMark Roman
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Agus Suhanto
 

What's hot (20)

Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure Checklist
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guide
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution Process
 
Projectcontrol
ProjectcontrolProjectcontrol
Projectcontrol
 
Pmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementPmp chapter(5) Scope Management
Pmp chapter(5) Scope Management
 
Project audit & closure
Project audit & closureProject audit & closure
Project audit & closure
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control Checklist
 
Chap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterChap 4.1- Develop Project Charter
Chap 4.1- Develop Project Charter
 
Project stakeholders
Project stakeholdersProject stakeholders
Project stakeholders
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinar
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
PMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOKPMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOK
 
PMP_Project Stakeholder Management
PMP_Project Stakeholder ManagementPMP_Project Stakeholder Management
PMP_Project Stakeholder Management
 
Project Management
Project ManagementProject Management
Project Management
 
project management (10).pptx
project management (10).pptxproject management (10).pptx
project management (10).pptx
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6
 

Viewers also liked

PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2ejlp12
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality managementejlp12
 
PMP Training - 05 project scope management
PMP Training - 05 project scope managementPMP Training - 05 project scope management
PMP Training - 05 project scope managementejlp12
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource managementejlp12
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost managementejlp12
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication managementejlp12
 
PMP Training - 12 project procurement management
PMP Training - 12 project procurement managementPMP Training - 12 project procurement management
PMP Training - 12 project procurement managementejlp12
 
RESTful web service with JBoss Fuse
RESTful web service with JBoss FuseRESTful web service with JBoss Fuse
RESTful web service with JBoss Fuseejlp12
 
Agile & SCRUM
Agile & SCRUMAgile & SCRUM
Agile & SCRUMejlp12
 
Pmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management finalPmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management finalYudha Pratama, PMP
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5pankajsh10
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Managementpankajsh10
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Saad Merie
 
Pmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charterPmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charterYudha Pratama, PMP
 
PMPProcessGroupTasks
PMPProcessGroupTasksPMPProcessGroupTasks
PMPProcessGroupTasksAnand Bobade
 
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT Summary
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT SummaryPMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT Summary
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT SummaryYudha Pratama, PMP
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5pankajsh10
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Editionpankajsh10
 

Viewers also liked (20)

PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality management
 
PMP Training - 05 project scope management
PMP Training - 05 project scope managementPMP Training - 05 project scope management
PMP Training - 05 project scope management
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource management
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication management
 
PMP Training - 12 project procurement management
PMP Training - 12 project procurement managementPMP Training - 12 project procurement management
PMP Training - 12 project procurement management
 
RESTful web service with JBoss Fuse
RESTful web service with JBoss FuseRESTful web service with JBoss Fuse
RESTful web service with JBoss Fuse
 
Agile & SCRUM
Agile & SCRUMAgile & SCRUM
Agile & SCRUM
 
Pmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management finalPmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management final
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
Pmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charterPmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charter
 
PMPProcessGroupTasks
PMPProcessGroupTasksPMPProcessGroupTasks
PMPProcessGroupTasks
 
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT Summary
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT SummaryPMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT Summary
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT Summary
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Edition
 

Similar to PMP Training - 04 project integration management

L03 integration management
L03 integration managementL03 integration management
L03 integration managementAsa Chan
 
2.04 integration management
2.04 integration management2.04 integration management
2.04 integration managementreddvise
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration managementIrefuser1
 
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...GlobalSkillup
 
Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Amr Miqdadi
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagementDhamo daran
 
Project management processes Groups
Project management processes GroupsProject management processes Groups
Project management processes GroupsSourabh Kumar
 
Project Integration
Project IntegrationProject Integration
Project IntegrationTechNoleGirl
 
Effective Project Integration Management
Effective Project Integration ManagementEffective Project Integration Management
Effective Project Integration Managementssuser9d62d6
 
Projects Management
Projects ManagementProjects Management
Projects ManagementNirmal Shah
 
Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6gatecomro
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptxvamsnrsfdevuqsrtmy
 
PM Session 4
PM Session 4PM Session 4
PM Session 4dmdk12
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -Hossam Maghrabi
 
Project management lecture 11 slide 11
Project management lecture 11 slide 11Project management lecture 11 slide 11
Project management lecture 11 slide 11beautyshine
 

Similar to PMP Training - 04 project integration management (20)

L03 integration management
L03 integration managementL03 integration management
L03 integration management
 
2.04 integration management
2.04 integration management2.04 integration management
2.04 integration management
 
Ch04
Ch04Ch04
Ch04
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
 
Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagement
 
Project management processes Groups
Project management processes GroupsProject management processes Groups
Project management processes Groups
 
4 integration
4 integration4 integration
4 integration
 
Project Integration
Project IntegrationProject Integration
Project Integration
 
Effective Project Integration Management
Effective Project Integration ManagementEffective Project Integration Management
Effective Project Integration Management
 
PMP integration review
PMP integration reviewPMP integration review
PMP integration review
 
Projects Management
Projects ManagementProjects Management
Projects Management
 
Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptx
 
Project management
Project managementProject management
Project management
 
PM Session 4
PM Session 4PM Session 4
PM Session 4
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -
 
Project management lecture 11 slide 11
Project management lecture 11 slide 11Project management lecture 11 slide 11
Project management lecture 11 slide 11
 

More from ejlp12

Introduction to Docker storage, volume and image
Introduction to Docker storage, volume and imageIntroduction to Docker storage, volume and image
Introduction to Docker storage, volume and imageejlp12
 
Java troubleshooting thread dump
Java troubleshooting thread dumpJava troubleshooting thread dump
Java troubleshooting thread dumpejlp12
 
WebSphere Application Server Information Resources
WebSphere Application Server Information ResourcesWebSphere Application Server Information Resources
WebSphere Application Server Information Resourcesejlp12
 
WebSphere Application Server Family (Editions Comparison)
WebSphere Application Server Family (Editions Comparison)WebSphere Application Server Family (Editions Comparison)
WebSphere Application Server Family (Editions Comparison)ejlp12
 
Linux container & docker
Linux container & dockerLinux container & docker
Linux container & dockerejlp12
 
BPEL, BPEL vs ESB (Integration)
BPEL, BPEL vs ESB (Integration)BPEL, BPEL vs ESB (Integration)
BPEL, BPEL vs ESB (Integration)ejlp12
 
BPMN Introduction
BPMN IntroductionBPMN Introduction
BPMN Introductionejlp12
 
JBoss Data Virtualization (JDV) Sample Physical Deployment Architecture
JBoss Data Virtualization (JDV) Sample Physical Deployment ArchitectureJBoss Data Virtualization (JDV) Sample Physical Deployment Architecture
JBoss Data Virtualization (JDV) Sample Physical Deployment Architectureejlp12
 
WebSphere Application Server Topology Options
WebSphere Application Server Topology OptionsWebSphere Application Server Topology Options
WebSphere Application Server Topology Optionsejlp12
 
IBM WebSphere Application Server version to version comparison
IBM WebSphere Application Server version to version comparisonIBM WebSphere Application Server version to version comparison
IBM WebSphere Application Server version to version comparisonejlp12
 
IBM WebSphere Application Server (Clustering) Concept
IBM WebSphere Application Server (Clustering) ConceptIBM WebSphere Application Server (Clustering) Concept
IBM WebSphere Application Server (Clustering) Conceptejlp12
 
IBM WebSphere MQ Introduction
IBM WebSphere MQ Introduction IBM WebSphere MQ Introduction
IBM WebSphere MQ Introduction ejlp12
 
Java EE Introduction
Java EE IntroductionJava EE Introduction
Java EE Introductionejlp12
 
Introduction to Apache Cordova (Phonegap)
Introduction to Apache Cordova (Phonegap)Introduction to Apache Cordova (Phonegap)
Introduction to Apache Cordova (Phonegap)ejlp12
 
Introduction to jQuery Mobile
Introduction to jQuery MobileIntroduction to jQuery Mobile
Introduction to jQuery Mobileejlp12
 
Introduction to JPA (JPA version 2.0)
Introduction to JPA (JPA version 2.0)Introduction to JPA (JPA version 2.0)
Introduction to JPA (JPA version 2.0)ejlp12
 
Introduction to JavaBeans Activation Framework v1.1
Introduction to JavaBeans Activation Framework v1.1Introduction to JavaBeans Activation Framework v1.1
Introduction to JavaBeans Activation Framework v1.1ejlp12
 
Arah pengembangan core network architecture (Indonesia)
Arah pengembangan core network architecture (Indonesia)Arah pengembangan core network architecture (Indonesia)
Arah pengembangan core network architecture (Indonesia)ejlp12
 
GSM/UMTS network architecture tutorial (Indonesia)
GSM/UMTS network architecture tutorial (Indonesia)GSM/UMTS network architecture tutorial (Indonesia)
GSM/UMTS network architecture tutorial (Indonesia)ejlp12
 

More from ejlp12 (19)

Introduction to Docker storage, volume and image
Introduction to Docker storage, volume and imageIntroduction to Docker storage, volume and image
Introduction to Docker storage, volume and image
 
Java troubleshooting thread dump
Java troubleshooting thread dumpJava troubleshooting thread dump
Java troubleshooting thread dump
 
WebSphere Application Server Information Resources
WebSphere Application Server Information ResourcesWebSphere Application Server Information Resources
WebSphere Application Server Information Resources
 
WebSphere Application Server Family (Editions Comparison)
WebSphere Application Server Family (Editions Comparison)WebSphere Application Server Family (Editions Comparison)
WebSphere Application Server Family (Editions Comparison)
 
Linux container & docker
Linux container & dockerLinux container & docker
Linux container & docker
 
BPEL, BPEL vs ESB (Integration)
BPEL, BPEL vs ESB (Integration)BPEL, BPEL vs ESB (Integration)
BPEL, BPEL vs ESB (Integration)
 
BPMN Introduction
BPMN IntroductionBPMN Introduction
BPMN Introduction
 
JBoss Data Virtualization (JDV) Sample Physical Deployment Architecture
JBoss Data Virtualization (JDV) Sample Physical Deployment ArchitectureJBoss Data Virtualization (JDV) Sample Physical Deployment Architecture
JBoss Data Virtualization (JDV) Sample Physical Deployment Architecture
 
WebSphere Application Server Topology Options
WebSphere Application Server Topology OptionsWebSphere Application Server Topology Options
WebSphere Application Server Topology Options
 
IBM WebSphere Application Server version to version comparison
IBM WebSphere Application Server version to version comparisonIBM WebSphere Application Server version to version comparison
IBM WebSphere Application Server version to version comparison
 
IBM WebSphere Application Server (Clustering) Concept
IBM WebSphere Application Server (Clustering) ConceptIBM WebSphere Application Server (Clustering) Concept
IBM WebSphere Application Server (Clustering) Concept
 
IBM WebSphere MQ Introduction
IBM WebSphere MQ Introduction IBM WebSphere MQ Introduction
IBM WebSphere MQ Introduction
 
Java EE Introduction
Java EE IntroductionJava EE Introduction
Java EE Introduction
 
Introduction to Apache Cordova (Phonegap)
Introduction to Apache Cordova (Phonegap)Introduction to Apache Cordova (Phonegap)
Introduction to Apache Cordova (Phonegap)
 
Introduction to jQuery Mobile
Introduction to jQuery MobileIntroduction to jQuery Mobile
Introduction to jQuery Mobile
 
Introduction to JPA (JPA version 2.0)
Introduction to JPA (JPA version 2.0)Introduction to JPA (JPA version 2.0)
Introduction to JPA (JPA version 2.0)
 
Introduction to JavaBeans Activation Framework v1.1
Introduction to JavaBeans Activation Framework v1.1Introduction to JavaBeans Activation Framework v1.1
Introduction to JavaBeans Activation Framework v1.1
 
Arah pengembangan core network architecture (Indonesia)
Arah pengembangan core network architecture (Indonesia)Arah pengembangan core network architecture (Indonesia)
Arah pengembangan core network architecture (Indonesia)
 
GSM/UMTS network architecture tutorial (Indonesia)
GSM/UMTS network architecture tutorial (Indonesia)GSM/UMTS network architecture tutorial (Indonesia)
GSM/UMTS network architecture tutorial (Indonesia)
 

Recently uploaded

Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 

Recently uploaded (20)

Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 

PMP Training - 04 project integration management

  • 1. Created by ejlp12@gmail.com, June 2010 5 - Project Integration Management Project Management Training
  • 2. Project Integration Management Monitoring & Controlling Processes Planning Processes Enter phase/ Start project Exit phase/ End project Initiating Processes Closing Processes Executing Processes
  • 3. Project Integration Management Process and activities needed to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.
  • 4. 4.1 Develop Project Charter The process of developing a document that formally authorizes a project or a phase and documenting initial requirements that satisfy the stakeholder’s needs and expectations
  • 5.
  • 6. Project Selection – Economic Models You just need to understand the following concepts FP = future value r = interest rate n = number of time period Present value (PV): The value today of future cash flows Net present value (NPV): Project with positive & greater NPV value is better Internal rate of return (IRR): Project with greater IRR value is better Payback period: The number of time periods it takes to recover your investment in the project before you start accumulating profit. Benefit-cost ratio: compares the benefits to the costs of different options relates to costing projects and to determining what work should be done Project with greater benefit-cost ratio value is better
  • 7. Project Selection – Important Terms Economic Value Added (EVA): concerned with whether the project returns to the company more value than it costs. Opportunity Cost: the opportunity given up by selecting one project over another Sunk Costs: Are expended costs Should not be considered when deciding whether to continue with a troubled project. Lay of Diminishing Returns: after a certain point, adding more input/resource will not produce a proportional increase in productivity
  • 8. Project Selection – Important Terms Working Capital current assets minus current liabilities for an organization or amount of money the company has available to invest Depreciation Straight line depreciation The same amount of depreciation is taken each year. Accelerated depreciation Depreciates faster than straight line Two forms: (1) Double Declining Balance, (2) Sum of the Years Digits
  • 9.
  • 13. PMO
  • 15.
  • 16.
  • 17. Change Management Plan Describes how changes will be managed and controlled. Covers for the project as whole May includes: Change control procedures (how and who) The approval levels for authorizing changes The creation of a change control board to approve changes A plan outlining how changes will be managed and controlled Who should attend meetings regarding changes Tools to use to track and control changes Each knowledge area are described in the individual management plans
  • 18. Configuration Management Plan Defines how you will manage changes to the deliverables and the resulting documentation, including which organizational tools you will use
  • 19. 4.3 Direct & Manage Project Execution The process of performing the work defined in the project management plan to achieve the project’s objectives.
  • 20. 4.4 Monitor & Control Project Work The process of tracking, reviewing, and regulating the progress to meet the performance objectives defined in the project management plan.
  • 21. 4.5 Perform Integrated Change Control The process of reviewing all change requests, approving changes and managing changes to deliverables, organizational process assets, project documents and the project management plan.
  • 22. 4.6 Closing Project or Phase The process of of finalizing all activities across all of the Project Management Process Groups to formally complete the project or phase.