IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 400
MATERIAL MANAGEMENT IN CONSTRUCTION – A CASE STUDY
T. Phani Madhavi1
, Steve Varghese Mathew2
, Roy Sasidharan3
1
Assistant Professor, 2, 3
Former Graduate Student, Department of Civil Engineering, Sathyabama University,
Chennai, Tamil Nadu, India, talasilamadhavi@gmail.com
Abstract
The objective of the present study is to understand about all the problems occurring in the company because of improper application
of material management. In construction project operation, often there is a project cost variance in terms of the material, equipments,
manpower, subcontractor, overhead cost, and general condition. Material is the main component in construction projects. Therefore,
if the material management is not properly managed it will create a project cost variance. Project cost can be controlled by taking
corrective actions towards the cost variance. Therefore a methodology is used to diagnose and evaluate the procurement process
involved in material management and launch a continuous improvement was developed and applied. A thorough study was carried
out along with study of cases, surveys and interviews to professionals involved in this area. As a result, a methodology for diagnosis
and improvement was proposed and tested in selected projects. The results obtained show that the main problem of procurement is
related to schedule delays and lack of specified quality for the project. To prevent this situation it is often necessary to dedicate
important resources like money, personnel, time, etc. To monitor and control the process. A great potential for improvement was
detected if state of the art technologies such as, electronic mail, electronic data interchange (EDI), and analysis were applied to the
procurement process. These helped to eliminate the root causes for many types of problems that were detected.
Keywords: Material Management, Construction
-------------------------------------------------------------------***--------------------------------------------------------------------------
1. INTRODUCTION
Materials management is defined as a management system
that is required in planning and controlling the quality &
quantity of the material, punctual equipment placement, good
price and the right quantity as required. Material management
is a management system that integrates purchasing, shipping
and material control from suppliers. Based on those
definitions, generally materials management can be defined as
a process of planning, executing, and controlling the right
source of materials with the exact quality, at the right time and
place suitable for minimum cost construction process.
Capability to coordinate and integrate purchasing, shipping
and material control from suppliers is required for material
cost control. Three important phases that holds the key to a
successful materials management are materials purchasing,
materials usage, and storage .It is used to reduce the cost,
which increases profitability and streamlines the production.
Apart from management of material cost and its supply it
helps in its proper utilization, transportation, storage, handling
and distribution. Selection of personnel for marketing,
purchasing, inventory control, stores management and
materials handling and their training and placement is also to
be seen by the materials management department This
indicates that it is very essential to have a materials
management department in any organization to support the
management in the production activities. It also helps in the
marketing, sales promotion and control of all the types of
materials for its quantity, quality and cost. Thus, the objective
of this paper is to clarify the roles and possibilities of material
management in construction.
The present case study was done at Raviz hills. It was noticed
that the materials are improperly procured and stored and there
is a lack of inventory control and improper management. The
finest details of procurement process was studied and an
attempt has been made to meet the effective transportation
system, proper inventory control and purchase can be done
with technological measures and also, determines the profit
and loss that occur under particular schedule based on the
purchasing and inventory stores.
2. EXPERIMENTAL METHODOLOGIES
The experimental analysis consists of theories and practical
consideration of the concepts. Therefore, the present work was
classified as follows.
2.1 Analysis of site and management
2.2 Analysis on Inventory controlling
2.3 Analysis on purchasing procedures
2.4 Analysis on Procurement and Tracking
2.5 Analysis on costs
2.1 Analysis of Site and Management
The analysis was done to understand what are all the problems
occurring in the company because of improper application of
material management. The solutions that provided in this work
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 401
may cost a lot in the beginning, but it will help the company in
the long run by providing solutions to the key problems like
lack of specification, delay, improper procurement etc.
According to the problems that generally occur in the site due
to the improper material management, was categorised each
problem and created a cause-effect diagram, where factors
such as, inventory, purchase, procurement, were all generally
addressed to procurement cycle. For this purpose, the study
was done by visiting the site. Site survey was done, and
prepared questionnaires accordingly and problems to each
above mentioned groups were analysed and solutions thus
were given. Substantial evidences in the form of photos were
taken to analyse the procurement problems occurring in the
present case study. Questions were prepared accordingly and
those prepared questions were given as a challenge to the site
managers, quality control inspector, project manager, purchase
manager. From the questionnaires prepared and the answers
thus obtained from them were categorized into each class of
problems. From those classes it was understood that lack of
technological implications and scientific approach were
lacking with respect to the procurement process. Thus the
problems were pointed out to them and they agreed to each
above mentioned problems that were occurring in their site
and thus corrections would be implemented by them in their
next oncoming projects.
2.2 Analysis on Inventory Controlling
In the inventory process, the methodology adopted was
preparing questionnaires and allocating marks for each, by
categorizing them into each of their subsystem problems, such
as supply, materials and equipments, weightages were given
substantially. Then, based on this the solutions were offered in
the form of cause – effect diagram and flow charts, graphs
were also prepared, depicting problems such as delay, lack of
specification, excess and lack of inspection.
2.2.1 Inventory Planning
i. Production planning requires purchase and inventory
planning decisions for an organization to control expenses and
finances.
ii. To get the purchase benefits, discounts, reduced
transportation and ordering cost the bulk purchase may be
economical. Inventory of such materials are stored for longer
time.
2.3 Analysis on Purchasing Procedures
All the organizations need an efficient and economic
purchasing and procurement of its various supplies of
materials from the suppliers.
2.3.1 Process of Purchasing
The process of purchasing involves various steps to be
followed as routine matter by the purchase department.
i) Identification of materials: Identify the materials to be
purchased by receiving the requisitions received from various
departments.
(ii) Purchase requisitions: Purchase requisitions are documents
listing the requirements of materials from the various stores
written by the storekeeper received by the purchase
department from various departments. The planning
department for special purchases for non-stock items also
prepares the purchase requisitions. The purchase requisitions
are made as Bill of Materials (BOM) of a product, which
specifies quantities, needed. The purchase requisitions are
generally prepared in triplicate. One copy sent to the purchase
department signed by the storekeeper, works manager and
production controller, second copy sent to materials control or
planning department and third copy is retained by the
requisitioned.
2.4 Analysis on Procurement and Tracking
In this, the concept is based on procurement and tracking of
the materials which is done with the help of RFID and bar
coding scanners. In procurement tracking, the concept of
tracking the material is done mainly with the help of barcode
scanners, where the quality control manager can view the
materials to where it is being transported. Hence a check on
the materials can be done. Once the transportation has arrived
at site, the material is being passed by cross checking it with
the bill of quantities and bill of loading, with the consignee.
Once the consignee accepts the bill of loading it is then
conveyed to the consigner. The whole case study of
procurement and tracking was done by us with the help of
questionnaires.
2.5 Analysis on Cost
2.5.1 ABC Analysis
This is most popular inventory control technique adopted as
Pareto’s Law. Large amount of capital is invested in purchase
of costly items in small number. Eighty percent of the cost of
materials purchased is required for only Twenty percent costly
items for efficient inventory control in stores where the large
number of materials are to be handled, the classification of
them is necessary to take particular care of costly items, which
are less in number. The ABC analysis is commonly used in
most of the organizations
To classify the materials according to their sales values. In this
method, all the items of stores are classified in three groups as
A, B and C as explained below.
(i) The quantity of each item used annually multiply by its unit
sales price is sales value of that item. All such sales values of
all the items are calculated and tabulated.
(ii) The items, its quantity sold and sales values are tabulated
in decreasing order and the sales values are added item-wise
and shown in next column.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 402
(iii) The totals of quantity and sales values of all the items
used annually are found out. The percentage sales values of
each item is found out and percentage of quantity of each item
is also found out. These two columns are added showing
percentage of total sales values item wise and percentage of
total quantity of sales.
(iv) Seventy percent of total sales value items will be listed in
A category. Its percentage quantity used is found out.
(v) About 20 % of total sales value items will be listed in B
category. Its percentage quantity used is found out.
(vi)Balanced about 10 % of total sales value items will be
listed in C category. Its percentage quantity will be remaining
balance.
2.5.2 Characteristics of ABC Items
A-Items
These items have 70% of sales value but less in quantity about
15 to 20%. The capital should not be blocked in these items.
They can be ordered frequently and consumed immediately.
The purchase of these items will be controlled by Director and
cared most in the company. They are only 10 to 15% quantity-
wise and require special attention in stores.
B-Items
They have about 20 to 25% sales value and same quantity to
purchase. Since they are medium valued items therefore large
inventory of them is not necessary. They can be ordered
frequently but at the same time the quantity ordered should be
such that it will be economic to purchase and its shortage
should not be there. They are less valued than A items and
quantity-wise about 15 to 25%.
C-Items
They have the least sales cost about 10%. They are required in
large quantity about 50 to 60%. They can be purchased in bulk
to avail large discounts and fewer prices to pay. This will also
reduce the cost of ordering and purchasing. They can be
purchased once or twice in a year. They are least-valued items.
Advantages of ABC Analysis
(i) The inventory control of different categories of items will
be better if costlier items are not stored for large period, which
reduces capital investment.
(ii) The quantities of various categories of items are
economically ordered and stored as per need. It saves the cost
of ordering and carrying the inventories.
(iii) The purchasing of various categories of items becomes
easy and discounts are also obtained on large purchase of
items of C category.
(iv)Better record keeping of different categories of items helps
in good inventory control
2.5.3 First In First Out (FIFO) Method
In this method, the material stored first is issued first. For
using this procedure, the following methods are used.
Double Area System: In this particular method, two areas are
used for each item to be stored and issued. The new lots of
items are stored in second empty area and materials are issued
from first area where previous old lot is stored. When first
area is emptied, the material from second area is shifted to
first area so that second area is emptied to receive the fresh
materials.
Moving Division System: In this method is the place selected
for each item is more in area than required to provide space
between new and old lots. The materials supplied first are
placed first in right hand side area from where it is issued. The
fresh lot is supplied in the second area on left hand side and
shifted to right hand side when it is emptied.
Gravity Feed System: The new materials are fed at the top of
the containers or piles and removed from the bottom.
2.5.4 Benefits of the Method
The method uses actual cost of the material for valuation and
it is very easy to use. The only disadvantage of the method is
that if large variation of prices is there, no consideration is
given to current market prices. When the prices are falling, the
material charged to production is high and when the prices are
rising, the material charged to production is low and
replacement cost is high.
3. RESULTS AND DISCUSSION
A comprehensive case study on material management at work
site was done. Attempt has been made to improvise the
inventory controlling measures, purchasing measures, by
looking into the detailed report of previous organization
hierarchy and their management. The present work comprises
the redesigning of the entire organization hierarchy without
touching the core competency. Management was sub divided
into sub system and further task work such as purchase
manager, supervisor in charge. Under them further sub divide
into supervisors and helpers. Effort is taken to improvise the
existing hierarchy effectively, by improving purchasing
department, financial department, material management
department to merge with one and each other.
Microscopically, dissections was done into the matters of
purchasing, transportation and introduction of new
possibilities, like, purchase requisition slip, tender quotation
form, technologies like RFID and PDA were also initiated to
help in achieving a better procurement control at the work site.
Analysis was done at the site based on cost input, such as
ABD analysis and FIFO analysis. In ABC analysis, we
categorize whole material into ABC type materials were A
category consist of 10% of total material involved in
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 403
construction but that cost 70% of the total cost. Similarly B
and C type material were also classified accordingly by this
we mean that during construction the materials can be released
as per the above concept, so that, we can strengthen the
financial control and proper scheduling and programming of
the work can be achieved, there by graduating progress in
work efficiently.
Further cost analysis was done based on FIFO input, and
similarly cost controlling efficiently was achieved, that is, if a
contractor quotes a rate, and later on we calculate a similar
quote for the same material for what the contractor has given.
We can find that there is a change in the quotation. Thus,
enabling us to have a broad outlook on the financial control of
the work. Thus, helping in proper release of the finance and
preparation of the budget preparing process.
New technological implications like RFID, PDA, were helped
in proper scheduling and financial control. Accurate data
collection has always been an important part of project control
both in procurement and construction phases. The Radio
Frequency Identification RFID enables precise data
acquisition by tracking materials. This technology enables the
detection and identification of tagged objects through the data
it transmits. RFID uses radio waves to identify people and
objects. An RFID system consists of an RFID tag and an
RFID reader. The RFID tag consists of a small microchip and
an antenna. Data is stored in the tag, usually in the form of a
unique serial number. The RFID reader acts as a
transmitter/receiver. The reader transmits an electromagnetic
field that wakes up the tag and provides the power required for
the tag to operate. The tag then transfers the data to the reader
through the antenna. This data is then read by the RFID reader
and transferred to the Pocket PC or computer. RFID tags do
not have to be line-of sight. They only have to be within the
reader’s radio range. This evolution in automated data
acquisition has become the next paradigm in construction
industry. By using software, construction site documentation
can be simplified and made faster and there is increased
efficiency. Therefore, there is a need of Personal Digital
Assistant (PDA) to run the software to enhance the
productivity of jobsite management.
CONCLUSIONS
1) In the present case study, analysis on the work site was
done with the previous knowledge of the material
management, and new methodologies were implemented at
work site, based on the current construction scenario.
2) Following aspects were taken into consideration, the
original site layout was redesigned, then the proper
management was bought in and a whole new concept was
derived.
3) Understanding of the problems that occur at the work site
due to, inventory, purchasing and on how materials are being
handled at the work site were taken into consideration. On
how, materials are being procured was done with
questionnaires and weight ages were given to each. On further
these problems were tackled with cause effect and diagram
and how materials can be properly procured with the help of
proper flow charts.
4) Similarly, analysis was done on purchasing and new
concept of purchase requisition slip and tender quotation were
introduced.
5) Importance on how materials are properly procured at the
site was also taken into consideration and new appropriate
technological implications were introduced like RFID, PDA,
which helped us in a proper scheduling and financial control
for proper scheduling and based on the materials importance,
and on how they have to be released, ABC analysis and FIFO
analysis were done.
6) From the above theory and concepts, new theories which
help us in proper material management at worksite were
identified and prime importance was given to them. The case
study as a whole was submitted to the Raviz Hills
management system, and they have been agreed, and also
promises were done to implement these material management
strategies, within 2 to 3 years for the future projects.
REFERENCES
[1]. Bell, L. C. and Stukhart, G, ”Cost and Benefits of
Materials Management Systems Journal of Construction
Engineering and Management, Vol. 113, No. 2, 1987,pp 222-
234.
[2]. Elbeltagi, E., Hegazy, T. and Eldosouky. A.,”Dynamic
Layout of Construction Temporary Facilities Considering
Safety”, Journal of Construction Engineering and
Management, Vol. 130, No. 4, 2004, pp 534-541
[3]. Formoso, C. T., Soibelman, L., De Cesare, C. and Isatto,
E. L, “Material Waste in Building Industry: Main Causes and
Prevention” Journal of Construction Engineering and
Management. Vol. 128, No. 4, 2002,pp. 316-325.

More Related Content

What's hot

Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...A Makwana
 
An assessment of material management on building construction sites
An assessment of material management on building construction sitesAn assessment of material management on building construction sites
An assessment of material management on building construction sitesAlexander Decker
 
Construction site management material storage
Construction site management material storageConstruction site management material storage
Construction site management material storagedaviesdiaz
 
Material management control power point presentation
Material management control power point presentationMaterial management control power point presentation
Material management control power point presentationMuhammad Asif Khan Awan
 
Material Management: Inventory Control & QC Techniques
Material Management: Inventory Control & QC TechniquesMaterial Management: Inventory Control & QC Techniques
Material Management: Inventory Control & QC TechniquesS.Vijaya Bhaskar
 
Material Management And Human Resources Managemnet
Material Management And Human Resources ManagemnetMaterial Management And Human Resources Managemnet
Material Management And Human Resources Managemnetnimbalkarpranit
 
The Impact of Materials Management on Profitability of Manufacturing Companie...
The Impact of Materials Management on Profitability of Manufacturing Companie...The Impact of Materials Management on Profitability of Manufacturing Companie...
The Impact of Materials Management on Profitability of Manufacturing Companie...Dr. Amarjeet Singh
 
Material Management and ABC analysis
Material Management and ABC analysisMaterial Management and ABC analysis
Material Management and ABC analysisDr. Sonal Mandhotra
 
Purchasing and Material Management training Certification with iACT Global
Purchasing and Material Management training Certification with iACT Global Purchasing and Material Management training Certification with iACT Global
Purchasing and Material Management training Certification with iACT Global iACT Global
 
Materials management
Materials managementMaterials management
Materials managementlearnito
 
integrated material management
integrated material managementintegrated material management
integrated material managementReetu Manglani
 
Material management
Material managementMaterial management
Material managementMadiha Ahmed
 
Constructionmaterialmanagement 140920032237-phpapp01
Constructionmaterialmanagement 140920032237-phpapp01Constructionmaterialmanagement 140920032237-phpapp01
Constructionmaterialmanagement 140920032237-phpapp01MVNVKUMAR
 

What's hot (18)

Module :- 8 material management
Module :- 8 material managementModule :- 8 material management
Module :- 8 material management
 
Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...
 
An assessment of material management on building construction sites
An assessment of material management on building construction sitesAn assessment of material management on building construction sites
An assessment of material management on building construction sites
 
Construction site management material storage
Construction site management material storageConstruction site management material storage
Construction site management material storage
 
Material management control power point presentation
Material management control power point presentationMaterial management control power point presentation
Material management control power point presentation
 
Material Management: Inventory Control & QC Techniques
Material Management: Inventory Control & QC TechniquesMaterial Management: Inventory Control & QC Techniques
Material Management: Inventory Control & QC Techniques
 
Material Management And Human Resources Managemnet
Material Management And Human Resources ManagemnetMaterial Management And Human Resources Managemnet
Material Management And Human Resources Managemnet
 
Materials management
Materials managementMaterials management
Materials management
 
The Impact of Materials Management on Profitability of Manufacturing Companie...
The Impact of Materials Management on Profitability of Manufacturing Companie...The Impact of Materials Management on Profitability of Manufacturing Companie...
The Impact of Materials Management on Profitability of Manufacturing Companie...
 
Material Management and ABC analysis
Material Management and ABC analysisMaterial Management and ABC analysis
Material Management and ABC analysis
 
Purchasing and Material Management training Certification with iACT Global
Purchasing and Material Management training Certification with iACT Global Purchasing and Material Management training Certification with iACT Global
Purchasing and Material Management training Certification with iACT Global
 
Material management
Material managementMaterial management
Material management
 
Materials management ppt
Materials management pptMaterials management ppt
Materials management ppt
 
Materials management
Materials managementMaterials management
Materials management
 
integrated material management
integrated material managementintegrated material management
integrated material management
 
Material management
Material managementMaterial management
Material management
 
MS II UNIT MATERIAL MANAGEMENT PPT
MS II UNIT MATERIAL MANAGEMENT PPTMS II UNIT MATERIAL MANAGEMENT PPT
MS II UNIT MATERIAL MANAGEMENT PPT
 
Constructionmaterialmanagement 140920032237-phpapp01
Constructionmaterialmanagement 140920032237-phpapp01Constructionmaterialmanagement 140920032237-phpapp01
Constructionmaterialmanagement 140920032237-phpapp01
 

Viewers also liked

Modeling Curvature Damage Surface for Damage Detection in Cantilever Beam
Modeling Curvature Damage Surface for Damage Detection in Cantilever BeamModeling Curvature Damage Surface for Damage Detection in Cantilever Beam
Modeling Curvature Damage Surface for Damage Detection in Cantilever BeamIDES Editor
 
Finite element analysis of engine mounting bracket by considering pretension ...
Finite element analysis of engine mounting bracket by considering pretension ...Finite element analysis of engine mounting bracket by considering pretension ...
Finite element analysis of engine mounting bracket by considering pretension ...eSAT Journals
 
A study of the constraints affecting the proper utilization of computer appli...
A study of the constraints affecting the proper utilization of computer appli...A study of the constraints affecting the proper utilization of computer appli...
A study of the constraints affecting the proper utilization of computer appli...eSAT Journals
 
How Engine Mount Affect The Engine
How Engine Mount Affect The EngineHow Engine Mount Affect The Engine
How Engine Mount Affect The EngineHarmony Motor Works
 
Identifying and Solving Personnel Issues
Identifying and Solving Personnel IssuesIdentifying and Solving Personnel Issues
Identifying and Solving Personnel IssuesKirkie44
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...eSAT Journals
 
Humanside of project management
Humanside of project managementHumanside of project management
Humanside of project managementDMR Panda
 
Research Paper - Recruitment Issues in the Public Sector
Research Paper - Recruitment Issues in the Public SectorResearch Paper - Recruitment Issues in the Public Sector
Research Paper - Recruitment Issues in the Public SectorMarsha Noel
 
Silvapen Industrialized Cons.
Silvapen Industrialized Cons.Silvapen Industrialized Cons.
Silvapen Industrialized Cons.Silvapen
 
Designing Better Applications, Websites and Intranets
Designing Better Applications, Websites and IntranetsDesigning Better Applications, Websites and Intranets
Designing Better Applications, Websites and IntranetsnForm User Experience
 
Fau Innovation 6 2010 Progress
Fau Innovation  6 2010 ProgressFau Innovation  6 2010 Progress
Fau Innovation 6 2010 Progressfzollo
 
Partially Industrialized Construction
Partially Industrialized ConstructionPartially Industrialized Construction
Partially Industrialized Constructionturbi
 
nForm better intranets | PCL construction case study
nForm better intranets | PCL construction case studynForm better intranets | PCL construction case study
nForm better intranets | PCL construction case studynForm User Experience
 
David Smith 2016 CV
David Smith 2016 CVDavid Smith 2016 CV
David Smith 2016 CVDavid Smith
 
PRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIAPRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIADevender Kumar
 
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTSASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTSIAEME Publication
 
Land cruiser (engine_[1_vd-ftv]) (2)
Land cruiser (engine_[1_vd-ftv]) (2)Land cruiser (engine_[1_vd-ftv]) (2)
Land cruiser (engine_[1_vd-ftv]) (2)roikhan roikhan
 
C:\Fakepath\Activity Project Management Atlas 2000
C:\Fakepath\Activity Project Management Atlas 2000C:\Fakepath\Activity Project Management Atlas 2000
C:\Fakepath\Activity Project Management Atlas 2000Henk, van Soest
 
Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementseSAT Journals
 
Ush company case study
Ush company case studyUsh company case study
Ush company case studystartguru
 

Viewers also liked (20)

Modeling Curvature Damage Surface for Damage Detection in Cantilever Beam
Modeling Curvature Damage Surface for Damage Detection in Cantilever BeamModeling Curvature Damage Surface for Damage Detection in Cantilever Beam
Modeling Curvature Damage Surface for Damage Detection in Cantilever Beam
 
Finite element analysis of engine mounting bracket by considering pretension ...
Finite element analysis of engine mounting bracket by considering pretension ...Finite element analysis of engine mounting bracket by considering pretension ...
Finite element analysis of engine mounting bracket by considering pretension ...
 
A study of the constraints affecting the proper utilization of computer appli...
A study of the constraints affecting the proper utilization of computer appli...A study of the constraints affecting the proper utilization of computer appli...
A study of the constraints affecting the proper utilization of computer appli...
 
How Engine Mount Affect The Engine
How Engine Mount Affect The EngineHow Engine Mount Affect The Engine
How Engine Mount Affect The Engine
 
Identifying and Solving Personnel Issues
Identifying and Solving Personnel IssuesIdentifying and Solving Personnel Issues
Identifying and Solving Personnel Issues
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...
 
Humanside of project management
Humanside of project managementHumanside of project management
Humanside of project management
 
Research Paper - Recruitment Issues in the Public Sector
Research Paper - Recruitment Issues in the Public SectorResearch Paper - Recruitment Issues in the Public Sector
Research Paper - Recruitment Issues in the Public Sector
 
Silvapen Industrialized Cons.
Silvapen Industrialized Cons.Silvapen Industrialized Cons.
Silvapen Industrialized Cons.
 
Designing Better Applications, Websites and Intranets
Designing Better Applications, Websites and IntranetsDesigning Better Applications, Websites and Intranets
Designing Better Applications, Websites and Intranets
 
Fau Innovation 6 2010 Progress
Fau Innovation  6 2010 ProgressFau Innovation  6 2010 Progress
Fau Innovation 6 2010 Progress
 
Partially Industrialized Construction
Partially Industrialized ConstructionPartially Industrialized Construction
Partially Industrialized Construction
 
nForm better intranets | PCL construction case study
nForm better intranets | PCL construction case studynForm better intranets | PCL construction case study
nForm better intranets | PCL construction case study
 
David Smith 2016 CV
David Smith 2016 CVDavid Smith 2016 CV
David Smith 2016 CV
 
PRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIAPRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIA
 
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTSASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
 
Land cruiser (engine_[1_vd-ftv]) (2)
Land cruiser (engine_[1_vd-ftv]) (2)Land cruiser (engine_[1_vd-ftv]) (2)
Land cruiser (engine_[1_vd-ftv]) (2)
 
C:\Fakepath\Activity Project Management Atlas 2000
C:\Fakepath\Activity Project Management Atlas 2000C:\Fakepath\Activity Project Management Atlas 2000
C:\Fakepath\Activity Project Management Atlas 2000
 
Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavements
 
Ush company case study
Ush company case studyUsh company case study
Ush company case study
 

Similar to Material management in construction – a case study

IRJET- Research Paper on Inventory Management System
IRJET-  	  Research Paper on Inventory Management SystemIRJET-  	  Research Paper on Inventory Management System
IRJET- Research Paper on Inventory Management SystemIRJET Journal
 
Application of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential BuildingApplication of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential BuildingIRJET Journal
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET Journal
 
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...IJAEMSJORNAL
 
IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET Journal
 
Investigation on Cycle Time Reduction in Production and Implementation of an ...
Investigation on Cycle Time Reduction in Production and Implementation of an ...Investigation on Cycle Time Reduction in Production and Implementation of an ...
Investigation on Cycle Time Reduction in Production and Implementation of an ...IRJET Journal
 
Review of Inventory Management System to Ensure the Optimization of Resources
Review of Inventory Management System to Ensure the Optimization of ResourcesReview of Inventory Management System to Ensure the Optimization of Resources
Review of Inventory Management System to Ensure the Optimization of ResourcesIRJET Journal
 
Materials management
Materials managementMaterials management
Materials managementARUNAYESUDAS
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET Journal
 
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET Journal
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...IRJET Journal
 
Achieving operational excellence by implementing an erp (enterprise resource ...
Achieving operational excellence by implementing an erp (enterprise resource ...Achieving operational excellence by implementing an erp (enterprise resource ...
Achieving operational excellence by implementing an erp (enterprise resource ...eSAT Publishing House
 
Scope and functons of materals management
Scope and functons of materals managementScope and functons of materals management
Scope and functons of materals managementSunil kushwaha
 
Logistics for better exports
Logistics for better exportsLogistics for better exports
Logistics for better exportsRudresh Kumar
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryAM Publications
 

Similar to Material management in construction – a case study (20)

IRJET- Research Paper on Inventory Management System
IRJET-  	  Research Paper on Inventory Management SystemIRJET-  	  Research Paper on Inventory Management System
IRJET- Research Paper on Inventory Management System
 
Application of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential BuildingApplication of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential Building
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction Projects
 
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
 
IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...
 
Investigation on Cycle Time Reduction in Production and Implementation of an ...
Investigation on Cycle Time Reduction in Production and Implementation of an ...Investigation on Cycle Time Reduction in Production and Implementation of an ...
Investigation on Cycle Time Reduction in Production and Implementation of an ...
 
B1304021217
B1304021217B1304021217
B1304021217
 
Review of Inventory Management System to Ensure the Optimization of Resources
Review of Inventory Management System to Ensure the Optimization of ResourcesReview of Inventory Management System to Ensure the Optimization of Resources
Review of Inventory Management System to Ensure the Optimization of Resources
 
Materials management
Materials managementMaterials management
Materials management
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction Project
 
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites Progress
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...
 
Achieving operational excellence by implementing an erp (enterprise resource ...
Achieving operational excellence by implementing an erp (enterprise resource ...Achieving operational excellence by implementing an erp (enterprise resource ...
Achieving operational excellence by implementing an erp (enterprise resource ...
 
material mngmnt.pdf
material mngmnt.pdfmaterial mngmnt.pdf
material mngmnt.pdf
 
global logistics and distribution
global logistics and distributionglobal logistics and distribution
global logistics and distribution
 
Pom1
Pom1Pom1
Pom1
 
Pom1
Pom1Pom1
Pom1
 
Scope and functons of materals management
Scope and functons of materals managementScope and functons of materals management
Scope and functons of materals management
 
Logistics for better exports
Logistics for better exportsLogistics for better exports
Logistics for better exports
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction Industry
 

More from eSAT Journals

Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case studyeSAT Journals
 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreeSAT Journals
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialseSAT Journals
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...eSAT Journals
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...eSAT Journals
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizereSAT Journals
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementeSAT Journals
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...eSAT Journals
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteeSAT Journals
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...eSAT Journals
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...eSAT Journals
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabseSAT Journals
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaeSAT Journals
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...eSAT Journals
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodeSAT Journals
 
Estimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniquesEstimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniqueseSAT Journals
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...eSAT Journals
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...eSAT Journals
 
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...Effect of skew angle on static behaviour of reinforced concrete slab bridge d...
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...eSAT Journals
 
Earthquake analysis on 2 d rc frames with different aspect ratios of masonry ...
Earthquake analysis on 2 d rc frames with different aspect ratios of masonry ...Earthquake analysis on 2 d rc frames with different aspect ratios of masonry ...
Earthquake analysis on 2 d rc frames with different aspect ratios of masonry ...eSAT Journals
 

More from eSAT Journals (20)

Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case study
 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangalore
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizer
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concrete
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabs
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in india
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
 
Estimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniquesEstimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniques
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...
 
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...Effect of skew angle on static behaviour of reinforced concrete slab bridge d...
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...
 
Earthquake analysis on 2 d rc frames with different aspect ratios of masonry ...
Earthquake analysis on 2 d rc frames with different aspect ratios of masonry ...Earthquake analysis on 2 d rc frames with different aspect ratios of masonry ...
Earthquake analysis on 2 d rc frames with different aspect ratios of masonry ...
 

Recently uploaded

Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 

Recently uploaded (20)

Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

Material management in construction – a case study

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 400 MATERIAL MANAGEMENT IN CONSTRUCTION – A CASE STUDY T. Phani Madhavi1 , Steve Varghese Mathew2 , Roy Sasidharan3 1 Assistant Professor, 2, 3 Former Graduate Student, Department of Civil Engineering, Sathyabama University, Chennai, Tamil Nadu, India, talasilamadhavi@gmail.com Abstract The objective of the present study is to understand about all the problems occurring in the company because of improper application of material management. In construction project operation, often there is a project cost variance in terms of the material, equipments, manpower, subcontractor, overhead cost, and general condition. Material is the main component in construction projects. Therefore, if the material management is not properly managed it will create a project cost variance. Project cost can be controlled by taking corrective actions towards the cost variance. Therefore a methodology is used to diagnose and evaluate the procurement process involved in material management and launch a continuous improvement was developed and applied. A thorough study was carried out along with study of cases, surveys and interviews to professionals involved in this area. As a result, a methodology for diagnosis and improvement was proposed and tested in selected projects. The results obtained show that the main problem of procurement is related to schedule delays and lack of specified quality for the project. To prevent this situation it is often necessary to dedicate important resources like money, personnel, time, etc. To monitor and control the process. A great potential for improvement was detected if state of the art technologies such as, electronic mail, electronic data interchange (EDI), and analysis were applied to the procurement process. These helped to eliminate the root causes for many types of problems that were detected. Keywords: Material Management, Construction -------------------------------------------------------------------***-------------------------------------------------------------------------- 1. INTRODUCTION Materials management is defined as a management system that is required in planning and controlling the quality & quantity of the material, punctual equipment placement, good price and the right quantity as required. Material management is a management system that integrates purchasing, shipping and material control from suppliers. Based on those definitions, generally materials management can be defined as a process of planning, executing, and controlling the right source of materials with the exact quality, at the right time and place suitable for minimum cost construction process. Capability to coordinate and integrate purchasing, shipping and material control from suppliers is required for material cost control. Three important phases that holds the key to a successful materials management are materials purchasing, materials usage, and storage .It is used to reduce the cost, which increases profitability and streamlines the production. Apart from management of material cost and its supply it helps in its proper utilization, transportation, storage, handling and distribution. Selection of personnel for marketing, purchasing, inventory control, stores management and materials handling and their training and placement is also to be seen by the materials management department This indicates that it is very essential to have a materials management department in any organization to support the management in the production activities. It also helps in the marketing, sales promotion and control of all the types of materials for its quantity, quality and cost. Thus, the objective of this paper is to clarify the roles and possibilities of material management in construction. The present case study was done at Raviz hills. It was noticed that the materials are improperly procured and stored and there is a lack of inventory control and improper management. The finest details of procurement process was studied and an attempt has been made to meet the effective transportation system, proper inventory control and purchase can be done with technological measures and also, determines the profit and loss that occur under particular schedule based on the purchasing and inventory stores. 2. EXPERIMENTAL METHODOLOGIES The experimental analysis consists of theories and practical consideration of the concepts. Therefore, the present work was classified as follows. 2.1 Analysis of site and management 2.2 Analysis on Inventory controlling 2.3 Analysis on purchasing procedures 2.4 Analysis on Procurement and Tracking 2.5 Analysis on costs 2.1 Analysis of Site and Management The analysis was done to understand what are all the problems occurring in the company because of improper application of material management. The solutions that provided in this work
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 401 may cost a lot in the beginning, but it will help the company in the long run by providing solutions to the key problems like lack of specification, delay, improper procurement etc. According to the problems that generally occur in the site due to the improper material management, was categorised each problem and created a cause-effect diagram, where factors such as, inventory, purchase, procurement, were all generally addressed to procurement cycle. For this purpose, the study was done by visiting the site. Site survey was done, and prepared questionnaires accordingly and problems to each above mentioned groups were analysed and solutions thus were given. Substantial evidences in the form of photos were taken to analyse the procurement problems occurring in the present case study. Questions were prepared accordingly and those prepared questions were given as a challenge to the site managers, quality control inspector, project manager, purchase manager. From the questionnaires prepared and the answers thus obtained from them were categorized into each class of problems. From those classes it was understood that lack of technological implications and scientific approach were lacking with respect to the procurement process. Thus the problems were pointed out to them and they agreed to each above mentioned problems that were occurring in their site and thus corrections would be implemented by them in their next oncoming projects. 2.2 Analysis on Inventory Controlling In the inventory process, the methodology adopted was preparing questionnaires and allocating marks for each, by categorizing them into each of their subsystem problems, such as supply, materials and equipments, weightages were given substantially. Then, based on this the solutions were offered in the form of cause – effect diagram and flow charts, graphs were also prepared, depicting problems such as delay, lack of specification, excess and lack of inspection. 2.2.1 Inventory Planning i. Production planning requires purchase and inventory planning decisions for an organization to control expenses and finances. ii. To get the purchase benefits, discounts, reduced transportation and ordering cost the bulk purchase may be economical. Inventory of such materials are stored for longer time. 2.3 Analysis on Purchasing Procedures All the organizations need an efficient and economic purchasing and procurement of its various supplies of materials from the suppliers. 2.3.1 Process of Purchasing The process of purchasing involves various steps to be followed as routine matter by the purchase department. i) Identification of materials: Identify the materials to be purchased by receiving the requisitions received from various departments. (ii) Purchase requisitions: Purchase requisitions are documents listing the requirements of materials from the various stores written by the storekeeper received by the purchase department from various departments. The planning department for special purchases for non-stock items also prepares the purchase requisitions. The purchase requisitions are made as Bill of Materials (BOM) of a product, which specifies quantities, needed. The purchase requisitions are generally prepared in triplicate. One copy sent to the purchase department signed by the storekeeper, works manager and production controller, second copy sent to materials control or planning department and third copy is retained by the requisitioned. 2.4 Analysis on Procurement and Tracking In this, the concept is based on procurement and tracking of the materials which is done with the help of RFID and bar coding scanners. In procurement tracking, the concept of tracking the material is done mainly with the help of barcode scanners, where the quality control manager can view the materials to where it is being transported. Hence a check on the materials can be done. Once the transportation has arrived at site, the material is being passed by cross checking it with the bill of quantities and bill of loading, with the consignee. Once the consignee accepts the bill of loading it is then conveyed to the consigner. The whole case study of procurement and tracking was done by us with the help of questionnaires. 2.5 Analysis on Cost 2.5.1 ABC Analysis This is most popular inventory control technique adopted as Pareto’s Law. Large amount of capital is invested in purchase of costly items in small number. Eighty percent of the cost of materials purchased is required for only Twenty percent costly items for efficient inventory control in stores where the large number of materials are to be handled, the classification of them is necessary to take particular care of costly items, which are less in number. The ABC analysis is commonly used in most of the organizations To classify the materials according to their sales values. In this method, all the items of stores are classified in three groups as A, B and C as explained below. (i) The quantity of each item used annually multiply by its unit sales price is sales value of that item. All such sales values of all the items are calculated and tabulated. (ii) The items, its quantity sold and sales values are tabulated in decreasing order and the sales values are added item-wise and shown in next column.
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 402 (iii) The totals of quantity and sales values of all the items used annually are found out. The percentage sales values of each item is found out and percentage of quantity of each item is also found out. These two columns are added showing percentage of total sales values item wise and percentage of total quantity of sales. (iv) Seventy percent of total sales value items will be listed in A category. Its percentage quantity used is found out. (v) About 20 % of total sales value items will be listed in B category. Its percentage quantity used is found out. (vi)Balanced about 10 % of total sales value items will be listed in C category. Its percentage quantity will be remaining balance. 2.5.2 Characteristics of ABC Items A-Items These items have 70% of sales value but less in quantity about 15 to 20%. The capital should not be blocked in these items. They can be ordered frequently and consumed immediately. The purchase of these items will be controlled by Director and cared most in the company. They are only 10 to 15% quantity- wise and require special attention in stores. B-Items They have about 20 to 25% sales value and same quantity to purchase. Since they are medium valued items therefore large inventory of them is not necessary. They can be ordered frequently but at the same time the quantity ordered should be such that it will be economic to purchase and its shortage should not be there. They are less valued than A items and quantity-wise about 15 to 25%. C-Items They have the least sales cost about 10%. They are required in large quantity about 50 to 60%. They can be purchased in bulk to avail large discounts and fewer prices to pay. This will also reduce the cost of ordering and purchasing. They can be purchased once or twice in a year. They are least-valued items. Advantages of ABC Analysis (i) The inventory control of different categories of items will be better if costlier items are not stored for large period, which reduces capital investment. (ii) The quantities of various categories of items are economically ordered and stored as per need. It saves the cost of ordering and carrying the inventories. (iii) The purchasing of various categories of items becomes easy and discounts are also obtained on large purchase of items of C category. (iv)Better record keeping of different categories of items helps in good inventory control 2.5.3 First In First Out (FIFO) Method In this method, the material stored first is issued first. For using this procedure, the following methods are used. Double Area System: In this particular method, two areas are used for each item to be stored and issued. The new lots of items are stored in second empty area and materials are issued from first area where previous old lot is stored. When first area is emptied, the material from second area is shifted to first area so that second area is emptied to receive the fresh materials. Moving Division System: In this method is the place selected for each item is more in area than required to provide space between new and old lots. The materials supplied first are placed first in right hand side area from where it is issued. The fresh lot is supplied in the second area on left hand side and shifted to right hand side when it is emptied. Gravity Feed System: The new materials are fed at the top of the containers or piles and removed from the bottom. 2.5.4 Benefits of the Method The method uses actual cost of the material for valuation and it is very easy to use. The only disadvantage of the method is that if large variation of prices is there, no consideration is given to current market prices. When the prices are falling, the material charged to production is high and when the prices are rising, the material charged to production is low and replacement cost is high. 3. RESULTS AND DISCUSSION A comprehensive case study on material management at work site was done. Attempt has been made to improvise the inventory controlling measures, purchasing measures, by looking into the detailed report of previous organization hierarchy and their management. The present work comprises the redesigning of the entire organization hierarchy without touching the core competency. Management was sub divided into sub system and further task work such as purchase manager, supervisor in charge. Under them further sub divide into supervisors and helpers. Effort is taken to improvise the existing hierarchy effectively, by improving purchasing department, financial department, material management department to merge with one and each other. Microscopically, dissections was done into the matters of purchasing, transportation and introduction of new possibilities, like, purchase requisition slip, tender quotation form, technologies like RFID and PDA were also initiated to help in achieving a better procurement control at the work site. Analysis was done at the site based on cost input, such as ABD analysis and FIFO analysis. In ABC analysis, we categorize whole material into ABC type materials were A category consist of 10% of total material involved in
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 403 construction but that cost 70% of the total cost. Similarly B and C type material were also classified accordingly by this we mean that during construction the materials can be released as per the above concept, so that, we can strengthen the financial control and proper scheduling and programming of the work can be achieved, there by graduating progress in work efficiently. Further cost analysis was done based on FIFO input, and similarly cost controlling efficiently was achieved, that is, if a contractor quotes a rate, and later on we calculate a similar quote for the same material for what the contractor has given. We can find that there is a change in the quotation. Thus, enabling us to have a broad outlook on the financial control of the work. Thus, helping in proper release of the finance and preparation of the budget preparing process. New technological implications like RFID, PDA, were helped in proper scheduling and financial control. Accurate data collection has always been an important part of project control both in procurement and construction phases. The Radio Frequency Identification RFID enables precise data acquisition by tracking materials. This technology enables the detection and identification of tagged objects through the data it transmits. RFID uses radio waves to identify people and objects. An RFID system consists of an RFID tag and an RFID reader. The RFID tag consists of a small microchip and an antenna. Data is stored in the tag, usually in the form of a unique serial number. The RFID reader acts as a transmitter/receiver. The reader transmits an electromagnetic field that wakes up the tag and provides the power required for the tag to operate. The tag then transfers the data to the reader through the antenna. This data is then read by the RFID reader and transferred to the Pocket PC or computer. RFID tags do not have to be line-of sight. They only have to be within the reader’s radio range. This evolution in automated data acquisition has become the next paradigm in construction industry. By using software, construction site documentation can be simplified and made faster and there is increased efficiency. Therefore, there is a need of Personal Digital Assistant (PDA) to run the software to enhance the productivity of jobsite management. CONCLUSIONS 1) In the present case study, analysis on the work site was done with the previous knowledge of the material management, and new methodologies were implemented at work site, based on the current construction scenario. 2) Following aspects were taken into consideration, the original site layout was redesigned, then the proper management was bought in and a whole new concept was derived. 3) Understanding of the problems that occur at the work site due to, inventory, purchasing and on how materials are being handled at the work site were taken into consideration. On how, materials are being procured was done with questionnaires and weight ages were given to each. On further these problems were tackled with cause effect and diagram and how materials can be properly procured with the help of proper flow charts. 4) Similarly, analysis was done on purchasing and new concept of purchase requisition slip and tender quotation were introduced. 5) Importance on how materials are properly procured at the site was also taken into consideration and new appropriate technological implications were introduced like RFID, PDA, which helped us in a proper scheduling and financial control for proper scheduling and based on the materials importance, and on how they have to be released, ABC analysis and FIFO analysis were done. 6) From the above theory and concepts, new theories which help us in proper material management at worksite were identified and prime importance was given to them. The case study as a whole was submitted to the Raviz Hills management system, and they have been agreed, and also promises were done to implement these material management strategies, within 2 to 3 years for the future projects. REFERENCES [1]. Bell, L. C. and Stukhart, G, ”Cost and Benefits of Materials Management Systems Journal of Construction Engineering and Management, Vol. 113, No. 2, 1987,pp 222- 234. [2]. Elbeltagi, E., Hegazy, T. and Eldosouky. A.,”Dynamic Layout of Construction Temporary Facilities Considering Safety”, Journal of Construction Engineering and Management, Vol. 130, No. 4, 2004, pp 534-541 [3]. Formoso, C. T., Soibelman, L., De Cesare, C. and Isatto, E. L, “Material Waste in Building Industry: Main Causes and Prevention” Journal of Construction Engineering and Management. Vol. 128, No. 4, 2002,pp. 316-325.