Field Assessment Plan
14 December 20201
 Surveys
 Sediment Investigation
 Geotechnical Investigation
 Desktop Studies
© Arcadis 2020
Surveys
14 December 2020 2
Image courtesy WSSI Image: https://www.auav.com.au/articles/drone-data-vs-lidar/Image courtesy Waterways
Image courtesy Waterways
Investigation Purpose Activities
Aerial Survey Generate topography data to support
design of potential support areas
LiDAR data and aerial photography
from fixed-wing plane
Hydrographic Survey Map bathymetry for dredging design
and identify potential obstacles to
dredging
Single beam bathymetry, side scan
sonar, and magnetometer survey
© Arcadis 2020
Sediment Investigation
14 December 2020 3
 Purpose: Determine
sediment physical
properties for dredging,
dewatering, and disposal
 Activities:
 Sediment core collection
 Laboratory testing for
physical parameters
 Treatability testing
Images provided by Arcadis
© Arcadis 2020
Sediment
Investigation
14 December 2020 4
Sanitary
Sewer
© Arcadis 2020
Geotechnical Investigation
14 December 2020 5
 Purpose: Provide the design
basis for earthwork and
structural components
 Activities:
 Soil borings
 Groundwater gauging
 Laboratory testing for physical
parameters
© Arcadis 2020
Desktop Evaluations
Wetland Delineation Vegetative Community Mapping
14 December 2020 6
Source: Portion of Environmental Constraints Map in Lake Accotink Management Plan – Additional Study (WSSI 2018)
Selection Criteria
14 December 20207
• Dredging
• Pipeline / Material Conveyance
• Dredge Material Processing
© Arcadis 2020
Dredging Operations
Category Proposed Selection Criteria
Park Management Consistency with Long-Term Park Vision
Community
Recreational Use Restrictions During Construction
Community Considerations During Construction
Environment
Environmental Considerations
Floodplain Impacts
Compatibility with Water Quality Requirements
Sustainability
Construction
Accessibility to Work Areas
Constructability
Schedule
Cost
14 December 2020 8
© Arcadis 2020
Pipeline / Material Conveyance
14 December 2020 9
Category Proposed Selection Criteria
Park Management Consistency with Long-Term Park Vision
Community
Recreational Use Restrictions During Construction
Community Considerations During Construction
Environment
Environmental Considerations
Floodplain Impacts
Sustainability
Construction
Construction/Maintenance Accessibility and Security
Flexibility/Compatibility with Various Equipment
Long-Term Infrastructure Maintenance
Constructability
Schedule
Cost
© Arcadis 2020
Dredged Material Processing
14 December 2020 10
Category Proposed Selection Criteria
Park Management
Consistency with Long-Term Park Vision
Compatibility with Long-Term Operation and
Maintenance
Community
Recreational Use Restrictions During Construction
Community Considerations During Construction
Environment
Environmental Considerations
Floodplain Impacts
Sustainability
Construction
Available Area and Accessibility
Site Preparation Requirements
Efficient Water Return
Flexibility/Compatibility with Various Equipment
Constructability
Schedule
Cost

More Related Content

What's hot

Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestFairfax County
 
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...Recycling and Resource Management Division
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshoppublicinvolvement
 
Huntington Levee Community Meeting
Huntington Levee Community Meeting Huntington Levee Community Meeting
Huntington Levee Community Meeting Fairfax County
 
Part 2: Bay-Delta Conservation Plan Implementation Process and Portfolio Alte...
Part 2: Bay-Delta Conservation Plan Implementation Process and Portfolio Alte...Part 2: Bay-Delta Conservation Plan Implementation Process and Portfolio Alte...
Part 2: Bay-Delta Conservation Plan Implementation Process and Portfolio Alte...San Diego County Water Authority
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther
 
GreenSquareProjectPresentation_optimized
GreenSquareProjectPresentation_optimizedGreenSquareProjectPresentation_optimized
GreenSquareProjectPresentation_optimizedJose Calderon Garcia
 
Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Fairfax County
 
RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)apwacoachellavalley
 
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...Douglas B. Blatchford, PE, PH, CEM, CFM
 
August 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public ForumAugust 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public Forumpublicinvolvement
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower ProjectAli Sial
 

What's hot (20)

Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshop
 
January 10, 2013
January 10, 2013January 10, 2013
January 10, 2013
 
Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014
 
Huntington Levee Community Meeting
Huntington Levee Community Meeting Huntington Levee Community Meeting
Huntington Levee Community Meeting
 
Climate Action Plan Update Sept 12 2013 Special Board Mtg
Climate Action Plan Update Sept 12 2013 Special Board MtgClimate Action Plan Update Sept 12 2013 Special Board Mtg
Climate Action Plan Update Sept 12 2013 Special Board Mtg
 
Part 2: Bay-Delta Conservation Plan Implementation Process and Portfolio Alte...
Part 2: Bay-Delta Conservation Plan Implementation Process and Portfolio Alte...Part 2: Bay-Delta Conservation Plan Implementation Process and Portfolio Alte...
Part 2: Bay-Delta Conservation Plan Implementation Process and Portfolio Alte...
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr Resume
 
March 22, 2012
March 22, 2012March 22, 2012
March 22, 2012
 
GreenSquareProjectPresentation_optimized
GreenSquareProjectPresentation_optimizedGreenSquareProjectPresentation_optimized
GreenSquareProjectPresentation_optimized
 
Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3
 
RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)
 
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...
 
Bear River Development Project
Bear River Development ProjectBear River Development Project
Bear River Development Project
 
December 6 Public Forum
December 6 Public ForumDecember 6 Public Forum
December 6 Public Forum
 
August 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public ForumAugust 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public Forum
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower Project
 
Municipal Wetland Initiatives by Frankie Barker
Municipal Wetland Initiatives by Frankie BarkerMunicipal Wetland Initiatives by Frankie Barker
Municipal Wetland Initiatives by Frankie Barker
 

Similar to Arcadis Design Lake Accotink Dredging Public Meeting December 2020

20131030 baid nssi_briefing
20131030 baid nssi_briefing20131030 baid nssi_briefing
20131030 baid nssi_briefingProper Printshop
 
Bhuvan and DIVA-GIS software Training
Bhuvan and DIVA-GIS software TrainingBhuvan and DIVA-GIS software Training
Bhuvan and DIVA-GIS software TrainingSainath Aher
 
Increasing Access to MODIS data through Web services and visualization tools
Increasing Access to MODIS data through Web services and visualization tools Increasing Access to MODIS data through Web services and visualization tools
Increasing Access to MODIS data through Web services and visualization tools CIMMYT
 
Friedrich - LiDAR CADD Engr. Design
Friedrich - LiDAR CADD Engr. DesignFriedrich - LiDAR CADD Engr. Design
Friedrich - LiDAR CADD Engr. DesignJose A. Hernandez
 
Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014aceas13tern
 
Lect-2 Introduction to GIS .pptx
Lect-2  Introduction to GIS .pptxLect-2  Introduction to GIS .pptx
Lect-2 Introduction to GIS .pptxmuqaddaskhan27
 
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
Geospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. SharmaGeospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. Sharma
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharmaindiawrm
 
Lect 1 & 2 introduction to gis & rs
Lect 1 & 2  introduction to gis & rsLect 1 & 2  introduction to gis & rs
Lect 1 & 2 introduction to gis & rsRehana Jamal
 
Hydrography : Tools & Techniques
Hydrography : Tools & TechniquesHydrography : Tools & Techniques
Hydrography : Tools & TechniquesAbdul Alim Kamran
 
Geonode Presentation (ppt)
Geonode Presentation (ppt)Geonode Presentation (ppt)
Geonode Presentation (ppt)Iwl Pcu
 
Well identification and environmental management
Well identification and environmental managementWell identification and environmental management
Well identification and environmental managementJean-Michel Bergeon
 
IRJET - Delineation of Groundwater Potential Zones in Hard Rock Terrain A...
IRJET -  	  Delineation of Groundwater Potential Zones in Hard Rock Terrain A...IRJET -  	  Delineation of Groundwater Potential Zones in Hard Rock Terrain A...
IRJET - Delineation of Groundwater Potential Zones in Hard Rock Terrain A...IRJET Journal
 

Similar to Arcadis Design Lake Accotink Dredging Public Meeting December 2020 (20)

20131030 baid nssi_briefing
20131030 baid nssi_briefing20131030 baid nssi_briefing
20131030 baid nssi_briefing
 
NRCS Geospatial Data and Tools
NRCS Geospatial Data and ToolsNRCS Geospatial Data and Tools
NRCS Geospatial Data and Tools
 
Bhuvan and DIVA-GIS software Training
Bhuvan and DIVA-GIS software TrainingBhuvan and DIVA-GIS software Training
Bhuvan and DIVA-GIS software Training
 
Increasing Access to MODIS data through Web services and visualization tools
Increasing Access to MODIS data through Web services and visualization tools Increasing Access to MODIS data through Web services and visualization tools
Increasing Access to MODIS data through Web services and visualization tools
 
Vivek Resume
Vivek Resume Vivek Resume
Vivek Resume
 
Friedrich - LiDAR CADD Engr. Design
Friedrich - LiDAR CADD Engr. DesignFriedrich - LiDAR CADD Engr. Design
Friedrich - LiDAR CADD Engr. Design
 
Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014
 
Light Detection and Ranging Technology for Energy Sector
Light Detection and Ranging Technology for Energy Sector Light Detection and Ranging Technology for Energy Sector
Light Detection and Ranging Technology for Energy Sector
 
Underwater Object Recognition
Underwater Object RecognitionUnderwater Object Recognition
Underwater Object Recognition
 
Lect-2 Introduction to GIS .pptx
Lect-2  Introduction to GIS .pptxLect-2  Introduction to GIS .pptx
Lect-2 Introduction to GIS .pptx
 
Remote Sensing Analysis (OPERA) Overview
Remote Sensing Analysis (OPERA) OverviewRemote Sensing Analysis (OPERA) Overview
Remote Sensing Analysis (OPERA) Overview
 
WA+ Praveen Kalura.pptx
WA+ Praveen Kalura.pptxWA+ Praveen Kalura.pptx
WA+ Praveen Kalura.pptx
 
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
Geospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. SharmaGeospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. Sharma
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
 
Lect 1 & 2 introduction to gis & rs
Lect 1 & 2  introduction to gis & rsLect 1 & 2  introduction to gis & rs
Lect 1 & 2 introduction to gis & rs
 
Hydrography : Tools & Techniques
Hydrography : Tools & TechniquesHydrography : Tools & Techniques
Hydrography : Tools & Techniques
 
Geonode Presentation (ppt)
Geonode Presentation (ppt)Geonode Presentation (ppt)
Geonode Presentation (ppt)
 
murali_cv_updated
murali_cv_updatedmurali_cv_updated
murali_cv_updated
 
AdilCV-WB-F
AdilCV-WB-FAdilCV-WB-F
AdilCV-WB-F
 
Well identification and environmental management
Well identification and environmental managementWell identification and environmental management
Well identification and environmental management
 
IRJET - Delineation of Groundwater Potential Zones in Hard Rock Terrain A...
IRJET -  	  Delineation of Groundwater Potential Zones in Hard Rock Terrain A...IRJET -  	  Delineation of Groundwater Potential Zones in Hard Rock Terrain A...
IRJET - Delineation of Groundwater Potential Zones in Hard Rock Terrain A...
 

More from Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 

Recently uploaded (20)

kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 

Arcadis Design Lake Accotink Dredging Public Meeting December 2020

  • 1. Field Assessment Plan 14 December 20201  Surveys  Sediment Investigation  Geotechnical Investigation  Desktop Studies
  • 2. © Arcadis 2020 Surveys 14 December 2020 2 Image courtesy WSSI Image: https://www.auav.com.au/articles/drone-data-vs-lidar/Image courtesy Waterways Image courtesy Waterways Investigation Purpose Activities Aerial Survey Generate topography data to support design of potential support areas LiDAR data and aerial photography from fixed-wing plane Hydrographic Survey Map bathymetry for dredging design and identify potential obstacles to dredging Single beam bathymetry, side scan sonar, and magnetometer survey
  • 3. © Arcadis 2020 Sediment Investigation 14 December 2020 3  Purpose: Determine sediment physical properties for dredging, dewatering, and disposal  Activities:  Sediment core collection  Laboratory testing for physical parameters  Treatability testing Images provided by Arcadis
  • 4. © Arcadis 2020 Sediment Investigation 14 December 2020 4 Sanitary Sewer
  • 5. © Arcadis 2020 Geotechnical Investigation 14 December 2020 5  Purpose: Provide the design basis for earthwork and structural components  Activities:  Soil borings  Groundwater gauging  Laboratory testing for physical parameters
  • 6. © Arcadis 2020 Desktop Evaluations Wetland Delineation Vegetative Community Mapping 14 December 2020 6 Source: Portion of Environmental Constraints Map in Lake Accotink Management Plan – Additional Study (WSSI 2018)
  • 7. Selection Criteria 14 December 20207 • Dredging • Pipeline / Material Conveyance • Dredge Material Processing
  • 8. © Arcadis 2020 Dredging Operations Category Proposed Selection Criteria Park Management Consistency with Long-Term Park Vision Community Recreational Use Restrictions During Construction Community Considerations During Construction Environment Environmental Considerations Floodplain Impacts Compatibility with Water Quality Requirements Sustainability Construction Accessibility to Work Areas Constructability Schedule Cost 14 December 2020 8
  • 9. © Arcadis 2020 Pipeline / Material Conveyance 14 December 2020 9 Category Proposed Selection Criteria Park Management Consistency with Long-Term Park Vision Community Recreational Use Restrictions During Construction Community Considerations During Construction Environment Environmental Considerations Floodplain Impacts Sustainability Construction Construction/Maintenance Accessibility and Security Flexibility/Compatibility with Various Equipment Long-Term Infrastructure Maintenance Constructability Schedule Cost
  • 10. © Arcadis 2020 Dredged Material Processing 14 December 2020 10 Category Proposed Selection Criteria Park Management Consistency with Long-Term Park Vision Compatibility with Long-Term Operation and Maintenance Community Recreational Use Restrictions During Construction Community Considerations During Construction Environment Environmental Considerations Floodplain Impacts Sustainability Construction Available Area and Accessibility Site Preparation Requirements Efficient Water Return Flexibility/Compatibility with Various Equipment Constructability Schedule Cost