SlideShare a Scribd company logo
1 of 38
Hunter Mill Road and Sunset Hills
Road Study
Community Meeting #5
Progress Update
September 15, 2016
Kristin Calkins
Fairfax County Department of Transportation
Presentation Agenda
• Project Objectives
• Summary of Prior Community Involvement
• Review of Alternatives Considered
• Traffic Analysis Results
• Detailed Evaluation of a 5-leg Roundabout
• Evaluation of Sunset Hills Road Relocation
• Next Steps
• Questions and Answers
2
Project Objectives
• Address existing congestion
• Plan for future traffic
• Address queuing along Hunter Mill Road and
Sunset Hills Road
• Improve access to the Dulles Toll Road by
minimizing congestion
• Maintain Hunter Mill Road’s character by
applying context sensitive solutions
3
Project Study Area
4
Intersection ID Intersection
Current
Intersection
Control Type
1
Hunter Mill Road at
Sunrise Valley Drive
Signalized
2
Hunter Mill Road at
DTR EB Ramps
Signalized
3
Hunter Mill Road at
DTR WB Ramps
Signalized
4
Hunter Mill Road at
Sunset Hills Road
Signalized
5
Hunter Mill Road at
Crowell Road
Unsignalized
(All-Way Stop)
6
Hunter Mill Road at
Hunting Crest Lane
Unsignalized
(Two-Way Stop)
7
Hunter Mill Road at
Lake Fairfax Park
Unsignalized
(Two-Way Stop)
7
6
5
43
2
1
Project Background
• Board of Supervisors authorized study as a follow-on study to
the Reston Phase I Plan Amendment
• Meetings held on:
• December 8, 2014: Kick-Off
• February 24, 2015: Existing & No-Build conditions and community
input on alternatives
• May 20, 2015: Analysis Findings
• July 2015: Project put on hold at request of community to
allow for new capacity analysis methodologies for
roundabouts to be adopted by the Transportation Research
Board
• Meeting held on: June 30, 2016: Roundabout capacity results
5
Project Process
24 MONTHS
6
We are Here
Summary of Community Comments
• Concern that traffic from Wiehle Avenue may be
diverted to Hunter Mill Road
• Concern that the signal at Crowell Road may
increase delays in the off-peak
• Maintain the character of Hunter Mill Road
• Main goal of study is to improve Level of Service
(LOS) on Hunter Mill Road
7
Summary of Community Comments (Cont.)
• Roundabouts preferred at Dulles Toll Road ramps
• Widen Hunter Mill Road from eastbound Dulles
Toll Road to Sunrise Valley Drive
• Concern that improvements may attract more
development
• Community wants an in-depth review of
roundabouts
• There should be a mix and match of alternatives
8
Alternatives Considered
9
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
No-Build
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 1A
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 1B
Roundabout
Signal Proffered
Alternatives Considered (Cont.)
10
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
No-Build
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 2
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 3
Signal Proffered
Alternatives Considered (Cont.)
11
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
No-Build
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 4A
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 4B
Signal Proffered
Traffic Analysis Results
Traffic Analysis:
• Performed for both 2030 and 2050
• Consistent with VDOT Policies and Procedures
• Used new Roundabout Methodology
12
New Roundabout Methodology
• New research resulted in:
• Re-assessment of Roundabout Capacity Models for the Highway
Capacity Manual
• New methodology (adopted January 2016) resulted in an
approximate 10-12% increase in roundabout capacity
• New model prioritizes movements with higher volumes
• Resulting in improved LOS for heavier movements and overall
LOS
• This study is an operational assessment, not an engineering design.
Roundabouts generally have greater ROW impacts
• The best operating roundabout might have a tradeoff of a larger ROW
footprint
13
2030 Traffic Analysis
• Utilized Future Year Projections from the Reston
Phase I Plan Amendment.
• Included development potential associated with
development of the Reston Transit Station Areas.
14
2030 Traffic Analysis Results
15
Crowell Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
No-Build
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 1A (Roundabouts)
Crowell Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 1B (Roundabouts)
Signal Proffered C C
D D
C E
C C
D D
E C
D D
B B
C D C D
B B
B D
C B
LOS: A, B, C
LOS: D
LOS: E
LOS: F
AM/PM LOS
Key for Levels of Service
Sunset Hills Road
Sunset Hills Road
24 sec./26 sec.
41 sec./53 sec.
29 sec./73 sec.
30 sec./25 sec.
38 sec./48 sec.
37 sec./18 sec.
45 sec./49 sec.
29 sec./47 sec.
17 sec./17 sec.
23 sec./12 sec.
14 sec./42 sec.
29 sec./47 sec.
17 sec./17 sec.
2030 Traffic Analysis Results
16
Crowell Road
Sunrise Valley Drive
WB DTR
EB DTR
No-Build
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
WB DTR
EB DTR
Alt. 2 (Signals)
Crowell Road
Sunrise Valley Drive
WB DTR
EB DTR
Alt. 3 (Signals)
Signal Proffered C C
D D
C E
C C
D D
C C
C D
C C
D D
D C
D C
D D
C D
Sunset Hills Road
Sunset Hills RoadHunterMillRoad
HunterMillRoad
HunterMillRoad
LOS: A, B, C
LOS: D
LOS: E
LOS: F
AM/PM LOS
Key for Levels of Service
22 sec./27 sec.
21 sec./45 sec.
55 sec./37 sec.
33 sec./31 sec.
39 sec./44 sec.
42 sec./34 sec.
19 sec./41 sec.
36 sec./35 sec.
35 sec./44 sec.
24 sec./26 sec.
41 sec./ 53 sec.
29 sec./73 sec.
30 sec./25 sec.
38 sec./48 sec.
B D
2030 Traffic Analysis Results
17
Crowell Road
Sunrise Valley Drive
WB DTR
EB DTR
No-Build
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
WB DTR
EB DTR
Alt. 4A (Roundabouts at Ramps)
Crowell Road
Sunrise Valley Drive
WB DTR
EB DTR
Alt. 4B (Signals at Ramps)
Signal Proffered C C
D D
C E
C C
D D
C C
D D
B B
F F
E C
D C
C B
C D
Sunset Hills Road
Sunset Hills RoadHunterMillRoad
HunterMillRoad
HunterMillRoad
LOS: A, B, C
LOS: D
LOS: E
LOS: F
AM/PM LOS
Key for Levels of Service
29 sec./47 sec.
45 sec./50 sec.
123 sec./143 sec.
29 sec./27 sec.
17 sec./17 sec.
23 sec./12 sec.
39 sec./32 sec.
66 sec./27 sec.
24 sec./26 sec.
41 sec./ 53 sec.
29 sec./73 sec.
30 sec./25 sec.
38 sec./48 sec.
2030 Traffic Analysis Summary
18
LOS Standard = LOS D
* Alt 2 in new location
** No Build includes the proffered signal at Crowell Road
Intersection
Roundabouts Signals Mix & Match
No Build Alt. 1A Alt. 1B Alt. 2 Alt. 3 Alt. 4A Alt. 4B
OVERALL LOS AM (PM)
Hunter Mill Rd. @
Crowell Rd. / Sunset Hills Rd.
- - C (B) - D (C) - C (B)
Hunter Mill Rd. @
Crowell Rd.**
C (C) E (C) - C (C) - C (C) -
Hunter Mill Rd. @
Sunset Hills Rd.*
D (D) - - D (D) - - -
Hunter Mill Rd. @
DTR WB Ramps & Sunset Hills Rd.
- D (D) - - - D (D) -
Hunter Mill Rd. @
DTR WB Ramps
C (E) - B (D) C (D) B (D) - D (C)
Hunter Mill Rd. @
DTR EB Ramps
C (C) B (B) B (B) C (C) D (C) B (B) E (C)
Hunter Mill Rd. @
Sunrise Valley Dr.
D (D) C (D) C (D) D (D) C (D) F (F) C (D)
2050 Traffic Analysis Results
19
Crowell Road
Sunrise Valley Drive
WB DTR
EB DTR
No-Build
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
WB DTR
EB DTR
Crowell Road
Sunrise Valley Drive
WB DTR
EB DTR
Signal Proffered B C
C B
D C
E C
E D
F F
F F
D B
C C
F B
D B D B
D B
Sunset Hills Road
Sunset Hills RoadHunterMillRoad
HunterMillRoad
HunterMillRoad
LOS: A, B, C
LOS: D
LOS: E
LOS: F
AM/PM LOS
Key for Levels of Service
50 sec./14 sec.
137 sec./58 sec.
82 sec./82 sec.
37 sec./13 sec.
104 sec./14 sec.
26 sec./35 sec.
37 sec./13 sec.
50 sec./14 sec.
17 sec./23 sec.
25 sec./17 sec.
42 sec./32 sec.
60 sec./21 sec.
58 sec./48 sec.
Alt. 1A (Roundabouts) Alt. 1B (Roundabouts)
2050 Traffic Analysis Results
20
Crowell Road
Sunrise Valley Drive
WB DTR
EB DTR
No-Build
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
WB DTR
EB DTR
Crowell Road
Sunrise Valley Drive
WB DTR
EB DTR
Signal Proffered B C
C B
D C
E C
E D
C B
D C
E C
C C
F C
E D
E D
E D
E C
Sunset Hills Road
Sunset Hills RoadHunterMillRoad
HunterMillRoad
HunterMillRoad
LOS: A, B, C
LOS: D
LOS: E
LOS: F
AM/PM LOS
Key for Levels of Service
21 sec./14 sec.
71 sec./38 sec.
40 sec./29 sec.
58 sec./22 sec.
118 sec./24 sec.
34 sec./31 sec.
55 sec./22 sec.
59 sec./48 sec.57 sec./48 sec.
17 sec./23 sec.
25 sec./17 sec.
42 sec./32 sec.
60 sec./21 sec.
58 sec./48 sec.
Alt. 2 (Signals) Alt. 3 (Signals)
2050 Traffic Analysis Results
21
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
WB DTR
EB DTR
No-Build
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
WB DTR
EB DTR
Crowell RoadSunset Hills Road
Sunrise Valley Drive
WB DTR
EB DTR
Signal Proffered B C
C B
D C
E C
E D
C B
F F
D B
D C
F B
F E
E C
D B
HunterMillRoad
HunterMillRoad
HunterMillRoad
LOS: A, B, C
LOS: D
LOS: E
LOS: F
AM/PM LOS
Key for Levels of Service
117 sec./57 sec.
22 sec./20 sec.
82 sec./82 sec.
37 sec./13 sec.
104 sec./14 sec.
39 sec./32 sec.
66 sec./27 sec.
50 sec./14 sec.
60 sec./21 sec.
42 sec./32 sec.
25 sec./17 sec.
17 sec./23 sec.
58 sec./48 sec.
Alt. 4A (Roundabouts at Ramps) Alt. 4B (Signals at Ramps)
2050 Traffic Analysis Summary
22
Intersection
Roundabouts Signals Mix & Match
No Build Alt. 1A Alt. 1B Alt. 2 Alt. 3 Alt. 4A Alt. 4B
OVERALL LOS AM (PM)
Hunter Mill Rd. @
Crowell Rd. / Sunset Hills Rd.
- - F (B) - F (C) - F (B)
Hunter Mill Rd. @
Crowell Rd.**
B (C) F (F) - C (B) - C (B) -
Hunter Mill Rd. @
Sunset Hills Rd.*
C (B) - - E (D) - - -
Hunter Mill Rd. @
DTR WB Ramps & Sunset Hills Rd.
- F (F) - - - F (F) -
Hunter Mill Rd. @
DTR WB Ramps
D (C) - C (C) D (C) C (C) - D (C)
Hunter Mill Rd. @
DTR EB Ramps
E (C) D (B) D (B) E (C) E (C) D (B) E (C)
Hunter Mill Rd. @
Sunrise Valley Dr.
E (D) D (B) D (B) E (D) E (D) F (E) D (B)
LOS Standard = LOS D
* Alt 2 in new location
** No Build includes the proffered signal at Crowell Road
23
Detailed Evaluation of 5-leg Roundabout
• Intersection at Hunter Mill Road, Dulles
Toll Road (WB) and Sunset Hills Road
• This evaluation is being done at the
request of the community
• Designed per VDOT and FHWA standards
• Evaluated for safe speeds, turning radii
and vehicle paths
24
5-Leg Roundabout: Hunter Mill Defense League
5-Leg Roundabout Summary:
Hunter Mill Defense League
• Design:
– Utilized Bypass lanes to limit circle size
– No impact on toll plaza
• Concerns
– Additional conflict points due to bypass lanes
– Not designed to VDOT standards
– Requires widening under the bridge
25
26
5-Leg Roundabout: Elongated Oval
5-Leg Roundabout Summary: Elongated Oval
Elongated Oval
• Design:
– Minimized Impact on adjacent buildings
– No impact on toll plaza
• Concerns
– High speeds in circle
– Reduced sight distance across circle
– VDOT unlikely to approve design
27
28
5-Leg Roundabout: Tight Circle
5-Leg Roundabout Summary: Tight Circle
Tightest Circle
• Design
– Smallest total footprint allowable
– Provides minimal change to existing facilities
• Concerns
– Impacts Dulles Toll Road Ramp Plazas – would require relocation
– Considerable right-of-way impacts on the east side of Hunter Mill Road
– Approach angles violate NCHRP 672 guidance
• Would not be considered an allowable and constructible design
29
30
5-Leg Roundabout: Feasible Design
5-Leg Roundabout Summary:Feasible Design
Feasible Design
• Design is reflected in Alternatives 1A and 4A
– Only alternative that meets all VDOT and NCHRP design criteria
– Minimizes impact on toll plaza
• Concerns
– Impacts the Reston Presbyterian Church
– Cultural and structural impacts associated with the design
– Difficult Constructability
31
32
5-Leg Roundabout: Alternatives 1A and 4A
33
Sunset Hills Road Realignment
• Purpose of Sunset Hills Road Realignment:
– To create distance from the Dulles Toll Road
– To improve intersection efficiency along Hunter
Mill Road
– Improve queuing conditions along Hunter Mill
Road
• Two potential alignments have been
developed
34
Realignment Option A
35
Realignment Option B
Sunset Hills Realignment Summary
• Option A
– Most natural geometry
– Longest natural queuing area at Hunter Mill Road
– Most separation to the Dulles Toll Road
– Closest alignment to Hunting Crest neighborhood
• Option B
– Utilizes more of the existing facility
– Provides back access to parcels along Hunter Mill Road
– Has unusual curvature on breakaway point from existing
– Less queuing area along straightaway at Hunter Mill Road
– Separates school and soccer field
36
37
Next Steps
• Evaluate Community Feedback
• Review Analysis Results
• Select a Preferred Alternative based on:
• Community Feedback
• Traffic Analysis
• Impacts
• Select the Best Performing, Least Impactful Alternative
• Final Recommendations and Report
• Public meeting to present preferred alternative
• Thursday, November 17 (Location TBD)
38
Question & Answers
30 Minutes
Please limit yourself to one question so others
have an opportunity to ask
Kristin.Calkins@Fairfaxcounty.gov
http://www.fairfaxcounty.gov/fcdot/huntermillstudy.htm

More Related Content

What's hot

Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Fairfax County
 
North Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community MeetingNorth Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community MeetingFairfax County
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road WalkwayFairfax County
 
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016Fairfax County
 
Shirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyShirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyFairfax County
 
Reston Network Analysis Boards
Reston Network Analysis BoardsReston Network Analysis Boards
Reston Network Analysis BoardsFairfax County
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingCirculateSD
 
Silver Line Phase 1-Status Report
Silver Line Phase 1-Status ReportSilver Line Phase 1-Status Report
Silver Line Phase 1-Status ReportFairfax County
 
Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018Fairfax County
 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016Fairfax County
 
CCMPO - Local Transportation Funding Options
CCMPO - Local Transportation Funding OptionsCCMPO - Local Transportation Funding Options
CCMPO - Local Transportation Funding Optionsmpipe
 
EIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationEIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationCirculateSD
 
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017Fairfax County
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016Fairfax County
 
Pb Community Planning Group May 24
Pb Community Planning Group May 24Pb Community Planning Group May 24
Pb Community Planning Group May 24CirculateSD
 
Clairemont CPG ad hoc subcommittee presentation 1/18/18
Clairemont CPG ad hoc subcommittee presentation 1/18/18Clairemont CPG ad hoc subcommittee presentation 1/18/18
Clairemont CPG ad hoc subcommittee presentation 1/18/18CirculateSD
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station PresentationCirculateSD
 

What's hot (20)

Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
 
North Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community MeetingNorth Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community Meeting
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road Walkway
 
Beulah Road Walkway
Beulah Road WalkwayBeulah Road Walkway
Beulah Road Walkway
 
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
 
Shirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyShirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning Study
 
Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1
 
Reston Network Analysis Boards
Reston Network Analysis BoardsReston Network Analysis Boards
Reston Network Analysis Boards
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
 
Silver Line Phase 1-Status Report
Silver Line Phase 1-Status ReportSilver Line Phase 1-Status Report
Silver Line Phase 1-Status Report
 
Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018
 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016
 
CCMPO - Local Transportation Funding Options
CCMPO - Local Transportation Funding OptionsCCMPO - Local Transportation Funding Options
CCMPO - Local Transportation Funding Options
 
EIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationEIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentation
 
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016
 
Pb Community Planning Group May 24
Pb Community Planning Group May 24Pb Community Planning Group May 24
Pb Community Planning Group May 24
 
Clairemont CPG ad hoc subcommittee presentation 1/18/18
Clairemont CPG ad hoc subcommittee presentation 1/18/18Clairemont CPG ad hoc subcommittee presentation 1/18/18
Clairemont CPG ad hoc subcommittee presentation 1/18/18
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station Presentation
 

Viewers also liked

Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016Fairfax County
 
Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016Fairfax County
 
Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014Fairfax County
 
Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015Fairfax County
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumFairfax County
 
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016Fairfax County
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Fairfax County
 
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016Fairfax County
 
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementFairfax County
 
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Fairfax County
 
Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)Fairfax County
 
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Fairfax County
 
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County RoadsBi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County RoadsFairfax County
 
Proposed Fairfax Connector Silver Line Bus Service Plan
Proposed Fairfax Connector Silver Line Bus Service PlanProposed Fairfax Connector Silver Line Bus Service Plan
Proposed Fairfax Connector Silver Line Bus Service PlanFairfax County
 
Fairfax County Taxicab Regulation: A Review of Chapter 84.1 : May 17, 2016
Fairfax County Taxicab Regulation: A Review of Chapter 84.1 : May 17, 2016  Fairfax County Taxicab Regulation: A Review of Chapter 84.1 : May 17, 2016
Fairfax County Taxicab Regulation: A Review of Chapter 84.1 : May 17, 2016 Fairfax County
 
Potential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light ProgramPotential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light ProgramFairfax County
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Fairfax County
 
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal MobilitySouthrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal MobilityFairfax County
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Fairfax County
 
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Fairfax County
 

Viewers also liked (20)

Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
 
Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016
 
Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014
 
Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
 
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016
 
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
 
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
 
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
 
Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)
 
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
 
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County RoadsBi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
 
Proposed Fairfax Connector Silver Line Bus Service Plan
Proposed Fairfax Connector Silver Line Bus Service PlanProposed Fairfax Connector Silver Line Bus Service Plan
Proposed Fairfax Connector Silver Line Bus Service Plan
 
Fairfax County Taxicab Regulation: A Review of Chapter 84.1 : May 17, 2016
Fairfax County Taxicab Regulation: A Review of Chapter 84.1 : May 17, 2016  Fairfax County Taxicab Regulation: A Review of Chapter 84.1 : May 17, 2016
Fairfax County Taxicab Regulation: A Review of Chapter 84.1 : May 17, 2016
 
Potential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light ProgramPotential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light Program
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
 
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal MobilitySouthrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
 

Similar to Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15, 2016

Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Fairfax County
 
Gardiner short briefing package
Gardiner   short briefing packageGardiner   short briefing package
Gardiner short briefing packageWaterfrontTO
 
Operational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to TysonsOperational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to TysonsFairfax County
 
North Hall Connector
North Hall ConnectorNorth Hall Connector
North Hall Connectoralledia
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationFairfax County
 
Intern PPT Presentation
Intern PPT PresentationIntern PPT Presentation
Intern PPT PresentationGilson Hogan
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2syed abdul wahab
 
Traffic Evaluation DONE
Traffic Evaluation DONETraffic Evaluation DONE
Traffic Evaluation DONEJames E. Jones
 
Railwayto greenwayfinalpresentation
Railwayto greenwayfinalpresentationRailwayto greenwayfinalpresentation
Railwayto greenwayfinalpresentationcander014
 
Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Fairfax County
 
Bird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundaboutsBird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundaboutsTHECITYALLIANCE
 
Kite Hill Senior Design Mid Term Presentation Fall 2015
Kite Hill Senior Design Mid Term Presentation Fall 2015Kite Hill Senior Design Mid Term Presentation Fall 2015
Kite Hill Senior Design Mid Term Presentation Fall 2015Ashleigh Hough
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignKathleenFaithMamuad
 

Similar to Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15, 2016 (20)

Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
 
Gardiner short briefing package
Gardiner   short briefing packageGardiner   short briefing package
Gardiner short briefing package
 
Roadway Impact Fees
Roadway Impact FeesRoadway Impact Fees
Roadway Impact Fees
 
Operational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to TysonsOperational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to Tysons
 
North Hall Connector
North Hall ConnectorNorth Hall Connector
North Hall Connector
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater Consolidation
 
ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15 ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15
 
SWAIN
SWAINSWAIN
SWAIN
 
sh183_tracker
sh183_trackersh183_tracker
sh183_tracker
 
Intern PPT Presentation
Intern PPT PresentationIntern PPT Presentation
Intern PPT Presentation
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
 
Champions Track 3
Champions Track 3Champions Track 3
Champions Track 3
 
91 Design Build Update
91 Design Build Update91 Design Build Update
91 Design Build Update
 
Traffic Evaluation DONE
Traffic Evaluation DONETraffic Evaluation DONE
Traffic Evaluation DONE
 
Railwayto greenwayfinalpresentation
Railwayto greenwayfinalpresentationRailwayto greenwayfinalpresentation
Railwayto greenwayfinalpresentation
 
#27 Road Diets – Improving Safety for Everyone - Dougherty
#27 Road Diets – Improving Safety for Everyone - Dougherty#27 Road Diets – Improving Safety for Everyone - Dougherty
#27 Road Diets – Improving Safety for Everyone - Dougherty
 
Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015
 
Bird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundaboutsBird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundabouts
 
Kite Hill Senior Design Mid Term Presentation Fall 2015
Kite Hill Senior Design Mid Term Presentation Fall 2015Kite Hill Senior Design Mid Term Presentation Fall 2015
Kite Hill Senior Design Mid Term Presentation Fall 2015
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
 

More from Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkbhavenpr
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationReyMonsales
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012ankitnayak356677
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerOmarCabrera39
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfauroraaudrey4826
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsnaxymaxyy
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victoryanjanibaddipudi1
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 

Recently uploaded (13)

Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpk
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and information
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert Oppenheimer
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdf
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the rounds
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 

Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15, 2016

  • 1. Hunter Mill Road and Sunset Hills Road Study Community Meeting #5 Progress Update September 15, 2016 Kristin Calkins Fairfax County Department of Transportation
  • 2. Presentation Agenda • Project Objectives • Summary of Prior Community Involvement • Review of Alternatives Considered • Traffic Analysis Results • Detailed Evaluation of a 5-leg Roundabout • Evaluation of Sunset Hills Road Relocation • Next Steps • Questions and Answers 2
  • 3. Project Objectives • Address existing congestion • Plan for future traffic • Address queuing along Hunter Mill Road and Sunset Hills Road • Improve access to the Dulles Toll Road by minimizing congestion • Maintain Hunter Mill Road’s character by applying context sensitive solutions 3
  • 4. Project Study Area 4 Intersection ID Intersection Current Intersection Control Type 1 Hunter Mill Road at Sunrise Valley Drive Signalized 2 Hunter Mill Road at DTR EB Ramps Signalized 3 Hunter Mill Road at DTR WB Ramps Signalized 4 Hunter Mill Road at Sunset Hills Road Signalized 5 Hunter Mill Road at Crowell Road Unsignalized (All-Way Stop) 6 Hunter Mill Road at Hunting Crest Lane Unsignalized (Two-Way Stop) 7 Hunter Mill Road at Lake Fairfax Park Unsignalized (Two-Way Stop) 7 6 5 43 2 1
  • 5. Project Background • Board of Supervisors authorized study as a follow-on study to the Reston Phase I Plan Amendment • Meetings held on: • December 8, 2014: Kick-Off • February 24, 2015: Existing & No-Build conditions and community input on alternatives • May 20, 2015: Analysis Findings • July 2015: Project put on hold at request of community to allow for new capacity analysis methodologies for roundabouts to be adopted by the Transportation Research Board • Meeting held on: June 30, 2016: Roundabout capacity results 5
  • 7. Summary of Community Comments • Concern that traffic from Wiehle Avenue may be diverted to Hunter Mill Road • Concern that the signal at Crowell Road may increase delays in the off-peak • Maintain the character of Hunter Mill Road • Main goal of study is to improve Level of Service (LOS) on Hunter Mill Road 7
  • 8. Summary of Community Comments (Cont.) • Roundabouts preferred at Dulles Toll Road ramps • Widen Hunter Mill Road from eastbound Dulles Toll Road to Sunrise Valley Drive • Concern that improvements may attract more development • Community wants an in-depth review of roundabouts • There should be a mix and match of alternatives 8
  • 9. Alternatives Considered 9 Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR No-Build Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 1A Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 1B Roundabout Signal Proffered
  • 10. Alternatives Considered (Cont.) 10 Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR No-Build Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 2 Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 3 Signal Proffered
  • 11. Alternatives Considered (Cont.) 11 Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR No-Build Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 4A Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 4B Signal Proffered
  • 12. Traffic Analysis Results Traffic Analysis: • Performed for both 2030 and 2050 • Consistent with VDOT Policies and Procedures • Used new Roundabout Methodology 12
  • 13. New Roundabout Methodology • New research resulted in: • Re-assessment of Roundabout Capacity Models for the Highway Capacity Manual • New methodology (adopted January 2016) resulted in an approximate 10-12% increase in roundabout capacity • New model prioritizes movements with higher volumes • Resulting in improved LOS for heavier movements and overall LOS • This study is an operational assessment, not an engineering design. Roundabouts generally have greater ROW impacts • The best operating roundabout might have a tradeoff of a larger ROW footprint 13
  • 14. 2030 Traffic Analysis • Utilized Future Year Projections from the Reston Phase I Plan Amendment. • Included development potential associated with development of the Reston Transit Station Areas. 14
  • 15. 2030 Traffic Analysis Results 15 Crowell Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR No-Build Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 1A (Roundabouts) Crowell Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 1B (Roundabouts) Signal Proffered C C D D C E C C D D E C D D B B C D C D B B B D C B LOS: A, B, C LOS: D LOS: E LOS: F AM/PM LOS Key for Levels of Service Sunset Hills Road Sunset Hills Road 24 sec./26 sec. 41 sec./53 sec. 29 sec./73 sec. 30 sec./25 sec. 38 sec./48 sec. 37 sec./18 sec. 45 sec./49 sec. 29 sec./47 sec. 17 sec./17 sec. 23 sec./12 sec. 14 sec./42 sec. 29 sec./47 sec. 17 sec./17 sec.
  • 16. 2030 Traffic Analysis Results 16 Crowell Road Sunrise Valley Drive WB DTR EB DTR No-Build Crowell Road Sunset Hills Road Sunrise Valley Drive WB DTR EB DTR Alt. 2 (Signals) Crowell Road Sunrise Valley Drive WB DTR EB DTR Alt. 3 (Signals) Signal Proffered C C D D C E C C D D C C C D C C D D D C D C D D C D Sunset Hills Road Sunset Hills RoadHunterMillRoad HunterMillRoad HunterMillRoad LOS: A, B, C LOS: D LOS: E LOS: F AM/PM LOS Key for Levels of Service 22 sec./27 sec. 21 sec./45 sec. 55 sec./37 sec. 33 sec./31 sec. 39 sec./44 sec. 42 sec./34 sec. 19 sec./41 sec. 36 sec./35 sec. 35 sec./44 sec. 24 sec./26 sec. 41 sec./ 53 sec. 29 sec./73 sec. 30 sec./25 sec. 38 sec./48 sec. B D
  • 17. 2030 Traffic Analysis Results 17 Crowell Road Sunrise Valley Drive WB DTR EB DTR No-Build Crowell Road Sunset Hills Road Sunrise Valley Drive WB DTR EB DTR Alt. 4A (Roundabouts at Ramps) Crowell Road Sunrise Valley Drive WB DTR EB DTR Alt. 4B (Signals at Ramps) Signal Proffered C C D D C E C C D D C C D D B B F F E C D C C B C D Sunset Hills Road Sunset Hills RoadHunterMillRoad HunterMillRoad HunterMillRoad LOS: A, B, C LOS: D LOS: E LOS: F AM/PM LOS Key for Levels of Service 29 sec./47 sec. 45 sec./50 sec. 123 sec./143 sec. 29 sec./27 sec. 17 sec./17 sec. 23 sec./12 sec. 39 sec./32 sec. 66 sec./27 sec. 24 sec./26 sec. 41 sec./ 53 sec. 29 sec./73 sec. 30 sec./25 sec. 38 sec./48 sec.
  • 18. 2030 Traffic Analysis Summary 18 LOS Standard = LOS D * Alt 2 in new location ** No Build includes the proffered signal at Crowell Road Intersection Roundabouts Signals Mix & Match No Build Alt. 1A Alt. 1B Alt. 2 Alt. 3 Alt. 4A Alt. 4B OVERALL LOS AM (PM) Hunter Mill Rd. @ Crowell Rd. / Sunset Hills Rd. - - C (B) - D (C) - C (B) Hunter Mill Rd. @ Crowell Rd.** C (C) E (C) - C (C) - C (C) - Hunter Mill Rd. @ Sunset Hills Rd.* D (D) - - D (D) - - - Hunter Mill Rd. @ DTR WB Ramps & Sunset Hills Rd. - D (D) - - - D (D) - Hunter Mill Rd. @ DTR WB Ramps C (E) - B (D) C (D) B (D) - D (C) Hunter Mill Rd. @ DTR EB Ramps C (C) B (B) B (B) C (C) D (C) B (B) E (C) Hunter Mill Rd. @ Sunrise Valley Dr. D (D) C (D) C (D) D (D) C (D) F (F) C (D)
  • 19. 2050 Traffic Analysis Results 19 Crowell Road Sunrise Valley Drive WB DTR EB DTR No-Build Crowell Road Sunset Hills Road Sunrise Valley Drive WB DTR EB DTR Crowell Road Sunrise Valley Drive WB DTR EB DTR Signal Proffered B C C B D C E C E D F F F F D B C C F B D B D B D B Sunset Hills Road Sunset Hills RoadHunterMillRoad HunterMillRoad HunterMillRoad LOS: A, B, C LOS: D LOS: E LOS: F AM/PM LOS Key for Levels of Service 50 sec./14 sec. 137 sec./58 sec. 82 sec./82 sec. 37 sec./13 sec. 104 sec./14 sec. 26 sec./35 sec. 37 sec./13 sec. 50 sec./14 sec. 17 sec./23 sec. 25 sec./17 sec. 42 sec./32 sec. 60 sec./21 sec. 58 sec./48 sec. Alt. 1A (Roundabouts) Alt. 1B (Roundabouts)
  • 20. 2050 Traffic Analysis Results 20 Crowell Road Sunrise Valley Drive WB DTR EB DTR No-Build Crowell Road Sunset Hills Road Sunrise Valley Drive WB DTR EB DTR Crowell Road Sunrise Valley Drive WB DTR EB DTR Signal Proffered B C C B D C E C E D C B D C E C C C F C E D E D E D E C Sunset Hills Road Sunset Hills RoadHunterMillRoad HunterMillRoad HunterMillRoad LOS: A, B, C LOS: D LOS: E LOS: F AM/PM LOS Key for Levels of Service 21 sec./14 sec. 71 sec./38 sec. 40 sec./29 sec. 58 sec./22 sec. 118 sec./24 sec. 34 sec./31 sec. 55 sec./22 sec. 59 sec./48 sec.57 sec./48 sec. 17 sec./23 sec. 25 sec./17 sec. 42 sec./32 sec. 60 sec./21 sec. 58 sec./48 sec. Alt. 2 (Signals) Alt. 3 (Signals)
  • 21. 2050 Traffic Analysis Results 21 Crowell Road Sunset Hills Road Sunrise Valley Drive WB DTR EB DTR No-Build Crowell Road Sunset Hills Road Sunrise Valley Drive WB DTR EB DTR Crowell RoadSunset Hills Road Sunrise Valley Drive WB DTR EB DTR Signal Proffered B C C B D C E C E D C B F F D B D C F B F E E C D B HunterMillRoad HunterMillRoad HunterMillRoad LOS: A, B, C LOS: D LOS: E LOS: F AM/PM LOS Key for Levels of Service 117 sec./57 sec. 22 sec./20 sec. 82 sec./82 sec. 37 sec./13 sec. 104 sec./14 sec. 39 sec./32 sec. 66 sec./27 sec. 50 sec./14 sec. 60 sec./21 sec. 42 sec./32 sec. 25 sec./17 sec. 17 sec./23 sec. 58 sec./48 sec. Alt. 4A (Roundabouts at Ramps) Alt. 4B (Signals at Ramps)
  • 22. 2050 Traffic Analysis Summary 22 Intersection Roundabouts Signals Mix & Match No Build Alt. 1A Alt. 1B Alt. 2 Alt. 3 Alt. 4A Alt. 4B OVERALL LOS AM (PM) Hunter Mill Rd. @ Crowell Rd. / Sunset Hills Rd. - - F (B) - F (C) - F (B) Hunter Mill Rd. @ Crowell Rd.** B (C) F (F) - C (B) - C (B) - Hunter Mill Rd. @ Sunset Hills Rd.* C (B) - - E (D) - - - Hunter Mill Rd. @ DTR WB Ramps & Sunset Hills Rd. - F (F) - - - F (F) - Hunter Mill Rd. @ DTR WB Ramps D (C) - C (C) D (C) C (C) - D (C) Hunter Mill Rd. @ DTR EB Ramps E (C) D (B) D (B) E (C) E (C) D (B) E (C) Hunter Mill Rd. @ Sunrise Valley Dr. E (D) D (B) D (B) E (D) E (D) F (E) D (B) LOS Standard = LOS D * Alt 2 in new location ** No Build includes the proffered signal at Crowell Road
  • 23. 23 Detailed Evaluation of 5-leg Roundabout • Intersection at Hunter Mill Road, Dulles Toll Road (WB) and Sunset Hills Road • This evaluation is being done at the request of the community • Designed per VDOT and FHWA standards • Evaluated for safe speeds, turning radii and vehicle paths
  • 24. 24 5-Leg Roundabout: Hunter Mill Defense League
  • 25. 5-Leg Roundabout Summary: Hunter Mill Defense League • Design: – Utilized Bypass lanes to limit circle size – No impact on toll plaza • Concerns – Additional conflict points due to bypass lanes – Not designed to VDOT standards – Requires widening under the bridge 25
  • 27. 5-Leg Roundabout Summary: Elongated Oval Elongated Oval • Design: – Minimized Impact on adjacent buildings – No impact on toll plaza • Concerns – High speeds in circle – Reduced sight distance across circle – VDOT unlikely to approve design 27
  • 29. 5-Leg Roundabout Summary: Tight Circle Tightest Circle • Design – Smallest total footprint allowable – Provides minimal change to existing facilities • Concerns – Impacts Dulles Toll Road Ramp Plazas – would require relocation – Considerable right-of-way impacts on the east side of Hunter Mill Road – Approach angles violate NCHRP 672 guidance • Would not be considered an allowable and constructible design 29
  • 31. 5-Leg Roundabout Summary:Feasible Design Feasible Design • Design is reflected in Alternatives 1A and 4A – Only alternative that meets all VDOT and NCHRP design criteria – Minimizes impact on toll plaza • Concerns – Impacts the Reston Presbyterian Church – Cultural and structural impacts associated with the design – Difficult Constructability 31
  • 33. 33 Sunset Hills Road Realignment • Purpose of Sunset Hills Road Realignment: – To create distance from the Dulles Toll Road – To improve intersection efficiency along Hunter Mill Road – Improve queuing conditions along Hunter Mill Road • Two potential alignments have been developed
  • 36. Sunset Hills Realignment Summary • Option A – Most natural geometry – Longest natural queuing area at Hunter Mill Road – Most separation to the Dulles Toll Road – Closest alignment to Hunting Crest neighborhood • Option B – Utilizes more of the existing facility – Provides back access to parcels along Hunter Mill Road – Has unusual curvature on breakaway point from existing – Less queuing area along straightaway at Hunter Mill Road – Separates school and soccer field 36
  • 37. 37 Next Steps • Evaluate Community Feedback • Review Analysis Results • Select a Preferred Alternative based on: • Community Feedback • Traffic Analysis • Impacts • Select the Best Performing, Least Impactful Alternative • Final Recommendations and Report • Public meeting to present preferred alternative • Thursday, November 17 (Location TBD)
  • 38. 38 Question & Answers 30 Minutes Please limit yourself to one question so others have an opportunity to ask Kristin.Calkins@Fairfaxcounty.gov http://www.fairfaxcounty.gov/fcdot/huntermillstudy.htm