PROJECT MANAGEMENT to realize
Leveraging the Science and Art of
Summary of FICCI-PMI Recommendations
Make in India
Acknowledgements
•
•
•
•
•
•
•
•
•
•
•
•
Arun Maira, Chief Mentor, India Backbone Implementation Network
Raj Kalady, Managing Director, PMI India
Galahad Franklin, Director, Product Marketing, Project and Visio, Microsoft India
Yogesh Arora and Shilpa Srivastava, Tata Consultancy Services Limited
Paramita Mukerji, Wipro Technologies
Supriyo Dasgupta, Bharti Airtel Limited
Arun Vasudevan, Tata Consultancy Services Limited
Kiran Kambhampati, Breakthrough Management Group International
Sanjukta Mandal, Somdatta Bannerjee, Sudipto Roy, Ananda Chakraborty, and Anand Prasad, Cognizant Technology
Solutions India Pvt. Ltd
Lt Col L Shri Harsha, Retd, PMI Bangalore India Chapter
Dr. Mona N Shah and Prof Ramakrishna Nallathiga, National Institute of Construction Management and Research,
Pune
Tanmoy Prasad and Nitin Sood, Department of Information Technology, Government of Haryana
01
A very significant part of the project management field requires logic and structure, whether it is to make task lists or
manage project dependencies. As a discipline amenable to scientific management practices, project management best
practices have been encapsulated in Gantt charts, PERT charts, earned value calculations, risk management techniques,
contingency planning, etc. Factual data enables measurement of project progress, estimation of time to completion and
calculation of costs.
There is also something about projects that enforces the value of relationships, diversity in approach, and communication
effectiveness. The art of project management revolves around inspiration, communication, team building, leadership and
empathy. A project falling behind schedule needs improvisation fuelled by on-your-feet thinking. As priorities shift or
situations change, the skill to discern through multiple courses of action comes into play, as does the ability to determine
which information to communicate when and to whom.
Projects are considered successful if they are completed on budget, as per scope, on schedule, and more importantly when
desired objectives are met, and project outcomes are satisfying for stakeholders. This is not easy, but neither is it
impossible. It all comes together with the art and science of project management combined with a supporting eco-system
within which projects are conceived, nurtured and brought to fruition.
Summary of FICCI-PMI Recommendations for
Leveraging the Science and Art of Project Management
to realize Make in India
Introduction
02
Project Management in India
India’s track record on Project Management has been a mixed bag with successful projects but also a large number of
them being plagued with cost over runs and delays. With formal launch of the Make in India initiative by Hon’ble Prime
Minster of India, it is all the more necessary to build projects management capabilities for higher level of repeatability and
predictability.
Realizing this, FICCI and PMI have identified the top three critical issues to reduce the gap between the as-is and to-be
states to create a conducive environment for programs like Make in India to succeed. The three areas are:
Framework and implementation plan for continuous improvement in quality of stakeholder engagement and risk
management in large projects
Need for nodal agencies to monitor project execution and provide support for on time completion, especially to
intervene when projects run into problems and to pick up signals for proactive action in future
Training and tools for enhancing organizational project management capabilities, especially in government for
project monitoring and organization for project execution.
•
•
•
03
Recommendation 1:
Stakeholder Engagement
There seems to be a universal acknowledgement amongst project management practitioners that stakeholders need to be
engaged and managed. But there also seems to be a universal situation of projects running into problems because of
inadequate stakeholder engagement. Why does this happen? Is it because stakeholder engagement is treated as a routine,
mechanical task rather than a critical activity which requires creative thinking and genuine openness to achieve results.
Stakeholder engagement is a make or break activity that determines the final quality of the outcome.
Stakeholders are real people, and there is no one size fits all approach when it comes to strategizing to engage
stakeholders and develop a true collaboration with them. Therefore no amount of knowledge transfer can provide
answers to specific situation based questions. However, the topic of stakeholder engagement has been extensively
researched and frameworks are available to help practitioners find the answers for themselves.
As a matter of principle, effective stakeholder engagement requires genuine and sincere effort. If the idea is to undertake a
perfunctory exercise for the sake of ticking of an activity box, no framework can be of help. Stakeholder engagement must
be done with a strategic eye on the ultimate results which the project is intended to achieve, not with the tactical purpose
of handling an immediate issue. Once this basic world view is imbibed and stakeholder engagement activities have been
identified, the following questions must be addressed:
04
Do the activities include an external scan to identify the forces that could impede and those that could support the
program/project?
Those who would benefit?
Those who would be adversely affected?
Those likely to support and those likely to oppose?
Were the needs of these stakeholders understood and mapped?
How will this initiative affect these stakeholders and what is the strategy to obtain their support?
Has a system been installed for periodic feedback from stakeholders and its consideration for designing project activities?
There are several frameworks / tool sets are available in management literature which can be used as formats to use
answers to the above questions and populate a generic stakeholder analysis table with project-specific information and
develop stakeholder engagement activities. Such tool sets typically consist of Stakeholder Diagnostic, Power/Influence Map,
Leverage Matrix that help develop an Action Plan. Stakeholder engagement, however, should not be considered as a one
time activity. It is often required throughout the project lifecycle and may even be required after project completion.
While all project plans contain a section on stakeholders, the real issue is about quality of stakeholder engagement.
Recommended parameters to assess quality are: range of stakeholder groups analysed and range of activities undertaken
beyond exchange of information.
•
•
•
05
An empowered nodal agency is an essential part of the project management eco-system. The agency does not manage
projects itself, but supports other Project Management and Monitoring Units in solving problems that are beyond the
control of these Units. The Project Monitoring Group (PMG) set up by the central government in the Cabinet Secretariat
is an example of such an agency. Considering the large number of mega projects getting held up, PMG was formally set up
in June 2013 as an institutional mechanism to track stalled investment projects, both in the public and private sectors and
to remove implementation bottlenecks in these projects on a fast-track basis. Only projects with issues or problems are
considered for fast tracking by PMG. Since then, PMG has accepted 507 projects for consideration and successfully
facilitated resolution of all issues in 207 stalled projects with an investment of around ` 7.4 lakh crores till date.*
The need for an institutional mechanism to fast-track projects, especially large and complex ones is well-recognized in the
project management discipline. This mechanism is required because success of such projects is invariably dependent on
clearances from or actions of other independent agencies for whom each project is only one piece and not always a key
priority. Therefore, an institutional mechanism that can exercise influence over these independent agencies is required.
The efficacy of such an institutional mechanism flows from the government’s strategic priorities. With this strategic
alignment firmly in place, the following project management principles should be applied to maximize effectiveness of the
institutional mechanism:
Recommendation 2: Nodal Agency
* http://cabsecpmg.gov.in/cabsec/index.php March 9, 2015
06
Crisis Management
Alert Generation
Benefits Realization
Saving a ship that has hit an iceberg requires a skill set different from the one needed to steer a ship out of troubled
waters. An institutional mechanism that takes up only those projects which have reported issues or problems must
specialize in distinguishing between the kinds of problems that are likely to be encountered and deal with them
accordingly. Crisis Management, for example, encompasses different stages: pre-crisis, warning, crisis, recovery, post-crisis,
which require appropriate responses.
Very often issues that are not recognized, evaluated and correctly managed turn into crisis. While it is important to build
expertise in managing crisis and coming out of them, it is also important to build expertise in sensing and preventing them.
For example, use of past experience to generate alerts in respect of projects most likely to get stalled could reduce
resolution time and effort. Maintaining a knowledge repository with well-designed entry and search criteria to enable
efficient knowledge transfer for problem resolution is also critical.
The ultimate objective of resolving issues in stalled projects is to see that the project is finally completed and delivering the
desired results. Thus retaining on the radar projects for which a particular issue has been resolved may be needed to
ensure that the project is successfully completed and it does not move from one problem to another.
07
Like stakeholder engagement, training is universally acknowledged as a critical need for successful project management.
Department of Personnel and Training and Department of Public Enterprises, Government of India have both recognized
the importance of Project Management training as is evident from the circulars on such trainings to be made mandatory.
Our recommendations focus on the twin questions on what is the right kind of project management training, and how
does effective knowledge transfer take place for organizational rather than individual capability? In this respect, the following
five principles deserve consideration:
Each project is unique and therefor training needs are also unique to projects; training needs assessment is
therefore a critical component for each project
Capacity building interventions are not one time activities; they are needed at different stages of the project with
content suited to each stage
For best results, a mix of standard project management practices on a regular basis s coupled with need-based
project-specific technology and process training is recommended
Formal process for assessing organizational capability in project management is required to enable effective
transfer of individual learning into organizational learning; this includes learning for not only the project teams, but
also project owners and sponsors
Project management know how of our times also includes knowledge of project management tools and their use
•
•
•
•
•
Recommendation 3: Formal Training on
Project Management
08
The first principle implies that for every project training needs must be assessed and training interventions designed
accordingly. The following structure illustrates how to arrive at the critical learning agenda at the project level.
Most important
WHAT DO WE
NEED TO KNOW
Less important
A lot
HOW WELL DO WE KNOW IT NOW Very little
Learning Agenda
Necessary
Project management practices
(Standard modules)
Critical
Technology and processes
(Project and role specific)
09
Established in 1927, FICCI is the largest and oldest apex business organisation in India. Its history is closely interwoven with India's struggle for independence, its
industrialization, and its emergence as one of the most rapidly growing global economies. FICCI has contributed to this historical process by encouraging debate,
articulating the private sector's views and influencing policy.
A non-government, not-for-profit organisation, FICCI is the voice of India's business and industry.
FICCI draws its membership from the corporate sector, both private and public, including SMEs and MNCs; FICCI enjoys an indirect membership of over 2,50,000
companies from various regional chambers of commerce.
FICCI provides a platform for sector specific consensus building and networking and as the first port of call for Indian industry and the international business
community.
To be the thought leader for industry, its voice for policy change and its guardian for effective implementation.
To carry forward our initiatives in support of rapid, inclusive and sustainable growth that encompass health, education, livelihood, governance and skill development.
To enhance efficiency and global competitiveness of Indian industry and to expand business opportunities both in domestic and foreign markets through a range of
specialised services and global linkages.
Our Vision
Our Mission
ABOUT PMI
Project Management Institute (PMI) - is the world's leading
profession. Founded in 1969, PMI delivers value for more than 2.9 million professionals working in nearly every country in the world through global advocacy,
collaboration, education and research. PMI enhances careers, improves organizational success and further matures the profession of project management through
its globally recognized standards, certifications, resources, tools, and networking opportunities.
The PMI India office is set up with the key mandate of driving advocacy of Project Management across organizations, academia and governments in India. In India,
PMI is represented by 3 offices (Mumbai, Bangalore and New Delhi) and 8 Chapters (Delhi, Bangalore, Chennai, Hyderabad, Trivandrum, Kolkata, Pune, Mumbai)
where we have around certified 36,500+ professionals in project management. For more details, please visit: www.pmi.org/www.pmi.org.in
not-for-profit professional membership association for the project, program and portfolio management
ABOUT FICCI
10
Mumbai office:
PMI Organization Centre Pvt. Ltd.,
rd
302-305, 3 Floor, Balarama, Plot No. C-3, E Block,
BandraKurla Complex, Bandra East,
Mumbai – 400051, India
Tel: +91 22 6525 9067 | Fax: +91 22 4070 0800
Fax: +91 22 4070 0800
Email: pmi.india@pmi.org
www.pmi.org
www.pmi.org.in
FICCI Quality Forum
Federation of Indian Chambers
of Commerce and Industry
Federation House, Tansen Marg
New Delhi-110 001 - India
Tel: +91-11-2335 9735, 2373 9947
Fax: +91-11-2332 0714, 2372 1504
Email: fqf@ficci.com
www.ficci.com
This summary has been prepared by FICCI Quality Forum for the unveiling of recommendations
at the FICCI-PMI Symposium on Project Management Practices at New Delhi on March 10, 2015

More Related Content

What's hot

What is the Risk in Steering Committee?
What is the Risk in Steering Committee?What is the Risk in Steering Committee?
What is the Risk in Steering Committee?Christine Aykac
 
Nine keys to successful delegation in Project Management
Nine keys to successful delegation in Project ManagementNine keys to successful delegation in Project Management
Nine keys to successful delegation in Project Managementmrinalsingh385
 
Presentation by rahul ghodke
Presentation by rahul ghodkePresentation by rahul ghodke
Presentation by rahul ghodkePMI_IREP_TP
 
Presentation by vikas dubey
Presentation by vikas dubeyPresentation by vikas dubey
Presentation by vikas dubeyPMI_IREP_TP
 
Presentation by mangesh sardesai
Presentation by mangesh sardesaiPresentation by mangesh sardesai
Presentation by mangesh sardesaiPMI_IREP_TP
 
Deciding project management methodology for e governance projects in india
Deciding project management methodology for e governance projects in indiaDeciding project management methodology for e governance projects in india
Deciding project management methodology for e governance projects in indiaAshish Karan
 
Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadirPMI_IREP_TP
 
Designing Agile Feedbacks for Agile Learning
Designing Agile Feedbacks for Agile LearningDesigning Agile Feedbacks for Agile Learning
Designing Agile Feedbacks for Agile LearningTathagat Varma
 
Presentation by parag saha
Presentation by parag sahaPresentation by parag saha
Presentation by parag sahaPMI_IREP_TP
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjeePMI_IREP_TP
 
Presentation by anipriya p
Presentation by anipriya pPresentation by anipriya p
Presentation by anipriya pPMI_IREP_TP
 
Enabling Organizational Change
Enabling Organizational ChangeEnabling Organizational Change
Enabling Organizational ChangeFORMAEMPLEO
 

What's hot (20)

What is the Risk in Steering Committee?
What is the Risk in Steering Committee?What is the Risk in Steering Committee?
What is the Risk in Steering Committee?
 
Nine keys to successful delegation in Project Management
Nine keys to successful delegation in Project ManagementNine keys to successful delegation in Project Management
Nine keys to successful delegation in Project Management
 
Stakeholder analysis tool
Stakeholder analysis toolStakeholder analysis tool
Stakeholder analysis tool
 
ETPM3
ETPM3ETPM3
ETPM3
 
Pm lecture
Pm lecturePm lecture
Pm lecture
 
Presentation by rahul ghodke
Presentation by rahul ghodkePresentation by rahul ghodke
Presentation by rahul ghodke
 
3aug-ConferenceProceedings-final
3aug-ConferenceProceedings-final3aug-ConferenceProceedings-final
3aug-ConferenceProceedings-final
 
Presentation by vikas dubey
Presentation by vikas dubeyPresentation by vikas dubey
Presentation by vikas dubey
 
Presentation by mangesh sardesai
Presentation by mangesh sardesaiPresentation by mangesh sardesai
Presentation by mangesh sardesai
 
Deciding project management methodology for e governance projects in india
Deciding project management methodology for e governance projects in indiaDeciding project management methodology for e governance projects in india
Deciding project management methodology for e governance projects in india
 
Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadir
 
Designing Agile Feedbacks for Agile Learning
Designing Agile Feedbacks for Agile LearningDesigning Agile Feedbacks for Agile Learning
Designing Agile Feedbacks for Agile Learning
 
Presentation by parag saha
Presentation by parag sahaPresentation by parag saha
Presentation by parag saha
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjee
 
Presentation by anipriya p
Presentation by anipriya pPresentation by anipriya p
Presentation by anipriya p
 
LPM3
LPM3LPM3
LPM3
 
Systematic Innovation
Systematic InnovationSystematic Innovation
Systematic Innovation
 
Enabling Organizational Change
Enabling Organizational ChangeEnabling Organizational Change
Enabling Organizational Change
 
PFEG_1
PFEG_1PFEG_1
PFEG_1
 
PMP_Project Stakeholder Management
PMP_Project Stakeholder ManagementPMP_Project Stakeholder Management
PMP_Project Stakeholder Management
 

Similar to Leveraging the Science and Art of PROJECT MANAGEMENT to realize Make in India

Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Renee Jones
 
Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...IOSR Journals
 
Why projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsWhy projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsTa Ngoc
 
CHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docxCHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docxcravennichole326
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxcpatriciarpatricia
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxdeanmtaylor1545
 
Project Estimating Paper
Project Estimating PaperProject Estimating Paper
Project Estimating PaperCamella Taylor
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAllison Thompson
 
Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01PMI_IREP_TP
 
3The Project Management ProcessGroups A Case StudyAft.docx
3The Project Management ProcessGroups A Case StudyAft.docx3The Project Management ProcessGroups A Case StudyAft.docx
3The Project Management ProcessGroups A Case StudyAft.docxgilbertkpeters11344
 
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docx
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docxRunning Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docx
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docxtodd581
 
UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment Mark Ritchie
 

Similar to Leveraging the Science and Art of PROJECT MANAGEMENT to realize Make in India (20)

Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.
 
Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...
 
Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...
 
7 keys
7 keys7 keys
7 keys
 
Change and project_management
Change and project_managementChange and project_management
Change and project_management
 
CIB8942.pdf
CIB8942.pdfCIB8942.pdf
CIB8942.pdf
 
Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...
 
Why projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsWhy projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfalls
 
CHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docxCHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docx
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docx
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docx
 
Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...
 
Project Estimating Paper
Project Estimating PaperProject Estimating Paper
Project Estimating Paper
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
ICT 4109.pdf
ICT 4109.pdfICT 4109.pdf
ICT 4109.pdf
 
Managing IT Projects
Managing IT ProjectsManaging IT Projects
Managing IT Projects
 
Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01
 
3The Project Management ProcessGroups A Case StudyAft.docx
3The Project Management ProcessGroups A Case StudyAft.docx3The Project Management ProcessGroups A Case StudyAft.docx
3The Project Management ProcessGroups A Case StudyAft.docx
 
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docx
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docxRunning Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docx
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docx
 
UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment
 

More from Federation of Indian Chambers of Commerce & Industry (FICCI)

More from Federation of Indian Chambers of Commerce & Industry (FICCI) (20)

ANNUAL FIBAC PRODUCTIVITY REPORT ON INDIAN BANKING INDUSTRY, 2018
ANNUAL FIBAC PRODUCTIVITY REPORT ON INDIAN BANKING INDUSTRY, 2018ANNUAL FIBAC PRODUCTIVITY REPORT ON INDIAN BANKING INDUSTRY, 2018
ANNUAL FIBAC PRODUCTIVITY REPORT ON INDIAN BANKING INDUSTRY, 2018
 
FICCI | "One Year of GST" Survey 2018
FICCI | "One Year of GST" Survey 2018FICCI | "One Year of GST" Survey 2018
FICCI | "One Year of GST" Survey 2018
 
Opportunities and Financing Outlook for Aviation sector
Opportunities and Financing Outlook for Aviation sectorOpportunities and Financing Outlook for Aviation sector
Opportunities and Financing Outlook for Aviation sector
 
Sustainable Development Goals - Linkages with corporate actions in India
Sustainable Development Goals - Linkages with corporate actions in IndiaSustainable Development Goals - Linkages with corporate actions in India
Sustainable Development Goals - Linkages with corporate actions in India
 
FICCI-Avalon Non-ferrous Metals industry report 2018
FICCI-Avalon Non-ferrous Metals industry report 2018FICCI-Avalon Non-ferrous Metals industry report 2018
FICCI-Avalon Non-ferrous Metals industry report 2018
 
Industry Survey Report on GST
Industry Survey Report on GST Industry Survey Report on GST
Industry Survey Report on GST
 
Medical Device Conference 2018: CEO Speak
Medical Device Conference 2018: CEO SpeakMedical Device Conference 2018: CEO Speak
Medical Device Conference 2018: CEO Speak
 
Trends & Opportunities for Indian Pharma
Trends & Opportunities for Indian PharmaTrends & Opportunities for Indian Pharma
Trends & Opportunities for Indian Pharma
 
FICCI IBA Bankers' Survey
FICCI IBA Bankers' Survey FICCI IBA Bankers' Survey
FICCI IBA Bankers' Survey
 
FICCI's Voice (December 2017)
FICCI's Voice (December 2017)FICCI's Voice (December 2017)
FICCI's Voice (December 2017)
 
FICCI Economic Outlook Survey | November 2017
FICCI Economic Outlook Survey | November 2017 FICCI Economic Outlook Survey | November 2017
FICCI Economic Outlook Survey | November 2017
 
FICCI Manufacturing Survey Report - July 2017
FICCI Manufacturing Survey Report -  July 2017FICCI Manufacturing Survey Report -  July 2017
FICCI Manufacturing Survey Report - July 2017
 
FICCI's Voice, May, 2017
FICCI's Voice, May, 2017FICCI's Voice, May, 2017
FICCI's Voice, May, 2017
 
FICCI Business Confidence Survey | January 2017
FICCI Business Confidence Survey | January 2017FICCI Business Confidence Survey | January 2017
FICCI Business Confidence Survey | January 2017
 
FICCI Economic Outlook Survey | January 2017
FICCI Economic Outlook Survey | January 2017FICCI Economic Outlook Survey | January 2017
FICCI Economic Outlook Survey | January 2017
 
FICCI IBA Bankers Survey Report | July - December 2016
FICCI IBA Bankers Survey Report | July - December 2016FICCI IBA Bankers Survey Report | July - December 2016
FICCI IBA Bankers Survey Report | July - December 2016
 
FICCI's Voice (December 2016)
FICCI's Voice (December 2016)FICCI's Voice (December 2016)
FICCI's Voice (December 2016)
 
FICCI Business Confidence Survey | October 2016
FICCI Business Confidence Survey | October 2016FICCI Business Confidence Survey | October 2016
FICCI Business Confidence Survey | October 2016
 
FICCI's Voice
FICCI's VoiceFICCI's Voice
FICCI's Voice
 
FICCI Voice
FICCI VoiceFICCI Voice
FICCI Voice
 

Recently uploaded

8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Pitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalPitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalEvelina300651
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 

Recently uploaded (20)

Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Pitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalPitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business Proposal
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 

Leveraging the Science and Art of PROJECT MANAGEMENT to realize Make in India

  • 1. PROJECT MANAGEMENT to realize Leveraging the Science and Art of Summary of FICCI-PMI Recommendations Make in India
  • 2. Acknowledgements • • • • • • • • • • • • Arun Maira, Chief Mentor, India Backbone Implementation Network Raj Kalady, Managing Director, PMI India Galahad Franklin, Director, Product Marketing, Project and Visio, Microsoft India Yogesh Arora and Shilpa Srivastava, Tata Consultancy Services Limited Paramita Mukerji, Wipro Technologies Supriyo Dasgupta, Bharti Airtel Limited Arun Vasudevan, Tata Consultancy Services Limited Kiran Kambhampati, Breakthrough Management Group International Sanjukta Mandal, Somdatta Bannerjee, Sudipto Roy, Ananda Chakraborty, and Anand Prasad, Cognizant Technology Solutions India Pvt. Ltd Lt Col L Shri Harsha, Retd, PMI Bangalore India Chapter Dr. Mona N Shah and Prof Ramakrishna Nallathiga, National Institute of Construction Management and Research, Pune Tanmoy Prasad and Nitin Sood, Department of Information Technology, Government of Haryana 01
  • 3. A very significant part of the project management field requires logic and structure, whether it is to make task lists or manage project dependencies. As a discipline amenable to scientific management practices, project management best practices have been encapsulated in Gantt charts, PERT charts, earned value calculations, risk management techniques, contingency planning, etc. Factual data enables measurement of project progress, estimation of time to completion and calculation of costs. There is also something about projects that enforces the value of relationships, diversity in approach, and communication effectiveness. The art of project management revolves around inspiration, communication, team building, leadership and empathy. A project falling behind schedule needs improvisation fuelled by on-your-feet thinking. As priorities shift or situations change, the skill to discern through multiple courses of action comes into play, as does the ability to determine which information to communicate when and to whom. Projects are considered successful if they are completed on budget, as per scope, on schedule, and more importantly when desired objectives are met, and project outcomes are satisfying for stakeholders. This is not easy, but neither is it impossible. It all comes together with the art and science of project management combined with a supporting eco-system within which projects are conceived, nurtured and brought to fruition. Summary of FICCI-PMI Recommendations for Leveraging the Science and Art of Project Management to realize Make in India Introduction 02
  • 4. Project Management in India India’s track record on Project Management has been a mixed bag with successful projects but also a large number of them being plagued with cost over runs and delays. With formal launch of the Make in India initiative by Hon’ble Prime Minster of India, it is all the more necessary to build projects management capabilities for higher level of repeatability and predictability. Realizing this, FICCI and PMI have identified the top three critical issues to reduce the gap between the as-is and to-be states to create a conducive environment for programs like Make in India to succeed. The three areas are: Framework and implementation plan for continuous improvement in quality of stakeholder engagement and risk management in large projects Need for nodal agencies to monitor project execution and provide support for on time completion, especially to intervene when projects run into problems and to pick up signals for proactive action in future Training and tools for enhancing organizational project management capabilities, especially in government for project monitoring and organization for project execution. • • • 03
  • 5. Recommendation 1: Stakeholder Engagement There seems to be a universal acknowledgement amongst project management practitioners that stakeholders need to be engaged and managed. But there also seems to be a universal situation of projects running into problems because of inadequate stakeholder engagement. Why does this happen? Is it because stakeholder engagement is treated as a routine, mechanical task rather than a critical activity which requires creative thinking and genuine openness to achieve results. Stakeholder engagement is a make or break activity that determines the final quality of the outcome. Stakeholders are real people, and there is no one size fits all approach when it comes to strategizing to engage stakeholders and develop a true collaboration with them. Therefore no amount of knowledge transfer can provide answers to specific situation based questions. However, the topic of stakeholder engagement has been extensively researched and frameworks are available to help practitioners find the answers for themselves. As a matter of principle, effective stakeholder engagement requires genuine and sincere effort. If the idea is to undertake a perfunctory exercise for the sake of ticking of an activity box, no framework can be of help. Stakeholder engagement must be done with a strategic eye on the ultimate results which the project is intended to achieve, not with the tactical purpose of handling an immediate issue. Once this basic world view is imbibed and stakeholder engagement activities have been identified, the following questions must be addressed: 04
  • 6. Do the activities include an external scan to identify the forces that could impede and those that could support the program/project? Those who would benefit? Those who would be adversely affected? Those likely to support and those likely to oppose? Were the needs of these stakeholders understood and mapped? How will this initiative affect these stakeholders and what is the strategy to obtain their support? Has a system been installed for periodic feedback from stakeholders and its consideration for designing project activities? There are several frameworks / tool sets are available in management literature which can be used as formats to use answers to the above questions and populate a generic stakeholder analysis table with project-specific information and develop stakeholder engagement activities. Such tool sets typically consist of Stakeholder Diagnostic, Power/Influence Map, Leverage Matrix that help develop an Action Plan. Stakeholder engagement, however, should not be considered as a one time activity. It is often required throughout the project lifecycle and may even be required after project completion. While all project plans contain a section on stakeholders, the real issue is about quality of stakeholder engagement. Recommended parameters to assess quality are: range of stakeholder groups analysed and range of activities undertaken beyond exchange of information. • • • 05
  • 7. An empowered nodal agency is an essential part of the project management eco-system. The agency does not manage projects itself, but supports other Project Management and Monitoring Units in solving problems that are beyond the control of these Units. The Project Monitoring Group (PMG) set up by the central government in the Cabinet Secretariat is an example of such an agency. Considering the large number of mega projects getting held up, PMG was formally set up in June 2013 as an institutional mechanism to track stalled investment projects, both in the public and private sectors and to remove implementation bottlenecks in these projects on a fast-track basis. Only projects with issues or problems are considered for fast tracking by PMG. Since then, PMG has accepted 507 projects for consideration and successfully facilitated resolution of all issues in 207 stalled projects with an investment of around ` 7.4 lakh crores till date.* The need for an institutional mechanism to fast-track projects, especially large and complex ones is well-recognized in the project management discipline. This mechanism is required because success of such projects is invariably dependent on clearances from or actions of other independent agencies for whom each project is only one piece and not always a key priority. Therefore, an institutional mechanism that can exercise influence over these independent agencies is required. The efficacy of such an institutional mechanism flows from the government’s strategic priorities. With this strategic alignment firmly in place, the following project management principles should be applied to maximize effectiveness of the institutional mechanism: Recommendation 2: Nodal Agency * http://cabsecpmg.gov.in/cabsec/index.php March 9, 2015 06
  • 8. Crisis Management Alert Generation Benefits Realization Saving a ship that has hit an iceberg requires a skill set different from the one needed to steer a ship out of troubled waters. An institutional mechanism that takes up only those projects which have reported issues or problems must specialize in distinguishing between the kinds of problems that are likely to be encountered and deal with them accordingly. Crisis Management, for example, encompasses different stages: pre-crisis, warning, crisis, recovery, post-crisis, which require appropriate responses. Very often issues that are not recognized, evaluated and correctly managed turn into crisis. While it is important to build expertise in managing crisis and coming out of them, it is also important to build expertise in sensing and preventing them. For example, use of past experience to generate alerts in respect of projects most likely to get stalled could reduce resolution time and effort. Maintaining a knowledge repository with well-designed entry and search criteria to enable efficient knowledge transfer for problem resolution is also critical. The ultimate objective of resolving issues in stalled projects is to see that the project is finally completed and delivering the desired results. Thus retaining on the radar projects for which a particular issue has been resolved may be needed to ensure that the project is successfully completed and it does not move from one problem to another. 07
  • 9. Like stakeholder engagement, training is universally acknowledged as a critical need for successful project management. Department of Personnel and Training and Department of Public Enterprises, Government of India have both recognized the importance of Project Management training as is evident from the circulars on such trainings to be made mandatory. Our recommendations focus on the twin questions on what is the right kind of project management training, and how does effective knowledge transfer take place for organizational rather than individual capability? In this respect, the following five principles deserve consideration: Each project is unique and therefor training needs are also unique to projects; training needs assessment is therefore a critical component for each project Capacity building interventions are not one time activities; they are needed at different stages of the project with content suited to each stage For best results, a mix of standard project management practices on a regular basis s coupled with need-based project-specific technology and process training is recommended Formal process for assessing organizational capability in project management is required to enable effective transfer of individual learning into organizational learning; this includes learning for not only the project teams, but also project owners and sponsors Project management know how of our times also includes knowledge of project management tools and their use • • • • • Recommendation 3: Formal Training on Project Management 08
  • 10. The first principle implies that for every project training needs must be assessed and training interventions designed accordingly. The following structure illustrates how to arrive at the critical learning agenda at the project level. Most important WHAT DO WE NEED TO KNOW Less important A lot HOW WELL DO WE KNOW IT NOW Very little Learning Agenda Necessary Project management practices (Standard modules) Critical Technology and processes (Project and role specific) 09
  • 11. Established in 1927, FICCI is the largest and oldest apex business organisation in India. Its history is closely interwoven with India's struggle for independence, its industrialization, and its emergence as one of the most rapidly growing global economies. FICCI has contributed to this historical process by encouraging debate, articulating the private sector's views and influencing policy. A non-government, not-for-profit organisation, FICCI is the voice of India's business and industry. FICCI draws its membership from the corporate sector, both private and public, including SMEs and MNCs; FICCI enjoys an indirect membership of over 2,50,000 companies from various regional chambers of commerce. FICCI provides a platform for sector specific consensus building and networking and as the first port of call for Indian industry and the international business community. To be the thought leader for industry, its voice for policy change and its guardian for effective implementation. To carry forward our initiatives in support of rapid, inclusive and sustainable growth that encompass health, education, livelihood, governance and skill development. To enhance efficiency and global competitiveness of Indian industry and to expand business opportunities both in domestic and foreign markets through a range of specialised services and global linkages. Our Vision Our Mission ABOUT PMI Project Management Institute (PMI) - is the world's leading profession. Founded in 1969, PMI delivers value for more than 2.9 million professionals working in nearly every country in the world through global advocacy, collaboration, education and research. PMI enhances careers, improves organizational success and further matures the profession of project management through its globally recognized standards, certifications, resources, tools, and networking opportunities. The PMI India office is set up with the key mandate of driving advocacy of Project Management across organizations, academia and governments in India. In India, PMI is represented by 3 offices (Mumbai, Bangalore and New Delhi) and 8 Chapters (Delhi, Bangalore, Chennai, Hyderabad, Trivandrum, Kolkata, Pune, Mumbai) where we have around certified 36,500+ professionals in project management. For more details, please visit: www.pmi.org/www.pmi.org.in not-for-profit professional membership association for the project, program and portfolio management ABOUT FICCI 10
  • 12. Mumbai office: PMI Organization Centre Pvt. Ltd., rd 302-305, 3 Floor, Balarama, Plot No. C-3, E Block, BandraKurla Complex, Bandra East, Mumbai – 400051, India Tel: +91 22 6525 9067 | Fax: +91 22 4070 0800 Fax: +91 22 4070 0800 Email: pmi.india@pmi.org www.pmi.org www.pmi.org.in FICCI Quality Forum Federation of Indian Chambers of Commerce and Industry Federation House, Tansen Marg New Delhi-110 001 - India Tel: +91-11-2335 9735, 2373 9947 Fax: +91-11-2332 0714, 2372 1504 Email: fqf@ficci.com www.ficci.com This summary has been prepared by FICCI Quality Forum for the unveiling of recommendations at the FICCI-PMI Symposium on Project Management Practices at New Delhi on March 10, 2015