Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
1. OCP workshop
1. Compute Project
The Open Compute Project
Project Committee Update
Charlie Manese
Hardware Design, Facebook
Channel Development, OCP Foundation
Fall 2013
1
4. Facebook Greenfield Datacenter
Goal
Design and build the most efficient datacenter eco-system possible
Control
Application
Server configuration
Datacenter design
Sites
Prineville, OR
Forest City, NC
Luleå, Sweden
Compute Project
5. Electrical Overview
Eliminate 480V to 208V transformation
Remove centralized UPS
Used 480/277VAC distribution to IT equipment
Implemented 48VDC UPS System
Result a highly efficient electrical system and small failure domain
Compute Project
6. Typical Power
Utility Transformer
480/277 VAC
Prineville Power
Utility Transformer
480/277 VAC
Standby
Generator
2% loss
Standby
Generator
2% loss
UPS
480VAC
AC/DC
DC/AC
6% - 12% loss
ASTS/PDU
208/120VAC
3% loss
SERVER PS
99.999%
Availability
10% loss
(assuming 90% plus PS)
Total loss up to server:
21% to 27%
99.9999%
Availability
480/277VAC
FB SERVER
PS
48VDC DC UPS
5.5% loss
(Stand-by)
Total loss up to server:
7.5%
Compute Project
7. Battery Cabinet
Custom DC UPS
56kW or 85kW
480VAC, 3-phase input
45 second back-up
20 sealed VRLA batteries
Battery Validation System
Six 48VDC Output
Two 50A 48VDC aux outputs
Compute Project
8. Mechanical Overview
Removed
Centralized chiller plant
HVAC ductwork
System
Basis of Design
ASHRAE Weather Data: N=50 years
TC9.9 2008:
Recommended Envelopes
Built-up
Server
penthouse air handling system
waste heat is used for office space heating
Compute Project
12. Open Compute Rack v2: Open Rack
Well-defined “Mechanical API” between
the server and the rack
Accepts any size equipment 1U – 10U
Wide 21” equipment bay for maximum
space efficiency
Shared 12v DC power system
Available now from Delta Electronics
(more suppliers coming soon)
Compute Project
13. Open Rack Project Updates
• Open Rack Specification in community review
• DC Power Shelf submission
13
Compute Project
15. Open Compute v2
First step with shared
components by reusing PSU
and fans between two servers
Increased rack density without
sacrificing efficiency or cost
All new Facebook deployments
in 2012 were “v2” servers
Compute Project
16. Open Compute v3
Reuses the “v2” half-width
motherboards
Self-contained sled for Open
Rack
3-across 2U form factor enables
80mm fans with 45 servers per
rack
Compute Project
29. OCP Ready and Certified
Note: Logo graphics are a representation and may not be the final logos.
29
Compute Project
30. C&I Project Updates
• Certification Labs being set up at ITRI and UTSA
• Focused engineering workshop in NY on October
1, 2013
30
Compute Project
31. Get Involved!
Sign the CLA!
Join the mailing lists!
Open Source the Data Center
Change the world
http://opencompute.org/about/get-invo
31
Compute Project