SlideShare a Scribd company logo
1 of 14
FIRSTGREEN CONSULTING

          Project Management
                   for
   1 MW Solar PV Project in Rajasthan
                  under
   Rajasthan Solar Energy Policy 2011

                   by
      Tariff Based Bidding Process
Key features of Rajasthan Solar Policy

•   Developing a global hub of solar power of 10000-12000 MW capacity in next 10-12
    years to meet energy requirements of Rajasthan and India.
•   To achieve the grid parity in next 7-8 years, the State will encourage the Solar
    Power Developers to establish manufacturing plant of their technology in
    Rajasthan.
•   Single Window Clearance: A State Level Empowered Committee consisting of
    following will provide single window clearance on proposals
•   Exemption from Electricity Duty: - Consumption of electricity generated by Eligible
    Power Producers for its captive use or for sale to a nominated third party will be
    exempted from Electricity Duty @ 50% for a period of 7 years from COD
•   Solar power projects will get land allotement at concessional rates viz, 10% of DLC
    rates Rajasthan is likely to emerge as the power house of the country with the
    possibilities of setting up installed capacity exceeding 100,000 MW.
•   So far, 49 Nos. solar project proposals totaling of 1524.MW have been registered
    to RRECL
Solar Radiation levels in Rajasthan
City        Jan    Feb    Mar    Apr    May    Jun    July   Aug    Sep    Oct    Nov    Dec    Avg

Ajmer       3.9    4.58   5.42   6.08   6.64   6.43   5.3    5.04   5.1    4.76   4.04   3.64   5.08

Alwar       3.75   4.5    5.32   5.82   6.26   6.06   4.99   4.66   4.93   4.59   3.92   3.47   4.86

Bali        4.13   4.89   5.59   5.99   5.79   4.49   4.09   3.9    3.88   4.32   4.21   4.02   4.61

Bharatpur   3.67   4.6    5.43   5.9    6.23   5.95   4.95   4.54   4.76   4.62   3.93   3.46   4.84

Bhilwara    4.1    4.89   5.62   6.06   6.36   6.08   4.87   4.53   5.11   4.9    4.2    3.83   5.05

Bikaner     3.51   4.11   4.9    5.85   6.52   6.44   5.77   5.36   4.95   4.38   3.66   3.19   4.89

Jaipur      3.9    4.67   5.4    5.99   6.35   6.21   5.08   4.68   5.05   4.75   4.04   3.66   4.98

Jodhpur     3.84   4.54   5.48   6.27   6.79   6.6    5.57   5.27   5.23   4.64   3.96   3.52   5.14

Kota        4.01   4.87   5.55   6.11   6.31   6.01   4.83   4.36   5.12   4.92   4.19   3.81   5.01

Pali        4.03   4.75   5.55   6.18   6.65   6.38   5.22   4.89   5.18   4.79   4.18   3.7    5.13
Registration of Project
Step 1: Registration of Project in RRECL as per clause no 8 of Rajasthan Energy Policy
2011.
• This requires submission of the application to RREC with following required
   documents, as applicable
    – A certified copy of the Memorandum & Article of Association of the Company
    – Certified copy of the registration certificate
    – Certified copy of the partnership deed
    – Certified copy of the Authority conferring powers on the person(s) who are competent to
      execute the MOU / the agreement with GoR / RREC / RVPN / Discom of Rajasthan / NVVN
    – Solar Data Assessment Report for the site where the plant is to be developed.
    – Detailed Project Report (in two hard copies and one soft copy)
    – Annual Report of the Company for last three years

Along with this it is important to submit
• Demand Draft for processing fees @ Rs. 50000 per MW + Service Tax in favour of
   Rajasthan Renewable Energy Corporation Ltd. payable at Jaipur.
Registration of Project
Step 2: Registration and Approval
• In Principal Clearance will be granted by State Level Screening Committee (SLSC) of
   RRECL.
Bid Submission
Step 3: Submission of Bid against the RfS Document
• Last Date of Submission: 9th May 2012 up to 3:00 PM
• This is for setting up of 50 Projects of 1 MW (AC) each Small Solar PV Plant to be
   connected on 11 kV level at 33 / 11kV Discom's Substation in Rajasthan under
   Rajasthan solar Energy Policy 2011
• RREC has been designated as the Nodal Agency for selection of the Solar Power
   Producer.

With Bid Document Following needs to be submitted
• Demand Draft / Pay Order should be made in favour of “Rajasthan Renewable
   Energy Corporation Limited” payable at Jaipur
     – As Cost of RfS (non-refundable) Rs.5000/- or 125 US Dollars
     – Processing Fee A non-refundable processing fee of Rs.10,000/- per MW in the form of DD /
       pay order is to be submitted for each Solar Project
•    EMD Earnest Money Deposit (EMD) @ Rs.20.00 lacs / MW is to be submitted in
    the form of Bank Guarantee along with RfS Document for each project.
Important Information
Important information
• The Bidders should be registered with RREC prior to participation in this bid
   process. All the companies registered earlier need not to be registered again.
• This is tariff based competitive bidding is under phase -1 of Rajasthan Solar Energy
   Policy
• Consortium is allowed
•   The Bidder is free to choose any Solar PV power generation technology viz
   Crystalline Silicon Solar Cell Modules / Thin Film Modules /Concentrated PV
   Modules/ any Other Technology manufactured in India or Imported.
• It is proposed to promote only commercially established and operational
   technologies to minimize the technology risk and to achieve the commissioning of
   the projects in state.
• The Bidder has to submit their proposed technology at the stage of RfS
• MoU or any type of agreement with technology provider is not required to be
   submitted along with the response to RfS. Also any technology Partner‘s details
   are not required at RfS stage.
Technology Consideration
• Conventional Technology: PV Modules without trackers etc generating up to 21%
   CUF will come under category of Conventional Technology.
• Advance Technology: PV Modules with trackers etc generating more than 21% CUF
   will come under category of Advance Technology.

Capacity of each Project
• The capacity of each Solar PV Project should be 1 MW +5% AC (means 1 MW AC
   output at inverter)
• This power plant will be connected on 11kV level at nearby 33kV Substation with-
   in 5 km.
• No two projects of 1 MW AC will be connected to one 33 KV GSS.

Financial Criteria
• The “Net Worth” of the Bidder should be equal to or greater than Rs 3 crore per
    MW or equivalent US$.
• If Technology Partner has an equity participation in Bidding Consortium then it has
    to be a Company with equity participation less than 10%.
Eligibility for Participation
• Companies incorporated under the Company's Act, 1956 are eligible on standalone
    basis or as a part of the bidding consortium.
• Companies shortlisted in RfS / RfP can also execute the project through a Special
    Purpose Vehicle (SPV). However the SPV has to be formed before signing of PPA.
• Limited Liability Partnerships (LLPs) are not eligible for participation.

Tariff
• Tariff: PPA will be signed between Procurer and Successful Bidder. The Procurer
    will pay to the Seller the Quoted Tariff which has been arrived after discount in
    generic tariff (benchmark tariff) declared by Rajasthan Electricity Regulatory
    Commission
General Information
•   Estimated Cost of the Project Rs 90 per W (Rs Cr per MW as per recent market
    development of Solar PV in India
•   Land requirement (As per Policy)
     – SPV Crystalline: 2.5 Hectare / MW (6.1 Acre / MW = 25,000 square m/MW)
     – Thin Film / Amorphous: 3.5 Hectare / MW (8.6 Acre / MW = 35,000 square m/MW)
     – However based on our experiences and use of better technology lead to the decrease in
       the land requirement up to 20,234 square m per MW (5 Acre / MW = 2.023 Hectare /
       MW)
Approval given by RRECL
•   Moser Baer Photovoltaic Ltd. 5 SPVCPV
•   Astonfield Solar (Rajasthan) Pvt. Ltd. 5 SPV/CPV
•   Videocon Industries Ltd. 5 SPV/CPV
•   Refex Refrigerants Ltd. 5 SPV/CPV
•   AES Solar Energy Pvt. Ltd. 5 SPV/CPV
•   6.* Zoom Developers 5 SPV/CPV
•   Entegra 1 SPV/CPV
•   Swiss Park Vanijya 5 SPV/CPV
•   OPG Energy 5 SPV/CPV
•   Acme Telepower Ltd. 10 Thermal
•   Essar Power (Essar Abengoa solar one) 10 Thermal
•   Entegra 10 Thermal
Solar PV Projects in Rajasthan
•   Par Solar, Jodhpur (5MW)
•   Reliance Industries Ltd., Nagaur (5MW)
•   Vivek Pharmachem (India) Ltd., Barmer (1MW)
•   AEW Infratech Pvt. Ltd., Bikaner (1MW)
•   Nav Bharat Buildcon Pvt. Ltd., Churu (1MW)
•   Rays Power Pvt. Ltd., Jaisalmer (1MW)
•   Asian Aero-Edu Aviation Pvt. Ltd., Jaisalmer (1MW)
•   Lanco Solar Pvt. Ltd., Jaisalmer (1MW)
•   Basant Enterprises, Jaisalmer (1MW)
•   Ganges Enterprises Pvt. Ltd., Jhunjhunu (1MW)
•   Zamil New Delhi Infrastructure Pvt. Ltd., Jodhpur (1MW)
•   Sovox Renewables Pvt. Ltd., Jodhpur (1MW)
•   Conflux Infratech Pvt. Ltd., Jodhpur (1MW)
•   Sun Edision Energy India Pvt. Ltd., Sirohi (1MW)
Thank you for approaching us.....




    FirstGreen Consulting Private Limited

    Gurgaon:
    1202, Tower B, Millennium Plaza, Sec 27, Gurgaon – 122002, India
    Tel.: (+91) 124 424 1750 , 9899295854
     Fax: (+91) 124 424 1751



    Web: www.firstgreenconsulting.in
    Email: sanjayvashishtha@gmail.com

More Related Content

What's hot

Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects Gensol Engineering Limited
 
500 MW SECI’s Government Rooftop Tender: Technical Bid Analysis
500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis
500 MW SECI’s Government Rooftop Tender: Technical Bid AnalysisGensol Engineering Limited
 
World's Largest Solar Project
World's Largest Solar ProjectWorld's Largest Solar Project
World's Largest Solar ProjectMitchellDong
 
Ensuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical PersepectiveEnsuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical PersepectivePuneet Jaggi
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTRenato Borra
 
Cost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power ProjectCost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power ProjectSrini Chopakatla, PE, PMP
 
Solar Cell & Module Supplier - India (01.02.17)
Solar Cell & Module Supplier - India (01.02.17)Solar Cell & Module Supplier - India (01.02.17)
Solar Cell & Module Supplier - India (01.02.17)Gensol Engineering Limited
 
Rfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiRfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiHeadway Solar
 
Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportShrikant Hiremath
 
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)Muzaffar Ahmad
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installationAmitesh Kumar
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, DesignVignesh Sekar
 

What's hot (20)

Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
 
500 MW SECI’s Government Rooftop Tender: Technical Bid Analysis
500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis
500 MW SECI’s Government Rooftop Tender: Technical Bid Analysis
 
World's Largest Solar Project
World's Largest Solar ProjectWorld's Largest Solar Project
World's Largest Solar Project
 
Ensuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical PersepectiveEnsuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical Persepective
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANT
 
Cost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power ProjectCost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power Project
 
Lecture 1 piyush 21
Lecture 1 piyush 21Lecture 1 piyush 21
Lecture 1 piyush 21
 
Solar Cell & Module Supplier - India (01.02.17)
Solar Cell & Module Supplier - India (01.02.17)Solar Cell & Module Supplier - India (01.02.17)
Solar Cell & Module Supplier - India (01.02.17)
 
Rfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiRfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in Delhi
 
Solarig Gensol 'An Overview'
Solarig Gensol 'An Overview' Solarig Gensol 'An Overview'
Solarig Gensol 'An Overview'
 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
 
Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design report
 
Gensol Lender's Engineer Services
Gensol Lender's Engineer ServicesGensol Lender's Engineer Services
Gensol Lender's Engineer Services
 
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
 
Presented by Munjal Rangwala
Presented by Munjal RangwalaPresented by Munjal Rangwala
Presented by Munjal Rangwala
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
 
Presentation By Rahul Galgate
Presentation By Rahul GalgatePresentation By Rahul Galgate
Presentation By Rahul Galgate
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
Gensol detailed engineering services
Gensol detailed engineering servicesGensol detailed engineering services
Gensol detailed engineering services
 

Viewers also liked

Solar Power Project Development
Solar Power Project DevelopmentSolar Power Project Development
Solar Power Project Developmentfirstgreen
 
Solar Project Financing
Solar Project FinancingSolar Project Financing
Solar Project Financingfirstgreen
 
Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsDrawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsGensol Engineering Limited
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Managementfirstgreen
 
1.5 MW Financial Analysis (1)
1.5 MW Financial Analysis (1)1.5 MW Financial Analysis (1)
1.5 MW Financial Analysis (1)ANKUR CHUGH
 
List of solar technologies
List of solar technologiesList of solar technologies
List of solar technologiesfirstgreen
 
List Of Solar Technologies
List Of Solar TechnologiesList Of Solar Technologies
List Of Solar Technologiesfirstgreen
 
Solar Resource Assessment
Solar Resource AssessmentSolar Resource Assessment
Solar Resource Assessmentfirstgreen
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantShahbaz Makandar A.
 
Solar Power Plant System Sizing
Solar Power Plant System SizingSolar Power Plant System Sizing
Solar Power Plant System Sizingfirstgreen
 
Tender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at DamanTender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at DamanHeadway Solar
 
Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaAkash Jauhari
 
Solar Energy Presentation
Solar Energy PresentationSolar Energy Presentation
Solar Energy PresentationKurt Kublbeck
 
Solar energy
Solar energySolar energy
Solar energyAmeenah
 
Solar energy power point presentation
Solar energy power point presentation Solar energy power point presentation
Solar energy power point presentation Shrijeet Modi
 

Viewers also liked (20)

Solar Power Project Development
Solar Power Project DevelopmentSolar Power Project Development
Solar Power Project Development
 
Solar Project Financing
Solar Project FinancingSolar Project Financing
Solar Project Financing
 
Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsDrawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar Projects
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Management
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
1.5 MW Financial Analysis (1)
1.5 MW Financial Analysis (1)1.5 MW Financial Analysis (1)
1.5 MW Financial Analysis (1)
 
List of solar technologies
List of solar technologiesList of solar technologies
List of solar technologies
 
List Of Solar Technologies
List Of Solar TechnologiesList Of Solar Technologies
List Of Solar Technologies
 
Solar Resource Assessment
Solar Resource AssessmentSolar Resource Assessment
Solar Resource Assessment
 
List of Clearances for Solar Project
List of Clearances for Solar ProjectList of Clearances for Solar Project
List of Clearances for Solar Project
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
Energy Efficient Architecture-Sustainable Habitat
Energy Efficient Architecture-Sustainable HabitatEnergy Efficient Architecture-Sustainable Habitat
Energy Efficient Architecture-Sustainable Habitat
 
Failure To Thrive With Notes
Failure To Thrive With NotesFailure To Thrive With Notes
Failure To Thrive With Notes
 
Solar Power Plant System Sizing
Solar Power Plant System SizingSolar Power Plant System Sizing
Solar Power Plant System Sizing
 
Tender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at DamanTender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at Daman
 
Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in India
 
Solar Energy Presentation
Solar Energy PresentationSolar Energy Presentation
Solar Energy Presentation
 
MS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation ScheduleMS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation Schedule
 
Solar energy
Solar energySolar energy
Solar energy
 
Solar energy power point presentation
Solar energy power point presentation Solar energy power point presentation
Solar energy power point presentation
 

Similar to Rajasthan Solar Policy Frist Green

200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALATahnoon Elahi
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
Solar Rooftop Business in India
Solar Rooftop Business in IndiaSolar Rooftop Business in India
Solar Rooftop Business in IndiaAshish Rajendran
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 
GC Advisors - REC Offering
GC Advisors - REC OfferingGC Advisors - REC Offering
GC Advisors - REC OfferingGCAdvisors
 
Solar power projects under rec mechanism in india
Solar power projects under rec mechanism in indiaSolar power projects under rec mechanism in india
Solar power projects under rec mechanism in indiaBhargav Parmar
 
Renewable Energy Certificate (REC) Mechanism
Renewable Energy Certificate (REC) MechanismRenewable Energy Certificate (REC) Mechanism
Renewable Energy Certificate (REC) MechanismKranav Sharma
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.antastoya
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanHeadway Solar
 
PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)C.P Singh
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010Headway Solar
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesSaurabh Mehta
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHHarish Sharma
 
Wind Force Newsletter January, Edition, 2012
Wind Force Newsletter   January, Edition, 2012Wind Force Newsletter   January, Edition, 2012
Wind Force Newsletter January, Edition, 2012rupeshsingh_1
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012Bakul Haria
 
Opportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in IndiaOpportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in India Devesh Gautam
 

Similar to Rajasthan Solar Policy Frist Green (20)

1 final com.sum
1 final com.sum1 final com.sum
1 final com.sum
 
REC status
REC statusREC status
REC status
 
200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Solar Rooftop Business in India
Solar Rooftop Business in IndiaSolar Rooftop Business in India
Solar Rooftop Business in India
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
Final faq booklet
Final faq bookletFinal faq booklet
Final faq booklet
 
GC Advisors - REC Offering
GC Advisors - REC OfferingGC Advisors - REC Offering
GC Advisors - REC Offering
 
Solar power projects under rec mechanism in india
Solar power projects under rec mechanism in indiaSolar power projects under rec mechanism in india
Solar power projects under rec mechanism in india
 
Renewable Energy Certificate (REC) Mechanism
Renewable Energy Certificate (REC) MechanismRenewable Energy Certificate (REC) Mechanism
Renewable Energy Certificate (REC) Mechanism
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project Rajasthan
 
PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010
 
SOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANT
SOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANTSOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANT
SOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANT
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent Initiatives
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
 
Wind Force Newsletter January, Edition, 2012
Wind Force Newsletter   January, Edition, 2012Wind Force Newsletter   January, Edition, 2012
Wind Force Newsletter January, Edition, 2012
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
Opportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in IndiaOpportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in India
 

Rajasthan Solar Policy Frist Green

  • 1. FIRSTGREEN CONSULTING Project Management for 1 MW Solar PV Project in Rajasthan under Rajasthan Solar Energy Policy 2011 by Tariff Based Bidding Process
  • 2. Key features of Rajasthan Solar Policy • Developing a global hub of solar power of 10000-12000 MW capacity in next 10-12 years to meet energy requirements of Rajasthan and India. • To achieve the grid parity in next 7-8 years, the State will encourage the Solar Power Developers to establish manufacturing plant of their technology in Rajasthan. • Single Window Clearance: A State Level Empowered Committee consisting of following will provide single window clearance on proposals • Exemption from Electricity Duty: - Consumption of electricity generated by Eligible Power Producers for its captive use or for sale to a nominated third party will be exempted from Electricity Duty @ 50% for a period of 7 years from COD • Solar power projects will get land allotement at concessional rates viz, 10% of DLC rates Rajasthan is likely to emerge as the power house of the country with the possibilities of setting up installed capacity exceeding 100,000 MW. • So far, 49 Nos. solar project proposals totaling of 1524.MW have been registered to RRECL
  • 3. Solar Radiation levels in Rajasthan City Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec Avg Ajmer 3.9 4.58 5.42 6.08 6.64 6.43 5.3 5.04 5.1 4.76 4.04 3.64 5.08 Alwar 3.75 4.5 5.32 5.82 6.26 6.06 4.99 4.66 4.93 4.59 3.92 3.47 4.86 Bali 4.13 4.89 5.59 5.99 5.79 4.49 4.09 3.9 3.88 4.32 4.21 4.02 4.61 Bharatpur 3.67 4.6 5.43 5.9 6.23 5.95 4.95 4.54 4.76 4.62 3.93 3.46 4.84 Bhilwara 4.1 4.89 5.62 6.06 6.36 6.08 4.87 4.53 5.11 4.9 4.2 3.83 5.05 Bikaner 3.51 4.11 4.9 5.85 6.52 6.44 5.77 5.36 4.95 4.38 3.66 3.19 4.89 Jaipur 3.9 4.67 5.4 5.99 6.35 6.21 5.08 4.68 5.05 4.75 4.04 3.66 4.98 Jodhpur 3.84 4.54 5.48 6.27 6.79 6.6 5.57 5.27 5.23 4.64 3.96 3.52 5.14 Kota 4.01 4.87 5.55 6.11 6.31 6.01 4.83 4.36 5.12 4.92 4.19 3.81 5.01 Pali 4.03 4.75 5.55 6.18 6.65 6.38 5.22 4.89 5.18 4.79 4.18 3.7 5.13
  • 4. Registration of Project Step 1: Registration of Project in RRECL as per clause no 8 of Rajasthan Energy Policy 2011. • This requires submission of the application to RREC with following required documents, as applicable – A certified copy of the Memorandum & Article of Association of the Company – Certified copy of the registration certificate – Certified copy of the partnership deed – Certified copy of the Authority conferring powers on the person(s) who are competent to execute the MOU / the agreement with GoR / RREC / RVPN / Discom of Rajasthan / NVVN – Solar Data Assessment Report for the site where the plant is to be developed. – Detailed Project Report (in two hard copies and one soft copy) – Annual Report of the Company for last three years Along with this it is important to submit • Demand Draft for processing fees @ Rs. 50000 per MW + Service Tax in favour of Rajasthan Renewable Energy Corporation Ltd. payable at Jaipur.
  • 5. Registration of Project Step 2: Registration and Approval • In Principal Clearance will be granted by State Level Screening Committee (SLSC) of RRECL.
  • 6. Bid Submission Step 3: Submission of Bid against the RfS Document • Last Date of Submission: 9th May 2012 up to 3:00 PM • This is for setting up of 50 Projects of 1 MW (AC) each Small Solar PV Plant to be connected on 11 kV level at 33 / 11kV Discom's Substation in Rajasthan under Rajasthan solar Energy Policy 2011 • RREC has been designated as the Nodal Agency for selection of the Solar Power Producer. With Bid Document Following needs to be submitted • Demand Draft / Pay Order should be made in favour of “Rajasthan Renewable Energy Corporation Limited” payable at Jaipur – As Cost of RfS (non-refundable) Rs.5000/- or 125 US Dollars – Processing Fee A non-refundable processing fee of Rs.10,000/- per MW in the form of DD / pay order is to be submitted for each Solar Project • EMD Earnest Money Deposit (EMD) @ Rs.20.00 lacs / MW is to be submitted in the form of Bank Guarantee along with RfS Document for each project.
  • 7. Important Information Important information • The Bidders should be registered with RREC prior to participation in this bid process. All the companies registered earlier need not to be registered again. • This is tariff based competitive bidding is under phase -1 of Rajasthan Solar Energy Policy • Consortium is allowed • The Bidder is free to choose any Solar PV power generation technology viz Crystalline Silicon Solar Cell Modules / Thin Film Modules /Concentrated PV Modules/ any Other Technology manufactured in India or Imported. • It is proposed to promote only commercially established and operational technologies to minimize the technology risk and to achieve the commissioning of the projects in state. • The Bidder has to submit their proposed technology at the stage of RfS • MoU or any type of agreement with technology provider is not required to be submitted along with the response to RfS. Also any technology Partner‘s details are not required at RfS stage.
  • 8. Technology Consideration • Conventional Technology: PV Modules without trackers etc generating up to 21% CUF will come under category of Conventional Technology. • Advance Technology: PV Modules with trackers etc generating more than 21% CUF will come under category of Advance Technology. Capacity of each Project • The capacity of each Solar PV Project should be 1 MW +5% AC (means 1 MW AC output at inverter) • This power plant will be connected on 11kV level at nearby 33kV Substation with- in 5 km. • No two projects of 1 MW AC will be connected to one 33 KV GSS. Financial Criteria • The “Net Worth” of the Bidder should be equal to or greater than Rs 3 crore per MW or equivalent US$. • If Technology Partner has an equity participation in Bidding Consortium then it has to be a Company with equity participation less than 10%.
  • 9. Eligibility for Participation • Companies incorporated under the Company's Act, 1956 are eligible on standalone basis or as a part of the bidding consortium. • Companies shortlisted in RfS / RfP can also execute the project through a Special Purpose Vehicle (SPV). However the SPV has to be formed before signing of PPA. • Limited Liability Partnerships (LLPs) are not eligible for participation. Tariff • Tariff: PPA will be signed between Procurer and Successful Bidder. The Procurer will pay to the Seller the Quoted Tariff which has been arrived after discount in generic tariff (benchmark tariff) declared by Rajasthan Electricity Regulatory Commission
  • 10. General Information • Estimated Cost of the Project Rs 90 per W (Rs Cr per MW as per recent market development of Solar PV in India • Land requirement (As per Policy) – SPV Crystalline: 2.5 Hectare / MW (6.1 Acre / MW = 25,000 square m/MW) – Thin Film / Amorphous: 3.5 Hectare / MW (8.6 Acre / MW = 35,000 square m/MW) – However based on our experiences and use of better technology lead to the decrease in the land requirement up to 20,234 square m per MW (5 Acre / MW = 2.023 Hectare / MW)
  • 11. Approval given by RRECL • Moser Baer Photovoltaic Ltd. 5 SPVCPV • Astonfield Solar (Rajasthan) Pvt. Ltd. 5 SPV/CPV • Videocon Industries Ltd. 5 SPV/CPV • Refex Refrigerants Ltd. 5 SPV/CPV • AES Solar Energy Pvt. Ltd. 5 SPV/CPV • 6.* Zoom Developers 5 SPV/CPV • Entegra 1 SPV/CPV • Swiss Park Vanijya 5 SPV/CPV • OPG Energy 5 SPV/CPV • Acme Telepower Ltd. 10 Thermal • Essar Power (Essar Abengoa solar one) 10 Thermal • Entegra 10 Thermal
  • 12. Solar PV Projects in Rajasthan • Par Solar, Jodhpur (5MW) • Reliance Industries Ltd., Nagaur (5MW) • Vivek Pharmachem (India) Ltd., Barmer (1MW) • AEW Infratech Pvt. Ltd., Bikaner (1MW) • Nav Bharat Buildcon Pvt. Ltd., Churu (1MW) • Rays Power Pvt. Ltd., Jaisalmer (1MW) • Asian Aero-Edu Aviation Pvt. Ltd., Jaisalmer (1MW) • Lanco Solar Pvt. Ltd., Jaisalmer (1MW) • Basant Enterprises, Jaisalmer (1MW) • Ganges Enterprises Pvt. Ltd., Jhunjhunu (1MW) • Zamil New Delhi Infrastructure Pvt. Ltd., Jodhpur (1MW) • Sovox Renewables Pvt. Ltd., Jodhpur (1MW) • Conflux Infratech Pvt. Ltd., Jodhpur (1MW) • Sun Edision Energy India Pvt. Ltd., Sirohi (1MW)
  • 13.
  • 14. Thank you for approaching us..... FirstGreen Consulting Private Limited Gurgaon: 1202, Tower B, Millennium Plaza, Sec 27, Gurgaon – 122002, India Tel.: (+91) 124 424 1750 , 9899295854 Fax: (+91) 124 424 1751 Web: www.firstgreenconsulting.in Email: sanjayvashishtha@gmail.com