(Insert logo)

(Insert Co. Name)

Health Safety & Environmental
Plan - PLN 001

REV

ABN: (Insert ABN)
BSA

DATE

DESCRIPTION

Prepared

Reviewed

Signature
0

INDEX
1.

INTRODUCTION

4

1.1
1.2
1.3

Purpose
Abbreviations And Terminology
References

4
4
5

2.

HSE MANAGEMENT SYSTEM

5

3.

MANAGEMENT LEADERSHIP AND COMMITMENT

6

3.1
3.2
3.3

Responsibilities
HSE Policy
Objectives and Goals

6
7
7

4.

SUB-CONTRACTOR MANAGEMENT

7

4.1
4.2

Sub -contractor HSE Systems and Procedures
Assessment of sub-contractors

8
8

5.

COMMUNICATION AND CONSULTATION

8

5.1
5.2
5.3

HSE Meetings
HSE Alerts
HSE Issue Resolution

8
10
10

6.

RISK MANAGEMENT

10

6.1
6.2
6.3
6.4
6.5

Risk Assessment
Hazard Register
Safe Health and Enviromental Work Method Statement (SH&EWMS)
Hazard Observation and Reporting
Workplace Inspections

11
11
12
12
12

7.

TRAINING AND COMPETENCY

13

7.1
7.2
7.3
7.4
7.5
7.6
7.7

Personnel Selection
Licenses and Certificates of Competency
Inductions
First Aid Training
Emergency Response
Training Assessment
Training Records

13
13
13
13
13
14
14

8.

OCCUPATIONAL HEALTH

14

8.1
8.2
8.3
8.4
8.5
8.6

Fitness For Work
Hazardous Substances and Dangerous Goods
Working in Heat
Noise and Hearing
Hygiene
First Aid Facilities

14
14
15
15
15
15

9.

ENVIRONMENT

15

10.

INCIDENT / INJURY REPORTING AND INVESTIGATION

16

10.1
10.2
10.3
10.4

Incident / Injury Reporting
Incident Response
Guidelines for Investigation
Incident Notification

16
16
16
16

(Insert Co Name)
HSE Plan Rev 0

Page 2 of 29
Saved date: 09/09/13
0
10.5

Injury Management

17

11.

EMERGENCY RESPONSE

17

11.1

Emergency Procedures

17

12.

HSE AUDITS

17

13.

PROCEDURES AND WORK PRACTICES

18

13.1
13.2
13.3
13.4
13.5
13.6
13.7
13.8
13.9
13.10
13.11
13.12
13.13
13.14

Angle Grinders
Confined Space
Cranes, Rigging and Lifting Operations
Working at heights
Manual Handling
Electrical
Fire Prevention
Housekeeping
Out of Service Equipment
Personal Protective Equipment (PPE)
Signs and Barricades
Vehicles and Mobile Equipment
Welding and Cutting
Ladders - only for access

18
18
18
18
22
22
23
23
23
23
24
24
25
25

14.

ATTACHMENTS

25

Health and Safety Policy
Environment Policy
Workplace Rehabilitation Policy
General Safety Rules

(Insert Co Name)
HSE Plan Rev 0

26
27
28
29

Page 3 of 29
Saved date: 09/09/13
0

1.

INTRODUCTION

1.1 Purpose
(Insert Co. Name) (hereafter referred to as (Insert Co. Name)) Health Safety and
Environmental Plan (hereafter referred to as the HSE Plan) describes the minimum
requirements expected of (Insert Co. Name)s' officers, employees, sub-contractors and
visitors.
The HSE Plan is part of (Insert Co. Name)s' total commitment to providing a safe work
environment at all times and the goal of achieving incident and injury free projects.
This HSE plan shall outline how (Insert Co. Name) shall comply with relevant Acts,
Regulations, Codes of Practice, Standards, and client requirements. It is a live plan, that is,
the plan shall be updated regularly with relevant changes and tailored to every client and
project.
This plan applies to all activities associated with (Insert Co. Name)s' operations.

1.2 Abbreviations And Terminology
ALARP
All Personnel

AS/NZS/ISO
Brown Field
Client
Contractor
SO
HSE
dB(A)
BCPU
Principal Contractor
ERT
FAI
SH&EWMS
LTI
SDS
MTI
PPE
RDI
Supervisor

(Insert Co Name)
HSE Plan Rev 0

As Low As Reasonably Practicable
All personnel associated with any (INSERT CO. NAME) including
Principal Contractor personnel, Contractor personnel , visitors,
delivery drivers and vendor representatives.
Australian/New Zealand/International Standard
All construction works in close proximity to operational equipment
Aurizon
Contractors and Subcontractors
Safety Officer
Health, Safety and Environment
Decibels (A-weighted scale)
Person Conducting and business or undertaking
(Insert Co. Name) Builders of Distinction
Emergency Response Team
First Aid Injury
Safe Health and Environmental Work Method Statement
Lost Time Injury
Safety Data Sheet
Medically Treated Injury
Personal Protective Equipment
Restricted Duties Injury
Contractor and Subcontractor Supervisors

Page 4 of 29
Saved date: 09/09/13
0

1.3 References
The primary Acts, Regulations and Australian Standards applicable to this operation include
(Insert based on operations and jurisdiction).
Legislation

Australian and New Zealand Standards

Codes of Practice

2.

HSE MANAGEMENT SYSTEM
The Project HSE Management System is made up of the following documents:
Document

Description

Policy

Policies set the overall guidelines and direction of (Insert
Co. Name)s' approach to HSE.

Health Safety & Environment Plan
(This plan)
Site Environmental Management
Plan

Defines the HSE administration and management
framework for (Insert Co. Name). This includes
responsibilities, risk assessment, training and inductions,
general site rules and protocols, risk controls, audit and
management review.
Describes the environmental controls to be implemented
and measured for a particular geographical work area,
process or discipline.

HSE Procedures

Procedures relevant to the management and administration
of this project.

Emergency Response

The project emergency response plan which includes
identified environmental responses.

(Insert Co Name)
HSE Plan Rev 0

Page 5 of 29
Saved date: 09/09/13
0

3.

MANAGEMENT LEADERSHIP AND COMMITMENT

3.1 Responsibilities
Project Manager
The Project Manager has the overall responsibility of ensuring the objectives of the HSE Plan and
Policy are met and that the project is delivered injury and incident free, this will be achieved by:





Ensuring the allocation of all relevant and necessary human and material resources to enable
the team to meet their responsibilities.
Ensuring the appropriate HSE systems are developed approved, implemented, maintained
during operation.
Ensuring that trained and competent personnel are used.
Establishing a process of review and continual improvement.

Project Safety Officer
The Safety Officer is responsible and accountable for development and implementation of HSE
plan, this will be achieved by:






Development and training of the HSE plan.
Liaison with Project, Statutory and local authorities where required, to ensure Safety and
Health issues raised are resolved in a timely manner, to the benefit of the project.
Review relevant subcontractor Workplace Health and Safety documents, including
procedures, work method statements (risk assessments) etc.
Resolve disputes which may impact the health and safety of project personnel, plant and
equipment onsite.
Undertaking regular safety and health inspections and audits onsite.

Supervisors
Supervisor are responsible and accountable for ensuring;
 Compliance with the requirements of the HSE plan.
 Employees and sub-contractors follow the requirements of this HSE plan.
 The Emergency Response Plan is followed should any safety incidents, emergencies or
accidents occur onsite
 The reporting of any OHS non-conformances, safety and environmental hazards, accidents
and injuries, and
 Reasonable care is taken to maintain a high standard of workmanship, protect the health and
safety of themselves and their fellow works and other persons on site, ensuring they leave site
in the same condition as they arrived.
Subcontractors and Suppliers
Subcontractors and suppliers shall:
 Provide to the PC copies of SH&EWMS and Specialist Plans, so far as they apply to their
works.
 Shall comply with site on-boarding requirements for plant, plant Operators and general
personnel.
 Shall provide SDS for any hazardous sub-stance they bring onto site.
 Follow reasonable instruction given to them by site personnel.
 Attend regular toolbox talks and daily pre-start meetings.
(Insert Co Name)
HSE Plan Rev 0

Page 6 of 29
Saved date: 09/09/13
0







Participate in inspections and observations conducted on them.
Conduct regular inspections and observation on their works.
Comply with SH&EWMS and Special plans.
Stop works and amend SH&EWMS if the scope of work changes or the hazard is no longer
controlled.
Observe subcontract and statutory requirements relating to health and safety, quality and
environment.
Cooperate fully with site procedures and consultative arrangements.

Employees
Employees shall:
 Present to work fit for duty
 Have the appropriate skill, qualifications and training to undertaken the task they are
performing.
 Follow all reasonable health and safety instructions.
 Rectify and report hazards.
 Follow work procedures and to stop and reassess if the work methodology or risk change.

3.2 HSE Policy
(INSERT CO. NAME) is committed to ensure a safe and healthy working environment for all
personnel associated with their operations, and caring for the environment.
The HSE Plan shall support the HSE Policy which provides a framework for management‟s
commitment to visible leadership and a vigilant culture that rigorously supports the
implementation and continuous improvement of the HSE Program.
The (INSERT CO. NAME) policies shall be prominently displayed in relevant areas.

3.3 Objectives and Goals
All levels of (INSERT CO. NAME) management, employees and sub -contractors are
required to demonstrate a personal commitment to achieving excellence in project delivery.
This will help us achieve our goals of:



Ensure the environment is not adversely affected by our operations.



Foster a quality culture of “ Do it once and do it well”.



To respect the community.



4.

To operate incident and injury free.

To provide our clients with a great experience.

SUB-CONTRACTOR MANAGEMENT
All sub-contactor's and sub-contractor employees have an obligation to adhere to and
comply with all relevant legislation, policy, procedures and instruction given in striving for an
injury and incident free operation.

(Insert Co Name)
HSE Plan Rev 0

Page 7 of 29
Saved date: 09/09/13
0

4.1 Sub -contractor HSE Systems and Procedures
The sub-contractor shall as a minimum comply with:


(Insert relevant legislation)



This plan



Site Specific Rules



Any client requirements

4.2 Assessment of sub-contractors
Prior to engagement, all sub-contractors will submit: SH&EWM, copies of relevant licences
and qualifications, insurances and any other relevant documentation for review by (Insert Co.
Name).
Only after review and approval shall the sub-contractor be permitted to commence.
At times (INSERT CO. NAME) or its client may request that a sub-contractor submit
additional records, procedures, SH&EWMS, training records or other information for
assessment and/or validation. Upon any reasonable request the sub-contractor will submit
such documentation.

5.

COMMUNICATION AND CONSULTATION
An integral part of the HSE Management system is the open communication of information
between all levels of management and employees. In achieving this goal, (INSERT CO.
NAME) will conduct various HSE meetings including: toolbox meetings and daily pre-start
briefings, etc.

5.1 HSE Meetings
The standard HSE meetings that will be carried out may include as a minimum:


Pre-start Briefings (each Shift)



Special Toolbox Meetings (as required)



Sub-contractor coordination meetings (as required)



Site Safety Committee Meetings (where require by law, or requested by the client and
reasonable).

Formal records of the above meetings shall be maintained.

5.1.1 Pre-start Briefing
All personnel will attend pre-start briefings (Form 003 Pre-start briefing) prior to
commencement of each working shift. The client may provide relevant project specific
information prior to each meeting as appropriate. At completion of the pre-start briefing and
all personnel have signed on, the briefing shall be returned to the predetermined collection
point.
(Insert Co Name)
HSE Plan Rev 0

Page 8 of 29
Saved date: 09/09/13
0
Items to be discussed may include:


Emergency provisions and SH&EWMS to be employed during the shift.



Weather conditions and safety concerns.



Vehicle movement plans.



Interfacing activities including simultaneous operations.



Reporting requirements for the day.



Issues raised by management.

Late employees are to locate their supervisor, read and sign the day‟s pre-start meeting form
prior to commencing work.

5.1.2 Toolbox Meetings
Toolbox Meetings shall be held each month as a minimum and, or as otherwise determined.
These meetings shall involve all personnel and be documented (Form 004 Record of
Training) by the relevant Supervisor.
The topics covered at a Toolbox Meeting shall include:


Review of hazards and incidents since last meeting.



Presentation of nominated HSE topics.

Copies of toolbox meeting will be retained for record keeping.

5.1.3 Special Toolbox Meetings
Special toolbox meetings may be called by the client or (INSERT CO. NAME) at any time to
review specific safety issues with their respective workgroups. These meetings may include:


Significant Incident details



Continual breaches of safety or environmental issues



Dissemination of urgent safety or environmental information

5.1.4 Contractor Coordination Meeting
Contractor coordination meetings will be scheduled by (INSERT CO. NAME) management.
These meetings may include:


Forward projection of works



Integration of workgroups activities



Health & Safety



Environment

(Insert Co Name)
HSE Plan Rev 0

Page 9 of 29
Saved date: 09/09/13
0
5.1.5 Health & Safety Committee
The formulation of health and safety committees and the appointment of health and safety
representatives will be done in accordance with relevant legislation.

5.2 HSE Alerts
HSE Alerts will be issued to alert personnel of incidents or potential incidents and/or injuries
that may have occurred, provided they are relevant to the (INSERT CO. NAME) operations.
They will be issued with the aim of ensuring that measures are adopted so that the risks of
similar events occurring are reduced. These shall be distributed as required and displayed
on HSE notice boards.

5.3 HSE Issue Resolution
The Project Manager will endeavour to resolve HSE issues whilst wherever possible
maintaining productive work. It is emphasised that at all times employees must accept
responsibility for their own safety. In general the process is:
a) Where a health or safety problem exists which can be rectified by an individual, it
shall be rectified; otherwise:
b) Report the problem to a supervisor for rectification, allowing sufficient time; otherwise
c) Report the problem to an elected safety representative (where elected) for
rectification, allowing sufficient time; otherwise
d) Report the problem to a safety officer / safety committee member (where established)
for rectification, allowing sufficient time; otherwise
e) Report the problem to the project Manager for rectification, allowing sufficient time;
otherwise
f)

Where resolution is not made Workplace Health & Safety Qld shall be consulted for a
determination.

Once the issue is resolved all relevant personal will be notified of the outcome.

6.

RISK MANAGEMENT
Risk management is the systematic process of identifying hazards, evaluating risk,
implementing controls and monitoring for effectiveness. Throughout the duration of the
operations, hazard identification tools and techniques shall be used.

(Insert Co Name)
HSE Plan Rev 0

Page 10 of 29
Saved date: 09/09/13
0
Controls shall be determined using the following hierarchy, called the hierarchy of controls.
Most
Effective

Eliminate

Remove hazard completely

Substitute

Replace/reduce the hazard with a lower risk
alternative

Isolation

Isolate the worker from the hazard

Engineer

Involves some change to the work
environment or work process to place a
barrier to, or interrupt the transmission path
between the worker and the hazard.
The use of procedures, Integrated Work
Method Statements, hazard control plans,
signage and training etc.
Use protective equipment, clothing.

Administrate

Least
Effective

Protect

Note: Where the risk cannot be eliminated, a combination of controls will normally be utilised to control
the risk.
Assessments will be based on details of the works to be constructed and the site limitations as well as;
legislative requirements, Australian Standards, codes of practice, historical records, and will be
undertaken by appropriately qualified and experienced personnel.

6.1 Risk Assessment
All hazards / risks are to be
evaluated using the following
Risk matrix. Risks are to be
rated as Residual Risk, that is
with controls in place.

The Risk Assessment
Matrix provides a tool to
measure
the
risk
associated with any work
practice and or activities.

6.2 Hazard Register
(INSERT CO. NAME) shall maintained, review and communicated a hazard register (Reg
001-Hazard Register) as an ongoing record of hazards identified during operations. This
hazard register will be supplied to clients at the commencement of operation. It is
recommended that clients incorporate hazards and relevant controls into the project site risk
assessment.
The Hazard register shall record each identified hazard as part of operations, rank the risk,
allocate a responsible person, determine a closeout date, record actual closeout information,
and the actual date of closeout.

(Insert Co Name)
HSE Plan Rev 0

Page 11 of 29
Saved date: 09/09/13
0
(INSERT CO. NAME) shall develop plans and procedures to eliminate or mitigate the
hazards listed in the Hazard Register and communicate identified hazards and control
measures to appropriate personnel.

6.3 Safe Health and Enviromental Work Method Statement (SH&EWMS)


SH&EWMS are developed to provide a safe manner of work for tasks to be performed
within the workplace. The approved template for SH&EWMS is: Form 002 Safe Work
Method Statement.



(INSERT CO. NAME) will have a SH&EWMS in place that covers all high risk activities.



The development of SH&EWMS will include a cross section of the workers involved, as
well as suitably competent personnel.



All persons involved in an task involving high risk activity will have the SMWS
communicated to them, be offered the chance to provide input and sign onto the
SH&EWMS (as acknowledgement they understand the hazards and controls relevant to
the task and have been given the opportunity to consult on the SH&EWMS).



SH&EWMS will be made available at the Job face, or in the cab of each working plant
item.

6.4 Hazard Observation and Reporting
The reporting of all observed hazards shall be encouraged so that they are investigated and
assessed to ensure timely remedial / preventive action(s) are taken.
Supervisors shall be trained in this procedure during (INSERT CO. NAME) induction and
encouraged to use this HSE tool to record any observed low or moderate risk hazards or
unsafe conditions that present little or no immediate risk to health, safety or the environment.
Hazards or dangerous conditions that present high or extreme risk to people, plant,
equipment or the environment must be made safe if safe to do so and reported immediately
to the Supervisor.
Records and of hazard shall be reported on a Form 008 Hazard Report.

6.5 Workplace Inspections
To identify potential hazards and to initiate corrective action to ensure compliance with the
HSE Management Plan, client requirements and relevant legislation, the following work place
inspections shall be conducted and shall involve all personnel:


Informal Inspections (all personnel)



Formal Inspections



Plant and equipment inspections



Inspections and audit as required by the contract.

(Insert Co Name)
HSE Plan Rev 0

Page 12 of 29
Saved date: 09/09/13
0
Details of inspection will be recorded on a Form 007 HSE Inspection and retained for record
keeping.

7.

TRAINING AND COMPETENCY

7.1 Personnel Selection
All personnel employed or engaged by (INSERT CO. NAME) shall have adequate work
experience in the task in which they are employed and shall hold the appropriate
qualifications / licenses for the position.

7.2 Licenses and Certificates of Competency
All persons shall have adequate qualifications and work experience to perform the task for
which they are employed.
All personnel performing activities or tasks on the project that require licenses or certificates
of competency, shall submit a current copy of all the relevant licenses or certificates of
competency to prior to induction. Copies of all certificates will be retained.
Other training certificates, such as First Aid Certificates, held by employees are to be copied
and attached to these files.

7.3 Inductions
The following inductions are applicable:


General Industry (Construction) Induction (White card) (by a registered RTO).



Company Induction - for persons who actively work within the scope of the operation.



Visitor Inductions – all visitors to site (people who are not company inducted).



Work Activity Induction - Task specific training i.e. SH&EWMS.



Client Induction - Any induction required by the client.

Any personnel whose works may have direct impact on the project will receive induction
training prior to commencing work.
Personnel in attendance at inductions must complete the induction questionnaire (Form 5
(INSERT CO. NAME) Induction Questionnaire). Copies of these records shall be held by the
Project for a period of seven (7) years.

7.4 First Aid Training
Personnel must have access to adequate first aid personnel. First aid personnel shall have
current Senior First Aid qualification from a recognised training facility, as a minimum.

7.5 Emergency Response
Emergency response requirements will be considered in all operations. (INSERT CO. NAME)
will comply with client and project requirements.
(Insert Co Name)
HSE Plan Rev 0

Page 13 of 29
Saved date: 09/09/13
0
Personnel shall participate in regular emergency drills based on likely incident scenarios at
times to be determined by the client.

7.6 Training Assessment
All personnel shall be suitably qualified based on appropriate education, training and/or
experience as is necessary to meet the requirements of the tasks they are employed to carry
out.
Where required (INSERT CO. NAME) shall work with the client to carry out a training
assessment to identify specific project HSE training requirements for its personnel, based
upon scheduled activities.

7.7 Training Records
Records shall be maintained of all HSE training undertaken, and retained.

8.

OCCUPATIONAL HEALTH

8.1 Fitness For Work
No person shall be allowed onto the work site or in the office while, fatigued or under the
influence of alcohol or non-prescribed drugs, or if otherwise deemed to be in an at risk
physical or emotional condition.
In the event of an employee using prescribed legal medication, the employee must advise
his/her Supervisor by completing a Medical Advice Form prior to the commencement of any
work on the project, and use the medication in accordance with relevant instructions.
Generally people who breach fitness for work requirements will disciplined on three strikes
basis. However (INSERT CO. NAME) will follow client requirements in regards to discipline
requirements.

8.2 Hazardous Substances and Dangerous Goods
(INSERT CO. NAME) shall comply with relevant State, National and International Standards
and relevant Codes of Practice, as well as client requirements for Hazardous Substances
and Dangerous Goods.
All hazardous substance and dangerous goods will be handled, transported, stored and
disposed of using correct methods.

8.2.1 Safety Data Sheets (SDS)
Dangerous Goods and Hazardous Substances approved for use must be recorded in the site
hazardous substances and dangerous goods register.
All provisions including PPE recommended on a SDS shall be made available to all
employees required to handle the substance. Personnel using hazardous substances or
dangerous goods shall be appropriately trained in the correct use of the substance.
First Aid requirements shall be supplied as per the information on the SDS.

(Insert Co Name)
HSE Plan Rev 0

Page 14 of 29
Saved date: 09/09/13

More Related Content

What's hot

Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...AMIT SAHU
 
HEALTH, SAFETY AND ENVIRONMENTAL MANUAL
HEALTH, SAFETY AND ENVIRONMENTAL  MANUALHEALTH, SAFETY AND ENVIRONMENTAL  MANUAL
HEALTH, SAFETY AND ENVIRONMENTAL MANUALDwarika Bhushan Sharma
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementationDr Madhu Aman Sharma
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction TrainingThe Pathway Group
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statisticsArber Dogani
 
Safety health and environment
Safety health and environmentSafety health and environment
Safety health and environmentImran Amami
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CVSony Mani
 
Health and Safety Induction Training
Health and Safety Induction TrainingHealth and Safety Induction Training
Health and Safety Induction TrainingElsie Lessing
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management systemgraha katiga
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety inductionGanesan Raju
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management PlanPhilip Hà
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05txsafety1
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training Claire
 

What's hot (20)

Hse plan
Hse planHse plan
Hse plan
 
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
 
HEALTH, SAFETY AND ENVIRONMENTAL MANUAL
HEALTH, SAFETY AND ENVIRONMENTAL  MANUALHEALTH, SAFETY AND ENVIRONMENTAL  MANUAL
HEALTH, SAFETY AND ENVIRONMENTAL MANUAL
 
Induction QHSE
Induction QHSEInduction QHSE
Induction QHSE
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementation
 
shamim ahmad HSE manager CV
shamim ahmad HSE manager CVshamim ahmad HSE manager CV
shamim ahmad HSE manager CV
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction Training
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
 
Safety health and environment
Safety health and environmentSafety health and environment
Safety health and environment
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CV
 
Health and Safety Induction Training
Health and Safety Induction TrainingHealth and Safety Induction Training
Health and Safety Induction Training
 
HSE Monitoring schedule plan
HSE Monitoring schedule planHSE Monitoring schedule plan
HSE Monitoring schedule plan
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management system
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management Plan
 
Hse Action Plan
Hse Action PlanHse Action Plan
Hse Action Plan
 
Occupational health plan
Occupational health planOccupational health plan
Occupational health plan
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training
 

Similar to Health, Safety and Environmental Management Plan

Similar to Health, Safety and Environmental Management Plan (20)

Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctp
 
Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1
 
Mohan Giri CV
Mohan Giri CVMohan Giri CV
Mohan Giri CV
 
Kiran Safety
Kiran Safety Kiran Safety
Kiran Safety
 
EISA Annex 14 HSE Plan.pdf
EISA Annex 14 HSE Plan.pdfEISA Annex 14 HSE Plan.pdf
EISA Annex 14 HSE Plan.pdf
 
Veeraragavan-CV
Veeraragavan-CVVeeraragavan-CV
Veeraragavan-CV
 
Touseef cv
Touseef cvTouseef cv
Touseef cv
 
Bizsafe Risk Assessment
Bizsafe Risk AssessmentBizsafe Risk Assessment
Bizsafe Risk Assessment
 
Bizsafe risk assessment
Bizsafe risk assessmentBizsafe risk assessment
Bizsafe risk assessment
 
RaissAbinCV2
RaissAbinCV2RaissAbinCV2
RaissAbinCV2
 
Murugan_Resume
Murugan_ResumeMurugan_Resume
Murugan_Resume
 
ANEESH THOMAS CV
ANEESH THOMAS CVANEESH THOMAS CV
ANEESH THOMAS CV
 
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
 
CV Nilesh-EHS Leader
CV Nilesh-EHS LeaderCV Nilesh-EHS Leader
CV Nilesh-EHS Leader
 
Full H&S policy
Full H&S policyFull H&S policy
Full H&S policy
 
Full HS policy
Full HS policyFull HS policy
Full HS policy
 
Akash Updated cv
Akash Updated cvAkash Updated cv
Akash Updated cv
 
ANTHONY A. BERNALDO SAFETY OFFICER SUPERVISOR(CV)
ANTHONY A. BERNALDO  SAFETY OFFICER SUPERVISOR(CV)ANTHONY A. BERNALDO  SAFETY OFFICER SUPERVISOR(CV)
ANTHONY A. BERNALDO SAFETY OFFICER SUPERVISOR(CV)
 
Senior HSE Engineer with 17 years experiences
Senior HSE Engineer with 17 years experiencesSenior HSE Engineer with 17 years experiences
Senior HSE Engineer with 17 years experiences
 

More from Flevy.com Best Practices

100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdf100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdfFlevy.com Best Practices
 
[Whitepaper] Business Transformation Success Factors
[Whitepaper] Business Transformation Success Factors[Whitepaper] Business Transformation Success Factors
[Whitepaper] Business Transformation Success FactorsFlevy.com Best Practices
 
[Whitepaper] 5 Dimensions of Employee Engagement Scorecard
[Whitepaper] 5 Dimensions of Employee Engagement Scorecard[Whitepaper] 5 Dimensions of Employee Engagement Scorecard
[Whitepaper] 5 Dimensions of Employee Engagement ScorecardFlevy.com Best Practices
 
[Whitepaper] Digital Transformation: Workforce Digitization
[Whitepaper] Digital Transformation: Workforce Digitization[Whitepaper] Digital Transformation: Workforce Digitization
[Whitepaper] Digital Transformation: Workforce DigitizationFlevy.com Best Practices
 
[Whitepaper] Strategic Human Resources: Evolution of Competition
[Whitepaper] Strategic Human Resources: Evolution of Competition[Whitepaper] Strategic Human Resources: Evolution of Competition
[Whitepaper] Strategic Human Resources: Evolution of CompetitionFlevy.com Best Practices
 
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...Flevy.com Best Practices
 
[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines ModelFlevy.com Best Practices
 
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...Flevy.com Best Practices
 
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...Flevy.com Best Practices
 
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?Flevy.com Best Practices
 
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain ManagementFlevy.com Best Practices
 
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...Flevy.com Best Practices
 
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...Flevy.com Best Practices
 
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...Flevy.com Best Practices
 
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative BehaviorsFlevy.com Best Practices
 
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...Flevy.com Best Practices
 
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...Flevy.com Best Practices
 

More from Flevy.com Best Practices (20)

100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdf100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdf
 
Project Management for MBA (in French)
Project Management for MBA (in French)Project Management for MBA (in French)
Project Management for MBA (in French)
 
4 Stages of Disruption
4 Stages of Disruption4 Stages of Disruption
4 Stages of Disruption
 
Customer-centric Culture
Customer-centric CultureCustomer-centric Culture
Customer-centric Culture
 
[Whitepaper] Business Transformation Success Factors
[Whitepaper] Business Transformation Success Factors[Whitepaper] Business Transformation Success Factors
[Whitepaper] Business Transformation Success Factors
 
[Whitepaper] 5 Dimensions of Employee Engagement Scorecard
[Whitepaper] 5 Dimensions of Employee Engagement Scorecard[Whitepaper] 5 Dimensions of Employee Engagement Scorecard
[Whitepaper] 5 Dimensions of Employee Engagement Scorecard
 
[Whitepaper] Digital Transformation: Workforce Digitization
[Whitepaper] Digital Transformation: Workforce Digitization[Whitepaper] Digital Transformation: Workforce Digitization
[Whitepaper] Digital Transformation: Workforce Digitization
 
[Whitepaper] Strategic Human Resources: Evolution of Competition
[Whitepaper] Strategic Human Resources: Evolution of Competition[Whitepaper] Strategic Human Resources: Evolution of Competition
[Whitepaper] Strategic Human Resources: Evolution of Competition
 
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
 
[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model
 
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
 
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
 
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
 
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
 
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
 
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
 
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
 
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
 
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
 
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
 

Recently uploaded

Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Reportamberjiles31
 
Trauma Training Service for First Responders
Trauma Training Service for First RespondersTrauma Training Service for First Responders
Trauma Training Service for First RespondersBPOQe
 
Scrum Events & How to run them effectively
Scrum Events & How to run them effectivelyScrum Events & How to run them effectively
Scrum Events & How to run them effectivelyMarianna Nakou
 
MC Heights construction company in Jhang
MC Heights construction company in JhangMC Heights construction company in Jhang
MC Heights construction company in Jhangmcgroupjeya
 
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)tazeenaila12
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...Brian Solis
 
Plano de marketing- inglês em formato ppt
Plano de marketing- inglês  em formato pptPlano de marketing- inglês  em formato ppt
Plano de marketing- inglês em formato pptElizangelaSoaresdaCo
 
Data skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsData skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsyasinnathani
 
Anyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyAnyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyHanna Klim
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...AustraliaChapterIIBA
 
MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentationbaron83
 
Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Winbusinessin
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003believeminhh
 
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...IMARC Group
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfCharles Cotter, PhD
 
Lecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb toLecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb toumarfarooquejamali32
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxWorkforce Group
 

Recently uploaded (20)

Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Report
 
Trauma Training Service for First Responders
Trauma Training Service for First RespondersTrauma Training Service for First Responders
Trauma Training Service for First Responders
 
Scrum Events & How to run them effectively
Scrum Events & How to run them effectivelyScrum Events & How to run them effectively
Scrum Events & How to run them effectively
 
MC Heights construction company in Jhang
MC Heights construction company in JhangMC Heights construction company in Jhang
MC Heights construction company in Jhang
 
WAM Corporate Presentation Mar 25 2024.pdf
WAM Corporate Presentation Mar 25 2024.pdfWAM Corporate Presentation Mar 25 2024.pdf
WAM Corporate Presentation Mar 25 2024.pdf
 
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
 
Plano de marketing- inglês em formato ppt
Plano de marketing- inglês  em formato pptPlano de marketing- inglês  em formato ppt
Plano de marketing- inglês em formato ppt
 
Data skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsData skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story points
 
Anyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyAnyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agency
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
 
MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentation
 
Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
 
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
 
Lecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb toLecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb to
 
Investment Opportunity for Thailand's Automotive & EV Industries
Investment Opportunity for Thailand's Automotive & EV IndustriesInvestment Opportunity for Thailand's Automotive & EV Industries
Investment Opportunity for Thailand's Automotive & EV Industries
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
 

Health, Safety and Environmental Management Plan

  • 1. (Insert logo) (Insert Co. Name) Health Safety & Environmental Plan - PLN 001 REV ABN: (Insert ABN) BSA DATE DESCRIPTION Prepared Reviewed Signature
  • 2. 0 INDEX 1. INTRODUCTION 4 1.1 1.2 1.3 Purpose Abbreviations And Terminology References 4 4 5 2. HSE MANAGEMENT SYSTEM 5 3. MANAGEMENT LEADERSHIP AND COMMITMENT 6 3.1 3.2 3.3 Responsibilities HSE Policy Objectives and Goals 6 7 7 4. SUB-CONTRACTOR MANAGEMENT 7 4.1 4.2 Sub -contractor HSE Systems and Procedures Assessment of sub-contractors 8 8 5. COMMUNICATION AND CONSULTATION 8 5.1 5.2 5.3 HSE Meetings HSE Alerts HSE Issue Resolution 8 10 10 6. RISK MANAGEMENT 10 6.1 6.2 6.3 6.4 6.5 Risk Assessment Hazard Register Safe Health and Enviromental Work Method Statement (SH&EWMS) Hazard Observation and Reporting Workplace Inspections 11 11 12 12 12 7. TRAINING AND COMPETENCY 13 7.1 7.2 7.3 7.4 7.5 7.6 7.7 Personnel Selection Licenses and Certificates of Competency Inductions First Aid Training Emergency Response Training Assessment Training Records 13 13 13 13 13 14 14 8. OCCUPATIONAL HEALTH 14 8.1 8.2 8.3 8.4 8.5 8.6 Fitness For Work Hazardous Substances and Dangerous Goods Working in Heat Noise and Hearing Hygiene First Aid Facilities 14 14 15 15 15 15 9. ENVIRONMENT 15 10. INCIDENT / INJURY REPORTING AND INVESTIGATION 16 10.1 10.2 10.3 10.4 Incident / Injury Reporting Incident Response Guidelines for Investigation Incident Notification 16 16 16 16 (Insert Co Name) HSE Plan Rev 0 Page 2 of 29 Saved date: 09/09/13
  • 3. 0 10.5 Injury Management 17 11. EMERGENCY RESPONSE 17 11.1 Emergency Procedures 17 12. HSE AUDITS 17 13. PROCEDURES AND WORK PRACTICES 18 13.1 13.2 13.3 13.4 13.5 13.6 13.7 13.8 13.9 13.10 13.11 13.12 13.13 13.14 Angle Grinders Confined Space Cranes, Rigging and Lifting Operations Working at heights Manual Handling Electrical Fire Prevention Housekeeping Out of Service Equipment Personal Protective Equipment (PPE) Signs and Barricades Vehicles and Mobile Equipment Welding and Cutting Ladders - only for access 18 18 18 18 22 22 23 23 23 23 24 24 25 25 14. ATTACHMENTS 25 Health and Safety Policy Environment Policy Workplace Rehabilitation Policy General Safety Rules (Insert Co Name) HSE Plan Rev 0 26 27 28 29 Page 3 of 29 Saved date: 09/09/13
  • 4. 0 1. INTRODUCTION 1.1 Purpose (Insert Co. Name) (hereafter referred to as (Insert Co. Name)) Health Safety and Environmental Plan (hereafter referred to as the HSE Plan) describes the minimum requirements expected of (Insert Co. Name)s' officers, employees, sub-contractors and visitors. The HSE Plan is part of (Insert Co. Name)s' total commitment to providing a safe work environment at all times and the goal of achieving incident and injury free projects. This HSE plan shall outline how (Insert Co. Name) shall comply with relevant Acts, Regulations, Codes of Practice, Standards, and client requirements. It is a live plan, that is, the plan shall be updated regularly with relevant changes and tailored to every client and project. This plan applies to all activities associated with (Insert Co. Name)s' operations. 1.2 Abbreviations And Terminology ALARP All Personnel AS/NZS/ISO Brown Field Client Contractor SO HSE dB(A) BCPU Principal Contractor ERT FAI SH&EWMS LTI SDS MTI PPE RDI Supervisor (Insert Co Name) HSE Plan Rev 0 As Low As Reasonably Practicable All personnel associated with any (INSERT CO. NAME) including Principal Contractor personnel, Contractor personnel , visitors, delivery drivers and vendor representatives. Australian/New Zealand/International Standard All construction works in close proximity to operational equipment Aurizon Contractors and Subcontractors Safety Officer Health, Safety and Environment Decibels (A-weighted scale) Person Conducting and business or undertaking (Insert Co. Name) Builders of Distinction Emergency Response Team First Aid Injury Safe Health and Environmental Work Method Statement Lost Time Injury Safety Data Sheet Medically Treated Injury Personal Protective Equipment Restricted Duties Injury Contractor and Subcontractor Supervisors Page 4 of 29 Saved date: 09/09/13
  • 5. 0 1.3 References The primary Acts, Regulations and Australian Standards applicable to this operation include (Insert based on operations and jurisdiction). Legislation Australian and New Zealand Standards Codes of Practice 2. HSE MANAGEMENT SYSTEM The Project HSE Management System is made up of the following documents: Document Description Policy Policies set the overall guidelines and direction of (Insert Co. Name)s' approach to HSE. Health Safety & Environment Plan (This plan) Site Environmental Management Plan Defines the HSE administration and management framework for (Insert Co. Name). This includes responsibilities, risk assessment, training and inductions, general site rules and protocols, risk controls, audit and management review. Describes the environmental controls to be implemented and measured for a particular geographical work area, process or discipline. HSE Procedures Procedures relevant to the management and administration of this project. Emergency Response The project emergency response plan which includes identified environmental responses. (Insert Co Name) HSE Plan Rev 0 Page 5 of 29 Saved date: 09/09/13
  • 6. 0 3. MANAGEMENT LEADERSHIP AND COMMITMENT 3.1 Responsibilities Project Manager The Project Manager has the overall responsibility of ensuring the objectives of the HSE Plan and Policy are met and that the project is delivered injury and incident free, this will be achieved by:     Ensuring the allocation of all relevant and necessary human and material resources to enable the team to meet their responsibilities. Ensuring the appropriate HSE systems are developed approved, implemented, maintained during operation. Ensuring that trained and competent personnel are used. Establishing a process of review and continual improvement. Project Safety Officer The Safety Officer is responsible and accountable for development and implementation of HSE plan, this will be achieved by:      Development and training of the HSE plan. Liaison with Project, Statutory and local authorities where required, to ensure Safety and Health issues raised are resolved in a timely manner, to the benefit of the project. Review relevant subcontractor Workplace Health and Safety documents, including procedures, work method statements (risk assessments) etc. Resolve disputes which may impact the health and safety of project personnel, plant and equipment onsite. Undertaking regular safety and health inspections and audits onsite. Supervisors Supervisor are responsible and accountable for ensuring;  Compliance with the requirements of the HSE plan.  Employees and sub-contractors follow the requirements of this HSE plan.  The Emergency Response Plan is followed should any safety incidents, emergencies or accidents occur onsite  The reporting of any OHS non-conformances, safety and environmental hazards, accidents and injuries, and  Reasonable care is taken to maintain a high standard of workmanship, protect the health and safety of themselves and their fellow works and other persons on site, ensuring they leave site in the same condition as they arrived. Subcontractors and Suppliers Subcontractors and suppliers shall:  Provide to the PC copies of SH&EWMS and Specialist Plans, so far as they apply to their works.  Shall comply with site on-boarding requirements for plant, plant Operators and general personnel.  Shall provide SDS for any hazardous sub-stance they bring onto site.  Follow reasonable instruction given to them by site personnel.  Attend regular toolbox talks and daily pre-start meetings. (Insert Co Name) HSE Plan Rev 0 Page 6 of 29 Saved date: 09/09/13
  • 7. 0       Participate in inspections and observations conducted on them. Conduct regular inspections and observation on their works. Comply with SH&EWMS and Special plans. Stop works and amend SH&EWMS if the scope of work changes or the hazard is no longer controlled. Observe subcontract and statutory requirements relating to health and safety, quality and environment. Cooperate fully with site procedures and consultative arrangements. Employees Employees shall:  Present to work fit for duty  Have the appropriate skill, qualifications and training to undertaken the task they are performing.  Follow all reasonable health and safety instructions.  Rectify and report hazards.  Follow work procedures and to stop and reassess if the work methodology or risk change. 3.2 HSE Policy (INSERT CO. NAME) is committed to ensure a safe and healthy working environment for all personnel associated with their operations, and caring for the environment. The HSE Plan shall support the HSE Policy which provides a framework for management‟s commitment to visible leadership and a vigilant culture that rigorously supports the implementation and continuous improvement of the HSE Program. The (INSERT CO. NAME) policies shall be prominently displayed in relevant areas. 3.3 Objectives and Goals All levels of (INSERT CO. NAME) management, employees and sub -contractors are required to demonstrate a personal commitment to achieving excellence in project delivery. This will help us achieve our goals of:   Ensure the environment is not adversely affected by our operations.  Foster a quality culture of “ Do it once and do it well”.  To respect the community.  4. To operate incident and injury free. To provide our clients with a great experience. SUB-CONTRACTOR MANAGEMENT All sub-contactor's and sub-contractor employees have an obligation to adhere to and comply with all relevant legislation, policy, procedures and instruction given in striving for an injury and incident free operation. (Insert Co Name) HSE Plan Rev 0 Page 7 of 29 Saved date: 09/09/13
  • 8. 0 4.1 Sub -contractor HSE Systems and Procedures The sub-contractor shall as a minimum comply with:  (Insert relevant legislation)  This plan  Site Specific Rules  Any client requirements 4.2 Assessment of sub-contractors Prior to engagement, all sub-contractors will submit: SH&EWM, copies of relevant licences and qualifications, insurances and any other relevant documentation for review by (Insert Co. Name). Only after review and approval shall the sub-contractor be permitted to commence. At times (INSERT CO. NAME) or its client may request that a sub-contractor submit additional records, procedures, SH&EWMS, training records or other information for assessment and/or validation. Upon any reasonable request the sub-contractor will submit such documentation. 5. COMMUNICATION AND CONSULTATION An integral part of the HSE Management system is the open communication of information between all levels of management and employees. In achieving this goal, (INSERT CO. NAME) will conduct various HSE meetings including: toolbox meetings and daily pre-start briefings, etc. 5.1 HSE Meetings The standard HSE meetings that will be carried out may include as a minimum:  Pre-start Briefings (each Shift)  Special Toolbox Meetings (as required)  Sub-contractor coordination meetings (as required)  Site Safety Committee Meetings (where require by law, or requested by the client and reasonable). Formal records of the above meetings shall be maintained. 5.1.1 Pre-start Briefing All personnel will attend pre-start briefings (Form 003 Pre-start briefing) prior to commencement of each working shift. The client may provide relevant project specific information prior to each meeting as appropriate. At completion of the pre-start briefing and all personnel have signed on, the briefing shall be returned to the predetermined collection point. (Insert Co Name) HSE Plan Rev 0 Page 8 of 29 Saved date: 09/09/13
  • 9. 0 Items to be discussed may include:  Emergency provisions and SH&EWMS to be employed during the shift.  Weather conditions and safety concerns.  Vehicle movement plans.  Interfacing activities including simultaneous operations.  Reporting requirements for the day.  Issues raised by management. Late employees are to locate their supervisor, read and sign the day‟s pre-start meeting form prior to commencing work. 5.1.2 Toolbox Meetings Toolbox Meetings shall be held each month as a minimum and, or as otherwise determined. These meetings shall involve all personnel and be documented (Form 004 Record of Training) by the relevant Supervisor. The topics covered at a Toolbox Meeting shall include:  Review of hazards and incidents since last meeting.  Presentation of nominated HSE topics. Copies of toolbox meeting will be retained for record keeping. 5.1.3 Special Toolbox Meetings Special toolbox meetings may be called by the client or (INSERT CO. NAME) at any time to review specific safety issues with their respective workgroups. These meetings may include:  Significant Incident details  Continual breaches of safety or environmental issues  Dissemination of urgent safety or environmental information 5.1.4 Contractor Coordination Meeting Contractor coordination meetings will be scheduled by (INSERT CO. NAME) management. These meetings may include:  Forward projection of works  Integration of workgroups activities  Health & Safety  Environment (Insert Co Name) HSE Plan Rev 0 Page 9 of 29 Saved date: 09/09/13
  • 10. 0 5.1.5 Health & Safety Committee The formulation of health and safety committees and the appointment of health and safety representatives will be done in accordance with relevant legislation. 5.2 HSE Alerts HSE Alerts will be issued to alert personnel of incidents or potential incidents and/or injuries that may have occurred, provided they are relevant to the (INSERT CO. NAME) operations. They will be issued with the aim of ensuring that measures are adopted so that the risks of similar events occurring are reduced. These shall be distributed as required and displayed on HSE notice boards. 5.3 HSE Issue Resolution The Project Manager will endeavour to resolve HSE issues whilst wherever possible maintaining productive work. It is emphasised that at all times employees must accept responsibility for their own safety. In general the process is: a) Where a health or safety problem exists which can be rectified by an individual, it shall be rectified; otherwise: b) Report the problem to a supervisor for rectification, allowing sufficient time; otherwise c) Report the problem to an elected safety representative (where elected) for rectification, allowing sufficient time; otherwise d) Report the problem to a safety officer / safety committee member (where established) for rectification, allowing sufficient time; otherwise e) Report the problem to the project Manager for rectification, allowing sufficient time; otherwise f) Where resolution is not made Workplace Health & Safety Qld shall be consulted for a determination. Once the issue is resolved all relevant personal will be notified of the outcome. 6. RISK MANAGEMENT Risk management is the systematic process of identifying hazards, evaluating risk, implementing controls and monitoring for effectiveness. Throughout the duration of the operations, hazard identification tools and techniques shall be used. (Insert Co Name) HSE Plan Rev 0 Page 10 of 29 Saved date: 09/09/13
  • 11. 0 Controls shall be determined using the following hierarchy, called the hierarchy of controls. Most Effective Eliminate Remove hazard completely Substitute Replace/reduce the hazard with a lower risk alternative Isolation Isolate the worker from the hazard Engineer Involves some change to the work environment or work process to place a barrier to, or interrupt the transmission path between the worker and the hazard. The use of procedures, Integrated Work Method Statements, hazard control plans, signage and training etc. Use protective equipment, clothing. Administrate Least Effective Protect Note: Where the risk cannot be eliminated, a combination of controls will normally be utilised to control the risk. Assessments will be based on details of the works to be constructed and the site limitations as well as; legislative requirements, Australian Standards, codes of practice, historical records, and will be undertaken by appropriately qualified and experienced personnel. 6.1 Risk Assessment All hazards / risks are to be evaluated using the following Risk matrix. Risks are to be rated as Residual Risk, that is with controls in place. The Risk Assessment Matrix provides a tool to measure the risk associated with any work practice and or activities. 6.2 Hazard Register (INSERT CO. NAME) shall maintained, review and communicated a hazard register (Reg 001-Hazard Register) as an ongoing record of hazards identified during operations. This hazard register will be supplied to clients at the commencement of operation. It is recommended that clients incorporate hazards and relevant controls into the project site risk assessment. The Hazard register shall record each identified hazard as part of operations, rank the risk, allocate a responsible person, determine a closeout date, record actual closeout information, and the actual date of closeout. (Insert Co Name) HSE Plan Rev 0 Page 11 of 29 Saved date: 09/09/13
  • 12. 0 (INSERT CO. NAME) shall develop plans and procedures to eliminate or mitigate the hazards listed in the Hazard Register and communicate identified hazards and control measures to appropriate personnel. 6.3 Safe Health and Enviromental Work Method Statement (SH&EWMS)  SH&EWMS are developed to provide a safe manner of work for tasks to be performed within the workplace. The approved template for SH&EWMS is: Form 002 Safe Work Method Statement.  (INSERT CO. NAME) will have a SH&EWMS in place that covers all high risk activities.  The development of SH&EWMS will include a cross section of the workers involved, as well as suitably competent personnel.  All persons involved in an task involving high risk activity will have the SMWS communicated to them, be offered the chance to provide input and sign onto the SH&EWMS (as acknowledgement they understand the hazards and controls relevant to the task and have been given the opportunity to consult on the SH&EWMS).  SH&EWMS will be made available at the Job face, or in the cab of each working plant item. 6.4 Hazard Observation and Reporting The reporting of all observed hazards shall be encouraged so that they are investigated and assessed to ensure timely remedial / preventive action(s) are taken. Supervisors shall be trained in this procedure during (INSERT CO. NAME) induction and encouraged to use this HSE tool to record any observed low or moderate risk hazards or unsafe conditions that present little or no immediate risk to health, safety or the environment. Hazards or dangerous conditions that present high or extreme risk to people, plant, equipment or the environment must be made safe if safe to do so and reported immediately to the Supervisor. Records and of hazard shall be reported on a Form 008 Hazard Report. 6.5 Workplace Inspections To identify potential hazards and to initiate corrective action to ensure compliance with the HSE Management Plan, client requirements and relevant legislation, the following work place inspections shall be conducted and shall involve all personnel:  Informal Inspections (all personnel)  Formal Inspections  Plant and equipment inspections  Inspections and audit as required by the contract. (Insert Co Name) HSE Plan Rev 0 Page 12 of 29 Saved date: 09/09/13
  • 13. 0 Details of inspection will be recorded on a Form 007 HSE Inspection and retained for record keeping. 7. TRAINING AND COMPETENCY 7.1 Personnel Selection All personnel employed or engaged by (INSERT CO. NAME) shall have adequate work experience in the task in which they are employed and shall hold the appropriate qualifications / licenses for the position. 7.2 Licenses and Certificates of Competency All persons shall have adequate qualifications and work experience to perform the task for which they are employed. All personnel performing activities or tasks on the project that require licenses or certificates of competency, shall submit a current copy of all the relevant licenses or certificates of competency to prior to induction. Copies of all certificates will be retained. Other training certificates, such as First Aid Certificates, held by employees are to be copied and attached to these files. 7.3 Inductions The following inductions are applicable:  General Industry (Construction) Induction (White card) (by a registered RTO).  Company Induction - for persons who actively work within the scope of the operation.  Visitor Inductions – all visitors to site (people who are not company inducted).  Work Activity Induction - Task specific training i.e. SH&EWMS.  Client Induction - Any induction required by the client. Any personnel whose works may have direct impact on the project will receive induction training prior to commencing work. Personnel in attendance at inductions must complete the induction questionnaire (Form 5 (INSERT CO. NAME) Induction Questionnaire). Copies of these records shall be held by the Project for a period of seven (7) years. 7.4 First Aid Training Personnel must have access to adequate first aid personnel. First aid personnel shall have current Senior First Aid qualification from a recognised training facility, as a minimum. 7.5 Emergency Response Emergency response requirements will be considered in all operations. (INSERT CO. NAME) will comply with client and project requirements. (Insert Co Name) HSE Plan Rev 0 Page 13 of 29 Saved date: 09/09/13
  • 14. 0 Personnel shall participate in regular emergency drills based on likely incident scenarios at times to be determined by the client. 7.6 Training Assessment All personnel shall be suitably qualified based on appropriate education, training and/or experience as is necessary to meet the requirements of the tasks they are employed to carry out. Where required (INSERT CO. NAME) shall work with the client to carry out a training assessment to identify specific project HSE training requirements for its personnel, based upon scheduled activities. 7.7 Training Records Records shall be maintained of all HSE training undertaken, and retained. 8. OCCUPATIONAL HEALTH 8.1 Fitness For Work No person shall be allowed onto the work site or in the office while, fatigued or under the influence of alcohol or non-prescribed drugs, or if otherwise deemed to be in an at risk physical or emotional condition. In the event of an employee using prescribed legal medication, the employee must advise his/her Supervisor by completing a Medical Advice Form prior to the commencement of any work on the project, and use the medication in accordance with relevant instructions. Generally people who breach fitness for work requirements will disciplined on three strikes basis. However (INSERT CO. NAME) will follow client requirements in regards to discipline requirements. 8.2 Hazardous Substances and Dangerous Goods (INSERT CO. NAME) shall comply with relevant State, National and International Standards and relevant Codes of Practice, as well as client requirements for Hazardous Substances and Dangerous Goods. All hazardous substance and dangerous goods will be handled, transported, stored and disposed of using correct methods. 8.2.1 Safety Data Sheets (SDS) Dangerous Goods and Hazardous Substances approved for use must be recorded in the site hazardous substances and dangerous goods register. All provisions including PPE recommended on a SDS shall be made available to all employees required to handle the substance. Personnel using hazardous substances or dangerous goods shall be appropriately trained in the correct use of the substance. First Aid requirements shall be supplied as per the information on the SDS. (Insert Co Name) HSE Plan Rev 0 Page 14 of 29 Saved date: 09/09/13