This document provides a monthly environmental report for PT Gunanusa Utama Fabricators for work on the Bukit Tua Development Project in September 2014. It summarizes waste management activities including waste segregation and disposal. Environmental monitoring of drinking water, waste water, and air quality was conducted and found to be within standards. Training and awareness activities on environmental topics were provided to workers through toolbox talks. The report also describes work areas and lists chemicals used along with their material safety data sheets.
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Petronas Carigali Monthly Environment Report
1. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
PE'TTfONAS
CTR Reference: NA
Revision: 00 Rev Date:
Environment Monthly Report
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 1 of 19
BTJT-A TOPSIDE MODIFICATION, ADAPTOR
FABRICATION AND PILE MAKE-UP FOR BUKIT TUA
DEVELOPMENT PROJECT
PCK2L
Environment Monthly Report
(September 2014)
Prepared b : Checked b Acknowledged b :
En a RahmawatiName: S.W.Dewo/Mar'a aD.
Position: Sr.SHO/CSR
Signature:
ThIS dOOJment is the property of PT GUNANUSJ UTAi1A FABRICATORS. It must not be stored. reproduced« disdosed fa others 'Without 'HIltten authonsation frcm the Company.
Env Monftly Repat S9ptembBr 2014-Petronas
2. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 2 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
TABLE OF CONTENTS
Table of Contents .......................................................................................................................................2
1. Introduction ..........................................................................................................................................3
2. Purpose................................................................................................................................................3
3. Scope...................................................................................................................................................3
4. Abbreviations .......................................................................................................................................3
5. Environmental Statistic.........................................................................................................................4
6. Environmental Induction, Communication and Awareness Program ....................................................5
7. List of MSDS ........................................................................................................................................5
8. Activity and Area Description................................................................................................................7
9. Waste Management .............................................................................................................................7
10. Environmental and Hygiene Inspection ..............................................................................................10
11. Environmental Monitoring...................................................................................................................10
11.1 Drinking Water Quality..............................................................................................................10
11.2 Waste Water Quality.................................................................................................................10
11.3 Air Quality.................................................................................................................................10
ATTACHMENTS:
ATTACHMENT 1 : ENVIRONMENTAL TOOLBOX REPORT
ATTACHMENT 2 : WASTE TRANSFER NOTE
ATTACHMENT 3 : WASTE REGISTER
ATTACHMENT 4 : ENVIRONMENT & HYGIENE INSPECTION REPORT
ATTACHMENT 5 : DRINKING WATER ANALYSIS REPORT
ATTACHMENT 6 : WASTE WATER ANALYSIS REPORT
ATTACHMENT 7 : AIR QUALITY ANALYSIS REPORT
ATTACHMENT 8 : ENVIRONMENT ACTIVITY PHOTOGRAPH
3. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 3 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
1. Introduction
This Environment Monthly Report is provided by PT Gunanusa Utama Fabricators is order
to ensure the measurement of the consistency on implementing HSE Management System,
Legal requirements and HSE Policy related to environmental issues which might exist and
rise at workplace during the execution of BTJT-A Topside Modification, Adaptor Fabrication
and Pile Make Up For Bukit Tua Development Project in CTR Yard. CTR recognized the
importance of planning Control Measures into construction activities at the earlier possible
stage in order to prevent damage to the Environment. This Construction Yard and Site
Environment Management Report Plan has been produced to describe how to CTR intends
to manage, control, and coordinate its work, to ensure that no injury, to personal as result of
environmental related activities and no damage or loss shall occur to the environmental as
result of the construction activities. This report consists of summary of implementation of
PSP-BTJT-A-T011 Health, Safety and Environment Program that already approved by
Company
2. Purpose
The purposes of this report are as follows:
1. Identify all the operational activities that presume and may cause important and major
impact to environmental component.
2. Identify the environmental aspects especially presumed the environmental that may
contaminate by the important and major impact of activities.
3. Predicated and evaluated the important and major impacts that happen toward
environmental component because of the operational activities.
4. Mitigation the important and major impacts through environmental component.
5. To choose the exactly and realistic effort of environmental monitoring and management
efforts to minimize the negative impact and increase the positive benefit.
3. Scope
This report covered of all CTR activity on implementing and managing the environmental
requirements at the CTR Yard area on BTJT-A Topside Modification, Adaptor Fabrication
and Pile Make Up For Bukit Tua Development Project and CTR facilities such as: waste
register, environmental monitoring and inspection, environmental improvement,
environmental planning, environmental training, other environmental issues
4. Abbreviations
BAPEDAL Badan Pengelola Dampak Lingkungan
BLH Badan Lingkungan Hidup
4. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 4 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
BS British Standard
CPY Company – Petronas
CTR Contractor – PT. Gunanusa Utama Fabricators
EMP Environment Management Plan
EMS Environment Management System
ESIA Environment and Socio Impact Assessment
HSE Health, Safety and Environmental
ISO International Standard Organizations
MIGAS Minyak dan Gas
NFPA National Fire Protection Agency
OHSAS Occupational Health and Safety Advisory Services
PLN Perusahaan Listrik Negara
POSYANDU Pos Pelayanan Terpadu
PPE Personal Protective Equipment
SOP Standard Operating Procedure
WMP Waste Management Plan
5. Environmental Statistic
CTR will give efforts to received environment objectives such as: to ensure no oil spill and to
minimize dust exposure during sandblasting, and improve waste management. Therefore
with environmental statistic the environment objectives will be monitored.
Table 1. Environmental Statistic
No. Subject Statistic Performance
1
Environmental Incident
Incident Report: 0
5. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 5 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
Spill Form for Minor Spills: 0
2
Environmental Awareness & Communication
Training:
Toolbox Talks:
0 persons
25 persons
3
Fuel Consumption
Construction 830 Liters
4
Water Consumption
Fresh Water
Drinking Water
787 m3
16,272.55 m3
5
MSDS
Total No of Chemical with MSDS:
No of Chemicals without MSDS:
62
0
6. Environmental Induction, Communication and Awareness Program
Environmental induction has been given to each and every new employee which done
during HSE Induction. Environmental awareness was promoted continuously to the workers
through toolbox talk, mass meeting at work locations, and training, and Environment
Posters at HSE notice board for increased the knowledge about environmental and healthy
habit.
Title of Toolbox Topic in September 2014 is about “Housekeeping at Warehouse”.
Attendance List refer to ATTACHMENT 1.
7. List of MSDS
List of MSDS of all the chemicals being in use at CTR Yard is available at office, clinic and
yard area during BTJT-A Topside Modification, Adaptor Fabrication and Pile Make Up For
Bukit Tua Development Project. The MSDS currently available are:
6. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 6 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
No Gas Fuel, Oil & Grease Paint & Thinner Adhesive & Resin NDE Material Others
1 Argon Diesel Fuel Jotun: Barrier 80 Part A/B Ce Te Pox 293 R
Spotcheck Penetrant
SKL-SP2
WD-40
2 LPG Gas Shell Tellus Oil
Jotun: Tankguard White Storage Part
A/B
Ce Te Pox 1951 H
Spotcheck Developer
SKD-S2
Lead-Acid Battrey
3 Oxygen Gas Grease Shell Alvania Jotun: Hardtop XP (Ral 1003) Part A/B HZ918 Powder Spotcheck SKC-S
Galvanized-Carbon and Alloy
Steel
4
Carbon Dioxide
(CO2) Gas
Meditrand S40 Oil Jotun: Jotacoat Universal Part A/B HZ918 Liquid
Mega check Spray
SM15
Absorbents
5 Nitrogen Gas ATF Oil Jotun: Jotamastic 87 GF Part A/B HZ918 Primer
Mega check paint
MP35
Oil Spill Dispersant
6 Rubia Oil Jotun: Marathon Comp A/B
Aica Aibon-
Synthetic Rubber
Adhesive Polish
Type
Mega check cleaner Hobas CC-GRP Pipe
7 Jotun: Penguard Tiecoat 100 Part A/B Mega check developer Envirogrit:Garnet
8 Jotun: Solvalitt Alumunium Mega check Penetrant Toner
9 Jotun: Resist GTI CPA/CPB X-ray Liquid Fixer Bostik Expanda Foam
10 Jotun: Thinner No: 4; 7; 10; 17; 23
7. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 7 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
8. Activity and Area Description
Following were the work locations at CTR Yard during BTJT-A Topside Modification,
Adaptor Fabrication and Pile Make Up For Bukit Tua Development Project work activity in
the September 2014:
Table 3. Activity and Area Description
NO. LOCATION JOB DESCRIPTION
1 Workshop 5 Welding, grinding, lifting
2 Jetty 1 (Barge) Welding, grinding, lifting
3 Work Table 1 (Boat Landing) Welding, grinding, lifting
4 Mechanical Shop/Workshop 6
Heavy equipment preparation such as chain crane
repairing (welding)
5 Electrical Maintenance Shop Electrical preparation
6 Welding School Welding, grinding
7 X-ray chamber NDT
8 Blasting & Painting Area Blasting, painting
9. Waste Management
Waste is segregated through the different type of waste bins as per approved GNU-P-SH-
9005 Waste Management Plan. At CTR Yard area using 5 colors for each type of waste,
such as:
Yellow : Burnable Waste (Paper, Cartoon, Wooden, etc)
Green : Unburnable Waste (Plastic, Rubber, etc)
Blue : Organic Waste
Red : Metal Scrap
Black : Hazardous Waste
Waste management system at CTR Yard in BTJT-A Topside Modification, Adaptor
Fabrication and Pile Make Up For Bukit Tua Development Project can be defined as on flow
Diagram 1.
8. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 8 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
The domestic waste storage at CTR Yard and will transport by small truck to waste collector
(CV. Mandiri Pratama Abadi). Hazardous waste from CTR Yard will be sent to the third
party. Waste transfer note is recorded by HSE Department from CTR. Waste register has
been from the waste transfer note individually for Yard. Summary of waste transfer note
attached on ATTACHMENT 2 and total quantity of waste generated per month from yard is
entered in the register (ATTACHMENT 3).
9. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 9 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
TYPES/PROPERTIES HANDLING, STORAGE DISPOSALSOURCES
Diagram 1. Waste Management at CTR Yard
10. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 10 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
10. Environmental and Hygiene Inspection
Environmental and Hygiene Inspection have been performed in CTR Yard area during
Yadana Subsidence Project regularly. Environmental and Hygiene Inspection were done in
this period such as:
Table 5. Environmental and Hygiene Inspection
No. Inspection Description
Period of
Inspection
Remark
1. Eyewash Inspection Monthly Report on ATTACHMENT 4
2. Environment Inspection Monthly Report on ATTACHMENT 4
11. Environmental Monitoring
11.1 Drinking Water Quality
Drinking water supply for CTR Yard is supply from CTR Aqua/Water Maker. Drinking water
quality analyse was conducted on September 17, 2014 by Health Laboratory Department
Serang region. The checked parameter of drinking water was based on Health Minister
Regulation No. 492/MENKES/Per/IV/2010 regarding requirements and water quality
monitoring. The result is shown that drinking water from CTR Yard is safe to use. Report
related this matter can be seen on ATTACHMENT 5.
11.2 Waste Water Quality
Waste water monitoring conducted every six-months. Waste water quality sampling was
taken from drainage as domestic waste water or grey water at CTR Yard near Jetty 1 on
April 25, 2014, by Health Laboratory at Serang, will conduct as per quarterly basis. Analysis
based on Decree of Environmental Minister No. 51 Year 1995 regarding Standard of
Industrial Waste Water. The result of waste water sample was shown that waste water
saved to discharge to the sea. The result of monitoring refers to ATTACHMENT 6.
11.3 Air Quality
HSE department of CTR has done some efforts to minimize the effect from dust and
chemical pollution on air, such as:
Installation of dust screen at Manual Blasting and Painting area
Provide proper paint storage and mixing paint area
11. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 11 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
Provide PPE for employees (Masker)
Conducted regular induction for new employee and Toolbox Talk as per requirement
Air Quality Monitoring at CTR Yard conducted every six-months. Air Quality Monitoring with
chemical (SOx, NOx, H2S, NH3, O3) and dust parameter already conducted by Health
Laboratory Department Serang region on June 2014 for Workshop 2 area. Analysis of air
quality monitoring based on Decree of Environmental Minister No. 50 Year 1996 regarding
Standard of Odour and Indonesia Government Regulation No. 41 Year 1999 regarding Air
Pollution Prevention. The result of Air Quality Monitoring result was shown that air quality
monitoring with chemical parameter at Workshop 2 area below than threshold limit. The
result of monitoring refers to ATTACHMENT 7.
12. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 12 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 1 : ENVIRONMENTAL TOOLBOX REPORT
13.
14. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 13 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 2 : WASTE TRANSFER NOTE
15.
16. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 14 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 3 : WASTE REGISTER
17. Location : Grenyang
Period : September 2014
Used Oil Batteries
Contaminated
Drum & Jerrycan
September '14 583020 ton CV. Banyu Resmi SM waste transfer as per requested
22 May '14 56 Drum 38 EA 26 EA PT. RGM HZ waste transfer as per requested
1 Sept '14 - 30 Sept '14 14,9 m
3
22,3 m
3
37,1 m
3
CV. MPA
Note: BIO :Biodegradable
BR :Burnable
NBR :Non Burnable
SM :Scrap Metal
HZ :Hazardous
HZ
Transported by Remarks
WASTE REGISTER
Type of Waste
Date
BIO BR NBR SM
PT GUNANUSA UTAMA
FABRICATORS
18. Updated 30 Sept 2014
Jumlah/quantity Tanggal/date Jumah/quantity Tanggal/Date
21 28‐Jun‐13
89 3‐Jan‐14
110 6‐Jan‐14 managed by PT Wastec International
0
12 11‐Mar‐14
26 16‐Apr‐14
38 22‐May‐14 managed by PT Raja Goedang Mas
1 26‐Aug‐14
1
29 21‐Nov‐13
7 16‐Dec‐13
2 2‐Jan‐14
38 6 Jan 14 managed by PT Wastec International
HAZARDOUS AND TOXIC WASTE LOG BOOK
No Nama Limbah/Name of waste Satuan/Unit
Masuk/In Keluar/Out
Jumlah Sisa/Residual Quantity PIC Remarks
1 Tonner pcs
2 Acid Batteries pcs
38 6‐Jan‐14 managed by PT Wastec International
13 19‐Mar‐14
9 17‐Apr‐14
1 17‐Jun‐14
23
2 13‐May‐14
2
13 15‐Dec‐12
8 5‐Jan‐13
7 18‐Feb‐13
2 3‐Mar‐13
10 20‐May‐13
35 25‐Jun‐13
56 21‐Nov‐13
36 22‐May‐14 managed by PT Raja Goedang Mas
25
2 21‐Nov‐13
2 6‐Jan‐14 managed by PT Wastec International
0.5 22‐Apr‐14
0.5
1 22‐Apr‐14
1
1 20‐Mar‐14
0.5 22‐Apr‐14
1.5
15 3‐Jan‐14
15 6‐Jan‐14 managed by PT Wastec International
3 Paint & Thinner
drum (200 liter)
can (20 liter)
4 Used Oil drum (200 liter)
5 Oil Filter
drum (200 liter)
box (1.8mx1.2mx1.2m)
6 Oily rags drum (200 liter)
Medic kg7
19. Updated 30 Sept 2014
Jumlah/quantity Tanggal/date Jumah/quantity Tanggal/Date
HAZARDOUS AND TOXIC WASTE LOG BOOK
No Nama Limbah/Name of waste Satuan/Unit
Masuk/In Keluar/Out
Jumlah Sisa/Residual Quantity PIC Remarks
1 22‐Apr‐14
13 13‐May‐14
14
13 8‐Oct‐12
18 11‐Nov‐12
9 5‐Dec‐12
11 21‐Jan‐13
12 25‐Feb‐13
38 12‐Jul‐13 managed by PT Raja Goedang Mas
7 29‐Jan‐14
12 20‐Feb‐14
16 3‐Mar‐14
12 8‐Apr‐14
10 6‐May‐14
82 22‐May‐14 managed by PT Raja Goedang Mas
22.5
8 Contaminated Packaging
drum (200 liter)
7 kgMedic
12 16‐Jul‐13
10 3‐Jan‐14
10 6‐Jan‐14 managed by PT Wastec International
9 29‐Jan‐14
21
74 24‐Jun‐14
74
315 15‐Jul‐14
315
10 Dry Batteries pcs
Jerry can (25 liter)
9 Lamp pcs (long size)
20. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 15 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 4 : ENVIRONMENT & HYGIENE INSPECTION REPORT
21.
22. Period : September, 2014
E.1. EYE WASH INSPECTION CHECKLIST
Yes No Clogged up Unclogged up Clean Dirty Clean Dirty Clean Dirty
Note :
√
Remarks
Inside of
Eyewash
√1
2 23-Jan-13
Eyewash No.8
Hazardous Waste
Storage 8.3435.7
Jetty 1
Eyewash No.3
8.0638.1
√ √
Cleaning
Schedule Water
√
√ √
pH
Condition
Temperature
(
0
C)
Outside of
Eyewash
Date
Reported
√ √17-Sep-14 √
* pH Standard 6.5 - 8.5
Hygiene Inspection in PTG Yard Facility
No Location
Drainage
PT GUNANUSA UTAMA FABRICATORS
23.
24. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 16 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 5 : DRINKING WATER ANALYSIS REPORT
25.
26. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 17 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 6 : WASTE WATER ANALYSIS REPORT
27.
28. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 18 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 7 : AIR QUALITY ANALYSIS REPORT
29.
30.
31.
INTERP
Dari has
SOx, NO
No. 41 T
tidak me
INTERP
Dari hasi
Batas M
dalam a
Dimungk
REKOM
Dari hasi
1. Tenag
dalam
pemer
2. Untuk
melak
secara
Prep
Engga
Environm
PRETASI H
il analisis a
Ox, H2S, NH3
Tahun 1999
mbahayakan
PRETASI H
il analisis am
aksimum se
area WS 2
kinkan hasil d
MENDASI
il pengujian
ga kerja waji
m proses rev
riksaan kese
k lebih mew
kukan pengu
a berkesinam
pared by:
Rahmawati
mental Engin
ASIL PENG
mbien udara
3, Oksidan (O
dan Kep.50
n.
ASIL PENG
mbien udara
esuai denga
2 mengand
debu dari pr
yang telah d
b mengguna
vamping, di
ehatan seca
wujudkan li
ujian udara
mbungan.
eer
GUJIAN SA
a pada area
O3) menunju
0/MEN/1996
GUJIAN SA
area WS 2
an KEP 41/M
dung udara
roses pengh
dilakukan, di
akan maske
ikuti peman
ra berkala k
ingkungan
lingkungan
AMPEL AM
a pekerjaan
ukkan nilai d
6, sehingga
AMPEL KE
dengan para
MEN LH/199
a yang jum
ancuran bet
isarankan ha
er saat beke
ntauan kese
khususnya fu
kerja yang
n kerja deng
MBIEN UDA
revamping
di bawah Ba
kondisi uda
EBISINGAN
ameter debu
99. Dengan
mlan kadar
ton menggun
al-hal sebag
rja terutama
hatan tenag
ungsi paru.
sehat dan
gan lebih k
Co
ARA
di WS 2 de
aku Mutu Li
ara tersebut
N DAN DEB
u menunjukk
n demikian,
debunya
nakan jack h
gai berikut:
a saat meng
ga kerja de
n nyaman d
komprehens
Acknowledg
Tjahjo Sisw
orp. HSE Ma
engan param
ngkungan P
dapat dikat
BU
kan nilai me
dapat dikat
membahaya
hammer.
hancurkan b
ngan melak
disarankan
if dan dilak
ged by:
wadi
nager
meter
PP RI
takan
lebihi
takan
akan.
beton
kukan
agar
kukan
32.
Pengukkuran udara
Peng
ambien di a
gukuran uda
LAMP
rea WS 2 de
ra ambien d
PIRAN FOT
engan param
di area WS 2
TO
meter SOx, N
2 dengan par
NOx, H2S, NH
rameter deb
H3, Oksidan
bu
(O3)
33. Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 19 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 8 : ENVIRONMENT ACTIVITY PHOTOGRAPH
34. ENVIRONMENT ACTIVITY PERIOD SEPTEMBER’14
Installation of eyewash near barge Installation of smoking shelter near barge
General Housekeeping near workshop 5
BEFORE AFTER