Petronas Carigali Ketapang 2 Limited Doc. Ref.:
PE'TTfONAS
CTR Reference: NA
Revision: 00 Rev Date: ­
Environment Monthly Report
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 1 of 19
BTJT-A TOPSIDE MODIFICATION, ADAPTOR 

FABRICATION AND PILE MAKE-UP FOR BUKIT TUA 

DEVELOPMENT PROJECT 

PCK2L 

Environment Monthly Report
(September 2014)
Prepared b : Checked b Acknowledged b :
En a RahmawatiName: S.W.Dewo/Mar'a aD.
Position: Sr.SHO/CSR
Signature:
ThIS dOOJment is the property of PT GUNANUSJ UTAi1A FABRICATORS. It must not be stored. reproduced« disdosed fa others 'Without 'HIltten authonsation frcm the Company.
Env Monftly Repat S9ptembBr 2014-Petronas
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 2 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
TABLE OF CONTENTS
Table of Contents .......................................................................................................................................2 
1.  Introduction ..........................................................................................................................................3 
2.  Purpose................................................................................................................................................3 
3.  Scope...................................................................................................................................................3 
4.  Abbreviations .......................................................................................................................................3 
5.  Environmental Statistic.........................................................................................................................4 
6.  Environmental Induction, Communication and Awareness Program ....................................................5 
7.  List of MSDS ........................................................................................................................................5 
8.  Activity and Area Description................................................................................................................7 
9.  Waste Management .............................................................................................................................7 
10. Environmental and Hygiene Inspection ..............................................................................................10 
11. Environmental Monitoring...................................................................................................................10 
11.1  Drinking Water Quality..............................................................................................................10 
11.2  Waste Water Quality.................................................................................................................10 
11.3  Air Quality.................................................................................................................................10 
ATTACHMENTS:
ATTACHMENT 1 : ENVIRONMENTAL TOOLBOX REPORT
ATTACHMENT 2 : WASTE TRANSFER NOTE
ATTACHMENT 3 : WASTE REGISTER
ATTACHMENT 4 : ENVIRONMENT & HYGIENE INSPECTION REPORT
ATTACHMENT 5 : DRINKING WATER ANALYSIS REPORT
ATTACHMENT 6 : WASTE WATER ANALYSIS REPORT
ATTACHMENT 7 : AIR QUALITY ANALYSIS REPORT
ATTACHMENT 8 : ENVIRONMENT ACTIVITY PHOTOGRAPH
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 3 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
1. Introduction
This Environment Monthly Report is provided by PT Gunanusa Utama Fabricators is order
to ensure the measurement of the consistency on implementing HSE Management System,
Legal requirements and HSE Policy related to environmental issues which might exist and
rise at workplace during the execution of BTJT-A Topside Modification, Adaptor Fabrication
and Pile Make Up For Bukit Tua Development Project in CTR Yard. CTR recognized the
importance of planning Control Measures into construction activities at the earlier possible
stage in order to prevent damage to the Environment. This Construction Yard and Site
Environment Management Report Plan has been produced to describe how to CTR intends
to manage, control, and coordinate its work, to ensure that no injury, to personal as result of
environmental related activities and no damage or loss shall occur to the environmental as
result of the construction activities. This report consists of summary of implementation of
PSP-BTJT-A-T011 Health, Safety and Environment Program that already approved by
Company
2. Purpose
The purposes of this report are as follows:
1. Identify all the operational activities that presume and may cause important and major
impact to environmental component.
2. Identify the environmental aspects especially presumed the environmental that may
contaminate by the important and major impact of activities.
3. Predicated and evaluated the important and major impacts that happen toward
environmental component because of the operational activities.
4. Mitigation the important and major impacts through environmental component.
5. To choose the exactly and realistic effort of environmental monitoring and management
efforts to minimize the negative impact and increase the positive benefit.
3. Scope
This report covered of all CTR activity on implementing and managing the environmental
requirements at the CTR Yard area on BTJT-A Topside Modification, Adaptor Fabrication
and Pile Make Up For Bukit Tua Development Project and CTR facilities such as: waste
register, environmental monitoring and inspection, environmental improvement,
environmental planning, environmental training, other environmental issues
4. Abbreviations
BAPEDAL Badan Pengelola Dampak Lingkungan
BLH Badan Lingkungan Hidup
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 4 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
BS British Standard
CPY Company – Petronas
CTR Contractor – PT. Gunanusa Utama Fabricators
EMP Environment Management Plan
EMS Environment Management System
ESIA Environment and Socio Impact Assessment
HSE Health, Safety and Environmental
ISO International Standard Organizations
MIGAS Minyak dan Gas
NFPA National Fire Protection Agency
OHSAS Occupational Health and Safety Advisory Services
PLN Perusahaan Listrik Negara
POSYANDU Pos Pelayanan Terpadu
PPE Personal Protective Equipment
SOP Standard Operating Procedure
WMP Waste Management Plan
5. Environmental Statistic
CTR will give efforts to received environment objectives such as: to ensure no oil spill and to
minimize dust exposure during sandblasting, and improve waste management. Therefore
with environmental statistic the environment objectives will be monitored.
Table 1. Environmental Statistic
No. Subject Statistic Performance
1
Environmental Incident
Incident Report: 0
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 5 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
Spill Form for Minor Spills: 0
2
Environmental Awareness & Communication
Training:
Toolbox Talks:
0 persons
25 persons
3
Fuel Consumption
Construction 830 Liters
4
Water Consumption
Fresh Water
Drinking Water
787 m3
16,272.55 m3
5
MSDS
Total No of Chemical with MSDS:
No of Chemicals without MSDS:
62
0
6. Environmental Induction, Communication and Awareness Program
Environmental induction has been given to each and every new employee which done
during HSE Induction. Environmental awareness was promoted continuously to the workers
through toolbox talk, mass meeting at work locations, and training, and Environment
Posters at HSE notice board for increased the knowledge about environmental and healthy
habit.
Title of Toolbox Topic in September 2014 is about “Housekeeping at Warehouse”.
Attendance List refer to ATTACHMENT 1.
7. List of MSDS
List of MSDS of all the chemicals being in use at CTR Yard is available at office, clinic and
yard area during BTJT-A Topside Modification, Adaptor Fabrication and Pile Make Up For
Bukit Tua Development Project. The MSDS currently available are:
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 6 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
No Gas Fuel, Oil & Grease Paint & Thinner Adhesive & Resin NDE Material Others
1 Argon Diesel Fuel Jotun: Barrier 80 Part A/B Ce Te Pox 293 R
Spotcheck Penetrant
SKL-SP2
WD-40
2 LPG Gas Shell Tellus Oil
Jotun: Tankguard White Storage Part
A/B
Ce Te Pox 1951 H
Spotcheck Developer
SKD-S2
Lead-Acid Battrey
3 Oxygen Gas Grease Shell Alvania Jotun: Hardtop XP (Ral 1003) Part A/B HZ918 Powder Spotcheck SKC-S
Galvanized-Carbon and Alloy
Steel
4
Carbon Dioxide
(CO2) Gas
Meditrand S40 Oil Jotun: Jotacoat Universal Part A/B HZ918 Liquid
Mega check Spray
SM15
Absorbents
5 Nitrogen Gas ATF Oil Jotun: Jotamastic 87 GF Part A/B HZ918 Primer
Mega check paint
MP35
Oil Spill Dispersant
6 Rubia Oil Jotun: Marathon Comp A/B
Aica Aibon-
Synthetic Rubber
Adhesive Polish
Type
Mega check cleaner Hobas CC-GRP Pipe
7 Jotun: Penguard Tiecoat 100 Part A/B Mega check developer Envirogrit:Garnet
8 Jotun: Solvalitt Alumunium Mega check Penetrant Toner
9 Jotun: Resist GTI CPA/CPB X-ray Liquid Fixer Bostik Expanda Foam
10 Jotun: Thinner No: 4; 7; 10; 17; 23
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 7 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
8. Activity and Area Description
Following were the work locations at CTR Yard during BTJT-A Topside Modification,
Adaptor Fabrication and Pile Make Up For Bukit Tua Development Project work activity in
the September 2014:
Table 3. Activity and Area Description
NO. LOCATION JOB DESCRIPTION
1 Workshop 5 Welding, grinding, lifting
2 Jetty 1 (Barge) Welding, grinding, lifting
3 Work Table 1 (Boat Landing) Welding, grinding, lifting
4 Mechanical Shop/Workshop 6
Heavy equipment preparation such as chain crane
repairing (welding)
5 Electrical Maintenance Shop Electrical preparation
6 Welding School Welding, grinding
7 X-ray chamber NDT
8 Blasting & Painting Area Blasting, painting
9. Waste Management
Waste is segregated through the different type of waste bins as per approved GNU-P-SH-
9005 Waste Management Plan. At CTR Yard area using 5 colors for each type of waste,
such as:
 Yellow : Burnable Waste (Paper, Cartoon, Wooden, etc)
 Green : Unburnable Waste (Plastic, Rubber, etc)
 Blue : Organic Waste
 Red : Metal Scrap
 Black : Hazardous Waste
Waste management system at CTR Yard in BTJT-A Topside Modification, Adaptor
Fabrication and Pile Make Up For Bukit Tua Development Project can be defined as on flow
Diagram 1.
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 8 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
The domestic waste storage at CTR Yard and will transport by small truck to waste collector
(CV. Mandiri Pratama Abadi). Hazardous waste from CTR Yard will be sent to the third
party. Waste transfer note is recorded by HSE Department from CTR. Waste register has
been from the waste transfer note individually for Yard. Summary of waste transfer note
attached on ATTACHMENT 2 and total quantity of waste generated per month from yard is
entered in the register (ATTACHMENT 3).
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 9 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
TYPES/PROPERTIES HANDLING, STORAGE DISPOSALSOURCES
Diagram 1. Waste Management at CTR Yard
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 10 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
10. Environmental and Hygiene Inspection
Environmental and Hygiene Inspection have been performed in CTR Yard area during
Yadana Subsidence Project regularly. Environmental and Hygiene Inspection were done in
this period such as:
Table 5. Environmental and Hygiene Inspection
No. Inspection Description
Period of
Inspection
Remark
1. Eyewash Inspection Monthly Report on ATTACHMENT 4
2. Environment Inspection Monthly Report on ATTACHMENT 4
11. Environmental Monitoring
11.1 Drinking Water Quality
Drinking water supply for CTR Yard is supply from CTR Aqua/Water Maker. Drinking water
quality analyse was conducted on September 17, 2014 by Health Laboratory Department
Serang region. The checked parameter of drinking water was based on Health Minister
Regulation No. 492/MENKES/Per/IV/2010 regarding requirements and water quality
monitoring. The result is shown that drinking water from CTR Yard is safe to use. Report
related this matter can be seen on ATTACHMENT 5.
11.2 Waste Water Quality
Waste water monitoring conducted every six-months. Waste water quality sampling was
taken from drainage as domestic waste water or grey water at CTR Yard near Jetty 1 on
April 25, 2014, by Health Laboratory at Serang, will conduct as per quarterly basis. Analysis
based on Decree of Environmental Minister No. 51 Year 1995 regarding Standard of
Industrial Waste Water. The result of waste water sample was shown that waste water
saved to discharge to the sea. The result of monitoring refers to ATTACHMENT 6.
11.3 Air Quality
HSE department of CTR has done some efforts to minimize the effect from dust and
chemical pollution on air, such as:
 Installation of dust screen at Manual Blasting and Painting area
 Provide proper paint storage and mixing paint area
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 11 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
 Provide PPE for employees (Masker)
 Conducted regular induction for new employee and Toolbox Talk as per requirement
Air Quality Monitoring at CTR Yard conducted every six-months. Air Quality Monitoring with
chemical (SOx, NOx, H2S, NH3, O3) and dust parameter already conducted by Health
Laboratory Department Serang region on June 2014 for Workshop 2 area. Analysis of air
quality monitoring based on Decree of Environmental Minister No. 50 Year 1996 regarding
Standard of Odour and Indonesia Government Regulation No. 41 Year 1999 regarding Air
Pollution Prevention. The result of Air Quality Monitoring result was shown that air quality
monitoring with chemical parameter at Workshop 2 area below than threshold limit. The
result of monitoring refers to ATTACHMENT 7.
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 12 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 1 : ENVIRONMENTAL TOOLBOX REPORT
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 13 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 2 : WASTE TRANSFER NOTE
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 14 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 3 : WASTE REGISTER
Location : Grenyang
Period : September 2014
Used Oil Batteries
Contaminated
Drum & Jerrycan
September '14 583020 ton CV. Banyu Resmi SM waste transfer as per requested
22 May '14 56 Drum 38 EA 26 EA PT. RGM HZ waste transfer as per requested
1 Sept '14 - 30 Sept '14 14,9 m
3
22,3 m
3
37,1 m
3
CV. MPA
Note: BIO :Biodegradable
BR :Burnable
NBR :Non Burnable
SM :Scrap Metal
HZ :Hazardous
HZ
Transported by Remarks
WASTE REGISTER
Type of Waste
Date
BIO BR NBR SM
PT GUNANUSA UTAMA
FABRICATORS
Updated 30 Sept 2014
Jumlah/quantity Tanggal/date Jumah/quantity Tanggal/Date
21 28‐Jun‐13
89 3‐Jan‐14
110 6‐Jan‐14 managed by PT Wastec International
0
12 11‐Mar‐14
26 16‐Apr‐14
38 22‐May‐14 managed by PT Raja Goedang Mas
1 26‐Aug‐14
1
29 21‐Nov‐13
7 16‐Dec‐13
2 2‐Jan‐14
38 6 Jan 14 managed by PT Wastec International
HAZARDOUS AND TOXIC WASTE LOG BOOK
No Nama Limbah/Name of waste Satuan/Unit
Masuk/In Keluar/Out
Jumlah Sisa/Residual Quantity PIC Remarks
1 Tonner  pcs
2 Acid Batteries pcs
38 6‐Jan‐14 managed by PT Wastec International
13 19‐Mar‐14
9 17‐Apr‐14
1 17‐Jun‐14
23
2 13‐May‐14
2
13 15‐Dec‐12
8 5‐Jan‐13
7 18‐Feb‐13
2 3‐Mar‐13
10 20‐May‐13
35 25‐Jun‐13
56 21‐Nov‐13
36 22‐May‐14 managed by PT Raja Goedang Mas
25
2 21‐Nov‐13
2 6‐Jan‐14 managed by PT Wastec International
0.5 22‐Apr‐14
0.5
1 22‐Apr‐14
1
1 20‐Mar‐14
0.5 22‐Apr‐14
1.5
15 3‐Jan‐14
15 6‐Jan‐14 managed by PT Wastec International
3 Paint & Thinner
drum (200 liter)
can (20 liter)
4 Used Oil drum (200 liter)
5 Oil Filter
drum (200 liter)
box (1.8mx1.2mx1.2m)
6 Oily rags drum (200 liter)
Medic kg7
Updated 30 Sept 2014
Jumlah/quantity Tanggal/date Jumah/quantity Tanggal/Date
HAZARDOUS AND TOXIC WASTE LOG BOOK
No Nama Limbah/Name of waste Satuan/Unit
Masuk/In Keluar/Out
Jumlah Sisa/Residual Quantity PIC Remarks
1 22‐Apr‐14
13 13‐May‐14
14
13 8‐Oct‐12
18 11‐Nov‐12
9 5‐Dec‐12
11 21‐Jan‐13
12 25‐Feb‐13
38 12‐Jul‐13 managed by PT Raja Goedang Mas
7 29‐Jan‐14
12 20‐Feb‐14
16 3‐Mar‐14
12 8‐Apr‐14
10 6‐May‐14
82 22‐May‐14 managed by PT Raja Goedang Mas
22.5
8 Contaminated Packaging
drum (200 liter)
7 kgMedic
12 16‐Jul‐13
10 3‐Jan‐14
10 6‐Jan‐14 managed by PT Wastec International
9 29‐Jan‐14
21
74 24‐Jun‐14
74
315 15‐Jul‐14
315
10 Dry Batteries pcs
Jerry can (25 liter)
9 Lamp pcs (long size)
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 15 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 4 : ENVIRONMENT & HYGIENE INSPECTION REPORT
Period : September, 2014
E.1. EYE WASH INSPECTION CHECKLIST
Yes No Clogged up Unclogged up Clean Dirty Clean Dirty Clean Dirty
Note :
√
Remarks
Inside of
Eyewash
√1
2 23-Jan-13
Eyewash No.8
Hazardous Waste
Storage 8.3435.7
Jetty 1
Eyewash No.3
8.0638.1
√ √
Cleaning
Schedule Water
√
√ √
pH
Condition
Temperature
(
0
C)
Outside of
Eyewash
Date
Reported
√ √17-Sep-14 √
* pH Standard 6.5 - 8.5
Hygiene Inspection in PTG Yard Facility
No Location
Drainage
PT GUNANUSA UTAMA FABRICATORS
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 16 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 5 : DRINKING WATER ANALYSIS REPORT
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 17 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 6 : WASTE WATER ANALYSIS REPORT
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 18 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 7 : AIR QUALITY ANALYSIS REPORT
  
INTERP
Dari has
SOx, NO
No. 41 T
tidak me
INTERP
Dari hasi
Batas M
dalam a
Dimungk
REKOM
Dari hasi
1. Tenag
dalam
pemer
2. Untuk
melak
secara
Prep
Engga
Environm
PRETASI H
il analisis a
Ox, H2S, NH3
Tahun 1999
mbahayakan
PRETASI H
il analisis am
aksimum se
area WS 2
kinkan hasil d
MENDASI
il pengujian
ga kerja waji
m proses rev
riksaan kese
k lebih mew
kukan pengu
a berkesinam
pared by:
Rahmawati
mental Engin
ASIL PENG
mbien udara
3, Oksidan (O
dan Kep.50
n.
ASIL PENG
mbien udara
esuai denga
2 mengand
debu dari pr
yang telah d
b mengguna
vamping, di
ehatan seca
wujudkan li
ujian udara
mbungan.
eer
GUJIAN SA
a pada area
O3) menunju
0/MEN/1996
GUJIAN SA
area WS 2
an KEP 41/M
dung udara
roses pengh
dilakukan, di
akan maske
ikuti peman
ra berkala k
ingkungan
lingkungan
AMPEL AM
a pekerjaan
ukkan nilai d
6, sehingga
AMPEL KE
dengan para
MEN LH/199
a yang jum
ancuran bet
isarankan ha
er saat beke
ntauan kese
khususnya fu
kerja yang
n kerja deng
MBIEN UDA
revamping
di bawah Ba
kondisi uda
EBISINGAN
ameter debu
99. Dengan
mlan kadar
ton menggun
al-hal sebag
rja terutama
hatan tenag
ungsi paru.
sehat dan
gan lebih k
Co
ARA
di WS 2 de
aku Mutu Li
ara tersebut
N DAN DEB
u menunjukk
n demikian,
debunya
nakan jack h
gai berikut:
a saat meng
ga kerja de
n nyaman d
komprehens
Acknowledg
Tjahjo Sisw
orp. HSE Ma
engan param
ngkungan P
dapat dikat
BU
kan nilai me
dapat dikat
membahaya
hammer.
hancurkan b
ngan melak
disarankan
if dan dilak
ged by:
wadi
nager
meter
PP RI
takan
lebihi
takan
akan.
beton
kukan
agar
kukan
  
Pengukkuran udara
Peng
ambien di a
gukuran uda
LAMP
rea WS 2 de
ra ambien d
PIRAN FOT
engan param
di area WS 2
TO
meter SOx, N
2 dengan par
NOx, H2S, NH
rameter deb
H3, Oksidan
bu
(O3)
Petronas Carigali Ketapang 2 Limited Doc. Ref.:
Environment Monthly Report
CTR Reference: NA
Revision: 00 Rev Date: -
Discipline: HSE Document Type: Report
Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 19 of 19
This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Env Monthly Report September 2014-Petronas
ATTACHMENT 8 : ENVIRONMENT ACTIVITY PHOTOGRAPH
ENVIRONMENT ACTIVITY PERIOD SEPTEMBER’14
Installation of eyewash near barge Installation of smoking shelter near barge
General Housekeeping near workshop 5
BEFORE AFTER

More Related Content

What's hot

Accident Investigation Training- Safety First!
Accident Investigation Training- Safety First!Accident Investigation Training- Safety First!
Accident Investigation Training- Safety First!davidhongwei
 
Pelatihan Accident Investigation Training
Pelatihan Accident Investigation TrainingPelatihan Accident Investigation Training
Pelatihan Accident Investigation TrainingAli Fuad R
 
Emergency spill control drill
Emergency spill control drillEmergency spill control drill
Emergency spill control drillSami Ullah
 
Materi lock out & tag out khoirul huda
Materi lock out & tag out   khoirul hudaMateri lock out & tag out   khoirul huda
Materi lock out & tag out khoirul hudahandiv
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management systemgraha katiga
 
HSE Performance Record 2017 - PT. Shaftindo Energi
HSE Performance Record 2017 - PT. Shaftindo EnergiHSE Performance Record 2017 - PT. Shaftindo Energi
HSE Performance Record 2017 - PT. Shaftindo Energifachroe84
 
16 WEEKLY HSE REPORT_PT LMM FEB 2022.pptx
16 WEEKLY HSE REPORT_PT LMM FEB 2022.pptx16 WEEKLY HSE REPORT_PT LMM FEB 2022.pptx
16 WEEKLY HSE REPORT_PT LMM FEB 2022.pptxMichael482490
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Yuvraj Shrivastava
 
HSE Training Confined Space (okt 18)
HSE Training Confined Space (okt 18)HSE Training Confined Space (okt 18)
HSE Training Confined Space (okt 18)ibadil haqqi
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
Hazard Identification and Risk Assessment
Hazard Identification and Risk AssessmentHazard Identification and Risk Assessment
Hazard Identification and Risk AssessmentMirza Saifullah Baig
 

What's hot (20)

LOTO TRAINING.ppt
LOTO TRAINING.pptLOTO TRAINING.ppt
LOTO TRAINING.ppt
 
Accident Investigation Training- Safety First!
Accident Investigation Training- Safety First!Accident Investigation Training- Safety First!
Accident Investigation Training- Safety First!
 
Pelatihan Accident Investigation Training
Pelatihan Accident Investigation TrainingPelatihan Accident Investigation Training
Pelatihan Accident Investigation Training
 
Teknik Evakuasi
Teknik EvakuasiTeknik Evakuasi
Teknik Evakuasi
 
Emergency spill control drill
Emergency spill control drillEmergency spill control drill
Emergency spill control drill
 
Safety leadership
Safety leadershipSafety leadership
Safety leadership
 
Modul K3
Modul K3Modul K3
Modul K3
 
Materi lock out & tag out khoirul huda
Materi lock out & tag out   khoirul hudaMateri lock out & tag out   khoirul huda
Materi lock out & tag out khoirul huda
 
LOTO - LOCK OUT TAG OUT
LOTO - LOCK OUT TAG OUTLOTO - LOCK OUT TAG OUT
LOTO - LOCK OUT TAG OUT
 
Safety Leadership-1.ppt
Safety Leadership-1.pptSafety Leadership-1.ppt
Safety Leadership-1.ppt
 
HSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.pptHSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.ppt
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management system
 
SAFETY IS EVERYONE’S RESPONSIBILITY
SAFETY IS EVERYONE’S RESPONSIBILITYSAFETY IS EVERYONE’S RESPONSIBILITY
SAFETY IS EVERYONE’S RESPONSIBILITY
 
HSE Performance Record 2017 - PT. Shaftindo Energi
HSE Performance Record 2017 - PT. Shaftindo EnergiHSE Performance Record 2017 - PT. Shaftindo Energi
HSE Performance Record 2017 - PT. Shaftindo Energi
 
16 WEEKLY HSE REPORT_PT LMM FEB 2022.pptx
16 WEEKLY HSE REPORT_PT LMM FEB 2022.pptx16 WEEKLY HSE REPORT_PT LMM FEB 2022.pptx
16 WEEKLY HSE REPORT_PT LMM FEB 2022.pptx
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
 
HSE Training Confined Space (okt 18)
HSE Training Confined Space (okt 18)HSE Training Confined Space (okt 18)
HSE Training Confined Space (okt 18)
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
Confined Space - Ruang Terbatas
Confined Space - Ruang TerbatasConfined Space - Ruang Terbatas
Confined Space - Ruang Terbatas
 
Hazard Identification and Risk Assessment
Hazard Identification and Risk AssessmentHazard Identification and Risk Assessment
Hazard Identification and Risk Assessment
 

Similar to Petronas Carigali Monthly Environment Report

Review paper on operation and maintenance of effluent treatment plant of pape...
Review paper on operation and maintenance of effluent treatment plant of pape...Review paper on operation and maintenance of effluent treatment plant of pape...
Review paper on operation and maintenance of effluent treatment plant of pape...IRJET Journal
 
Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)abtabussam
 
Why is a CPCB Registration Certificate Important for Industries.pdf
Why is a CPCB Registration Certificate Important for Industries.pdfWhy is a CPCB Registration Certificate Important for Industries.pdf
Why is a CPCB Registration Certificate Important for Industries.pdfJagriti Agarwal
 
15020243019_NiharicaOgale_Final_Report
15020243019_NiharicaOgale_Final_Report15020243019_NiharicaOgale_Final_Report
15020243019_NiharicaOgale_Final_ReportNiharica Ogale
 
Environmental Audits
Environmental AuditsEnvironmental Audits
Environmental AuditsYajush Sonar
 
Managing risk and delivering outcomes through Environmental Regulation
Managing risk and delivering outcomes through Environmental RegulationManaging risk and delivering outcomes through Environmental Regulation
Managing risk and delivering outcomes through Environmental RegulationDara Lynott Consultants LTD.
 
Environmental impact assessment
Environmental impact assessment Environmental impact assessment
Environmental impact assessment BiplobDas38
 
Bat guidance note on best available techniques for pharmaceutical
Bat guidance note on best available techniques for pharmaceuticalBat guidance note on best available techniques for pharmaceutical
Bat guidance note on best available techniques for pharmaceuticalStephen Ndiboi
 
4.ASL_Kovvur_Safety-Audit-Report.pdf
4.ASL_Kovvur_Safety-Audit-Report.pdf4.ASL_Kovvur_Safety-Audit-Report.pdf
4.ASL_Kovvur_Safety-Audit-Report.pdfhit2020
 
Environmental auditing ppt
Environmental auditing pptEnvironmental auditing ppt
Environmental auditing pptNatthu Shrirame
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentArunAngadi5
 
Environment impact assessment study
Environment impact assessment studyEnvironment impact assessment study
Environment impact assessment studyArvind Kumar
 
Understanding Life Cycle Assessment (LCA) in Qatar
Understanding Life Cycle Assessment (LCA) in QatarUnderstanding Life Cycle Assessment (LCA) in Qatar
Understanding Life Cycle Assessment (LCA) in Qatarwaeyqatar
 
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...Giuseppe Moricca
 

Similar to Petronas Carigali Monthly Environment Report (20)

Review paper on operation and maintenance of effluent treatment plant of pape...
Review paper on operation and maintenance of effluent treatment plant of pape...Review paper on operation and maintenance of effluent treatment plant of pape...
Review paper on operation and maintenance of effluent treatment plant of pape...
 
Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)
 
NTPC Report
NTPC ReportNTPC Report
NTPC Report
 
Why is a CPCB Registration Certificate Important for Industries.pdf
Why is a CPCB Registration Certificate Important for Industries.pdfWhy is a CPCB Registration Certificate Important for Industries.pdf
Why is a CPCB Registration Certificate Important for Industries.pdf
 
15020243019_NiharicaOgale_Final_Report
15020243019_NiharicaOgale_Final_Report15020243019_NiharicaOgale_Final_Report
15020243019_NiharicaOgale_Final_Report
 
Environmental Audits
Environmental AuditsEnvironmental Audits
Environmental Audits
 
Managing risk and delivering outcomes through Environmental Regulation
Managing risk and delivering outcomes through Environmental RegulationManaging risk and delivering outcomes through Environmental Regulation
Managing risk and delivering outcomes through Environmental Regulation
 
Environmental impact assessment
Environmental impact assessment Environmental impact assessment
Environmental impact assessment
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
Bat guidance note on best available techniques for pharmaceutical
Bat guidance note on best available techniques for pharmaceuticalBat guidance note on best available techniques for pharmaceutical
Bat guidance note on best available techniques for pharmaceutical
 
4.ASL_Kovvur_Safety-Audit-Report.pdf
4.ASL_Kovvur_Safety-Audit-Report.pdf4.ASL_Kovvur_Safety-Audit-Report.pdf
4.ASL_Kovvur_Safety-Audit-Report.pdf
 
Environmental auditing ppt
Environmental auditing pptEnvironmental auditing ppt
Environmental auditing ppt
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessment
 
TCAC2022
TCAC2022TCAC2022
TCAC2022
 
Air and noise
Air and noiseAir and noise
Air and noise
 
Environmental management
Environmental managementEnvironmental management
Environmental management
 
Environment impact assessment study
Environment impact assessment studyEnvironment impact assessment study
Environment impact assessment study
 
Understanding Life Cycle Assessment (LCA) in Qatar
Understanding Life Cycle Assessment (LCA) in QatarUnderstanding Life Cycle Assessment (LCA) in Qatar
Understanding Life Cycle Assessment (LCA) in Qatar
 
Nadjia LaFontaine, Resume-150505
Nadjia LaFontaine, Resume-150505Nadjia LaFontaine, Resume-150505
Nadjia LaFontaine, Resume-150505
 
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
 

More from Fitri Ifony

Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...Fitri Ifony
 
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013Fitri Ifony
 
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Fitri Ifony
 
Hse incentive scheme rev 05 approved by yard (3)
Hse incentive scheme rev 05  approved by yard (3)Hse incentive scheme rev 05  approved by yard (3)
Hse incentive scheme rev 05 approved by yard (3)Fitri Ifony
 
Qhse objective & target 2015
Qhse objective & target 2015Qhse objective & target 2015
Qhse objective & target 2015Fitri Ifony
 
Safety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectSafety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectFitri Ifony
 
Hiradc training rev.0
Hiradc training rev.0Hiradc training rev.0
Hiradc training rev.0Fitri Ifony
 
Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Fitri Ifony
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Fitri Ifony
 
Melihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaMelihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaFitri Ifony
 
World day for health & safety rev.00
World day for health & safety rev.00World day for health & safety rev.00
World day for health & safety rev.00Fitri Ifony
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Fitri Ifony
 
World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareFitri Ifony
 
Shoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okShoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okFitri Ifony
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system trainingFitri Ifony
 

More from Fitri Ifony (15)

Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
 
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
 
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
 
Hse incentive scheme rev 05 approved by yard (3)
Hse incentive scheme rev 05  approved by yard (3)Hse incentive scheme rev 05  approved by yard (3)
Hse incentive scheme rev 05 approved by yard (3)
 
Qhse objective & target 2015
Qhse objective & target 2015Qhse objective & target 2015
Qhse objective & target 2015
 
Safety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectSafety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc project
 
Hiradc training rev.0
Hiradc training rev.0Hiradc training rev.0
Hiradc training rev.0
 
Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
 
Melihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaMelihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun Yahya
 
World day for health & safety rev.00
World day for health & safety rev.00World day for health & safety rev.00
World day for health & safety rev.00
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00
 
World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide share
 
Shoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okShoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_ok
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system training
 

Recently uploaded

Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call GirlsAl Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girlstiril72860
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxgrandmarshall132
 
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书zdzoqco
 
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
Title-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxTitle-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxSagar Chaudhary
 
UNIT ONE ppt history of Ethiopia and horn.pptx
UNIT ONE ppt history of Ethiopia and horn.pptxUNIT ONE ppt history of Ethiopia and horn.pptx
UNIT ONE ppt history of Ethiopia and horn.pptxzeyohannesamare
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhidelih Escorts
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证jdkhjh
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Open Access Research Paper
 
BIODIVERSITY QUIZ ELIMINATION ROUND.pptx
BIODIVERSITY QUIZ ELIMINATION ROUND.pptxBIODIVERSITY QUIZ ELIMINATION ROUND.pptx
BIODIVERSITY QUIZ ELIMINATION ROUND.pptxROLANARIBATO3
 
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMINSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMijsc
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
World Environment Day PPT slides for Earth DAy arpil 2022
World Environment Day PPT slides for Earth DAy arpil 2022World Environment Day PPT slides for Earth DAy arpil 2022
World Environment Day PPT slides for Earth DAy arpil 2022herebasit
 
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريالتغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريRawhyaShaheen
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfs2015004
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 

Recently uploaded (20)

Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call GirlsAl Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptx
 
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
 
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
 
Health Facility Electrification: State of Play
Health Facility Electrification: State of PlayHealth Facility Electrification: State of Play
Health Facility Electrification: State of Play
 
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Title-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxTitle-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptx
 
UNIT ONE ppt history of Ethiopia and horn.pptx
UNIT ONE ppt history of Ethiopia and horn.pptxUNIT ONE ppt history of Ethiopia and horn.pptx
UNIT ONE ppt history of Ethiopia and horn.pptx
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
 
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...
 
BIODIVERSITY QUIZ ELIMINATION ROUND.pptx
BIODIVERSITY QUIZ ELIMINATION ROUND.pptxBIODIVERSITY QUIZ ELIMINATION ROUND.pptx
BIODIVERSITY QUIZ ELIMINATION ROUND.pptx
 
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMINSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
World Environment Day PPT slides for Earth DAy arpil 2022
World Environment Day PPT slides for Earth DAy arpil 2022World Environment Day PPT slides for Earth DAy arpil 2022
World Environment Day PPT slides for Earth DAy arpil 2022
 
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريالتغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdf
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 

Petronas Carigali Monthly Environment Report

  • 1. Petronas Carigali Ketapang 2 Limited Doc. Ref.: PE'TTfONAS CTR Reference: NA Revision: 00 Rev Date: ­ Environment Monthly Report Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 1 of 19 BTJT-A TOPSIDE MODIFICATION, ADAPTOR FABRICATION AND PILE MAKE-UP FOR BUKIT TUA DEVELOPMENT PROJECT PCK2L Environment Monthly Report (September 2014) Prepared b : Checked b Acknowledged b : En a RahmawatiName: S.W.Dewo/Mar'a aD. Position: Sr.SHO/CSR Signature: ThIS dOOJment is the property of PT GUNANUSJ UTAi1A FABRICATORS. It must not be stored. reproduced« disdosed fa others 'Without 'HIltten authonsation frcm the Company. Env Monftly Repat S9ptembBr 2014-Petronas
  • 2. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 2 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas TABLE OF CONTENTS Table of Contents .......................................................................................................................................2  1.  Introduction ..........................................................................................................................................3  2.  Purpose................................................................................................................................................3  3.  Scope...................................................................................................................................................3  4.  Abbreviations .......................................................................................................................................3  5.  Environmental Statistic.........................................................................................................................4  6.  Environmental Induction, Communication and Awareness Program ....................................................5  7.  List of MSDS ........................................................................................................................................5  8.  Activity and Area Description................................................................................................................7  9.  Waste Management .............................................................................................................................7  10. Environmental and Hygiene Inspection ..............................................................................................10  11. Environmental Monitoring...................................................................................................................10  11.1  Drinking Water Quality..............................................................................................................10  11.2  Waste Water Quality.................................................................................................................10  11.3  Air Quality.................................................................................................................................10  ATTACHMENTS: ATTACHMENT 1 : ENVIRONMENTAL TOOLBOX REPORT ATTACHMENT 2 : WASTE TRANSFER NOTE ATTACHMENT 3 : WASTE REGISTER ATTACHMENT 4 : ENVIRONMENT & HYGIENE INSPECTION REPORT ATTACHMENT 5 : DRINKING WATER ANALYSIS REPORT ATTACHMENT 6 : WASTE WATER ANALYSIS REPORT ATTACHMENT 7 : AIR QUALITY ANALYSIS REPORT ATTACHMENT 8 : ENVIRONMENT ACTIVITY PHOTOGRAPH
  • 3. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 3 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas 1. Introduction This Environment Monthly Report is provided by PT Gunanusa Utama Fabricators is order to ensure the measurement of the consistency on implementing HSE Management System, Legal requirements and HSE Policy related to environmental issues which might exist and rise at workplace during the execution of BTJT-A Topside Modification, Adaptor Fabrication and Pile Make Up For Bukit Tua Development Project in CTR Yard. CTR recognized the importance of planning Control Measures into construction activities at the earlier possible stage in order to prevent damage to the Environment. This Construction Yard and Site Environment Management Report Plan has been produced to describe how to CTR intends to manage, control, and coordinate its work, to ensure that no injury, to personal as result of environmental related activities and no damage or loss shall occur to the environmental as result of the construction activities. This report consists of summary of implementation of PSP-BTJT-A-T011 Health, Safety and Environment Program that already approved by Company 2. Purpose The purposes of this report are as follows: 1. Identify all the operational activities that presume and may cause important and major impact to environmental component. 2. Identify the environmental aspects especially presumed the environmental that may contaminate by the important and major impact of activities. 3. Predicated and evaluated the important and major impacts that happen toward environmental component because of the operational activities. 4. Mitigation the important and major impacts through environmental component. 5. To choose the exactly and realistic effort of environmental monitoring and management efforts to minimize the negative impact and increase the positive benefit. 3. Scope This report covered of all CTR activity on implementing and managing the environmental requirements at the CTR Yard area on BTJT-A Topside Modification, Adaptor Fabrication and Pile Make Up For Bukit Tua Development Project and CTR facilities such as: waste register, environmental monitoring and inspection, environmental improvement, environmental planning, environmental training, other environmental issues 4. Abbreviations BAPEDAL Badan Pengelola Dampak Lingkungan BLH Badan Lingkungan Hidup
  • 4. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 4 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas BS British Standard CPY Company – Petronas CTR Contractor – PT. Gunanusa Utama Fabricators EMP Environment Management Plan EMS Environment Management System ESIA Environment and Socio Impact Assessment HSE Health, Safety and Environmental ISO International Standard Organizations MIGAS Minyak dan Gas NFPA National Fire Protection Agency OHSAS Occupational Health and Safety Advisory Services PLN Perusahaan Listrik Negara POSYANDU Pos Pelayanan Terpadu PPE Personal Protective Equipment SOP Standard Operating Procedure WMP Waste Management Plan 5. Environmental Statistic CTR will give efforts to received environment objectives such as: to ensure no oil spill and to minimize dust exposure during sandblasting, and improve waste management. Therefore with environmental statistic the environment objectives will be monitored. Table 1. Environmental Statistic No. Subject Statistic Performance 1 Environmental Incident Incident Report: 0
  • 5. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 5 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas Spill Form for Minor Spills: 0 2 Environmental Awareness & Communication Training: Toolbox Talks: 0 persons 25 persons 3 Fuel Consumption Construction 830 Liters 4 Water Consumption Fresh Water Drinking Water 787 m3 16,272.55 m3 5 MSDS Total No of Chemical with MSDS: No of Chemicals without MSDS: 62 0 6. Environmental Induction, Communication and Awareness Program Environmental induction has been given to each and every new employee which done during HSE Induction. Environmental awareness was promoted continuously to the workers through toolbox talk, mass meeting at work locations, and training, and Environment Posters at HSE notice board for increased the knowledge about environmental and healthy habit. Title of Toolbox Topic in September 2014 is about “Housekeeping at Warehouse”. Attendance List refer to ATTACHMENT 1. 7. List of MSDS List of MSDS of all the chemicals being in use at CTR Yard is available at office, clinic and yard area during BTJT-A Topside Modification, Adaptor Fabrication and Pile Make Up For Bukit Tua Development Project. The MSDS currently available are:
  • 6. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 6 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas No Gas Fuel, Oil & Grease Paint & Thinner Adhesive & Resin NDE Material Others 1 Argon Diesel Fuel Jotun: Barrier 80 Part A/B Ce Te Pox 293 R Spotcheck Penetrant SKL-SP2 WD-40 2 LPG Gas Shell Tellus Oil Jotun: Tankguard White Storage Part A/B Ce Te Pox 1951 H Spotcheck Developer SKD-S2 Lead-Acid Battrey 3 Oxygen Gas Grease Shell Alvania Jotun: Hardtop XP (Ral 1003) Part A/B HZ918 Powder Spotcheck SKC-S Galvanized-Carbon and Alloy Steel 4 Carbon Dioxide (CO2) Gas Meditrand S40 Oil Jotun: Jotacoat Universal Part A/B HZ918 Liquid Mega check Spray SM15 Absorbents 5 Nitrogen Gas ATF Oil Jotun: Jotamastic 87 GF Part A/B HZ918 Primer Mega check paint MP35 Oil Spill Dispersant 6 Rubia Oil Jotun: Marathon Comp A/B Aica Aibon- Synthetic Rubber Adhesive Polish Type Mega check cleaner Hobas CC-GRP Pipe 7 Jotun: Penguard Tiecoat 100 Part A/B Mega check developer Envirogrit:Garnet 8 Jotun: Solvalitt Alumunium Mega check Penetrant Toner 9 Jotun: Resist GTI CPA/CPB X-ray Liquid Fixer Bostik Expanda Foam 10 Jotun: Thinner No: 4; 7; 10; 17; 23
  • 7. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 7 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas 8. Activity and Area Description Following were the work locations at CTR Yard during BTJT-A Topside Modification, Adaptor Fabrication and Pile Make Up For Bukit Tua Development Project work activity in the September 2014: Table 3. Activity and Area Description NO. LOCATION JOB DESCRIPTION 1 Workshop 5 Welding, grinding, lifting 2 Jetty 1 (Barge) Welding, grinding, lifting 3 Work Table 1 (Boat Landing) Welding, grinding, lifting 4 Mechanical Shop/Workshop 6 Heavy equipment preparation such as chain crane repairing (welding) 5 Electrical Maintenance Shop Electrical preparation 6 Welding School Welding, grinding 7 X-ray chamber NDT 8 Blasting & Painting Area Blasting, painting 9. Waste Management Waste is segregated through the different type of waste bins as per approved GNU-P-SH- 9005 Waste Management Plan. At CTR Yard area using 5 colors for each type of waste, such as:  Yellow : Burnable Waste (Paper, Cartoon, Wooden, etc)  Green : Unburnable Waste (Plastic, Rubber, etc)  Blue : Organic Waste  Red : Metal Scrap  Black : Hazardous Waste Waste management system at CTR Yard in BTJT-A Topside Modification, Adaptor Fabrication and Pile Make Up For Bukit Tua Development Project can be defined as on flow Diagram 1.
  • 8. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 8 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas The domestic waste storage at CTR Yard and will transport by small truck to waste collector (CV. Mandiri Pratama Abadi). Hazardous waste from CTR Yard will be sent to the third party. Waste transfer note is recorded by HSE Department from CTR. Waste register has been from the waste transfer note individually for Yard. Summary of waste transfer note attached on ATTACHMENT 2 and total quantity of waste generated per month from yard is entered in the register (ATTACHMENT 3).
  • 9. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 9 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas TYPES/PROPERTIES HANDLING, STORAGE DISPOSALSOURCES Diagram 1. Waste Management at CTR Yard
  • 10. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 10 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas 10. Environmental and Hygiene Inspection Environmental and Hygiene Inspection have been performed in CTR Yard area during Yadana Subsidence Project regularly. Environmental and Hygiene Inspection were done in this period such as: Table 5. Environmental and Hygiene Inspection No. Inspection Description Period of Inspection Remark 1. Eyewash Inspection Monthly Report on ATTACHMENT 4 2. Environment Inspection Monthly Report on ATTACHMENT 4 11. Environmental Monitoring 11.1 Drinking Water Quality Drinking water supply for CTR Yard is supply from CTR Aqua/Water Maker. Drinking water quality analyse was conducted on September 17, 2014 by Health Laboratory Department Serang region. The checked parameter of drinking water was based on Health Minister Regulation No. 492/MENKES/Per/IV/2010 regarding requirements and water quality monitoring. The result is shown that drinking water from CTR Yard is safe to use. Report related this matter can be seen on ATTACHMENT 5. 11.2 Waste Water Quality Waste water monitoring conducted every six-months. Waste water quality sampling was taken from drainage as domestic waste water or grey water at CTR Yard near Jetty 1 on April 25, 2014, by Health Laboratory at Serang, will conduct as per quarterly basis. Analysis based on Decree of Environmental Minister No. 51 Year 1995 regarding Standard of Industrial Waste Water. The result of waste water sample was shown that waste water saved to discharge to the sea. The result of monitoring refers to ATTACHMENT 6. 11.3 Air Quality HSE department of CTR has done some efforts to minimize the effect from dust and chemical pollution on air, such as:  Installation of dust screen at Manual Blasting and Painting area  Provide proper paint storage and mixing paint area
  • 11. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 11 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas  Provide PPE for employees (Masker)  Conducted regular induction for new employee and Toolbox Talk as per requirement Air Quality Monitoring at CTR Yard conducted every six-months. Air Quality Monitoring with chemical (SOx, NOx, H2S, NH3, O3) and dust parameter already conducted by Health Laboratory Department Serang region on June 2014 for Workshop 2 area. Analysis of air quality monitoring based on Decree of Environmental Minister No. 50 Year 1996 regarding Standard of Odour and Indonesia Government Regulation No. 41 Year 1999 regarding Air Pollution Prevention. The result of Air Quality Monitoring result was shown that air quality monitoring with chemical parameter at Workshop 2 area below than threshold limit. The result of monitoring refers to ATTACHMENT 7.
  • 12. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 12 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas ATTACHMENT 1 : ENVIRONMENTAL TOOLBOX REPORT
  • 13.
  • 14. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 13 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas ATTACHMENT 2 : WASTE TRANSFER NOTE
  • 15.
  • 16. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 14 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas ATTACHMENT 3 : WASTE REGISTER
  • 17. Location : Grenyang Period : September 2014 Used Oil Batteries Contaminated Drum & Jerrycan September '14 583020 ton CV. Banyu Resmi SM waste transfer as per requested 22 May '14 56 Drum 38 EA 26 EA PT. RGM HZ waste transfer as per requested 1 Sept '14 - 30 Sept '14 14,9 m 3 22,3 m 3 37,1 m 3 CV. MPA Note: BIO :Biodegradable BR :Burnable NBR :Non Burnable SM :Scrap Metal HZ :Hazardous HZ Transported by Remarks WASTE REGISTER Type of Waste Date BIO BR NBR SM PT GUNANUSA UTAMA FABRICATORS
  • 18. Updated 30 Sept 2014 Jumlah/quantity Tanggal/date Jumah/quantity Tanggal/Date 21 28‐Jun‐13 89 3‐Jan‐14 110 6‐Jan‐14 managed by PT Wastec International 0 12 11‐Mar‐14 26 16‐Apr‐14 38 22‐May‐14 managed by PT Raja Goedang Mas 1 26‐Aug‐14 1 29 21‐Nov‐13 7 16‐Dec‐13 2 2‐Jan‐14 38 6 Jan 14 managed by PT Wastec International HAZARDOUS AND TOXIC WASTE LOG BOOK No Nama Limbah/Name of waste Satuan/Unit Masuk/In Keluar/Out Jumlah Sisa/Residual Quantity PIC Remarks 1 Tonner  pcs 2 Acid Batteries pcs 38 6‐Jan‐14 managed by PT Wastec International 13 19‐Mar‐14 9 17‐Apr‐14 1 17‐Jun‐14 23 2 13‐May‐14 2 13 15‐Dec‐12 8 5‐Jan‐13 7 18‐Feb‐13 2 3‐Mar‐13 10 20‐May‐13 35 25‐Jun‐13 56 21‐Nov‐13 36 22‐May‐14 managed by PT Raja Goedang Mas 25 2 21‐Nov‐13 2 6‐Jan‐14 managed by PT Wastec International 0.5 22‐Apr‐14 0.5 1 22‐Apr‐14 1 1 20‐Mar‐14 0.5 22‐Apr‐14 1.5 15 3‐Jan‐14 15 6‐Jan‐14 managed by PT Wastec International 3 Paint & Thinner drum (200 liter) can (20 liter) 4 Used Oil drum (200 liter) 5 Oil Filter drum (200 liter) box (1.8mx1.2mx1.2m) 6 Oily rags drum (200 liter) Medic kg7
  • 19. Updated 30 Sept 2014 Jumlah/quantity Tanggal/date Jumah/quantity Tanggal/Date HAZARDOUS AND TOXIC WASTE LOG BOOK No Nama Limbah/Name of waste Satuan/Unit Masuk/In Keluar/Out Jumlah Sisa/Residual Quantity PIC Remarks 1 22‐Apr‐14 13 13‐May‐14 14 13 8‐Oct‐12 18 11‐Nov‐12 9 5‐Dec‐12 11 21‐Jan‐13 12 25‐Feb‐13 38 12‐Jul‐13 managed by PT Raja Goedang Mas 7 29‐Jan‐14 12 20‐Feb‐14 16 3‐Mar‐14 12 8‐Apr‐14 10 6‐May‐14 82 22‐May‐14 managed by PT Raja Goedang Mas 22.5 8 Contaminated Packaging drum (200 liter) 7 kgMedic 12 16‐Jul‐13 10 3‐Jan‐14 10 6‐Jan‐14 managed by PT Wastec International 9 29‐Jan‐14 21 74 24‐Jun‐14 74 315 15‐Jul‐14 315 10 Dry Batteries pcs Jerry can (25 liter) 9 Lamp pcs (long size)
  • 20. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 15 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas ATTACHMENT 4 : ENVIRONMENT & HYGIENE INSPECTION REPORT
  • 21.
  • 22. Period : September, 2014 E.1. EYE WASH INSPECTION CHECKLIST Yes No Clogged up Unclogged up Clean Dirty Clean Dirty Clean Dirty Note : √ Remarks Inside of Eyewash √1 2 23-Jan-13 Eyewash No.8 Hazardous Waste Storage 8.3435.7 Jetty 1 Eyewash No.3 8.0638.1 √ √ Cleaning Schedule Water √ √ √ pH Condition Temperature ( 0 C) Outside of Eyewash Date Reported √ √17-Sep-14 √ * pH Standard 6.5 - 8.5 Hygiene Inspection in PTG Yard Facility No Location Drainage PT GUNANUSA UTAMA FABRICATORS
  • 23.
  • 24. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 16 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas ATTACHMENT 5 : DRINKING WATER ANALYSIS REPORT
  • 25.
  • 26. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 17 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas ATTACHMENT 6 : WASTE WATER ANALYSIS REPORT
  • 27.
  • 28. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 18 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas ATTACHMENT 7 : AIR QUALITY ANALYSIS REPORT
  • 29.
  • 30.
  • 31.    INTERP Dari has SOx, NO No. 41 T tidak me INTERP Dari hasi Batas M dalam a Dimungk REKOM Dari hasi 1. Tenag dalam pemer 2. Untuk melak secara Prep Engga Environm PRETASI H il analisis a Ox, H2S, NH3 Tahun 1999 mbahayakan PRETASI H il analisis am aksimum se area WS 2 kinkan hasil d MENDASI il pengujian ga kerja waji m proses rev riksaan kese k lebih mew kukan pengu a berkesinam pared by: Rahmawati mental Engin ASIL PENG mbien udara 3, Oksidan (O dan Kep.50 n. ASIL PENG mbien udara esuai denga 2 mengand debu dari pr yang telah d b mengguna vamping, di ehatan seca wujudkan li ujian udara mbungan. eer GUJIAN SA a pada area O3) menunju 0/MEN/1996 GUJIAN SA area WS 2 an KEP 41/M dung udara roses pengh dilakukan, di akan maske ikuti peman ra berkala k ingkungan lingkungan AMPEL AM a pekerjaan ukkan nilai d 6, sehingga AMPEL KE dengan para MEN LH/199 a yang jum ancuran bet isarankan ha er saat beke ntauan kese khususnya fu kerja yang n kerja deng MBIEN UDA revamping di bawah Ba kondisi uda EBISINGAN ameter debu 99. Dengan mlan kadar ton menggun al-hal sebag rja terutama hatan tenag ungsi paru. sehat dan gan lebih k Co ARA di WS 2 de aku Mutu Li ara tersebut N DAN DEB u menunjukk n demikian, debunya nakan jack h gai berikut: a saat meng ga kerja de n nyaman d komprehens Acknowledg Tjahjo Sisw orp. HSE Ma engan param ngkungan P dapat dikat BU kan nilai me dapat dikat membahaya hammer. hancurkan b ngan melak disarankan if dan dilak ged by: wadi nager meter PP RI takan lebihi takan akan. beton kukan agar kukan
  • 32.    Pengukkuran udara Peng ambien di a gukuran uda LAMP rea WS 2 de ra ambien d PIRAN FOT engan param di area WS 2 TO meter SOx, N 2 dengan par NOx, H2S, NH rameter deb H3, Oksidan bu (O3)
  • 33. Petronas Carigali Ketapang 2 Limited Doc. Ref.: Environment Monthly Report CTR Reference: NA Revision: 00 Rev Date: - Discipline: HSE Document Type: Report Phase: - System / Subsystem:- Equipment Type: - Status: - Class: - Page 19 of 19 This document is the property of PT.GUNANUSA UTAMA FABRICATORS. It must not be stored, reproduced or disclosed to others without written authorisation from the Company. Env Monthly Report September 2014-Petronas ATTACHMENT 8 : ENVIRONMENT ACTIVITY PHOTOGRAPH
  • 34. ENVIRONMENT ACTIVITY PERIOD SEPTEMBER’14 Installation of eyewash near barge Installation of smoking shelter near barge General Housekeeping near workshop 5 BEFORE AFTER