Why Top Down Construction
               Required
►    Distance between Boundary wall of Adjacent Existing
    Building and Building Line for New Building is too close and
    the depth of excavation is more than 6 meter and
    possibility of collapse the soil is higher during excavation.
►   Using Top Down Construction more Building and Basement
    Area can use. Suitable for two or more basement.
►   The first base slab level slab will act in such area as a strut
    member and the Retaining wall panels will not allow
    collapse of soil.
►   Water table is too high and difficult to cast Retaining wall,
    Diaphragm wall or Continuous Pile can use as a Retaining
    wall.
METHODOLOGY OF TOP DOWN
          CONSTRUCTION
1.   Setting out for alignment of bore cast in situ of
     piles .
2.   Bore Cast in Situ Piles to be cast and dowels bar
     to be kept for Retaining wall panels. The center
     of piles and Retaining wall panels center line to
     be kept in same line. The Diameter of Piles
     preferred 600 mm, distance between two piles
     center to center preferred 3.33 meters (Suit for
     C/C distance of Columns), Depth of Piles to be
     confirmed by Structural Consultants.
3.   Touching Piles can use as a Retaining wall with
     supporting arrangement during Excavation.
4.   If area of Basement is more and Span is less
     Diaphragm wall can be use as a Retaining wall.
3. Instead of Column C1 to Column C8,Bore
    cast in Situ piles to be cast with dowel
    bars for different level slab and
    connecting Beams, The Diameter of Piles
    (suit as per Columns size),
    Reinforcement details (with dowels for
    Retaining wall and different level slabs
    and Beam), Depth of Piles to be
    confirmed by Structural Consultants.
4. Excavation to be done around 2 meter
   depth and retaining wall panels to be
   cast in stages with dowels bars with
   adjacent piles and dowel bars for next
   Retaining wall panel to be kept .if soil
   between piles collapsed soil nails with
   wire mesh to be kept on earth side to
   retain the same. Retaining wall panels to
   be cast with dowels up to the first base
   slab bottom.
5. Dressing and compaction of soil to be
   done for PCC bed for casting of first base
   slab. 50mm PCC (M15 Grade) to be
   done, the top levels of PCC to be keep
   the base slab level bottom. For beams
   excavation to be done in same alignment
   and dimensions as required and PCC or
   brick work to be done as per beam
   dimensions in Vertical face.
6. After PCC 3mm ply to be laid on PCC
   Surface and PVC sheet to be nailed with
   PCC surface so surface of PCC and
   Surface of Slab Concrete will separate.
7. Reinforcement to be completed as per
   drawings, for beams dowel bar to be
   used from Cast in Situ Piles. Dowel bars
   to be keep for adjacent slabs for Bottom
   Up Construction.
8. Concreting of Slab and Beam to be
    completed.
 9. After 14 days of Concreting, PCC below
    slab to be break/removed excavation to
    be continued and retaining wall panels to
    be cast. Till final level of excavation.
10 Waterproofing to be done and base slab
    to be cast with dowels from Cast in Situ
    Piles.
11.Jacketing of Columns to be done if
    required.
►THANKS
►Ifany query please mail -
 gagangoswami@yahoo.co.in

More Related Content

What's hot

Types of deep foundation
Types of deep foundationTypes of deep foundation
Types of deep foundationMaliha Mehr
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural considerationBee Key Verma
 
Foundation and its types and detailed explanation
Foundation and its types and detailed explanationFoundation and its types and detailed explanation
Foundation and its types and detailed explanationTarun kumar
 
BASICS COMPONENTS OF BUILDING DRAWING FOR CIVIL ENGINEERS
BASICS COMPONENTS OF BUILDING DRAWING FOR CIVIL ENGINEERSBASICS COMPONENTS OF BUILDING DRAWING FOR CIVIL ENGINEERS
BASICS COMPONENTS OF BUILDING DRAWING FOR CIVIL ENGINEERSHafiz JUNAID
 
Pile Foundation - Rohan Dasgupta.pdf
Pile Foundation - Rohan Dasgupta.pdfPile Foundation - Rohan Dasgupta.pdf
Pile Foundation - Rohan Dasgupta.pdfRohan Dasgupta
 
Temporary structures
Temporary structuresTemporary structures
Temporary structuresDivya Vishnoi
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiakamal bhatia
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete9833356555
 
Underpinning presentation chakamba
Underpinning presentation  chakambaUnderpinning presentation  chakamba
Underpinning presentation chakambaJohn Chakamba
 
Pile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsPile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsNagma Modi
 

What's hot (20)

Types of deep foundation
Types of deep foundationTypes of deep foundation
Types of deep foundation
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
 
Shuttering (Formwork)
Shuttering (Formwork)Shuttering (Formwork)
Shuttering (Formwork)
 
Jump Formwork
Jump FormworkJump Formwork
Jump Formwork
 
Foundation and its types and detailed explanation
Foundation and its types and detailed explanationFoundation and its types and detailed explanation
Foundation and its types and detailed explanation
 
pile wall
pile wallpile wall
pile wall
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Piles, Piers and Caissons
Piles, Piers and CaissonsPiles, Piers and Caissons
Piles, Piers and Caissons
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
BASICS COMPONENTS OF BUILDING DRAWING FOR CIVIL ENGINEERS
BASICS COMPONENTS OF BUILDING DRAWING FOR CIVIL ENGINEERSBASICS COMPONENTS OF BUILDING DRAWING FOR CIVIL ENGINEERS
BASICS COMPONENTS OF BUILDING DRAWING FOR CIVIL ENGINEERS
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Pile Foundation - Rohan Dasgupta.pdf
Pile Foundation - Rohan Dasgupta.pdfPile Foundation - Rohan Dasgupta.pdf
Pile Foundation - Rohan Dasgupta.pdf
 
Diaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By GaganDiaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By Gagan
 
Temporary structures
Temporary structuresTemporary structures
Temporary structures
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatia
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
 
Underpinning presentation chakamba
Underpinning presentation  chakambaUnderpinning presentation  chakamba
Underpinning presentation chakamba
 
Pile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsPile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipments
 

Viewers also liked

Shield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and LessonsShield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and Lessonscoen_van_der_vliet
 
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Hamed Zarei
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridgesSravan Kumar
 
New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)Austrian Standards
 
NATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingNATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingHamed Zarei
 
World Tunnel Conference 2014
World Tunnel Conference 2014World Tunnel Conference 2014
World Tunnel Conference 2014richardbieniawski
 
Tunneling Construction - NATM
Tunneling Construction - NATMTunneling Construction - NATM
Tunneling Construction - NATMluisaam
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt1971995
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Mohit Shukla
 
Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel SolutionsCorrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel SolutionsCommunications Branding
 

Viewers also liked (20)

Shield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and LessonsShield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and Lessons
 
Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
 
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
 
Bridge 91 Design
Bridge 91 DesignBridge 91 Design
Bridge 91 Design
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
 
New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)
 
NATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingNATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in Tunneling
 
Tunneling
Tunneling Tunneling
Tunneling
 
World Tunnel Conference 2014
World Tunnel Conference 2014World Tunnel Conference 2014
World Tunnel Conference 2014
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Casting yard
Casting yardCasting yard
Casting yard
 
Tunneling Construction - NATM
Tunneling Construction - NATMTunneling Construction - NATM
Tunneling Construction - NATM
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
 
Dam PPT
Dam PPTDam PPT
Dam PPT
 
Tunnel engg.2
Tunnel engg.2Tunnel engg.2
Tunnel engg.2
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
 
Bridges precast
Bridges precastBridges precast
Bridges precast
 
Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel SolutionsCorrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions
 

Similar to Top Down Construction Presentation.

Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.Sai Towers P Ltd.
 
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايلSecant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايلDr.youssef hamida
 
How to build a besser block wall - APC
How to build a besser block wall - APCHow to build a besser block wall - APC
How to build a besser block wall - APCkristenjames
 
How to build a besser block wall
How to build a besser block wallHow to build a besser block wall
How to build a besser block wallkristenjames
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Shoring system and Dewatering
Shoring system and DewateringShoring system and Dewatering
Shoring system and DewateringSALEM MOHAMMED
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTUVATSAL PATEL
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationIshwar Chauhan
 
Guidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexGuidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexPriya Raj
 
Lesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptxLesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptxsydneyaugust1
 
Indian Standard
Indian StandardIndian Standard
Indian Standardaman kumar
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptxssuser480182
 
Easy steps to build a besser block wall
Easy steps to build a besser block wallEasy steps to build a besser block wall
Easy steps to build a besser block wallkristenjames
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building ConstructionEr.Karan Chauhan
 

Similar to Top Down Construction Presentation. (20)

Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.
 
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايلSecant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
 
Deep excavations
Deep excavationsDeep excavations
Deep excavations
 
How to build a besser block wall - APC
How to build a besser block wall - APCHow to build a besser block wall - APC
How to build a besser block wall - APC
 
How to build a besser block wall
How to build a besser block wallHow to build a besser block wall
How to build a besser block wall
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Shoring system and Dewatering
Shoring system and DewateringShoring system and Dewatering
Shoring system and Dewatering
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and Rehabilitation
 
Guidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexGuidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporex
 
Lesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptxLesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptx
 
1.2 Diaphragm walls.pptx
1.2 Diaphragm walls.pptx1.2 Diaphragm walls.pptx
1.2 Diaphragm walls.pptx
 
Indian Standard
Indian StandardIndian Standard
Indian Standard
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
 
Work check list
Work check listWork check list
Work check list
 
Form Work
Form Work Form Work
Form Work
 
bct%20final.pptx
bct%20final.pptxbct%20final.pptx
bct%20final.pptx
 
Easy steps to build a besser block wall
Easy steps to build a besser block wallEasy steps to build a besser block wall
Easy steps to build a besser block wall
 
construction study project sjce ctm
construction study project sjce ctmconstruction study project sjce ctm
construction study project sjce ctm
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building Construction
 

Top Down Construction Presentation.

  • 1. TOP DOWN CONSTRUCTION By- Gagan Goswami
  • 2. Why Top Down Construction Required ► Distance between Boundary wall of Adjacent Existing Building and Building Line for New Building is too close and the depth of excavation is more than 6 meter and possibility of collapse the soil is higher during excavation. ► Using Top Down Construction more Building and Basement Area can use. Suitable for two or more basement. ► The first base slab level slab will act in such area as a strut member and the Retaining wall panels will not allow collapse of soil. ► Water table is too high and difficult to cast Retaining wall, Diaphragm wall or Continuous Pile can use as a Retaining wall.
  • 3. METHODOLOGY OF TOP DOWN CONSTRUCTION 1. Setting out for alignment of bore cast in situ of piles . 2. Bore Cast in Situ Piles to be cast and dowels bar to be kept for Retaining wall panels. The center of piles and Retaining wall panels center line to be kept in same line. The Diameter of Piles preferred 600 mm, distance between two piles center to center preferred 3.33 meters (Suit for C/C distance of Columns), Depth of Piles to be confirmed by Structural Consultants. 3. Touching Piles can use as a Retaining wall with supporting arrangement during Excavation. 4. If area of Basement is more and Span is less Diaphragm wall can be use as a Retaining wall.
  • 4.
  • 5. 3. Instead of Column C1 to Column C8,Bore cast in Situ piles to be cast with dowel bars for different level slab and connecting Beams, The Diameter of Piles (suit as per Columns size), Reinforcement details (with dowels for Retaining wall and different level slabs and Beam), Depth of Piles to be confirmed by Structural Consultants.
  • 6. 4. Excavation to be done around 2 meter depth and retaining wall panels to be cast in stages with dowels bars with adjacent piles and dowel bars for next Retaining wall panel to be kept .if soil between piles collapsed soil nails with wire mesh to be kept on earth side to retain the same. Retaining wall panels to be cast with dowels up to the first base slab bottom.
  • 7.
  • 8. 5. Dressing and compaction of soil to be done for PCC bed for casting of first base slab. 50mm PCC (M15 Grade) to be done, the top levels of PCC to be keep the base slab level bottom. For beams excavation to be done in same alignment and dimensions as required and PCC or brick work to be done as per beam dimensions in Vertical face.
  • 9.
  • 10. 6. After PCC 3mm ply to be laid on PCC Surface and PVC sheet to be nailed with PCC surface so surface of PCC and Surface of Slab Concrete will separate. 7. Reinforcement to be completed as per drawings, for beams dowel bar to be used from Cast in Situ Piles. Dowel bars to be keep for adjacent slabs for Bottom Up Construction.
  • 11.
  • 12. 8. Concreting of Slab and Beam to be completed. 9. After 14 days of Concreting, PCC below slab to be break/removed excavation to be continued and retaining wall panels to be cast. Till final level of excavation. 10 Waterproofing to be done and base slab to be cast with dowels from Cast in Situ Piles. 11.Jacketing of Columns to be done if required.