2. Small grant to improve family friendliness
A selection of play equipment was purchased to
create a ‘sensory play area’
Our project was to ‘trial’ this equipment and
assess the effectiveness of it
3. First Friday:
‘Trial’ equipment
Compose ‘Q&A Today”
Second Friday:
Set up equipment in chosen location
Feedback
Third Friday:
Continued trials...
4. Learn how to build ‘sensory environment’
Construct it in a way that was most
appropriate and effective
Position in a suitable location
5.
6.
7.
8. Was the Hard Rock Museum really the best place for it??
2012 Room!
Tunnel: Entrance and Exit!
Ball Pond?
Somewhere where adults can let their children play in
safety
“Message needs to be put out that there is something for
younger children...Under 3’s and 4’s especially”
9. The issue of the dynamo torches...
‘Shit Bucket’?
Tunnel? Longer and EXIT tunnel is crucial
Summer Location...
10. Grassy area outside ‘model tunnel room’
Fencing is crucial however
Seating area for adults? Benches?
11. 2012 room = Ideal location
Good size
Close to reception/cafe and changing facilities
Changing facilities needed closer however?
Except for the torches, the equipment was effective, but
arguably need more? Two tunnels, balls?
For continued feedback on the family friendliness of the
site, the questionnaire could be available in the 2012
room...
12. Thank you to Rebecca, Nick and Claire and all those
that have helped us!
Any Questions??