5. There are close to 220 piles being installed to stabilize the
landslides, 8 of which will have Slope Inclinometers
attached to monitor future movement.
The Slope Inclinometer Piles pictured are ready to install.
17. Pile Row with Shotcrete Wall.
Excavation and removal of the landslide is now being performed. Some
areas of the pile wall will have a 70’ vertical exposure before the
material is replaced and re-compacted.