1. The Renovation of
the Comfort Rooms
in JFH Building
Detablan, Efril PSY21
Hongco, Mariah PSY23
Ignacio, Faye PSY24
Santuyo, Coleen PSY22
2. Renovation of the Comfort Rooms in
JFH Building
In order to give better facilities for the
students of our university, specially the
students of College of Liberal Arts and
Communications that frequently uses
the comfort rooms in JFH.
3. Problem
Julian Felipe Hall was constructed –
years ago and the design of its comfort
rooms were outdated.
- Some toilet bowls are clogged.
- Some sinks are broken.
- Trash bins are uncovered.
- Mirrors are too small.
- Lack of Vendo Machines.
- Vandalism in each doors of the cubicle.
- The awkward situation of the Boys CR.
- Lock and Door Knobs in the doors of the
cubicle.
8. Objectives
To give convenience to the students by giving
a better facility.
To make use of the paid tuition fees and see
that the money that they are paying goes on
having a comfortable and modern campus’
facilities.
Give more privacy for the male students or
faculty members by relocating their urinals.
9. Objectives
Ensure sanitation by covering the trash
bins inside the comfort rooms of the
said building.
To give the female students more
convenience by installing tissue and
sanitary napkin vendo machines on all
ladies’ comfort rooms.
10. Background
1. How often you use JFH
Building Comfort
Rooms?
37% - Twice/more
than thrice a day
36% - Once or Twice a
day
9% - Thrice a week
7% - Once a week
6% - Twice a week
5% - Others
2. Have you experienced
clogged toilet or toilet
bowl that has no flush?
72% YES
28% NO
3. Do you think that the
comfort rooms of JFH
should be renovated
and redesigned?
92% YES
8% NO
11. Background
4. If you think that the following
should be improved or
should be added, put a
check mark.
82 – Liquid Soap 46 – Bidet
77 – Tissue 38 – Ventilation
69 – Toilet 32 – Lighting
68 – Napkin 29 – Ceiling
66 – Mirrors 16 – Windows
63 – Repaint 16 – Curtains
60 – Hand Dryer
55 – Trash Can
51 – Tiles
5. Have you tried using
the comfort rooms on
1st floor up to 3rd floor?
90% YES
10% NO
6. Do you think that the sinks from
1st floor up to 3rd floor should
be improved and pattern its
design like the sinks on 4th and
5th floor?
94% YES
6% NO
12. Background
7. Do you think that students are
paying enough to get better
facilities here in DLSU-D
especially on your college’s
comfort rooms?
87% YES
13% NO
8. Are you satisfied with the
performance of the
maintenance staffs in giving us
the most sanitized comfort
rooms?
61% YES
39% NO
9. Do you agree that JFH comfort
rooms facilities are outdated
and the ugliest in the whole
campus?
83% YES
17% NO
10. Is there a time that you prefer to
use comfort rooms from other
buildings instead of using the
comfort rooms on JFH just
because you think that it lacks
on facilities?
78% YES
22% NO
13. Background
11. (FOR MALES ONLY)
Do you think that urinals
on the boy’s comfort
room should be
considered to reposition
to give more privacy?
84% YES
16% NO
12. (FOR FEMALES ONLY)
Do you think that adding
of trash bin covers on
each cubicle should be
considered to make
each cubicle sanitized?
100% YES
0% NO
14. Scope and Limitation
This proposal only covers the
renovation of the 10 comfort rooms
of Julian Felipe Hall (1st floor-5th
floor).
15. Benefits
There will be no complaints made by the
students if this proposal has been
approved.
The university have satisfied the needs
of the students.
The university will be known of having
good facilities.
Students and faculties will receive a
more comfortable comfort rooms
16. Methods
Gathered specific details of the proposal
by observing the comfort rooms of JFH.
Formulated survey questionnaires.
[100 Respondents – 50 Female, 50
Male]
The renovation of comfort rooms will be
patterned to the comfort rooms in PCH.
22. Schedule
Renovation Proposal Schedule
10-
Feb
15-
Feb
20-
Feb
25-
Feb
2-Mar 7-Mar 12-Mar
Submission of the three most
common and observed problem in
Formulated the questionnaires.
Tallying the data gathered.
Submission of Progress Report,
Minutes of Meeting and Worksheet
Submission of the final proposal.
Start Date
Duration
Duration 0 0 0 4 0 1 0 2 0
Start Date 20- 21- 22- 24- 28- 1- 3- 4- 7-
Sub
mis
sion
The
grou
p
For
mul
ated
Dat
a
Gat
Tally
ing
the
Inter
pret
atio
Sub
mis
sion
Star
t
writi
Sub
mis
sion
23. Personnel
Dr. Christian George C. Francisco
Dean,College of Liberal Arts and
Communication
Mary May C. Eulogio
Vice Chancellor for Finance and
Administrative Services
Dennis D. Pontanilla
Director, Buildings and Facilities Office
24. Cost/Budget
NOTE: Estimated Area on each comfort room: 5.33 x 3.65m
There are 10 comfort rooms to be renovated; prices listed are for general cost.
Price (Php)
MATERIALS
10 bags of Cement 2100
Tiles(estimated) 50000
10 bags of Ceramic Tile adhesive 2200
Paint (for ceiling) 6600
6 Gal. Enamel
5 Gal. Flat
30 pcs. Toilet bowls w/ flush 242992.50
15 pcs. Male urinals 77996.25
30 pcs. Sinks (faucet included) 188940
20 pcs. Wall Mirrors(18x48) 27995
40 pcs. LED tube lamps 38580
10 pcs. Ceiling fans 9997.50
FIXTURES
30 pcs. Bidet Sprays 6892.50
10 pcs. Air freshener(175ml) 1190
4 pcs. VendingMachines 79980
(Tissue and Sanitary napkins)
30 pcs. Trash bins with cover 7500
10 pcs. Hand dryers 23916
10 pcs. Liquid soap dispenser 1650
30 pcs. Toilet tissue holder 9450
LABOR AND DELIVERY
10 laborers 350/day 105000
Delivery Fee 1000
Total 883,979.95
Contingencies 88,397.99
25. Conclusion
Majority of the respondents agree with the
proposal.
Large percentage of the respondents
agrees to change the interior of the comfort
rooms of JFH and add some fixtures on it.
The university is supposed to discipline the
CLAC students.
The students and faculty members must
take the responsibility in taking care of the
comfort rooms in JFH Building.
The administration must ensure the
security of the comfort room of JFH