Construction Methods and Management, 8th
ed.
S. W. Nunnally
Chapter 20
IMPROVING
PRODUCTIVITY
AND
PERFORMANCE
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
THE BIG PICTURE
• State of the Industry
• What Is Productivity?
• Tools for Better Management
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
WORK IMPROVEMENT
• What Is It?
• Time Studies
• Flow Process Charts
• Layout Diagrams
• Crew Balance Charts
• Human Factors
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
WORK IMPROVEMENT
FIGURE 20-1. Flow process chart.
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
WORK IMPROVEMENT
FIGURE 20-2. Roof truss diagram.
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
WORK IMPROVEMENT
FIGURE 20-3. Crew balance chart.
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
QUANTITATIVE
MANAGEMENT METHODS
• Linear Programming—Graphical
Solution
• Computer Solution
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
QUANTITATIVE
MANAGEMENT METHODS
FIGURE 20-4. Graphical solution of Example 20-1.
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
QUANTITATIVE
MANAGEMENT METHODS
FIGURE 20-5. Computer solution of
Example 20-2.
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
COMPUTERS AND OTHER
TOOLS
• Computers in Construction
• Advanced Techniques
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
COMPUTERS AND OTHER
TOOLS
FIGURE 20-6. Scraper simulation program output.
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
ROBOTS IN CONSTRUCTION
• Recent Developments
– Building Construction
• Finishing of concrete floor slabs.
• Fireproofing of structural steel after erection.
• Positioning steel members for steel erection.
• Spray linings for silos and similar structures.
• Surfacing of walls and other building components.
– Heavy Construction
• Automated asphalt and concrete plants.
• Automated excavators.
• Automated tunnel boring machines.
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
ROBOTS IN CONSTRUCTION
FIGURE 20-7. Automatic grade control of an
excavation using a laser. (Courtesy of
Trimble)
FIGURE 20-8. Remote-controlled pipe
manipulator. (Courtesy of the Construction
Automation and Robotics Laboratory, North
Carolina State University)
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
ROBOTS IN CONSTRUCTION
FIGURE 20-9. Robot for interior
construction. (Courtesy of Prof.
A.Warszawski)
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
THE FUTURE
• As has been noted throughout this book,
changes in the construction industry are
occurring at an ever-increasing rate.
– Some recent trends in construction include
increasing international competition, rapid
changes in technology, the wide availability of
information via the Internet, increasing ease and
speed of communication, and increasing
governmental regulation of the industry,
particularly in the areas of safety and
environmental protection.
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
THE FUTURE
• Computers are playing a growing role in construction
equipment design and operation.
– Automation has taken over many aspects of construction
equipment control.
• When equipment control systems are integrated with
wireless communication systems and GPS (Global
Positioning System) systems, remote and even off-
site control of construction equipment operations
become highly feasible.
– In addition to requiring highly trained managers and
operators, such developments will increasingly demand
skilled technicians to maintain and repair the equipment
involved.
Copyright ©2011, 2006 by Pearson Education, Inc.
publishing as Pearson [imprint]
Construction Methods and Management, 8th
ed.
S. W. Nunnally
THE FUTURE
• In light of these developments,
tomorrow’s construction professional
faces an exciting future.

More Related Content

What's hot

i+iconUSA Corporate Presentation
i+iconUSA Corporate Presentationi+iconUSA Corporate Presentation
i+iconUSA Corporate Presentationi+iconUSA
 
Tilt up-concrete-06a
Tilt up-concrete-06aTilt up-concrete-06a
Tilt up-concrete-06aMazhar Syed
 
Tilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & ApplicationsTilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & ApplicationsMECandPMV
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherifhlksd
 
Dylan Kissinger project list
Dylan Kissinger project listDylan Kissinger project list
Dylan Kissinger project listDylan Kissinger
 
Dbc Pp Resume 2010 Nolinks
Dbc Pp Resume  2010 NolinksDbc Pp Resume  2010 Nolinks
Dbc Pp Resume 2010 Nolinksecolegy
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15Ron O'Connor
 
Rick presentation about central artery for stephaine pollocks class
Rick presentation about central artery for stephaine pollocks classRick presentation about central artery for stephaine pollocks class
Rick presentation about central artery for stephaine pollocks classDorothyFennell
 
Roch Le Blanc Architect
Roch Le Blanc ArchitectRoch Le Blanc Architect
Roch Le Blanc ArchitectRoch Le Blanc
 

What's hot (18)

0137033451 pp10
0137033451 pp100137033451 pp10
0137033451 pp10
 
0137033451 pp4
0137033451 pp40137033451 pp4
0137033451 pp4
 
0137033451 pp17
0137033451 pp170137033451 pp17
0137033451 pp17
 
0137033451 pp2
0137033451 pp20137033451 pp2
0137033451 pp2
 
i+iconUSA Corporate Presentation
i+iconUSA Corporate Presentationi+iconUSA Corporate Presentation
i+iconUSA Corporate Presentation
 
Feasability Study
Feasability StudyFeasability Study
Feasability Study
 
Tilt up-concrete-06a
Tilt up-concrete-06aTilt up-concrete-06a
Tilt up-concrete-06a
 
Tilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & ApplicationsTilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & Applications
 
Michael Sackler AIA_Portfolio
Michael Sackler AIA_PortfolioMichael Sackler AIA_Portfolio
Michael Sackler AIA_Portfolio
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherif
 
Poster 3
Poster 3Poster 3
Poster 3
 
PEB Steel Company profile
PEB Steel Company profilePEB Steel Company profile
PEB Steel Company profile
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
Dylan Kissinger project list
Dylan Kissinger project listDylan Kissinger project list
Dylan Kissinger project list
 
Dbc Pp Resume 2010 Nolinks
Dbc Pp Resume  2010 NolinksDbc Pp Resume  2010 Nolinks
Dbc Pp Resume 2010 Nolinks
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15
 
Rick presentation about central artery for stephaine pollocks class
Rick presentation about central artery for stephaine pollocks classRick presentation about central artery for stephaine pollocks class
Rick presentation about central artery for stephaine pollocks class
 
Roch Le Blanc Architect
Roch Le Blanc ArchitectRoch Le Blanc Architect
Roch Le Blanc Architect
 

Viewers also liked (14)

0137033451 pp7
0137033451 pp70137033451 pp7
0137033451 pp7
 
0137033451 pp15
0137033451 pp150137033451 pp15
0137033451 pp15
 
0137033451 pp8
0137033451 pp80137033451 pp8
0137033451 pp8
 
0137033451 pp6
0137033451 pp60137033451 pp6
0137033451 pp6
 
Sept 11 grade level meetings
Sept 11 grade level meetingsSept 11 grade level meetings
Sept 11 grade level meetings
 
Fys picture activity
Fys picture activityFys picture activity
Fys picture activity
 
Grade 8 farewell june 2015
Grade 8 farewell june 2015Grade 8 farewell june 2015
Grade 8 farewell june 2015
 
A Skeptic's Guide to Branding (RefreshPDX 2/16)
A Skeptic's Guide to Branding (RefreshPDX 2/16)A Skeptic's Guide to Branding (RefreshPDX 2/16)
A Skeptic's Guide to Branding (RefreshPDX 2/16)
 
Progetto quadricottero 1
Progetto quadricottero 1Progetto quadricottero 1
Progetto quadricottero 1
 
My Ignite Notes
My Ignite NotesMy Ignite Notes
My Ignite Notes
 
Video analysis fys
Video analysis fysVideo analysis fys
Video analysis fys
 
Arduino Tre reference
Arduino Tre referenceArduino Tre reference
Arduino Tre reference
 
Gwms expectations - Classroom presentation
Gwms expectations - Classroom presentationGwms expectations - Classroom presentation
Gwms expectations - Classroom presentation
 
Tips dietku(1)
Tips dietku(1)Tips dietku(1)
Tips dietku(1)
 

Similar to 0137033451 pp20

Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in ConstructionIRJET Journal
 
Productivity in Building Construction
Productivity in Building ConstructionProductivity in Building Construction
Productivity in Building ConstructionIOSR Journals
 
PRODUCTION FLOW IN THE CONSTRUCTION OF TALL BUILDINGS
 PRODUCTION FLOW IN THE CONSTRUCTION OF TALL BUILDINGS  PRODUCTION FLOW IN THE CONSTRUCTION OF TALL BUILDINGS
PRODUCTION FLOW IN THE CONSTRUCTION OF TALL BUILDINGS Nam N.N Tran M.Eng, PMP
 
The Impact of Digital Engineering – Tim Broyd (ICE) #COMIT2016
The Impact of Digital Engineering – Tim Broyd (ICE)  #COMIT2016The Impact of Digital Engineering – Tim Broyd (ICE)  #COMIT2016
The Impact of Digital Engineering – Tim Broyd (ICE) #COMIT2016Comit Projects Ltd
 
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...IRJET Journal
 
Structural Design of Concrete Structure Using E-Tabs
Structural Design of Concrete Structure Using E-TabsStructural Design of Concrete Structure Using E-Tabs
Structural Design of Concrete Structure Using E-TabsIOSRJMCE
 
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”IRJET Journal
 
Comparative Studies of Construction Techniques (Conventional VS MIVAN)
Comparative Studies of Construction Techniques (Conventional VS MIVAN)Comparative Studies of Construction Techniques (Conventional VS MIVAN)
Comparative Studies of Construction Techniques (Conventional VS MIVAN)IRJET Journal
 
BIM: A change Perspective
BIM: A change PerspectiveBIM: A change Perspective
BIM: A change PerspectiveTushan Bhugun
 
Site-Efficiency-Report
Site-Efficiency-ReportSite-Efficiency-Report
Site-Efficiency-ReportRon Farr
 
Site visit report
Site visit reportSite visit report
Site visit reportWen Crystal
 
IOS Application Development on Design of Shear wall
IOS Application Development on Design of Shear wallIOS Application Development on Design of Shear wall
IOS Application Development on Design of Shear wallIRJET Journal
 
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...IRJET Journal
 
SEVENTH EDITIONConstruction Methodsand ManagementS. .docx
SEVENTH EDITIONConstruction Methodsand ManagementS. .docxSEVENTH EDITIONConstruction Methodsand ManagementS. .docx
SEVENTH EDITIONConstruction Methodsand ManagementS. .docxedgar6wallace88877
 
Application of last planner system
Application of last planner systemApplication of last planner system
Application of last planner systemAnshi Verma
 
WHSG ICT Presentation Slides ARK
WHSG ICT Presentation Slides ARKWHSG ICT Presentation Slides ARK
WHSG ICT Presentation Slides ARKAndrew Kenyon
 
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCCIRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCCIRJET Journal
 
ACD FINAL SEMINAR REPORT (1).docx
ACD FINAL SEMINAR REPORT (1).docxACD FINAL SEMINAR REPORT (1).docx
ACD FINAL SEMINAR REPORT (1).docxSIDSDen
 

Similar to 0137033451 pp20 (20)

Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in Construction
 
Productivity in Building Construction
Productivity in Building ConstructionProductivity in Building Construction
Productivity in Building Construction
 
PRODUCTION FLOW IN THE CONSTRUCTION OF TALL BUILDINGS
 PRODUCTION FLOW IN THE CONSTRUCTION OF TALL BUILDINGS  PRODUCTION FLOW IN THE CONSTRUCTION OF TALL BUILDINGS
PRODUCTION FLOW IN THE CONSTRUCTION OF TALL BUILDINGS
 
The Impact of Digital Engineering – Tim Broyd (ICE) #COMIT2016
The Impact of Digital Engineering – Tim Broyd (ICE)  #COMIT2016The Impact of Digital Engineering – Tim Broyd (ICE)  #COMIT2016
The Impact of Digital Engineering – Tim Broyd (ICE) #COMIT2016
 
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...
IRJET- Comparative Study of Flat Slab Structure and Conventional Slab Structu...
 
Structural Design of Concrete Structure Using E-Tabs
Structural Design of Concrete Structure Using E-TabsStructural Design of Concrete Structure Using E-Tabs
Structural Design of Concrete Structure Using E-Tabs
 
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
 
Comparative Studies of Construction Techniques (Conventional VS MIVAN)
Comparative Studies of Construction Techniques (Conventional VS MIVAN)Comparative Studies of Construction Techniques (Conventional VS MIVAN)
Comparative Studies of Construction Techniques (Conventional VS MIVAN)
 
BIM: A change Perspective
BIM: A change PerspectiveBIM: A change Perspective
BIM: A change Perspective
 
Site-Efficiency-Report
Site-Efficiency-ReportSite-Efficiency-Report
Site-Efficiency-Report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
IOS Application Development on Design of Shear wall
IOS Application Development on Design of Shear wallIOS Application Development on Design of Shear wall
IOS Application Development on Design of Shear wall
 
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
 
SEVENTH EDITIONConstruction Methodsand ManagementS. .docx
SEVENTH EDITIONConstruction Methodsand ManagementS. .docxSEVENTH EDITIONConstruction Methodsand ManagementS. .docx
SEVENTH EDITIONConstruction Methodsand ManagementS. .docx
 
Application of last planner system
Application of last planner systemApplication of last planner system
Application of last planner system
 
WHSG ICT Presentation Slides ARK
WHSG ICT Presentation Slides ARKWHSG ICT Presentation Slides ARK
WHSG ICT Presentation Slides ARK
 
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCCIRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
 
ACD FINAL SEMINAR REPORT (1).docx
ACD FINAL SEMINAR REPORT (1).docxACD FINAL SEMINAR REPORT (1).docx
ACD FINAL SEMINAR REPORT (1).docx
 
Geosmart hong kong 2014 v8 for linkedin
Geosmart hong kong 2014 v8 for linkedinGeosmart hong kong 2014 v8 for linkedin
Geosmart hong kong 2014 v8 for linkedin
 
Resume3
Resume3Resume3
Resume3
 

0137033451 pp20

  • 1. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally Chapter 20 IMPROVING PRODUCTIVITY AND PERFORMANCE
  • 2. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally THE BIG PICTURE • State of the Industry • What Is Productivity? • Tools for Better Management
  • 3. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally WORK IMPROVEMENT • What Is It? • Time Studies • Flow Process Charts • Layout Diagrams • Crew Balance Charts • Human Factors
  • 4. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally WORK IMPROVEMENT FIGURE 20-1. Flow process chart.
  • 5. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally WORK IMPROVEMENT FIGURE 20-2. Roof truss diagram.
  • 6. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally WORK IMPROVEMENT FIGURE 20-3. Crew balance chart.
  • 7. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally QUANTITATIVE MANAGEMENT METHODS • Linear Programming—Graphical Solution • Computer Solution
  • 8. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally QUANTITATIVE MANAGEMENT METHODS FIGURE 20-4. Graphical solution of Example 20-1.
  • 9. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally QUANTITATIVE MANAGEMENT METHODS FIGURE 20-5. Computer solution of Example 20-2.
  • 10. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally COMPUTERS AND OTHER TOOLS • Computers in Construction • Advanced Techniques
  • 11. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally COMPUTERS AND OTHER TOOLS FIGURE 20-6. Scraper simulation program output.
  • 12. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally ROBOTS IN CONSTRUCTION • Recent Developments – Building Construction • Finishing of concrete floor slabs. • Fireproofing of structural steel after erection. • Positioning steel members for steel erection. • Spray linings for silos and similar structures. • Surfacing of walls and other building components. – Heavy Construction • Automated asphalt and concrete plants. • Automated excavators. • Automated tunnel boring machines.
  • 13. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally ROBOTS IN CONSTRUCTION FIGURE 20-7. Automatic grade control of an excavation using a laser. (Courtesy of Trimble) FIGURE 20-8. Remote-controlled pipe manipulator. (Courtesy of the Construction Automation and Robotics Laboratory, North Carolina State University)
  • 14. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally ROBOTS IN CONSTRUCTION FIGURE 20-9. Robot for interior construction. (Courtesy of Prof. A.Warszawski)
  • 15. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally THE FUTURE • As has been noted throughout this book, changes in the construction industry are occurring at an ever-increasing rate. – Some recent trends in construction include increasing international competition, rapid changes in technology, the wide availability of information via the Internet, increasing ease and speed of communication, and increasing governmental regulation of the industry, particularly in the areas of safety and environmental protection.
  • 16. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally THE FUTURE • Computers are playing a growing role in construction equipment design and operation. – Automation has taken over many aspects of construction equipment control. • When equipment control systems are integrated with wireless communication systems and GPS (Global Positioning System) systems, remote and even off- site control of construction equipment operations become highly feasible. – In addition to requiring highly trained managers and operators, such developments will increasingly demand skilled technicians to maintain and repair the equipment involved.
  • 17. Copyright ©2011, 2006 by Pearson Education, Inc. publishing as Pearson [imprint] Construction Methods and Management, 8th ed. S. W. Nunnally THE FUTURE • In light of these developments, tomorrow’s construction professional faces an exciting future.