Vendor Selection -
A Roadmap to Success
Decision Interface, Inc.
Gary Rinehart
January, 2005
2
Selecting a Technology Partner
 Vendor selection is a key strategic issue
over the life of an assessment project
 The selection process must involve the
key members of the utilities’ user
communities’ management team
 IT can coordinate the selection process,
but does not have to. Decision Interface recommends
a senior management team comprised of the CIO and
the manager’s of the user community.
 The CIO must drive the technology planning process from the top!
 There is no single correct vendor answer. Each has pros and cons
depending on the strategic vision, competitive position and existing
operations of each client.
3
Milestones in the Vendor Selection Process
Tech Assessment
Needs Analysis
RFP
Bid Evaluation/Finalists
Demos/Due Diligence
Vendor Selection
Contract Negotiation
4
Selecting a Core Systems Vendor - Criteria
Category Explanation
FUNCTIONALITY
 The current features and benefits of the system and the ability of these features to
allow the client employees to do their jobs better
 The users’ perception of future systems migration and the impact it will have on the
client
 The ability of the system to support the sales and service goals set by the client
VENDOR STRENGTH
 The ability of the vendor to support and enable the strategic goals of the client
 The ability of the vendor to deliver promised systems and programs on time and
with consistent high quality
 The track record of the vendor in supporting other utilities
 The perception of client management that the vendor understands the client and its
unique strategy and will proactively aid in its realization
 The financial strength of the vendor and the ability to continually invest in system
upgrades and enhancements
PRICE
 The base unit prices that will be charged
 The structure of price increases over five years in various growth scenarios
 The additional products and services that are included as part of the base price
 The value the client will receive in products and services for the money paid
5
Selecting a Core Systems Vendor - Criteria
Category Explanation
ARCHITECTURE
 The technical design of the system and the underlying hardware and software used to
support it
 The ability of the vendor platform to support the continual upgrade and improvement of
the core systems
 The vendor’s stated technology plan and its funding to support the plan
 The ability of the platform to incorporate and maximize the benefits provided by new
technologies
RISK
Risk is divided into three categories:
 Technology Risk – The potential that newer, unproven or undeveloped technology will
cause problems in the operating units. Conversely, the risk that older technology will lack
the functionality and flexibility needed by the client
 Conversion Risk – The possibility that the conversion to new systems will negatively
impact the ability of the client to execute plans and attain goals
 Operations Risk - The possibility that back office and other client operations will be
negatively impacted, either during or after conversion
6
Present a Project Plan to Your CEO
Planning/RFP Development
 Review strategic plan to determine key
technology and information implications
for the future
 Survey employees to discern user system
requirements and operational plans for the
future
 Develop request for proposal (RFP) soliciting bids from
the vendor community
 Develop vendor short list to receive RFP
 Decide upon desired delivery as early as possible
 Have RFP approved by senior management team
7
Decision Interface RFP Philosophy
 Articulate what’s important strategically to the organization
 Include an organized, complete summary of the current systems
environment:
• Applications
• Infrastructure
• Third-party systems and interfaces
• Account and transaction volumes
 Include the client’s technical standards
 Do not prepare 300 pages of “check the box” requirements
 Challenge your vendor with 6 – 8 critical “essay” questions
 Share the evaluation and selection criteria
 Give vendors 4 – 5 weeks to respond
8
Review of Vendor Background and Experience
Recommended Approaches:
 Article search/industry reports on vendor
 Annual report/financial statements of vendor
• Demand financial statements even from private companies
 # of installs by delivery channel and asset size
 Evaluate market momentum
 Ask for a long list of references with contact information
 Ask to see information concerning:
• R&D budget
• Training and user group offerings
• Current interfaces!
9
Review of Vendor Technology
Recommended Approaches:
 Ask for technology “white paper” from vendor
 Ask for product architectural details in RFP
• Product name
• First and last installation dates
• Original developer
• Programming languages
• Data structure and database product
• Operating system
• Hardware
• Communications
10
Review of Financial Proposals
Recommended Approaches:
 Build a five-year cash flow projection
 Ensure that each proposal includes the same products
and services to compare fairly
 Build a 10% - 20% contingency into each proposal
 Identify any “variable” charges that may
become expensive as transactions
and/or accounts grow
 Don’t forget COLA!
11
Review of Financial Proposals
Recommended Approaches:
 Attempt to negotiate fixed arrangements as much as
possible
 Ensure that any required additional hardware,
software, communications and staffing investments
have been identified
 This is especially important when comparing in-house
proposals to service bureau/ASP proposals
 Integration experience
• The difference between “Can do” and “Have done” can easily
be six figures
 Calculate a total five-year cost and an annual cost for
accounting purposes
12
User Demonstrations and Due Diligence
Recommended Approaches:
 Live demo at client site
 Written questions to vendor
 Active phone campaign with peers
 Live demo at vendor client site
 Visit to vendor corporate office
Recommended Evaluation:
 Devise a score sheet for each system user
 Use a worksheet to evaluate conversion,
support and operational risks
13
Sample Vendor Score Sheet
Weightin
g
Product A Product B Product C
Raw Weighted Raw Weighted Raw Weighted
Functionality X%
Vendor
Strength
X%
Architecture X%
Price X%
Risk X%
TOTAL
SCORE
100%
Rate vendors on a scale of 1 (poor) to 10 (excellent)
14
Contract Negotiation
 Decision Interface understands the myriad issues that can
arise in the Vendor Selection process.
 Decision Interface's Contract Negotiation Services
include:
• A thorough review of key pricing and service terms
• An examination of the proposed vendor contract
• Close coordination with you to resolve documented issues
• Interface with the vendor (as directed by you)
15
Contact Negotiation
 Decision Interface's Contract Negotiation Services are
entirely client-directed.
• We can act as Lead Negotiator
– Saving you time and preserving the client/vendor relationship.
• We can provide "behind the scenes" assistance
– Supplying you with a detailed issues list that you can use as the
foundation for negotiations with your vendor.
 In every contract negotiation, Decision Interface can be
available for insight and advice.
16
Contract Negotiation
 Decision Interface conducts a comprehensive evaluation
of every element of your proposed contract, including:
• Price, initial costs, license fees, conversion and training costs,
operating expense, etc.
• Term
• Business issues
• Payment terms
• Service level agreements
• Conversion timing
• Termination penalties
• Performance warranties
• Ownership of custom enhancements
• Escrow arrangements
• Bank and vendor responsibilities
17
Contract Negotiation
 The terms of the contract you sign with your vendor will
be with you for years to come.
 Decision Interface can help ensure you the best possible
advantage.
18
Contract Negotiation Tips
 Keep contract to a five-year maximum for core
processing, less for newer technology
 Real time versus batch interfaces
• Vendors often “forget” to mention when it’s a batch interface
• Cost difference can be dramatic
 Set a hard cap on COLA or guaranteed revenue growth
to vendor
 Aggressive SLA’s in the contract help to set the tone of
the upcoming relationship early
19
Vendor Selection -
A Roadmap to Success
Questions?

More Related Content

What's hot

Purchasing policy and procedures
Purchasing policy and proceduresPurchasing policy and procedures
Purchasing policy and proceduresKris Marie Laserna
 
Vendor Development as Strategic Alliance- Rakesh Ravindran
Vendor Development as Strategic Alliance- Rakesh RavindranVendor Development as Strategic Alliance- Rakesh Ravindran
Vendor Development as Strategic Alliance- Rakesh RavindranRakesh Ravindran
 
Materials management –objective, scope & function (2)
Materials management –objective, scope & function (2)Materials management –objective, scope & function (2)
Materials management –objective, scope & function (2)Vinay Kumar
 
Purchasing and vendor management
Purchasing and vendor managementPurchasing and vendor management
Purchasing and vendor managementNarendra Chaudhary
 
purchasing process
purchasing processpurchasing process
purchasing processonearbaein
 
Ppt of purchase cycle chandra 12mt07ind008
Ppt of purchase cycle chandra 12mt07ind008Ppt of purchase cycle chandra 12mt07ind008
Ppt of purchase cycle chandra 12mt07ind008samjune
 
Purchase Presentation 1
Purchase Presentation 1Purchase Presentation 1
Purchase Presentation 1prateekbubai
 
Presentation on procurement
Presentation on procurementPresentation on procurement
Presentation on procurementMuhammad Fahim
 
Supplier evaluation & selection
Supplier evaluation & selectionSupplier evaluation & selection
Supplier evaluation & selectionAnkit
 
Procurement and Sourcing Strategies
Procurement and Sourcing StrategiesProcurement and Sourcing Strategies
Procurement and Sourcing StrategiesShaikh Mahmood
 
Procurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzProcurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzDerek Hendrikz
 
Inventory management
Inventory managementInventory management
Inventory managementHpm India
 
VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTSWAPAN KUMAR ROY
 

What's hot (20)

Vendor rating
Vendor ratingVendor rating
Vendor rating
 
Purchasing policy and procedures
Purchasing policy and proceduresPurchasing policy and procedures
Purchasing policy and procedures
 
Vendor Development as Strategic Alliance- Rakesh Ravindran
Vendor Development as Strategic Alliance- Rakesh RavindranVendor Development as Strategic Alliance- Rakesh Ravindran
Vendor Development as Strategic Alliance- Rakesh Ravindran
 
Materials management –objective, scope & function (2)
Materials management –objective, scope & function (2)Materials management –objective, scope & function (2)
Materials management –objective, scope & function (2)
 
Purchasing and vendor management
Purchasing and vendor managementPurchasing and vendor management
Purchasing and vendor management
 
purchasing process
purchasing processpurchasing process
purchasing process
 
Ppt of purchase cycle chandra 12mt07ind008
Ppt of purchase cycle chandra 12mt07ind008Ppt of purchase cycle chandra 12mt07ind008
Ppt of purchase cycle chandra 12mt07ind008
 
Purchase Presentation 1
Purchase Presentation 1Purchase Presentation 1
Purchase Presentation 1
 
Purchase management
Purchase managementPurchase management
Purchase management
 
Presentation on procurement
Presentation on procurementPresentation on procurement
Presentation on procurement
 
Supplier evaluation & selection
Supplier evaluation & selectionSupplier evaluation & selection
Supplier evaluation & selection
 
Vendor Management
Vendor ManagementVendor Management
Vendor Management
 
procurement cycle
procurement cycleprocurement cycle
procurement cycle
 
Procurement and Sourcing Strategies
Procurement and Sourcing StrategiesProcurement and Sourcing Strategies
Procurement and Sourcing Strategies
 
Order Management
Order ManagementOrder Management
Order Management
 
Procurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzProcurement Strategy by Derek Hendrikz
Procurement Strategy by Derek Hendrikz
 
Inventory management
Inventory managementInventory management
Inventory management
 
VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENT
 
E procurement
E procurementE procurement
E procurement
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 

Viewers also liked

Enterprise Software Implementation
Enterprise Software ImplementationEnterprise Software Implementation
Enterprise Software Implementationbrh184
 
The software Implementation Process
The software Implementation ProcessThe software Implementation Process
The software Implementation Processrthompson604
 
An Insider's View of Choosing a Localization Vendor: When One Size Does Not F...
An Insider's View of Choosing a Localization Vendor: When One Size Does Not F...An Insider's View of Choosing a Localization Vendor: When One Size Does Not F...
An Insider's View of Choosing a Localization Vendor: When One Size Does Not F...SumaLatam
 
Agile Tour 2016 Chennai - Vendor selection an interactive process by Karthik...
Agile Tour 2016 Chennai - Vendor selection  an interactive process by Karthik...Agile Tour 2016 Chennai - Vendor selection  an interactive process by Karthik...
Agile Tour 2016 Chennai - Vendor selection an interactive process by Karthik...India Scrum Enthusiasts Community
 
Supplier selection
Supplier selectionSupplier selection
Supplier selectionjoecobe
 
Presentation On Warehousing
Presentation On WarehousingPresentation On Warehousing
Presentation On WarehousingRRChandran
 
SUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONSUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONZamri Yahya
 

Viewers also liked (12)

Enterprise Software Implementation
Enterprise Software ImplementationEnterprise Software Implementation
Enterprise Software Implementation
 
The software Implementation Process
The software Implementation ProcessThe software Implementation Process
The software Implementation Process
 
An Insider's View of Choosing a Localization Vendor: When One Size Does Not F...
An Insider's View of Choosing a Localization Vendor: When One Size Does Not F...An Insider's View of Choosing a Localization Vendor: When One Size Does Not F...
An Insider's View of Choosing a Localization Vendor: When One Size Does Not F...
 
Naresh
NareshNaresh
Naresh
 
Agile Tour 2016 Chennai - Vendor selection an interactive process by Karthik...
Agile Tour 2016 Chennai - Vendor selection  an interactive process by Karthik...Agile Tour 2016 Chennai - Vendor selection  an interactive process by Karthik...
Agile Tour 2016 Chennai - Vendor selection an interactive process by Karthik...
 
GMP-VENDORS SELECTION
GMP-VENDORS SELECTIONGMP-VENDORS SELECTION
GMP-VENDORS SELECTION
 
Supplier Selection
Supplier SelectionSupplier Selection
Supplier Selection
 
Vendor rating system
Vendor rating systemVendor rating system
Vendor rating system
 
Supplier selection
Supplier selectionSupplier selection
Supplier selection
 
Presentation On Warehousing
Presentation On WarehousingPresentation On Warehousing
Presentation On Warehousing
 
Warehousing
WarehousingWarehousing
Warehousing
 
SUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONSUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATION
 

Similar to Vendor Selection Process

Equipment finance systems project guide 101
Equipment finance systems project guide 101Equipment finance systems project guide 101
Equipment finance systems project guide 101David Pedreno
 
Equipment finance projects guide "101"
Equipment finance projects guide "101"Equipment finance projects guide "101"
Equipment finance projects guide "101"David Pedreno
 
Equipment finance systems project guide "101"
Equipment finance systems project guide "101"Equipment finance systems project guide "101"
Equipment finance systems project guide "101"David Pedreno
 
Equipment finance systems project guide "101"
Equipment finance systems project guide "101"Equipment finance systems project guide "101"
Equipment finance systems project guide "101"David Pedreno
 
Equipment finance projects 101
Equipment finance projects 101Equipment finance projects 101
Equipment finance projects 101David Pedreno
 
Best Practices for Preparing a Request for Proposalby Be.docx
Best Practices for Preparing a Request for Proposalby Be.docxBest Practices for Preparing a Request for Proposalby Be.docx
Best Practices for Preparing a Request for Proposalby Be.docxikirkton
 
Asset finance systems projects guide 101
Asset finance systems projects guide 101Asset finance systems projects guide 101
Asset finance systems projects guide 101David Pedreno
 
Equipment finance projects
Equipment finance projectsEquipment finance projects
Equipment finance projectsDavid Pedreno
 
Equipment finance system projects
Equipment finance system projectsEquipment finance system projects
Equipment finance system projectsDavid Pedreno
 
Equipment Finance Projects
Equipment Finance ProjectsEquipment Finance Projects
Equipment Finance ProjectsDavid Pedreno
 
Equipment finance system projects
Equipment finance system projectsEquipment finance system projects
Equipment finance system projectsDavid Pedreno
 
Equipment finance projects
Equipment finance projectsEquipment finance projects
Equipment finance projectsDavid Pedreno
 
Outsourcing and Vendor management
Outsourcing and Vendor managementOutsourcing and Vendor management
Outsourcing and Vendor managementRaminder Pal Singh
 
How to implement a strategic IT vendor management program
How to implement a strategic IT vendor management programHow to implement a strategic IT vendor management program
How to implement a strategic IT vendor management programJeff Kubacki
 
Procurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremProcurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremDaliaCulbertson719
 
CRM Consulting Services RFP
CRM Consulting Services RFPCRM Consulting Services RFP
CRM Consulting Services RFPDemand Metric
 
IWSM2014 Workshop FPA and quality metrics in contracts (Harold van Heeringen)
IWSM2014 Workshop FPA and quality metrics in contracts (Harold van Heeringen)IWSM2014 Workshop FPA and quality metrics in contracts (Harold van Heeringen)
IWSM2014 Workshop FPA and quality metrics in contracts (Harold van Heeringen)Nesma
 
Executive Buyers Guide
Executive Buyers GuideExecutive Buyers Guide
Executive Buyers Guideefinver
 

Similar to Vendor Selection Process (20)

Equipment finance systems project guide 101
Equipment finance systems project guide 101Equipment finance systems project guide 101
Equipment finance systems project guide 101
 
Equipment finance projects guide "101"
Equipment finance projects guide "101"Equipment finance projects guide "101"
Equipment finance projects guide "101"
 
Equipment finance systems project guide "101"
Equipment finance systems project guide "101"Equipment finance systems project guide "101"
Equipment finance systems project guide "101"
 
Equipment finance systems project guide "101"
Equipment finance systems project guide "101"Equipment finance systems project guide "101"
Equipment finance systems project guide "101"
 
Equipment finance projects 101
Equipment finance projects 101Equipment finance projects 101
Equipment finance projects 101
 
Best Practices for Preparing a Request for Proposalby Be.docx
Best Practices for Preparing a Request for Proposalby Be.docxBest Practices for Preparing a Request for Proposalby Be.docx
Best Practices for Preparing a Request for Proposalby Be.docx
 
Asset finance systems projects guide 101
Asset finance systems projects guide 101Asset finance systems projects guide 101
Asset finance systems projects guide 101
 
Equipment finance projects
Equipment finance projectsEquipment finance projects
Equipment finance projects
 
Equipment finance system projects
Equipment finance system projectsEquipment finance system projects
Equipment finance system projects
 
Equipment Finance Projects
Equipment Finance ProjectsEquipment Finance Projects
Equipment Finance Projects
 
Equipment finance system projects
Equipment finance system projectsEquipment finance system projects
Equipment finance system projects
 
Equipment finance projects
Equipment finance projectsEquipment finance projects
Equipment finance projects
 
Clarity It Sourcing Diagnostic Presentation
Clarity It Sourcing Diagnostic PresentationClarity It Sourcing Diagnostic Presentation
Clarity It Sourcing Diagnostic Presentation
 
Outsourcing and Vendor management
Outsourcing and Vendor managementOutsourcing and Vendor management
Outsourcing and Vendor management
 
Outsource.ppt
Outsource.pptOutsource.ppt
Outsource.ppt
 
How to implement a strategic IT vendor management program
How to implement a strategic IT vendor management programHow to implement a strategic IT vendor management program
How to implement a strategic IT vendor management program
 
Procurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremProcurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project Procurem
 
CRM Consulting Services RFP
CRM Consulting Services RFPCRM Consulting Services RFP
CRM Consulting Services RFP
 
IWSM2014 Workshop FPA and quality metrics in contracts (Harold van Heeringen)
IWSM2014 Workshop FPA and quality metrics in contracts (Harold van Heeringen)IWSM2014 Workshop FPA and quality metrics in contracts (Harold van Heeringen)
IWSM2014 Workshop FPA and quality metrics in contracts (Harold van Heeringen)
 
Executive Buyers Guide
Executive Buyers GuideExecutive Buyers Guide
Executive Buyers Guide
 

Vendor Selection Process

  • 1. Vendor Selection - A Roadmap to Success Decision Interface, Inc. Gary Rinehart January, 2005
  • 2. 2 Selecting a Technology Partner  Vendor selection is a key strategic issue over the life of an assessment project  The selection process must involve the key members of the utilities’ user communities’ management team  IT can coordinate the selection process, but does not have to. Decision Interface recommends a senior management team comprised of the CIO and the manager’s of the user community.  The CIO must drive the technology planning process from the top!  There is no single correct vendor answer. Each has pros and cons depending on the strategic vision, competitive position and existing operations of each client.
  • 3. 3 Milestones in the Vendor Selection Process Tech Assessment Needs Analysis RFP Bid Evaluation/Finalists Demos/Due Diligence Vendor Selection Contract Negotiation
  • 4. 4 Selecting a Core Systems Vendor - Criteria Category Explanation FUNCTIONALITY  The current features and benefits of the system and the ability of these features to allow the client employees to do their jobs better  The users’ perception of future systems migration and the impact it will have on the client  The ability of the system to support the sales and service goals set by the client VENDOR STRENGTH  The ability of the vendor to support and enable the strategic goals of the client  The ability of the vendor to deliver promised systems and programs on time and with consistent high quality  The track record of the vendor in supporting other utilities  The perception of client management that the vendor understands the client and its unique strategy and will proactively aid in its realization  The financial strength of the vendor and the ability to continually invest in system upgrades and enhancements PRICE  The base unit prices that will be charged  The structure of price increases over five years in various growth scenarios  The additional products and services that are included as part of the base price  The value the client will receive in products and services for the money paid
  • 5. 5 Selecting a Core Systems Vendor - Criteria Category Explanation ARCHITECTURE  The technical design of the system and the underlying hardware and software used to support it  The ability of the vendor platform to support the continual upgrade and improvement of the core systems  The vendor’s stated technology plan and its funding to support the plan  The ability of the platform to incorporate and maximize the benefits provided by new technologies RISK Risk is divided into three categories:  Technology Risk – The potential that newer, unproven or undeveloped technology will cause problems in the operating units. Conversely, the risk that older technology will lack the functionality and flexibility needed by the client  Conversion Risk – The possibility that the conversion to new systems will negatively impact the ability of the client to execute plans and attain goals  Operations Risk - The possibility that back office and other client operations will be negatively impacted, either during or after conversion
  • 6. 6 Present a Project Plan to Your CEO Planning/RFP Development  Review strategic plan to determine key technology and information implications for the future  Survey employees to discern user system requirements and operational plans for the future  Develop request for proposal (RFP) soliciting bids from the vendor community  Develop vendor short list to receive RFP  Decide upon desired delivery as early as possible  Have RFP approved by senior management team
  • 7. 7 Decision Interface RFP Philosophy  Articulate what’s important strategically to the organization  Include an organized, complete summary of the current systems environment: • Applications • Infrastructure • Third-party systems and interfaces • Account and transaction volumes  Include the client’s technical standards  Do not prepare 300 pages of “check the box” requirements  Challenge your vendor with 6 – 8 critical “essay” questions  Share the evaluation and selection criteria  Give vendors 4 – 5 weeks to respond
  • 8. 8 Review of Vendor Background and Experience Recommended Approaches:  Article search/industry reports on vendor  Annual report/financial statements of vendor • Demand financial statements even from private companies  # of installs by delivery channel and asset size  Evaluate market momentum  Ask for a long list of references with contact information  Ask to see information concerning: • R&D budget • Training and user group offerings • Current interfaces!
  • 9. 9 Review of Vendor Technology Recommended Approaches:  Ask for technology “white paper” from vendor  Ask for product architectural details in RFP • Product name • First and last installation dates • Original developer • Programming languages • Data structure and database product • Operating system • Hardware • Communications
  • 10. 10 Review of Financial Proposals Recommended Approaches:  Build a five-year cash flow projection  Ensure that each proposal includes the same products and services to compare fairly  Build a 10% - 20% contingency into each proposal  Identify any “variable” charges that may become expensive as transactions and/or accounts grow  Don’t forget COLA!
  • 11. 11 Review of Financial Proposals Recommended Approaches:  Attempt to negotiate fixed arrangements as much as possible  Ensure that any required additional hardware, software, communications and staffing investments have been identified  This is especially important when comparing in-house proposals to service bureau/ASP proposals  Integration experience • The difference between “Can do” and “Have done” can easily be six figures  Calculate a total five-year cost and an annual cost for accounting purposes
  • 12. 12 User Demonstrations and Due Diligence Recommended Approaches:  Live demo at client site  Written questions to vendor  Active phone campaign with peers  Live demo at vendor client site  Visit to vendor corporate office Recommended Evaluation:  Devise a score sheet for each system user  Use a worksheet to evaluate conversion, support and operational risks
  • 13. 13 Sample Vendor Score Sheet Weightin g Product A Product B Product C Raw Weighted Raw Weighted Raw Weighted Functionality X% Vendor Strength X% Architecture X% Price X% Risk X% TOTAL SCORE 100% Rate vendors on a scale of 1 (poor) to 10 (excellent)
  • 14. 14 Contract Negotiation  Decision Interface understands the myriad issues that can arise in the Vendor Selection process.  Decision Interface's Contract Negotiation Services include: • A thorough review of key pricing and service terms • An examination of the proposed vendor contract • Close coordination with you to resolve documented issues • Interface with the vendor (as directed by you)
  • 15. 15 Contact Negotiation  Decision Interface's Contract Negotiation Services are entirely client-directed. • We can act as Lead Negotiator – Saving you time and preserving the client/vendor relationship. • We can provide "behind the scenes" assistance – Supplying you with a detailed issues list that you can use as the foundation for negotiations with your vendor.  In every contract negotiation, Decision Interface can be available for insight and advice.
  • 16. 16 Contract Negotiation  Decision Interface conducts a comprehensive evaluation of every element of your proposed contract, including: • Price, initial costs, license fees, conversion and training costs, operating expense, etc. • Term • Business issues • Payment terms • Service level agreements • Conversion timing • Termination penalties • Performance warranties • Ownership of custom enhancements • Escrow arrangements • Bank and vendor responsibilities
  • 17. 17 Contract Negotiation  The terms of the contract you sign with your vendor will be with you for years to come.  Decision Interface can help ensure you the best possible advantage.
  • 18. 18 Contract Negotiation Tips  Keep contract to a five-year maximum for core processing, less for newer technology  Real time versus batch interfaces • Vendors often “forget” to mention when it’s a batch interface • Cost difference can be dramatic  Set a hard cap on COLA or guaranteed revenue growth to vendor  Aggressive SLA’s in the contract help to set the tone of the upcoming relationship early
  • 19. 19 Vendor Selection - A Roadmap to Success Questions?