Decision :
PLC or DCS


    Vivek Koshti
Selecting the technology and the right supplier can
help your company :
• To respond quickly to changing market conditions in
  a way that creates a sustainable competitive
  advantages.
• Minimize Total cost of ownership over the life of plant
• Create a system which is easily maintainable /
   upgradeable for the long term.
• Achieve its future goals & vision.
• Selecting an automation system based on a review
  of available products is the typical course of action
  for someone in the market for a new automation
  system.
The hybrid application typically requires a process
Control system that can deliver both PLC & DCS
Capabilities.

A successful evaluation should start by developing a
Clear picture of the requirements of your application
& the needs of your engineering, maintenance and
Operations personnel.

This presentation outlines the seven key questions
that will lead you to make the right choice.
Typical DCS System Architecture
• In DCS Architecture diagram, redundancy is often
  Employed for I/O Controller, Networks, HMI servers.
• Since redundancy adds cost & sometimes complexity
  DCS users must carefully evaluate their need for
  redundancy in order to achieve their required system
  availability and to prevent unplanned downtime.
• DCS is typically better suited for complex batch
  manufacturing facilities that require a high level of
  flexibility and recipe management.
• Plant operator can’t see the product which is within
  the vessel and may be hazardous in nature. There
  is usually a large amount of simple as well as complex
  analog control i.e. PID or loop control, although the
  response time is not exceptionally fast (100 ms or < )
Typical PLC System Architecture
• PLC Architecture diagram illustrate one of its most
  common applications, the control of discrete devices
  such as motor & drives.
• To effectively control motors and drives requires that
  the controller be able to execute at high speeds
  (10-20 msec scan rate) and that the electrical
  technician responsible for maintaining it be able to
  read and troubleshoot the configuration in a language
  that he is familiar with (relay ladder logic).
• From a technology point of view, one can see that
  PLC & DCS are not that different. We must look
  beyond technology that is built into these system by the
  supplier, so that we can better understand the “sweet-
  spots” where each is best applied.
At first glance, system architectures look very similar.
Both system share following Components :
• Field Devices
• I / O Modules
• Controllers
• Human Machine Interfaces (HMIs)
• Engineering
• Supervisory Control
• System Integration

 The differences become more apparent when you
consider the nature & requirement of an application.
The seven questions to ask yourself
before Choosing a system :

          PLC or DCS
Q. 1 – What are you manufacturing & how?

• No. of Products manufactured : Single / Multiple
• Recipe parameter : Constant or Variable
• Procedure : Single or Different
• Equipment Utilization : Fixed or Flexible
• Frequency of changes to formula & Recipe :
  Never or Often
PLC                             DCS

Manufacturing or assembly of      Involves the combination & / or
specific items                    Transformation of raw material



Product is visible & it moves   Impossible to visually see Product
through the process             as it moves thought the process



High speed logic control         Regulatory / Analog loop control



Simple Batch Control              Complex Batch Control
Q. 2 – What is the value of the product being
      manufactured and the cost of downtime?

• If the value of each independent product being
  manufactured is low, & / or downtime results in
  lost of production, but with additional cost or
  damage to the process, the PLC is likely choice.
• If the value of the batch is high, either in raw
  material cost or market value, & the downtime
  not only results is lost production but potentially
  dangerous and damaging conditions, the
  selection should be DCS.
PLC                                    DCS

Value of individual component being      The value of batch can be very
Manufactured is relatively low           High.


Downtime mainly results in lost         Downtime not only results in lost
Of production                           Production but can result dangerous
                                        Or hazardous conditions.


Downtime does not typically              Downtime can result in process
Damage the process equipment             Equipment damage.

Return to steady state production        Return to steady state production
after an outage is short & relatively    after an unplanned outage ca be
straightforward                          long, expensive & difficult.
Q. 3 – What do you view as the “heart” of the
       system?

• PLC is the heart of the factory Automation
  control system, which contains all of the logic
  To move the product through the assembly line.
  HMI is often an on machine panel or a PC
  based station.
• Operational information resulting from data
  analysis is also a requirement for factory
  automation applications – driving demand for a
  more sophisticated HMI
• The environment is process automation can be
  volatile & dangerous.
• In this scenario, the HMI is a central control
  room console that provides the only complete
  “window” into the process, enabling operator
  to monitor & control the process which are
  occurring inside pipes & vessels located through
  out the plant.
               PLC                                    DCS
 Typically, heart of the system is the   Typically, hear t of the system is
 Controller.                             The HMI
Q. 4 – What does the operator need to be
       successful ?

• In PLC environment, status information &
  exception alarming help to keep the operator
  aware of what is happening in the process.
• The DCS plant require an operator to make
  decision and continuously interact with the
  process to keep it running.
• In fact, operators process knowledge is often
  critical to operational excellence & keeping the
  process running optimally
• Operators has to keep an eye during product grade
  changes & when adjusting the process changes to
  overall production environment.
• The operator will change the set-points, open/ close
  valves or to make manual addition to move a batch to
  the next stage of production.
• Within the HMI, faceplates & analog trends provide a
  critical view into what is really happening in the
  production process, while alarm management system
  focuses operators attention on areas where he must
  intervene to keep the process running within its target
  performance.
• In the event of HMI failure, the plant could be forced to
  shutdown in order to keep the people & equipment
  safe.
PLC                                     DCS

The operator primary role is              Operator interaction is required to
to handle exceptions                      Keep the process in its target
                                          Performance range

Status information (ON/OFF, RUN/        Faceplates & analog trends are
STOP) is critical information for the   Critical to see what is happening to
operator                                The process.


Exception based alarming is key          Alarm management is key to safe
Information for the operator             Operation of the process

Manufacturing might be able to run        Failure of the HMI could force the
“light-outs”                              shutdown of the process
Q. 5 – What system performance is required ?

• The speed of logic execution is a key differentiator.
• Fast scan rates are necessary to be able to
  effectively control the operations involving
  motion control, high-speed interlocking, control
  of motors and drives.
• The DCS does not have to be that quick.
• Increasingly, PLC is capable of delivering simple to
  complex PID control, but DCS is the choice for
  applications with advanced analog control, cascade,
  Feed forward, ratio, model predictive control etc…
PLC                                 DCS
Fast logic scan rate(10ms) is        Control Loops require deterministic
required to perform motion control   Scan execution at speed 100-500ms


 Redundancy may not be cost            System redundancy is often
 justified                             required


 System can be taken offline to      Online configuration changes often
 Make configuration changes          required


Analog Control – Simple PID ONLY     Analog Control – Simple to Advanced
                                     PID upto Advanced Process Control

Diagnostic to tell you when something Asset Management alerts you to what
Is broken                             Might break before it does
Q. 6 – What degree of customization is required ?

• PLC delivers a “toolkit” of functions & elemental
   building blocks that can be custom developed and
   chained together to address the requirements of an
   application.
• Powerful Programming languages are typically available
  to facilitate the creation of custom code from scratch.
• DCS Pre-engineered solutions consists of standards,
  templates & extensive libraries.
• The highest priority of DCS is to deliver reliability &
  availability, which often results in a design which trades
  unlimited functionality for repeatability and
  dependability.
PLC                                      DCS

High Level Programming Languages          Custom Logic created from
Are available for creating custom         existing function blocks
logic

Customized routines usually              Many algorithms are complex (PID)
required                                 & do not vary among applications



Standard libraries considered             Function Blocks and faceplates
As nice features                          Are expected

Provisions must be available to           Entire system is expected to
Integrate functions / products into an    Function as a complete solution
Integrated architecture
Q. 7 – What are your engineering expectations ?

• Factory automation engineers want customizable
  control platform, which offer the individual components
  that can be quickly programmed together to accomplish
  the task at hand.
• PLC engineer demands flexibility & open
  architecture.
• DCS engineers focus on upfront design is a key to
  minimizing costs, compressing the project schedule &
  creating an application that can be maintained by plant
  personnel over the long term.
• The process engineers controlling entire plants
  with a DCS require more intuitive programming
  platforms, which utilize pre-defined & pre-tested
  functions to save time & drive repeatability.

• Think about in this way –
     The PLC is controlling a machine.
     The DCS is controlling the plant.
PLC                                 DCS
Program / configure individual      Upfront design of complete system
Components, integrate later         Before implementation begins.


 Desire customizable platforms to     Looking for significant “out-of-box”
 build upon                           Functionality


 System designed to be flexible     System designed to make it “easy”
                                    To engineer to process application


Use of Ladder logic to configure    Use of FBD for configuration of
applications                        applications
Do you have a Hybrid Application?

  What is a “ Hybrid ”?

• The marriage of the discrete functions, which PLC
   handles so simply and economically, with the
   sophisticated analog continuous control capabilities
   of the DCS.
• Defined based on the industries in which system
   works & serves like oil & gas, refinery, pharmaceutical
   food & beverages
• The architectural marriage of the PLC simplicity and
  cost with the sophisticated operator displays, alarm
  management & easy configuration capabilities of DCS.
How to select a Process Control System for
  Hybrid Application ?
• Controller : can execute fast scan logic (10-20 msce), such that
  required for motor control and slow scan logic (100-500 msec)
  such as required for analog control.
• Engineering Configuration Language: Provides ladder logic,
  Functional Block Diagram and a powerful programming language
  for creation of custom logic from scratch.
• Flexible Modular Redundancy: Offers the option of tailoring the
  level of system redundancy to deliver the required system
  availability by balancing up-front cost versus the cost of
  unplanned downtime.
• Modular batch from simple to complex – Provides modular
  batch capability to cost effective address of simple to complex
  batch application.
How to select a Process Control System for
  Hybrid Application ?
• Alarm Management : Offers power alarm management tools to
  help operators respond effectively to plant upset conditions
• System Diagnostics & Asset Management: Provides both a
  rich set of built in system diagnostics, as well as asset
  management of all critical assets (transmitters, valve Positioner,
  motors, drives, MCC’s, heat exchanger etc.) in the plant
• Scalable Platform: Hardware, software & licensing supports
 smooth & economical scale up from small all-in-one system
 (10’s of I/O’s) up to a large client / server system (1000’s of I/O’s)
In Nut-shell

 Characteristics                   PLC                    DCS
Market Introduction     1960                   1975
Replacement of          Electromagnetic Replays Pneumatic & SLC
Application             Automotive             Refinery
Type of Control         Discrete               Regulatory
Engineering Mindset     Programming            Configuration
Size                    Compact                Large
System                  Open                   Closed
Operator Interface      Simple Graphics        Sophisticated Graphics
Upfront Cost            $$                     $$$$
Operation interaction   Exception Basis        Man in the Loop
References :

[1] Bob Nelson, “Making the Right Choice for
    Process Industry”, Control Engineering Asia,
    October-2008.
[2] “Process Automation”, SIEMENS Energy &
     Automation.
[3] “Hybrid Control Identity Crisis: What's in a
     Name?”, In-Tech Sept. 2007.
[4] Rich Merritt, “Does DCS have A Future?
    If so, is it HMI/SCADA”, Control- Dec. 2008.

More Related Content

What's hot

DCS PRESENTATION
DCS PRESENTATIONDCS PRESENTATION
DCS PRESENTATIONbvent2005
 
Industrial automation (PLC, SCADA, VFD & HMI)
Industrial automation (PLC, SCADA, VFD & HMI)Industrial automation (PLC, SCADA, VFD & HMI)
Industrial automation (PLC, SCADA, VFD & HMI)Praveen Ramola
 
YOKOGAWA CENTUM CS 3000 R3
YOKOGAWA CENTUM CS 3000 R3YOKOGAWA CENTUM CS 3000 R3
YOKOGAWA CENTUM CS 3000 R3Rehan Fazal
 
Distributed control system presentation
Distributed control system presentationDistributed control system presentation
Distributed control system presentationAYUSH VARSHNEY
 
Scada ppt
Scada pptScada ppt
Scada pptzudakki
 
A presentation on scada system
A presentation on scada systemA presentation on scada system
A presentation on scada systemIIT INDORE
 
BASICS OF FIELDBUS
BASICS OF FIELDBUSBASICS OF FIELDBUS
BASICS OF FIELDBUSShivam Singh
 
Distributed Control System (Presentation)
Distributed Control System (Presentation)Distributed Control System (Presentation)
Distributed Control System (Presentation)Thunder Bolt
 
How scada systems work
How scada systems workHow scada systems work
How scada systems workelprocus
 
Automation PLC & SCADA
Automation PLC & SCADA Automation PLC & SCADA
Automation PLC & SCADA NITISH SINGH
 
Distributed Control System
Distributed Control SystemDistributed Control System
Distributed Control System3abooodi
 
Ch 5 Industrial Control Systems.ppt
Ch 5  Industrial Control Systems.pptCh 5  Industrial Control Systems.ppt
Ch 5 Industrial Control Systems.pptKhalil Alhatab
 
DCS fundamentals
DCS fundamentalsDCS fundamentals
DCS fundamentalsAlok Saikia
 
Override control system
Override control systemOverride control system
Override control systemAshvani Shukla
 
Basics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADABasics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADAIndira Kundu
 

What's hot (20)

DCS PRESENTATION
DCS PRESENTATIONDCS PRESENTATION
DCS PRESENTATION
 
All about scada
All about scadaAll about scada
All about scada
 
DCS an overview
DCS an overviewDCS an overview
DCS an overview
 
Dcs
DcsDcs
Dcs
 
Industrial automation (PLC, SCADA, VFD & HMI)
Industrial automation (PLC, SCADA, VFD & HMI)Industrial automation (PLC, SCADA, VFD & HMI)
Industrial automation (PLC, SCADA, VFD & HMI)
 
YOKOGAWA CENTUM CS 3000 R3
YOKOGAWA CENTUM CS 3000 R3YOKOGAWA CENTUM CS 3000 R3
YOKOGAWA CENTUM CS 3000 R3
 
Distributed control system presentation
Distributed control system presentationDistributed control system presentation
Distributed control system presentation
 
Scada ppt
Scada pptScada ppt
Scada ppt
 
A presentation on scada system
A presentation on scada systemA presentation on scada system
A presentation on scada system
 
BASICS OF FIELDBUS
BASICS OF FIELDBUSBASICS OF FIELDBUS
BASICS OF FIELDBUS
 
Distributed Control System (Presentation)
Distributed Control System (Presentation)Distributed Control System (Presentation)
Distributed Control System (Presentation)
 
How scada systems work
How scada systems workHow scada systems work
How scada systems work
 
Automation PLC & SCADA
Automation PLC & SCADA Automation PLC & SCADA
Automation PLC & SCADA
 
Distributed Control System
Distributed Control SystemDistributed Control System
Distributed Control System
 
Ch 5 Industrial Control Systems.ppt
Ch 5  Industrial Control Systems.pptCh 5  Industrial Control Systems.ppt
Ch 5 Industrial Control Systems.ppt
 
DCS fundamentals
DCS fundamentalsDCS fundamentals
DCS fundamentals
 
PLC Troubleshooting & Maintenance
PLC Troubleshooting & MaintenancePLC Troubleshooting & Maintenance
PLC Troubleshooting & Maintenance
 
Dcs operator training
Dcs operator trainingDcs operator training
Dcs operator training
 
Override control system
Override control systemOverride control system
Override control system
 
Basics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADABasics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADA
 

Viewers also liked

When is a SIL Rating of a Valve Required?
When is a SIL Rating of a Valve Required?When is a SIL Rating of a Valve Required?
When is a SIL Rating of a Valve Required?ISA Interchange
 
Practical Distributed Control Systems (DCS) for Engineers and Technicians
Practical Distributed Control Systems (DCS) for Engineers and TechniciansPractical Distributed Control Systems (DCS) for Engineers and Technicians
Practical Distributed Control Systems (DCS) for Engineers and TechniciansLiving Online
 
Ppt local tracking and gps
Ppt local tracking and gpsPpt local tracking and gps
Ppt local tracking and gpsmassab
 
Electro magnetic interference and compatibility(ECM,ECI)
Electro magnetic interference and compatibility(ECM,ECI)Electro magnetic interference and compatibility(ECM,ECI)
Electro magnetic interference and compatibility(ECM,ECI)Palani murugan
 
Short note on EMI & EMC
Short note on EMI & EMCShort note on EMI & EMC
Short note on EMI & EMCDolen Patel
 
Automotive lighting - Led road lighting
Automotive lighting - Led road lightingAutomotive lighting - Led road lighting
Automotive lighting - Led road lightingCaner Göksel Sonuzun
 
DC GENERATOR CHARACTERISTICS
DC GENERATOR CHARACTERISTICSDC GENERATOR CHARACTERISTICS
DC GENERATOR CHARACTERISTICSRitabrata Roy
 
Controller Area Network (Basic Level Presentation)
Controller Area Network (Basic Level Presentation)Controller Area Network (Basic Level Presentation)
Controller Area Network (Basic Level Presentation)Vikas Kumar
 
Tower crane Basics
Tower crane BasicsTower crane Basics
Tower crane Basicsrama24x7
 
CAN (Controller Area Network) Bus Protocol
CAN (Controller Area Network) Bus ProtocolCAN (Controller Area Network) Bus Protocol
CAN (Controller Area Network) Bus ProtocolAbhinaw Tiwari
 
Emi emc-pdf
Emi emc-pdfEmi emc-pdf
Emi emc-pdfnagastra
 
Serial Communication
Serial CommunicationSerial Communication
Serial CommunicationRashmi
 
cc tn aed aetc am&e p&p 2 tractors, farm equipments., ...
cc tn aed aetc am&e p&p 2 tractors, farm equipments., ...cc tn aed aetc am&e p&p 2 tractors, farm equipments., ...
cc tn aed aetc am&e p&p 2 tractors, farm equipments., ...Chidambaram Coomarasamy
 
8051 serial communication
8051 serial communication8051 serial communication
8051 serial communicationasteriskbimal
 

Viewers also liked (20)

When is a SIL Rating of a Valve Required?
When is a SIL Rating of a Valve Required?When is a SIL Rating of a Valve Required?
When is a SIL Rating of a Valve Required?
 
Dcs course
Dcs courseDcs course
Dcs course
 
Practical Distributed Control Systems (DCS) for Engineers and Technicians
Practical Distributed Control Systems (DCS) for Engineers and TechniciansPractical Distributed Control Systems (DCS) for Engineers and Technicians
Practical Distributed Control Systems (DCS) for Engineers and Technicians
 
Cranes ppt
Cranes pptCranes ppt
Cranes ppt
 
Ppt local tracking and gps
Ppt local tracking and gpsPpt local tracking and gps
Ppt local tracking and gps
 
Embedded Systems in Automotive
Embedded Systems in Automotive Embedded Systems in Automotive
Embedded Systems in Automotive
 
Electro magnetic interference and compatibility(ECM,ECI)
Electro magnetic interference and compatibility(ECM,ECI)Electro magnetic interference and compatibility(ECM,ECI)
Electro magnetic interference and compatibility(ECM,ECI)
 
Short note on EMI & EMC
Short note on EMI & EMCShort note on EMI & EMC
Short note on EMI & EMC
 
Automotive lighting - Led road lighting
Automotive lighting - Led road lightingAutomotive lighting - Led road lighting
Automotive lighting - Led road lighting
 
DC GENERATOR CHARACTERISTICS
DC GENERATOR CHARACTERISTICSDC GENERATOR CHARACTERISTICS
DC GENERATOR CHARACTERISTICS
 
Controller Area Network (Basic Level Presentation)
Controller Area Network (Basic Level Presentation)Controller Area Network (Basic Level Presentation)
Controller Area Network (Basic Level Presentation)
 
Tower crane Basics
Tower crane BasicsTower crane Basics
Tower crane Basics
 
Plc & scada report 6
Plc & scada report 6Plc & scada report 6
Plc & scada report 6
 
DC GENERATOR
DC GENERATORDC GENERATOR
DC GENERATOR
 
CAN (Controller Area Network) Bus Protocol
CAN (Controller Area Network) Bus ProtocolCAN (Controller Area Network) Bus Protocol
CAN (Controller Area Network) Bus Protocol
 
Emi emc-pdf
Emi emc-pdfEmi emc-pdf
Emi emc-pdf
 
Serial Communication
Serial CommunicationSerial Communication
Serial Communication
 
cc tn aed aetc am&e p&p 2 tractors, farm equipments., ...
cc tn aed aetc am&e p&p 2 tractors, farm equipments., ...cc tn aed aetc am&e p&p 2 tractors, farm equipments., ...
cc tn aed aetc am&e p&p 2 tractors, farm equipments., ...
 
8051 serial communication
8051 serial communication8051 serial communication
8051 serial communication
 
Rtos Concepts
Rtos ConceptsRtos Concepts
Rtos Concepts
 

Similar to DCS Or PLC

Session 21 - DCS Introduction
Session 21 - DCS IntroductionSession 21 - DCS Introduction
Session 21 - DCS IntroductionVidyaIA
 
Dcs or plc
Dcs or plcDcs or plc
Dcs or plcCh Aamir
 
PLC and SCADA summer training report- government engineering college ajmer
PLC and SCADA summer training report- government engineering college ajmerPLC and SCADA summer training report- government engineering college ajmer
PLC and SCADA summer training report- government engineering college ajmerNemichand sencha
 
PPT of PLC and SCADA
PPT of PLC and SCADAPPT of PLC and SCADA
PPT of PLC and SCADAMohseen1234
 
What Is a Programmable Logic Controller (PLC)
What Is a Programmable Logic Controller (PLC)What Is a Programmable Logic Controller (PLC)
What Is a Programmable Logic Controller (PLC)yogesh8418
 
PRESENTATION ON PLC AND SCADA
PRESENTATION ON PLC AND SCADAPRESENTATION ON PLC AND SCADA
PRESENTATION ON PLC AND SCADAAnandKumarJha33
 
PLC Training in Noida | PLC Scada Training in Delhi
PLC Training in Noida | PLC Scada Training in DelhiPLC Training in Noida | PLC Scada Training in Delhi
PLC Training in Noida | PLC Scada Training in DelhiSofcon India PVT LTD
 
Pendant Control System report
Pendant Control System reportPendant Control System report
Pendant Control System reportShwetonKedia
 
PLC SCADA report Paras Singhal
PLC SCADA report Paras SinghalPLC SCADA report Paras Singhal
PLC SCADA report Paras SinghalPARAS SINGHAL
 

Similar to DCS Or PLC (20)

Session 21 - DCS Introduction
Session 21 - DCS IntroductionSession 21 - DCS Introduction
Session 21 - DCS Introduction
 
Dcs or plc
Dcs or plcDcs or plc
Dcs or plc
 
PLC and SCADA summer training report- government engineering college ajmer
PLC and SCADA summer training report- government engineering college ajmerPLC and SCADA summer training report- government engineering college ajmer
PLC and SCADA summer training report- government engineering college ajmer
 
DEVENDRAPLC .pptx
DEVENDRAPLC .pptxDEVENDRAPLC .pptx
DEVENDRAPLC .pptx
 
PLC and SCADA
PLC and SCADAPLC and SCADA
PLC and SCADA
 
PLC & SCADA
PLC & SCADAPLC & SCADA
PLC & SCADA
 
PPT of PLC and SCADA
PPT of PLC and SCADAPPT of PLC and SCADA
PPT of PLC and SCADA
 
Plc description
Plc  descriptionPlc  description
Plc description
 
What Is a Programmable Logic Controller (PLC)
What Is a Programmable Logic Controller (PLC)What Is a Programmable Logic Controller (PLC)
What Is a Programmable Logic Controller (PLC)
 
Automation
AutomationAutomation
Automation
 
PRESENTATION ON PLC AND SCADA
PRESENTATION ON PLC AND SCADAPRESENTATION ON PLC AND SCADA
PRESENTATION ON PLC AND SCADA
 
Plc scada(by ankit)2
Plc scada(by ankit)2Plc scada(by ankit)2
Plc scada(by ankit)2
 
PLC Training in Noida | PLC Scada Training in Delhi
PLC Training in Noida | PLC Scada Training in DelhiPLC Training in Noida | PLC Scada Training in Delhi
PLC Training in Noida | PLC Scada Training in Delhi
 
PLC SCADA
PLC SCADAPLC SCADA
PLC SCADA
 
Plc scada-140717081152-phpapp02
Plc scada-140717081152-phpapp02Plc scada-140717081152-phpapp02
Plc scada-140717081152-phpapp02
 
Plc and scada
Plc and scadaPlc and scada
Plc and scada
 
Automation
AutomationAutomation
Automation
 
Pendant Control System report
Pendant Control System reportPendant Control System report
Pendant Control System report
 
PLC SCADA report Paras Singhal
PLC SCADA report Paras SinghalPLC SCADA report Paras Singhal
PLC SCADA report Paras Singhal
 
plc-basics.pptx
plc-basics.pptxplc-basics.pptx
plc-basics.pptx
 

Recently uploaded

31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesVijayaLaxmi84
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptxAneriPatwari
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 

Recently uploaded (20)

31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their uses
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptx
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 

DCS Or PLC

  • 1. Decision : PLC or DCS Vivek Koshti
  • 2. Selecting the technology and the right supplier can help your company : • To respond quickly to changing market conditions in a way that creates a sustainable competitive advantages. • Minimize Total cost of ownership over the life of plant • Create a system which is easily maintainable / upgradeable for the long term. • Achieve its future goals & vision. • Selecting an automation system based on a review of available products is the typical course of action for someone in the market for a new automation system.
  • 3. The hybrid application typically requires a process Control system that can deliver both PLC & DCS Capabilities. A successful evaluation should start by developing a Clear picture of the requirements of your application & the needs of your engineering, maintenance and Operations personnel. This presentation outlines the seven key questions that will lead you to make the right choice.
  • 4. Typical DCS System Architecture
  • 5. • In DCS Architecture diagram, redundancy is often Employed for I/O Controller, Networks, HMI servers. • Since redundancy adds cost & sometimes complexity DCS users must carefully evaluate their need for redundancy in order to achieve their required system availability and to prevent unplanned downtime. • DCS is typically better suited for complex batch manufacturing facilities that require a high level of flexibility and recipe management. • Plant operator can’t see the product which is within the vessel and may be hazardous in nature. There is usually a large amount of simple as well as complex analog control i.e. PID or loop control, although the response time is not exceptionally fast (100 ms or < )
  • 6. Typical PLC System Architecture
  • 7. • PLC Architecture diagram illustrate one of its most common applications, the control of discrete devices such as motor & drives. • To effectively control motors and drives requires that the controller be able to execute at high speeds (10-20 msec scan rate) and that the electrical technician responsible for maintaining it be able to read and troubleshoot the configuration in a language that he is familiar with (relay ladder logic). • From a technology point of view, one can see that PLC & DCS are not that different. We must look beyond technology that is built into these system by the supplier, so that we can better understand the “sweet- spots” where each is best applied.
  • 8. At first glance, system architectures look very similar. Both system share following Components : • Field Devices • I / O Modules • Controllers • Human Machine Interfaces (HMIs) • Engineering • Supervisory Control • System Integration The differences become more apparent when you consider the nature & requirement of an application.
  • 9. The seven questions to ask yourself before Choosing a system : PLC or DCS
  • 10. Q. 1 – What are you manufacturing & how? • No. of Products manufactured : Single / Multiple • Recipe parameter : Constant or Variable • Procedure : Single or Different • Equipment Utilization : Fixed or Flexible • Frequency of changes to formula & Recipe : Never or Often
  • 11. PLC DCS Manufacturing or assembly of Involves the combination & / or specific items Transformation of raw material Product is visible & it moves Impossible to visually see Product through the process as it moves thought the process High speed logic control Regulatory / Analog loop control Simple Batch Control Complex Batch Control
  • 12. Q. 2 – What is the value of the product being manufactured and the cost of downtime? • If the value of each independent product being manufactured is low, & / or downtime results in lost of production, but with additional cost or damage to the process, the PLC is likely choice. • If the value of the batch is high, either in raw material cost or market value, & the downtime not only results is lost production but potentially dangerous and damaging conditions, the selection should be DCS.
  • 13. PLC DCS Value of individual component being The value of batch can be very Manufactured is relatively low High. Downtime mainly results in lost Downtime not only results in lost Of production Production but can result dangerous Or hazardous conditions. Downtime does not typically Downtime can result in process Damage the process equipment Equipment damage. Return to steady state production Return to steady state production after an outage is short & relatively after an unplanned outage ca be straightforward long, expensive & difficult.
  • 14. Q. 3 – What do you view as the “heart” of the system? • PLC is the heart of the factory Automation control system, which contains all of the logic To move the product through the assembly line. HMI is often an on machine panel or a PC based station. • Operational information resulting from data analysis is also a requirement for factory automation applications – driving demand for a more sophisticated HMI
  • 15. • The environment is process automation can be volatile & dangerous. • In this scenario, the HMI is a central control room console that provides the only complete “window” into the process, enabling operator to monitor & control the process which are occurring inside pipes & vessels located through out the plant. PLC DCS Typically, heart of the system is the Typically, hear t of the system is Controller. The HMI
  • 16. Q. 4 – What does the operator need to be successful ? • In PLC environment, status information & exception alarming help to keep the operator aware of what is happening in the process. • The DCS plant require an operator to make decision and continuously interact with the process to keep it running. • In fact, operators process knowledge is often critical to operational excellence & keeping the process running optimally
  • 17. • Operators has to keep an eye during product grade changes & when adjusting the process changes to overall production environment. • The operator will change the set-points, open/ close valves or to make manual addition to move a batch to the next stage of production. • Within the HMI, faceplates & analog trends provide a critical view into what is really happening in the production process, while alarm management system focuses operators attention on areas where he must intervene to keep the process running within its target performance. • In the event of HMI failure, the plant could be forced to shutdown in order to keep the people & equipment safe.
  • 18. PLC DCS The operator primary role is Operator interaction is required to to handle exceptions Keep the process in its target Performance range Status information (ON/OFF, RUN/ Faceplates & analog trends are STOP) is critical information for the Critical to see what is happening to operator The process. Exception based alarming is key Alarm management is key to safe Information for the operator Operation of the process Manufacturing might be able to run Failure of the HMI could force the “light-outs” shutdown of the process
  • 19. Q. 5 – What system performance is required ? • The speed of logic execution is a key differentiator. • Fast scan rates are necessary to be able to effectively control the operations involving motion control, high-speed interlocking, control of motors and drives. • The DCS does not have to be that quick. • Increasingly, PLC is capable of delivering simple to complex PID control, but DCS is the choice for applications with advanced analog control, cascade, Feed forward, ratio, model predictive control etc…
  • 20. PLC DCS Fast logic scan rate(10ms) is Control Loops require deterministic required to perform motion control Scan execution at speed 100-500ms Redundancy may not be cost System redundancy is often justified required System can be taken offline to Online configuration changes often Make configuration changes required Analog Control – Simple PID ONLY Analog Control – Simple to Advanced PID upto Advanced Process Control Diagnostic to tell you when something Asset Management alerts you to what Is broken Might break before it does
  • 21. Q. 6 – What degree of customization is required ? • PLC delivers a “toolkit” of functions & elemental building blocks that can be custom developed and chained together to address the requirements of an application. • Powerful Programming languages are typically available to facilitate the creation of custom code from scratch. • DCS Pre-engineered solutions consists of standards, templates & extensive libraries. • The highest priority of DCS is to deliver reliability & availability, which often results in a design which trades unlimited functionality for repeatability and dependability.
  • 22. PLC DCS High Level Programming Languages Custom Logic created from Are available for creating custom existing function blocks logic Customized routines usually Many algorithms are complex (PID) required & do not vary among applications Standard libraries considered Function Blocks and faceplates As nice features Are expected Provisions must be available to Entire system is expected to Integrate functions / products into an Function as a complete solution Integrated architecture
  • 23. Q. 7 – What are your engineering expectations ? • Factory automation engineers want customizable control platform, which offer the individual components that can be quickly programmed together to accomplish the task at hand. • PLC engineer demands flexibility & open architecture. • DCS engineers focus on upfront design is a key to minimizing costs, compressing the project schedule & creating an application that can be maintained by plant personnel over the long term.
  • 24. • The process engineers controlling entire plants with a DCS require more intuitive programming platforms, which utilize pre-defined & pre-tested functions to save time & drive repeatability. • Think about in this way – The PLC is controlling a machine. The DCS is controlling the plant.
  • 25. PLC DCS Program / configure individual Upfront design of complete system Components, integrate later Before implementation begins. Desire customizable platforms to Looking for significant “out-of-box” build upon Functionality System designed to be flexible System designed to make it “easy” To engineer to process application Use of Ladder logic to configure Use of FBD for configuration of applications applications
  • 26. Do you have a Hybrid Application? What is a “ Hybrid ”? • The marriage of the discrete functions, which PLC handles so simply and economically, with the sophisticated analog continuous control capabilities of the DCS. • Defined based on the industries in which system works & serves like oil & gas, refinery, pharmaceutical food & beverages • The architectural marriage of the PLC simplicity and cost with the sophisticated operator displays, alarm management & easy configuration capabilities of DCS.
  • 27. How to select a Process Control System for Hybrid Application ? • Controller : can execute fast scan logic (10-20 msce), such that required for motor control and slow scan logic (100-500 msec) such as required for analog control. • Engineering Configuration Language: Provides ladder logic, Functional Block Diagram and a powerful programming language for creation of custom logic from scratch. • Flexible Modular Redundancy: Offers the option of tailoring the level of system redundancy to deliver the required system availability by balancing up-front cost versus the cost of unplanned downtime. • Modular batch from simple to complex – Provides modular batch capability to cost effective address of simple to complex batch application.
  • 28. How to select a Process Control System for Hybrid Application ? • Alarm Management : Offers power alarm management tools to help operators respond effectively to plant upset conditions • System Diagnostics & Asset Management: Provides both a rich set of built in system diagnostics, as well as asset management of all critical assets (transmitters, valve Positioner, motors, drives, MCC’s, heat exchanger etc.) in the plant • Scalable Platform: Hardware, software & licensing supports smooth & economical scale up from small all-in-one system (10’s of I/O’s) up to a large client / server system (1000’s of I/O’s)
  • 29. In Nut-shell Characteristics PLC DCS Market Introduction 1960 1975 Replacement of Electromagnetic Replays Pneumatic & SLC Application Automotive Refinery Type of Control Discrete Regulatory Engineering Mindset Programming Configuration Size Compact Large System Open Closed Operator Interface Simple Graphics Sophisticated Graphics Upfront Cost $$ $$$$ Operation interaction Exception Basis Man in the Loop
  • 30. References : [1] Bob Nelson, “Making the Right Choice for Process Industry”, Control Engineering Asia, October-2008. [2] “Process Automation”, SIEMENS Energy & Automation. [3] “Hybrid Control Identity Crisis: What's in a Name?”, In-Tech Sept. 2007. [4] Rich Merritt, “Does DCS have A Future? If so, is it HMI/SCADA”, Control- Dec. 2008.