SlideShare a Scribd company logo
1 of 51
Download to read offline
7 QC TOOLS
1. Flow Chart
2. Check Sheet
3. Histogram
4. Pareto
5. Cause & Effect Diagram
6. Scatter Plot
7. Control Chart
1. Flow Chart
2. Check Sheet
3. Histogram
4. Pareto
5. Cause & Effect Diagram
6. Scatter Plot
7. Control Chart
Flow Charts:
The benefits of flowcharts are as follows:
Communication: Flowcharts are better way of communicating the flow of a
system to all concerned.
Effective analysis: With the help of flowchart, problem can be analyzed in
more effective way.
Proper documentation: Program flowcharts serve as a good process
documentation, which is needed for various purposes.
Identifying errors: By breaking the process down into its constituent steps,
flowcharts can be useful in identifying where errors are likely to be found in the
system
• Flowcharts are pictorial representations of a process.
1. Flow Chart
2. Check Sheet
3. Histogram
4. Pareto
5. Cause & Effect Diagram
6. Scatter Plot
7. Control Chart
What is a check sheet ?
 The Check Sheet is a data-gathering and interpretation tool
 A Check Sheet is used for:
distinguishing between fact and opinion
gathering data about how often a problem is occurring
gathering data about the type of problem occurring
The most straight forward check sheet is simply to make a list of items that you
expect will appear in a process and to mark a check beside each item when it does
appear. This type of data collection can be used for almost anything, from checking
off the occurrence of particular types of defects to the counting of expected items
(e.g., the number of times the telephone rings before being answered).
Example of Check Sheet:
(continuous data use) No.___________741
PRODUCTION CHECK SHEET
Product Name_________________________________Alternator Pulley Date_________________________________12- 02- 02
Usage________________________________________Pulley Bolt Torque Factory_______________________________Church Street
Specification__________________________________2.2 +/- .5 Section Name__________________________SI Line
No. of Inspections______________________________185 Data Collector__________________________Sam The Man
Total Number__________________________________185 Group Name___________________________
Lot Number___________________________________1631 Remarks:_____________________________
Dimensions 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0 3.1 3.2
40
35
SpecLSL
SpecUSL
30
25
20
15 X
XXXX
XX X
XXXXX
XX
10
XXX
XXXXX
XXXXX
XXXXX
XX
XXXXX
XXXXX
XXXXX
XXX
5
XX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXX
X
0 X
XX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XX
X
TOTAL
FREQUENCY 1 2 7 13 10 16 19 17 12 16 20 17 13 8 5 6 2 1
1. Flow Chart
2. Check Sheet
3. Histogram
4. Pareto
5. Cause & Effect Diagram
6. Scatter Plot
7. Control Chart
• The purpose of a Histogram is to take the data that is
collected from a process and then display it graphically to
view how the distribution of the data, centers itself around
the mean, or main specification. From the data, the
histogram will graphically show:
The center of the data.
The spread of the data.
Any data skew ness (slant, bias or run at an angle).
The presence of outliers (product outside the specification
range).
The presence of multiple modes (or peaks) within the data.
Calculations needed…
Mean The average of all the values.
Minimum The smallest value.
Maximum The biggest value.
Std Dev An expression of how widely spread the values are
around the mean.
Class
Width
The x-axis distance between the left and right edges of
each bar in the histogram.
Number of
Classes
The number of bars (including zero height bars) in the
histograms.
Example: Histogram
The standard normal
distribution, with its zero
skewness and zero kurtosis
The standard normal distribution, with
its zero skewness and zero kurtosis
Example: Histogram
A truncated curve, with the peak at or
near the edge while trailing gently off
to the other side, often means that part
of the distribution has been removed
through screening, 100% inspection, or
review. These efforts are usually costly
and make good candidates for
improvement efforts
A double-peaked curve often means
that the data actually reflects two
distinct processes with different
centers. You will need to distinguish
between the two processes to get a
clear view of what is really happening
in either individual process
Example: Histogram
Outliers in a histogram – bars that are
removed from the others by at least the
width of one bar – sometimes indicate that
perhaps a separate process is included. It
may also indicate that special causes of
variation are present in the process and
should be investigated
A plateau-like curve often means that
the process is ill-defined to those
doing the work, which leaves
everyone on their own. Since
everyone handles the process
differently, there are many different
measurements with none standing
out. The solution here is to clearly
define an efficient process
Example: Histogram
1. Flow Chart
2. Check Sheet
3. Histogram
4. Pareto
5. Cause & Effect Diagram
6. Scatter Plot
7. Control Chart
• Pareto chart
• The Pareto chart is a specialized version of a histogram that ranks the
categories in the chart from most frequent to least frequent. A Pareto
Chart is useful for non-numeric data, such as "cause", "type", or
"classification". This tool helps to prioritize where action and process
changes should be focused. If one is trying to take action based upon
causes of accidents or events, it is generally most helpful to focus efforts
on the most frequent causes. Going after an "easy" yet infrequent cause
will probably not reap benefits.
 What Questions The Pareto Chart Answers
 What are the largest issues facing our team or business?
 What 20% of sources are causing 80% of the problems (80/20 Rule)?
 Where should we focus our efforts to achieve the greatest improvements?
Build a Pareto chart
 Sort your data in descending order by frequency of occurrence
Delay Due To Frequency % Cumulative %
Tool Change 31 36 36
No Raw material 26 30 66
No Steam Pressure 15 17 83
Power failure 9 10 93
others 6 7 100
87
 Create Percentage and Cumulative Percentage columns, as shown above.
1. Flow Chart
2. Check Sheet
3. Histogram
4. Pareto
5. Cause & Effect Diagram
6. Scatter Plot
7. Control Chart
Cause & Effect Diagram
 The cause and effect diagram is used to explore all the
potential or real causes (or inputs) that result in a single
effect (or output).
 Causes are arranged according to their level of importance or
detail.
 Causes in a cause & effect diagram are frequently arranged
into four major categories. While these categories can be
anything, you will often see:
 Manpower, Methods, Materials, and Machinery (recommended for
manufacturing)
 equipment, policies, procedures, and people (recommended for
administration and service).
Example
MAN MACHINE
METHOD MATERIAL ATMOSPHERE
Lack of
operator
Skill.
Lack of
knowledge
H E efficiency
Bypass blower efficiency
Quality of ICW.
Speed of R/C Fan.
Proper sealing
Of I/C flange
& Base flange
Servo flapper
Opening of
bypass
Water
servo
opening
Stacking rule
Start bypass gas
Tempr.
Cooling water temp.
cooling water flow.
EXCESS
BYPASS
COOLING
TIME.Quality of
degd. coils
Coil
chemistry
Climatic
effect
ICW quality
1. Flow Chart
2. Check Sheet
3. Histogram
4. Pareto
5. Cause & Effect Diagram
6. Scatter Plot
7. Control Chart
Example of scatter plot
Study
Hours
Test
Score
3 80
5 90
2 75
6 80
7 90
1 50
2 65
7 85
1 40
7 100
The data displayed on the graph resembles a line rising from left to right. Since the
slope of the line is positive, there is a positive correlation between the two sets of
data. This means that according to this set of data, the longer one studies, the better
grade he will get in examination.
Types of scatter plots
Scatter Plot: No Relationship
Scatter Plot: Strong Linear
(positive correlation) Relationship
Scatter Plot: Strong Linear
(negative correlation) Relationship
Scatter Plot: Exact Linear (positive
correlation) Relationship
Types of scatter plots
Scatter Plot: Outlier
Types of scatter plots
1. Flow Chart
2. Check Sheet
3. Histogram
4. Pareto
5. Cause & Effect Diagram
6. Scatter Plot
7. Control Chart
All control charts have three basic components:
•a centerline, usually the mathematical average of all the samples plotted.
•upper and lower statistical control limits that define the constraints of common
cause variations.
•performance data plotted over time.
Elements of Typical Control Chart
1. Horizontal axis for sample number
2. Vertical axis for sample statistics e.g.
mean, range, standard deviation of sample.
3. Target Line
4. Upper control line
5. Upper warning line
6. Lower control line
7. Lower warning line
8. Plotting of sample statistics
9. Line connecting the plotted statistics
Elements of Typical Control Chart
1 2 3 4 5
Sample Number
Upper control line
Target
Lower control line
Upper warning line
Lower warning line
SampleStatistics
Types of control chart
Types of Control Chart
We have two main types of control charts. One for
variable data and the other for attribute data.
Since now world-wide, the current operating level is
‘number of parts defective per million parts
produced’, aptly described as ‘PPM’; control charts
for ‘attribute data’ has no meaning. The reason
being that the sample size for maintaining control
chart at the ‘PPM’ level, is very large, perhaps
equal to lot size, that means 100% inspection.
Most Commonly Used Variable Control Charts
Following are the most commonly used
variable control charts:
To track the accuracy of the process
- Mean control chart or x-bar chart
To track the precision of the process
- Range control chart
Most Common Type of Control Chart for
Variable Data
Variable
Control
Chart
For tracking
Accuracy
For tracking
Precision
Mean
control chart
Range
control chart
Concepts behind control charts
Case When Process Mean is at Target
43 48 49 50 51 52 5344 45 46 47
Target Process
Mean
Chances of getting a reading beyond U & L is almost nil
42
U
L
- 3 s +3 s U - L = 6 s
Case - Small Shift of the Process Mean
43 48 49 50 51 52 5344 45 46 47
Target
Process
Mean
Chances of getting a reading outside U is small
Small shift in process
42
Shaded area
shows the
probability of
getting
a reading
beyond U
UL
U-L = 6 s
Process
Mean
Case - Large Shift of the Process Mean
43 48 49 50 51 52 5344 45 46 47
Target
Chances of getting a reading outside U is large
Large shift in process
42
Shaded area
shows the
probability of
getting
a reading
beyond U
UL
U-L = 6 s
Summary of Effect of Process Shift
When there is no shift in the process nearly all the
observations fall within -3 s and + 3 s.
When there is small shift in the mean of process
some observations fall outside original -3 s and
+3 s zone.
Chances of an observation falling outside original
-3 s and + 3 s zone increases with the increase
in the shift of process mean.
Our Conclusion from Normal Distribution
When an observation falls within original +3 s
and -3 s zone of mean of a process, we
conclude that there is no shift in the mean of
process. This is so because falling of an
observation between these limits is a chance.
When an observation falls beyond original +3 s
and -3 s zone of process mean, we conclude
that there is shift in location of the process
If the process output follows these rules, the
process is said to be stable or in control with
only common causes of variation present. If it
fails to follow these rules, it may be out of
control with special causes of variation present.
These special causes must be found and
corrected.
Interpreting Control Chart
Interpreting Control Chart
A single point above or below the control limits.
Probability of a point falling outside the control limit
is less than 0.14%. This pattern may indicate:
- a special cause of variation from a material,
equipment, method, operator etc.
- mismeasurement of a part or parts.
- miscalculated or misplotted data point.
Interpreting Control Chart
UCL
1 2 3 4 5 6 7 8
Sample Number
Statistics
UWL
LCL
Target
LWL
One point outside
control limit
Interpreting Control Chart
Seven consecutive points are falling on one side
of the centre line.
Probability of a point falling above or below the
centre line is 50-50. The probability of seven
consecutive points falling on one side of the
centre line is 0.78% ( 1 in 128)
This pattern indicates a shift in the process
output from changes in the equipment, methods,
or material or shift in the measurement system.
Interpreting Control Chart
UCLUCL
1 2 3 4 5 6 7 8
Sample Number
Statistics
UWLUWL
LCLLCL
TargetTarget
LWLLWL
Seven consecutive points on one
side of the centre line
Interpreting Control Chart
Two consecutive points fall between warning limit and
corresponding control limit.
In a normal distribution, the probability of two consecutive
points falling between warning limit and corresponding
control limit is 0.05%
(1 in 2000).
This could be due to large shift in the process, equipment,
material, method or
measurement system.
Interpreting Control Chart
UCL
1 2 3 4 5 6 7 8
Sample Number
Statistics
UWL
LCL
Target
LWL
Two consecutive points between warning limit and
corresponding control limit
Interpreting Control Chart
Two points out of three consecutive points fall
between warning limit and corresponding control
limit.
This could be due to large shift in the process,
equipment, material, method or measurement
system.
UCLUCL
1 2 3 4 5 6 7 8
Sample Number
Statistics
UWLUWL
LCLLCL
TargetTarget
LWLLWL
Two points out of three consecutive points
between warning limit and corresponding
control limit
Interpreting Control Chart
A trend of seven points in a row upward or
downward demonstrates nonrandomness.
This happens when
- Gradual deterioration or wear in
equipment.
- Improvement or deterioration in
technique.
- Operator fatigue.
Interpreting Control Chart
UCL
1 2 3 4 5 6 7 8
Sample Number
Statistics
UWL
LCL
Target
LWL
Seven consecutive points having
upward trend
Interpreting Control Chart
UCLUCL
1 2 3 4 5 6 7 8
Sample Number
Statistics
UWL
LCLLCL
Target
LWL
Seven consecutive points having
downward trend
Interpreting Control Chart

More Related Content

What's hot (20)

Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
CONTROL CHARTS
CONTROL CHARTSCONTROL CHARTS
CONTROL CHARTS
 
7 QC Tools
7 QC Tools7 QC Tools
7 QC Tools
 
7 qc tools training material[1]
7 qc tools training material[1]7 qc tools training material[1]
7 qc tools training material[1]
 
7 QC Tools training presentation
7 QC Tools training presentation7 QC Tools training presentation
7 QC Tools training presentation
 
Statistical process control (spc)
Statistical process control (spc)Statistical process control (spc)
Statistical process control (spc)
 
Tqm tools
Tqm toolsTqm tools
Tqm tools
 
Control chart
Control chartControl chart
Control chart
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
Production and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality ToolsProduction and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality Tools
 
7QC Tools
7QC Tools7QC Tools
7QC Tools
 
Root Cause Analysis (RCA) Tools
Root Cause Analysis (RCA) ToolsRoot Cause Analysis (RCA) Tools
Root Cause Analysis (RCA) Tools
 
7 QC Tools
7 QC Tools7 QC Tools
7 QC Tools
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
The Seven Basic Tools of Quality
The Seven Basic Tools of QualityThe Seven Basic Tools of Quality
The Seven Basic Tools of Quality
 
Qc 7 tools
Qc 7 toolsQc 7 tools
Qc 7 tools
 
Spc
SpcSpc
Spc
 
Control chart ppt
Control chart pptControl chart ppt
Control chart ppt
 
Spc training
Spc training Spc training
Spc training
 
7 tools of quality
7 tools of quality7 tools of quality
7 tools of quality
 

Viewers also liked

Seven tools of quality control
Seven tools of quality controlSeven tools of quality control
Seven tools of quality controlrashmi123vaish
 
Statistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic ToolsStatistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic ToolsMadeleine Lee
 
7 Quality Control Tools (SQC Model) [MARCH 2009]
7 Quality Control Tools (SQC Model) [MARCH 2009]7 Quality Control Tools (SQC Model) [MARCH 2009]
7 Quality Control Tools (SQC Model) [MARCH 2009]Fahad Mahmud Mirza
 
7 qc tools and spc training, December. 2015
7 qc tools and spc training, December. 20157 qc tools and spc training, December. 2015
7 qc tools and spc training, December. 2015Shakehand with Life
 
six sigma & 7 qc tools
six sigma  &  7 qc tools six sigma  &  7 qc tools
six sigma & 7 qc tools Varmahk
 
7 qc tool presentation material
7 qc tool presentation material7 qc tool presentation material
7 qc tool presentation materialRashidi Johari
 
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrixHakeem-Ur- Rehman
 
Basic Statistical Process Control
Basic Statistical Process ControlBasic Statistical Process Control
Basic Statistical Process ControlStephen Deas
 
Principles of design of experiments (doe)20 5-2014
Principles of  design of experiments (doe)20 5-2014Principles of  design of experiments (doe)20 5-2014
Principles of design of experiments (doe)20 5-2014Awad Albalwi
 
Statistical process control
Statistical process controlStatistical process control
Statistical process controlANOOPA NARAYANAN
 
Total quality management tools and techniques
Total quality management tools and techniquesTotal quality management tools and techniques
Total quality management tools and techniquesbhushan8233
 
7 qc toools LEARN and KNOW how to BUILD IN EXCEL
7 qc toools LEARN and KNOW how to BUILD IN EXCEL7 qc toools LEARN and KNOW how to BUILD IN EXCEL
7 qc toools LEARN and KNOW how to BUILD IN EXCELrajesh1655
 
PROJECT ON REDUCTION OF COMPLAINTS FROM NETWORK-anurag
PROJECT ON REDUCTION OF COMPLAINTS FROM NETWORK-anuragPROJECT ON REDUCTION OF COMPLAINTS FROM NETWORK-anurag
PROJECT ON REDUCTION OF COMPLAINTS FROM NETWORK-anuragAnurag Aggarwal
 

Viewers also liked (17)

Seven tools of quality control
Seven tools of quality controlSeven tools of quality control
Seven tools of quality control
 
Seven Basic Tools
Seven Basic ToolsSeven Basic Tools
Seven Basic Tools
 
Statistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic ToolsStatistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic Tools
 
7 Quality Control Tools (SQC Model) [MARCH 2009]
7 Quality Control Tools (SQC Model) [MARCH 2009]7 Quality Control Tools (SQC Model) [MARCH 2009]
7 Quality Control Tools (SQC Model) [MARCH 2009]
 
7 qc toolsTraining pdf
7 qc toolsTraining pdf7 qc toolsTraining pdf
7 qc toolsTraining pdf
 
7 qc tools and spc training, December. 2015
7 qc tools and spc training, December. 20157 qc tools and spc training, December. 2015
7 qc tools and spc training, December. 2015
 
six sigma & 7 qc tools
six sigma  &  7 qc tools six sigma  &  7 qc tools
six sigma & 7 qc tools
 
7 qc tool presentation material
7 qc tool presentation material7 qc tool presentation material
7 qc tool presentation material
 
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
 
Basic Statistical Process Control
Basic Statistical Process ControlBasic Statistical Process Control
Basic Statistical Process Control
 
Principles of design of experiments (doe)20 5-2014
Principles of  design of experiments (doe)20 5-2014Principles of  design of experiments (doe)20 5-2014
Principles of design of experiments (doe)20 5-2014
 
PDCA
PDCAPDCA
PDCA
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Total quality management tools and techniques
Total quality management tools and techniquesTotal quality management tools and techniques
Total quality management tools and techniques
 
7 qc toools LEARN and KNOW how to BUILD IN EXCEL
7 qc toools LEARN and KNOW how to BUILD IN EXCEL7 qc toools LEARN and KNOW how to BUILD IN EXCEL
7 qc toools LEARN and KNOW how to BUILD IN EXCEL
 
PROJECT ON REDUCTION OF COMPLAINTS FROM NETWORK-anurag
PROJECT ON REDUCTION OF COMPLAINTS FROM NETWORK-anuragPROJECT ON REDUCTION OF COMPLAINTS FROM NETWORK-anurag
PROJECT ON REDUCTION OF COMPLAINTS FROM NETWORK-anurag
 
7 QC Tools
7 QC Tools7 QC Tools
7 QC Tools
 

Similar to 7 qc tools

Seven traditional tools
Seven traditional toolsSeven traditional tools
Seven traditional toolsJavith Saleem
 
TQM-Unit 3-7-1 tools of quality-New.pptx
TQM-Unit 3-7-1 tools of quality-New.pptxTQM-Unit 3-7-1 tools of quality-New.pptx
TQM-Unit 3-7-1 tools of quality-New.pptxTamilselvan S
 
Tools and techniques used in tqm ppt
Tools and techniques used in tqm pptTools and techniques used in tqm ppt
Tools and techniques used in tqm pptabhandary
 
Quality_Control_Tools.ppt
Quality_Control_Tools.pptQuality_Control_Tools.ppt
Quality_Control_Tools.pptMurali Sama rao
 
Seven statistical tools of quality
Seven statistical tools of qualitySeven statistical tools of quality
Seven statistical tools of qualityBalaji Tamilselvam
 
Statistical quality control, sampling
Statistical quality control, samplingStatistical quality control, sampling
Statistical quality control, samplingSana Fatima
 
process monitoring (statistical process control)
process monitoring (statistical process control)process monitoring (statistical process control)
process monitoring (statistical process control)Bindutesh Saner
 
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعة
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعةSeven Basic Quality Control Tools أدوات ضبط الجودة السبعة
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعةMohamed Khaled
 
Statistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process CapabilityStatistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process Capabilityvaidehishah25
 
7 quality control tools
7 quality  control tools7 quality  control tools
7 quality control toolsVima Mali
 
Statistical Process Control & Control Chart
Statistical Process Control  & Control ChartStatistical Process Control  & Control Chart
Statistical Process Control & Control ChartShekhar Verma
 
Production and Quality Tools: The Basic Seven Quality Tools
Production and Quality Tools: The Basic Seven Quality ToolsProduction and Quality Tools: The Basic Seven Quality Tools
Production and Quality Tools: The Basic Seven Quality ToolsDr. John V. Padua
 
Qulaity Control 1.pptx
Qulaity Control 1.pptxQulaity Control 1.pptx
Qulaity Control 1.pptxnachiketkale5
 

Similar to 7 qc tools (20)

CHAPTER 7.pptx
CHAPTER 7.pptxCHAPTER 7.pptx
CHAPTER 7.pptx
 
Seven traditional tools
Seven traditional toolsSeven traditional tools
Seven traditional tools
 
TQM-Unit 3-7-1 tools of quality-New.pptx
TQM-Unit 3-7-1 tools of quality-New.pptxTQM-Unit 3-7-1 tools of quality-New.pptx
TQM-Unit 3-7-1 tools of quality-New.pptx
 
Tools and techniques used in tqm ppt
Tools and techniques used in tqm pptTools and techniques used in tqm ppt
Tools and techniques used in tqm ppt
 
7 quality management tools
7 quality management tools7 quality management tools
7 quality management tools
 
Quality_Control_Tools.ppt
Quality_Control_Tools.pptQuality_Control_Tools.ppt
Quality_Control_Tools.ppt
 
Seven statistical tools of quality
Seven statistical tools of qualitySeven statistical tools of quality
Seven statistical tools of quality
 
Statistical quality control, sampling
Statistical quality control, samplingStatistical quality control, sampling
Statistical quality control, sampling
 
Total Quality Management part 2
Total Quality Management part 2  Total Quality Management part 2
Total Quality Management part 2
 
process monitoring (statistical process control)
process monitoring (statistical process control)process monitoring (statistical process control)
process monitoring (statistical process control)
 
Total Quality tools
Total Quality toolsTotal Quality tools
Total Quality tools
 
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعة
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعةSeven Basic Quality Control Tools أدوات ضبط الجودة السبعة
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعة
 
Statistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process CapabilityStatistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process Capability
 
7 QC - NEW.ppt
7 QC - NEW.ppt7 QC - NEW.ppt
7 QC - NEW.ppt
 
Em33832837
Em33832837Em33832837
Em33832837
 
7 quality control tools
7 quality  control tools7 quality  control tools
7 quality control tools
 
Statistical Process Control & Control Chart
Statistical Process Control  & Control ChartStatistical Process Control  & Control Chart
Statistical Process Control & Control Chart
 
Control charts
Control chartsControl charts
Control charts
 
Production and Quality Tools: The Basic Seven Quality Tools
Production and Quality Tools: The Basic Seven Quality ToolsProduction and Quality Tools: The Basic Seven Quality Tools
Production and Quality Tools: The Basic Seven Quality Tools
 
Qulaity Control 1.pptx
Qulaity Control 1.pptxQulaity Control 1.pptx
Qulaity Control 1.pptx
 

Recently uploaded

Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptxmary850239
 
Employablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxEmployablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxryandux83rd
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxMadhavi Dharankar
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPCeline George
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesVijayaLaxmi84
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...HetalPathak10
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Osopher
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfChristalin Nelson
 
Comparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptxComparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptxAvaniJani1
 

Recently uploaded (20)

Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx
 
Employablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxEmployablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptx
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptx
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERP
 
Chi-Square Test Non Parametric Test Categorical Variable
Chi-Square Test Non Parametric Test Categorical VariableChi-Square Test Non Parametric Test Categorical Variable
Chi-Square Test Non Parametric Test Categorical Variable
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their uses
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdf
 
Comparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptxComparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptx
 

7 qc tools

  • 1. 7 QC TOOLS 1. Flow Chart 2. Check Sheet 3. Histogram 4. Pareto 5. Cause & Effect Diagram 6. Scatter Plot 7. Control Chart
  • 2. 1. Flow Chart 2. Check Sheet 3. Histogram 4. Pareto 5. Cause & Effect Diagram 6. Scatter Plot 7. Control Chart
  • 3. Flow Charts: The benefits of flowcharts are as follows: Communication: Flowcharts are better way of communicating the flow of a system to all concerned. Effective analysis: With the help of flowchart, problem can be analyzed in more effective way. Proper documentation: Program flowcharts serve as a good process documentation, which is needed for various purposes. Identifying errors: By breaking the process down into its constituent steps, flowcharts can be useful in identifying where errors are likely to be found in the system • Flowcharts are pictorial representations of a process.
  • 4. 1. Flow Chart 2. Check Sheet 3. Histogram 4. Pareto 5. Cause & Effect Diagram 6. Scatter Plot 7. Control Chart
  • 5. What is a check sheet ?  The Check Sheet is a data-gathering and interpretation tool  A Check Sheet is used for: distinguishing between fact and opinion gathering data about how often a problem is occurring gathering data about the type of problem occurring The most straight forward check sheet is simply to make a list of items that you expect will appear in a process and to mark a check beside each item when it does appear. This type of data collection can be used for almost anything, from checking off the occurrence of particular types of defects to the counting of expected items (e.g., the number of times the telephone rings before being answered).
  • 6. Example of Check Sheet: (continuous data use) No.___________741 PRODUCTION CHECK SHEET Product Name_________________________________Alternator Pulley Date_________________________________12- 02- 02 Usage________________________________________Pulley Bolt Torque Factory_______________________________Church Street Specification__________________________________2.2 +/- .5 Section Name__________________________SI Line No. of Inspections______________________________185 Data Collector__________________________Sam The Man Total Number__________________________________185 Group Name___________________________ Lot Number___________________________________1631 Remarks:_____________________________ Dimensions 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0 3.1 3.2 40 35 SpecLSL SpecUSL 30 25 20 15 X XXXX XX X XXXXX XX 10 XXX XXXXX XXXXX XXXXX XX XXXXX XXXXX XXXXX XXX 5 XX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXX X 0 X XX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XX X TOTAL FREQUENCY 1 2 7 13 10 16 19 17 12 16 20 17 13 8 5 6 2 1
  • 7. 1. Flow Chart 2. Check Sheet 3. Histogram 4. Pareto 5. Cause & Effect Diagram 6. Scatter Plot 7. Control Chart
  • 8. • The purpose of a Histogram is to take the data that is collected from a process and then display it graphically to view how the distribution of the data, centers itself around the mean, or main specification. From the data, the histogram will graphically show: The center of the data. The spread of the data. Any data skew ness (slant, bias or run at an angle). The presence of outliers (product outside the specification range). The presence of multiple modes (or peaks) within the data.
  • 9. Calculations needed… Mean The average of all the values. Minimum The smallest value. Maximum The biggest value. Std Dev An expression of how widely spread the values are around the mean. Class Width The x-axis distance between the left and right edges of each bar in the histogram. Number of Classes The number of bars (including zero height bars) in the histograms.
  • 11. The standard normal distribution, with its zero skewness and zero kurtosis The standard normal distribution, with its zero skewness and zero kurtosis Example: Histogram
  • 12. A truncated curve, with the peak at or near the edge while trailing gently off to the other side, often means that part of the distribution has been removed through screening, 100% inspection, or review. These efforts are usually costly and make good candidates for improvement efforts A double-peaked curve often means that the data actually reflects two distinct processes with different centers. You will need to distinguish between the two processes to get a clear view of what is really happening in either individual process Example: Histogram
  • 13. Outliers in a histogram – bars that are removed from the others by at least the width of one bar – sometimes indicate that perhaps a separate process is included. It may also indicate that special causes of variation are present in the process and should be investigated A plateau-like curve often means that the process is ill-defined to those doing the work, which leaves everyone on their own. Since everyone handles the process differently, there are many different measurements with none standing out. The solution here is to clearly define an efficient process Example: Histogram
  • 14. 1. Flow Chart 2. Check Sheet 3. Histogram 4. Pareto 5. Cause & Effect Diagram 6. Scatter Plot 7. Control Chart
  • 15. • Pareto chart • The Pareto chart is a specialized version of a histogram that ranks the categories in the chart from most frequent to least frequent. A Pareto Chart is useful for non-numeric data, such as "cause", "type", or "classification". This tool helps to prioritize where action and process changes should be focused. If one is trying to take action based upon causes of accidents or events, it is generally most helpful to focus efforts on the most frequent causes. Going after an "easy" yet infrequent cause will probably not reap benefits.  What Questions The Pareto Chart Answers  What are the largest issues facing our team or business?  What 20% of sources are causing 80% of the problems (80/20 Rule)?  Where should we focus our efforts to achieve the greatest improvements?
  • 16. Build a Pareto chart  Sort your data in descending order by frequency of occurrence Delay Due To Frequency % Cumulative % Tool Change 31 36 36 No Raw material 26 30 66 No Steam Pressure 15 17 83 Power failure 9 10 93 others 6 7 100 87  Create Percentage and Cumulative Percentage columns, as shown above.
  • 17.
  • 18. 1. Flow Chart 2. Check Sheet 3. Histogram 4. Pareto 5. Cause & Effect Diagram 6. Scatter Plot 7. Control Chart
  • 19. Cause & Effect Diagram  The cause and effect diagram is used to explore all the potential or real causes (or inputs) that result in a single effect (or output).  Causes are arranged according to their level of importance or detail.  Causes in a cause & effect diagram are frequently arranged into four major categories. While these categories can be anything, you will often see:  Manpower, Methods, Materials, and Machinery (recommended for manufacturing)  equipment, policies, procedures, and people (recommended for administration and service).
  • 20. Example MAN MACHINE METHOD MATERIAL ATMOSPHERE Lack of operator Skill. Lack of knowledge H E efficiency Bypass blower efficiency Quality of ICW. Speed of R/C Fan. Proper sealing Of I/C flange & Base flange Servo flapper Opening of bypass Water servo opening Stacking rule Start bypass gas Tempr. Cooling water temp. cooling water flow. EXCESS BYPASS COOLING TIME.Quality of degd. coils Coil chemistry Climatic effect ICW quality
  • 21. 1. Flow Chart 2. Check Sheet 3. Histogram 4. Pareto 5. Cause & Effect Diagram 6. Scatter Plot 7. Control Chart
  • 22. Example of scatter plot Study Hours Test Score 3 80 5 90 2 75 6 80 7 90 1 50 2 65 7 85 1 40 7 100 The data displayed on the graph resembles a line rising from left to right. Since the slope of the line is positive, there is a positive correlation between the two sets of data. This means that according to this set of data, the longer one studies, the better grade he will get in examination.
  • 23. Types of scatter plots Scatter Plot: No Relationship Scatter Plot: Strong Linear (positive correlation) Relationship
  • 24. Scatter Plot: Strong Linear (negative correlation) Relationship Scatter Plot: Exact Linear (positive correlation) Relationship Types of scatter plots
  • 25. Scatter Plot: Outlier Types of scatter plots
  • 26. 1. Flow Chart 2. Check Sheet 3. Histogram 4. Pareto 5. Cause & Effect Diagram 6. Scatter Plot 7. Control Chart
  • 27. All control charts have three basic components: •a centerline, usually the mathematical average of all the samples plotted. •upper and lower statistical control limits that define the constraints of common cause variations. •performance data plotted over time.
  • 28. Elements of Typical Control Chart 1. Horizontal axis for sample number 2. Vertical axis for sample statistics e.g. mean, range, standard deviation of sample. 3. Target Line 4. Upper control line 5. Upper warning line 6. Lower control line 7. Lower warning line 8. Plotting of sample statistics 9. Line connecting the plotted statistics
  • 29. Elements of Typical Control Chart 1 2 3 4 5 Sample Number Upper control line Target Lower control line Upper warning line Lower warning line SampleStatistics
  • 31. Types of Control Chart We have two main types of control charts. One for variable data and the other for attribute data. Since now world-wide, the current operating level is ‘number of parts defective per million parts produced’, aptly described as ‘PPM’; control charts for ‘attribute data’ has no meaning. The reason being that the sample size for maintaining control chart at the ‘PPM’ level, is very large, perhaps equal to lot size, that means 100% inspection.
  • 32. Most Commonly Used Variable Control Charts Following are the most commonly used variable control charts: To track the accuracy of the process - Mean control chart or x-bar chart To track the precision of the process - Range control chart
  • 33. Most Common Type of Control Chart for Variable Data Variable Control Chart For tracking Accuracy For tracking Precision Mean control chart Range control chart
  • 35. Case When Process Mean is at Target 43 48 49 50 51 52 5344 45 46 47 Target Process Mean Chances of getting a reading beyond U & L is almost nil 42 U L - 3 s +3 s U - L = 6 s
  • 36. Case - Small Shift of the Process Mean 43 48 49 50 51 52 5344 45 46 47 Target Process Mean Chances of getting a reading outside U is small Small shift in process 42 Shaded area shows the probability of getting a reading beyond U UL U-L = 6 s
  • 37. Process Mean Case - Large Shift of the Process Mean 43 48 49 50 51 52 5344 45 46 47 Target Chances of getting a reading outside U is large Large shift in process 42 Shaded area shows the probability of getting a reading beyond U UL U-L = 6 s
  • 38. Summary of Effect of Process Shift When there is no shift in the process nearly all the observations fall within -3 s and + 3 s. When there is small shift in the mean of process some observations fall outside original -3 s and +3 s zone. Chances of an observation falling outside original -3 s and + 3 s zone increases with the increase in the shift of process mean.
  • 39. Our Conclusion from Normal Distribution When an observation falls within original +3 s and -3 s zone of mean of a process, we conclude that there is no shift in the mean of process. This is so because falling of an observation between these limits is a chance. When an observation falls beyond original +3 s and -3 s zone of process mean, we conclude that there is shift in location of the process
  • 40. If the process output follows these rules, the process is said to be stable or in control with only common causes of variation present. If it fails to follow these rules, it may be out of control with special causes of variation present. These special causes must be found and corrected. Interpreting Control Chart
  • 41. Interpreting Control Chart A single point above or below the control limits. Probability of a point falling outside the control limit is less than 0.14%. This pattern may indicate: - a special cause of variation from a material, equipment, method, operator etc. - mismeasurement of a part or parts. - miscalculated or misplotted data point.
  • 42. Interpreting Control Chart UCL 1 2 3 4 5 6 7 8 Sample Number Statistics UWL LCL Target LWL One point outside control limit
  • 43. Interpreting Control Chart Seven consecutive points are falling on one side of the centre line. Probability of a point falling above or below the centre line is 50-50. The probability of seven consecutive points falling on one side of the centre line is 0.78% ( 1 in 128) This pattern indicates a shift in the process output from changes in the equipment, methods, or material or shift in the measurement system.
  • 44. Interpreting Control Chart UCLUCL 1 2 3 4 5 6 7 8 Sample Number Statistics UWLUWL LCLLCL TargetTarget LWLLWL Seven consecutive points on one side of the centre line
  • 45. Interpreting Control Chart Two consecutive points fall between warning limit and corresponding control limit. In a normal distribution, the probability of two consecutive points falling between warning limit and corresponding control limit is 0.05% (1 in 2000). This could be due to large shift in the process, equipment, material, method or measurement system.
  • 46. Interpreting Control Chart UCL 1 2 3 4 5 6 7 8 Sample Number Statistics UWL LCL Target LWL Two consecutive points between warning limit and corresponding control limit
  • 47. Interpreting Control Chart Two points out of three consecutive points fall between warning limit and corresponding control limit. This could be due to large shift in the process, equipment, material, method or measurement system.
  • 48. UCLUCL 1 2 3 4 5 6 7 8 Sample Number Statistics UWLUWL LCLLCL TargetTarget LWLLWL Two points out of three consecutive points between warning limit and corresponding control limit Interpreting Control Chart
  • 49. A trend of seven points in a row upward or downward demonstrates nonrandomness. This happens when - Gradual deterioration or wear in equipment. - Improvement or deterioration in technique. - Operator fatigue. Interpreting Control Chart
  • 50. UCL 1 2 3 4 5 6 7 8 Sample Number Statistics UWL LCL Target LWL Seven consecutive points having upward trend Interpreting Control Chart
  • 51. UCLUCL 1 2 3 4 5 6 7 8 Sample Number Statistics UWL LCLLCL Target LWL Seven consecutive points having downward trend Interpreting Control Chart