AN INDUSTRIAL TRAINING REPORT – I

                 Done by


               G.V.ROHIT
           Reg. No.:1011010072



                  At

        Simplex Infrastructures Ltd.
     Brigade Plaza, Anand Rao circle,
          Bengaluru, Karnataka.




              Submitted to




     Department of Civil Engineering
   Faculty of Engineering and Technology
               SRM University
    (Under section 3 of UGC Act, 1956)
   SRM Nagar, Kattankulathur – 603203
            Kancheepuram Dist.

                 July 2012




                                           1
BONAFIDE CERTIFICATE




      Certified that this Industrial Training Report – I is a work of
G.V.ROHIT (Reg.No.1011010072) who carried out the work at SIMPLEX
INFRASTRUCTURES LTD., Brigade Plaza, Anand rao circle,        Bengaluru,
Karnataka.




Class In charge                                 coordinator
(Mr. V R PRASATH KUMAR)                        (Mr. K S ANANDH)




                                                                       2
3
Acknowledgement


                      It is always a pleasure to remind the fine people
in the Engineering program for their sincere guidance I received to
uphold my practical as well as theoretical skills in engineering.

                      Firstly I would like to thank Dr.
C.Muthamizhchelvan (Director of E&T, SRM University) for
meticulously planning academic curriculum in such a way that
students are not only academically sound but also industry ready by
including such industrial training patterns.

                        I would also like to thanks Mr. V.R. Prasath
Kumar (Class In-charge) for the positive attitude he showed for my
work, always allowing me to question him and giving prompt replies
for my uncertainties in all the fields including educational, social and
managerial work.
                        I would also like to acknowledge and my
heartfelt gratitude to Mr.K.S.Anandh (coordinator) who continuously
supported me in every possible way, from initial advice to
encouragement till this date.

                        I express my immense pleasure and deep sense
of gratitude to Sri I.Nanajee (General Manager, CIVIL) and my guide
and solicitor to Mr.Srinivas (Planning) for spending his valuable time
with me and also helped me in completion of task.

                      Finally, I would also like to thanks Sri
Debabrata ray (Site- In charge), Mr.Srikanth (Asst.Manager) for
giving me this opportunity and guiding me during the course of the
training.



                                                                           4
CONTENTS




Chapter No            Topic                         Page No.
    1               Introduction                        1


    2              Details of the project
             2.1      Site location                     2
             2.2      Site map                          3
             2.3      About the project                 4


    3              Details of study
             3.1     Detail of structure               5-6
             3.2     Process of laying a slab          7-8
             3.3     Batching plant                    8-10
             3.4     QA/QC Lab                        10-11
             3.5     Process of laying of columns     11-13
             3.6     Model flat                        14-15
             3.7     Amenities provided                16
             3.8      Safety                            17


    4              Conclusions                          18




                                                               5
CHAPTER 1

                            INTRODUCTION


            We have been assigned Hiranandini lake verandahs and Hiranandini hill crest
construction sites for field study by the company. These are part of HIRANDINI UPSCALE
TOWNSHIP, a 32 acred luxury residential project located in Begur village gracing hulimavu
lake , off the bannerghatta road in Bengaluru .These residential projects are a premium multi
storey residential towers developed by renoved developers HIRANANDINI.

                   The construction of the structures has been assigned to
SIMPLEX INFRASTRUCTURES LTD., Bengaluru.

                     The building has been designed by Architect HAFEEZ
CONTRACTOR, Mumbai and the structural consultants are MAHIMTURA
CONSULTANTS, the associate engineers are WSP CANTOR SEINUK, New York.




About Developer
                         Hiranandani is one of the largest real estate developers in the country
diversified into entertainment, healthcare, hospitality, retail and call centers. Hiranandani
Constructions are known to incorporate a fantastic balance of space management and natural
beauty in their Building Constructions. Some of the world renowned developments are
Hiranandani Gardens in Powai, Meadows and Estates in Thane.



COMPANY PROFILE:
            Simplex infrastructures limited are one of the pioneers and a total solution
            provider in infrastructure and construction ambit.
            Been in business since 1924 and present in almost all the states and in middle east
            It employs 8110 people and has capital equipments worth rupees 1296 crore in
            FY10
            Ranked 7th amongst top 10 infrastructure companies by “construction week”
            Has present order book of over 12,000 cr rupees with over 150 site locations in
            india and overseas.
            The company reported a turnover of 4,500 cr rupees and PAT of 127 cr in FY10
            The company commands a market capitalization of over 3,000 cr rupees.




                                                                                                   6
CHAPTER 2

                  DETAILS OF THE PROJECT

2.1SITE LOCATION:
          The Hiranandini upscale project,Located off Bannerghatta Road, in a well
developed area replete with the best of social infrastructure, the project is accessible from
Electronic City, to major corporates like Infosys, Wipro, Dell, Siemens, 3M & HP, and the
country’s best educational institutions including IIM Bangalore, Sarala Birla Academy, Ryan
International School, in addition to large Multispecialty hospitals such as Wockhardt and
Apollo.




                      Figure 2.1 peripheral view of site location




                                                                                            7
2.2SITE MAP :




           Figure2.2 Arial view of hiranandini upscale project, bannerghatta(from left lake
verandahs, hill crest, club meadows)




                    Thoughtfully planned, secure, easily accessible, the highlights of the
development include panoramic vistas from large French decks, a plush club house, world-
class gourmet restaurants, exquisite landscaping and the best internal amenities. House of
Hiranandani has skills to nurture community, to connect people, to amplify the joys and
happiness of togetherness.




                                                                                              8
2.3ABOUT THE PROJECT:
Hiranandini lake verandahs:

       It is a classy project which redefines the style of living .This project gives rich detail
and fine finishes of interiors and exteriors exhibiting unique design and style. It is well
designed home with landscaped garden and panoramic views. It is 3BHK multi-storeyed
apartment for elite class, with varying sizes of 1660, 1826 and 2061sq ft .Each flat costs
ranging from 80lakh to 1.1crore rupees.




           Figure 2.3 view of lake verandahs after completion




                                                                                                    9
CHAPTER 3

                    DETAILS OF FIELD STUDY


3.1DETAILS OF STRUCTURE:



  1. The height of the structure is 99.5mts.
  2. The structure consists of 2 wings (wing-A and wing-B).
  3. Two wings are separated by an inaccessible partition wall in every floor throughout
     the structure.
  4. Each wing consists of 4 flats in each floor totalling 8 flats per floor.
  5. The lake verandahs consist of 27 floors totalling 216 flats in them.
  6. Apart from the 27 floors there are 2 subsurface floors designed for parking purpose.
  7. These subsurface floors are well protected by retaining walls with height varying from
     8-12m .
  8. A stilt lobby level is also provided.
  9. Each wing consists of 4 lift wells and 2 stair cases




         Figure 3.1 a plan describing placement of lift wells and stair cases in wing-A




                                                                                          10
Out of four 3BHK flats in every floor of a wing 1, 2 no.s Flats have area of
2061 sqft and 3no has1660 sqft and 4no.has 1826 sqft.




                  Figure 3.2 a typical floor plan of lake verandahs project




          Figure3.3 a plan for flat no’s 1, 2 describing positioning of various rooms

                                                                                            11
3.2PROCESS OF LAYING A SLAB:
             In this all the sophisticated equipments are used to finish the work in easy and
simple method. The thickness of each slab is 20cm and between 2 wings a strip is not casted
immediately but casted after 25 days known as Expansion strip. The steel rods used in
construction are THERMAX STEEL from Germany.



 Also shaft spaces are provided in slab for plumbing work




           Figure 3.4, 3.5 views of shafts on and below the surface of the slab




   Figure 3.6, 3.7 describes work of electrical conduting and cup locks support

                After framing using shutter boards filmed with shuttering oil, electrical
conduting will be done, here cup locks are used to support the frame, and then concrete is
poured over the frame with the help of hydraulic jack and concrete pipes which are used to
pump the concrete from transit mixer to the place where slab has to be laid. To prevent
coagulation inside pipes, first a cream slurry cement paste has to be passed through pipes for
smooth flow of concrete




                                                                                             12
Tower cranes are used to move the required material from one place to other in
site both vertically and horizontally. The tower cranes can with held the wind force up to
height of 30m, beyond which they need to be clamped to nearby column of building for
support.Each tower crane costs about Rs.95 lakhs




                 Figure3.8 view of the tower crane from the site office



3.3BATCHING PLANT:
M40 concrete mix is used here for the construction of structure. A separate batching plant is
present near the site for the construction of lake verandahs and hill crest structures.




                        Figure 3.9 batching plant with a transit mixer

                                                                                            13
Figure 3.10, 3.11 describes the control panel and closer look to batching plant respectively.

         A Transit mixer is used to transfer concrete from batching plant to the work site.It
           carries around 7cubic mtr volume of concrete and takes about 15 min to load.

The main components of batching plant are

       Control panel
       Silos
       Cement storage godown
       Small tower crane for pushing ingredients into mix using trayThe batching plant
       consists of silos which are used to store flyash and chemicals accelerators and
       retarders.

          M15              M20           M25           M30           M35           M40
          KG               KG            KG            KG            KG            KG
CA I      564              538           534           526           521           494
CA II     664              576           572           564           558           529
FA II     725              738           727           710           697           636
CEMENT    256              284           304           326           351           433
FLY ASH   76               82            88            94            101           126
WATER     180              180           175           180           170           180
CH. ADMIX .8-1.2 %         .8-1.2%       .8-1.2%       .8-1.2%       .8-1.2%       .8-1.2%
W/B RATIO .54              .49           .44           .42           .37           .32


   Table 3.1 A Table describing Mix Design Per Cubic Meter for various mix designs



                                                                                             14
The ingredients used in preparation of concrete are coarse aggregate I, II and
fine aggregate (pit sand, dead river sand),cement, fly ash, water ,chemical admixtures .The
W/B Ratio of M40 Mix is 0.32

The chemical admixtures used are MYK Save mix SP



3.4Q/A & Q/C LAB (Quality assurance &quality control lab):
          In this lab the quality and strength of various building materials like cement, sand,
concrete, water, coarse aggregate are tested using various testing machines and apparatus like

       vicat apparatus,
       Compression testing machine
       flakiness and elongation index gauges,
       volume measuring jars
       digital weighing scale(20kg max. and 2gm accuracy)
       sample collecting trays
       pycnometer




Figure 3.12, 3.13 describes view of QA/QC lab and frame work for concrete cubes for testing
respectively.



                                                                                             15
Figure 3.14 describes the view of curing tank near qa/qc lab



3.5LAYING OF COLUMNS:




     Figure 3.15 represents view of various columns from below ground surface




                                                                                16
Figure 3.16, 3.17 describes frame work for column concreting and tor rings respectively.




                    Columns are laid under utmost care. steel rods are firmly placed and these
are connected using different types of TOR RINGS with the help of binding wire. About 8
Tor rings are provided at spacing in every column. Basically tor rings are of different types
like rectangular, square type, triangular, trapezoidal used for connecting various amount of
steel rods.tie rod, ropes are used to place the shutters firmly around the column where the
concrete is to be laid. Once the shutter is firmly placed then the concrete is filled manually till
0.5 mtr in order to avoid HONEY COMBING. M40 grade concrete is used for laying
columns. The date on which concreting is done to a column is written on column so that care
has to be taken to cure it for 14 days




                                                                                                17
Figure3.18 the checklist for column concreting



                     Prior to concreting of a column it should fulfil all the requirements of the
checklist for the column concreting ,it checks all the activities and should meet the
acceptance criteria after checking the report will be signed by Foreman, Site engineer and
Sector engineer before giving a nod to concreting



                                                                                               18
3.6MODEL FLAT:




Figure3.19 a view of living room in model flat

      A Model flat is constructed near to the construction site so that the buyers can have a
glance about their future house.




Figure3.20 a view of master bedroom in model flat




                                                                                                19
Figure3.21 a view of study room in model flat




Figure3.22 a view of kitchen in model flat




                                                20
3.7AMENITIES PROVIDED IN LAKE VERANDAHS:
     100% Power Backup
     Children’s play area
     Gymnasium
     Marble flooring
     Swimming pool
     Club house
     Vaastu shaastra
     VRV central air-conditioning
     Wooden flooring in master bedroom
     Exquisitely landscaped gardens interspersed with water bodies, statues and children's
     play areas.
     Tree lined avenues and decorative iron railings set on natural stone compound wall.
     Grand entrance hall and well decorated corridors on all lift lobbies.
     High speed automatic lifts.
     Ample parking space.
     Modern fire fighting system.
     CCTV in entrance lobbies for security.
     Retail shopping.




  Club house features include:

     Swimming pool.
     Fully equipped, modern gymnasium.
     Tennis & Badminton courts.
     Multipurpose hall.
     Children's play area.
     Billiards room.
     Yoga, Meditation and Aerobics centre.




                                                                                         21
3.8SAFETY:
 The company has observed various safety norms as per ISO standards and A safety office is
present in the construction site. Various safety measures have been taken as shown below




       Figure 3.23, 3.24 represents the view of safety nets tied around the building edges




               Figure 3.25 the following items are provided as per ISO safety norms.




                                                                                             22
CHAPTER 4

                                     CONCLUSIONS




       From the field study report, it is evident that the construction is going on full swing, but
from according to the project monitoring chart, the project is lagging behind the schedule for
a period of about 6 months.

      As dated on 1st june2012 the construction for slab for 3th floor is going on and still
about 24 floors are to be constructed. The schedule to hand over the project is dated for
January, 2014 at the earliest.

      To accomplish this task the work should be done in 2 batches of workforce throughout
the day and the developers should lend more financial support than present.

      Gracing the Hulimavu Lake, this most happening realty destination for the elite will be
a self-sufficient and all encompassing community where its residents will prosper forever.




                                                                                                23

More Related Content

What's hot

Industrial Visit Report
Industrial Visit ReportIndustrial Visit Report
Industrial Visit ReportBabu Rao
 
Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Rahul Banerjee
 
Industrial training ppt.
Industrial training ppt.Industrial training ppt.
Industrial training ppt.Tarun Sharma
 
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTINTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTshone john
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentationMuhamad Farhan
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.JAPJEETSINGH13
 
Internship Report
Internship ReportInternship Report
Internship Reportprathagarg
 
BHEL SUMMER TRAINING REPORT
BHEL SUMMER TRAINING REPORTBHEL SUMMER TRAINING REPORT
BHEL SUMMER TRAINING REPORTBhupendra Shukla
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineeringalok0025
 
Final Year Project Report Sample for Engineers - IIT and State University
Final Year Project Report Sample for Engineers - IIT and State UniversityFinal Year Project Report Sample for Engineers - IIT and State University
Final Year Project Report Sample for Engineers - IIT and State UniversityHitesh Sharma
 
Internship report of mechanical student
Internship report of mechanical studentInternship report of mechanical student
Internship report of mechanical studentRitika Vyas
 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training ReportJaspreet singh
 
Final Report For Summer Training - Naif AlJuhani
Final Report For Summer Training - Naif AlJuhaniFinal Report For Summer Training - Naif AlJuhani
Final Report For Summer Training - Naif AlJuhaniNaif AlJuhani, PMP®
 
Summer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsSummer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsKashifRaza113
 
PROJECT 7TH SEM REPORT
PROJECT 7TH SEM REPORTPROJECT 7TH SEM REPORT
PROJECT 7TH SEM REPORTPradip Vasoya
 
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION L&W BUILDING SOLUTIONS PVT. LMT.
 
Student Industrial Training Presentation Slide
Student Industrial Training Presentation SlideStudent Industrial Training Presentation Slide
Student Industrial Training Presentation SlideKhairul Filhan
 

What's hot (20)

Industrial Visit Report
Industrial Visit ReportIndustrial Visit Report
Industrial Visit Report
 
Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)
 
Industrial training ppt.
Industrial training ppt.Industrial training ppt.
Industrial training ppt.
 
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTINTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.
 
Internship Report
Internship ReportInternship Report
Internship Report
 
BHEL SUMMER TRAINING REPORT
BHEL SUMMER TRAINING REPORTBHEL SUMMER TRAINING REPORT
BHEL SUMMER TRAINING REPORT
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineering
 
Final Year Project Report Sample for Engineers - IIT and State University
Final Year Project Report Sample for Engineers - IIT and State UniversityFinal Year Project Report Sample for Engineers - IIT and State University
Final Year Project Report Sample for Engineers - IIT and State University
 
Industrial Internship Report
Industrial Internship ReportIndustrial Internship Report
Industrial Internship Report
 
Internship report of mechanical student
Internship report of mechanical studentInternship report of mechanical student
Internship report of mechanical student
 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training Report
 
Final Report For Summer Training - Naif AlJuhani
Final Report For Summer Training - Naif AlJuhaniFinal Report For Summer Training - Naif AlJuhani
Final Report For Summer Training - Naif AlJuhani
 
Final Year Project
Final Year ProjectFinal Year Project
Final Year Project
 
Summer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsSummer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) Students
 
Mini Project Format
Mini Project Format Mini Project Format
Mini Project Format
 
PROJECT 7TH SEM REPORT
PROJECT 7TH SEM REPORTPROJECT 7TH SEM REPORT
PROJECT 7TH SEM REPORT
 
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
 
Student Industrial Training Presentation Slide
Student Industrial Training Presentation SlideStudent Industrial Training Presentation Slide
Student Industrial Training Presentation Slide
 

Viewers also liked

SIWES I.T REPORT ON WEB DESIGN
SIWES I.T REPORT ON WEB DESIGNSIWES I.T REPORT ON WEB DESIGN
SIWES I.T REPORT ON WEB DESIGNEjiro Ndifereke
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportAnurag Gautam
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&TUmed Paliwal
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building ConstructionEsmael Aragaw
 
Cafe construction project report
Cafe construction project reportCafe construction project report
Cafe construction project reportHagi Sahib
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 
QUANTITY SURVEY FOR BUILDING ESTIMATION
QUANTITY SURVEY FOR BUILDING ESTIMATIONQUANTITY SURVEY FOR BUILDING ESTIMATION
QUANTITY SURVEY FOR BUILDING ESTIMATIONM Usoof
 
computer science internship report
computer science  internship reportcomputer science  internship report
computer science internship reportkaahwa Armstrong
 
Attachment report IAT
Attachment report IATAttachment report IAT
Attachment report IATitronics
 
Responsive, Web design, Wordpress & Magento Mobile App Development Company i...
Responsive, Web design, Wordpress & Magento Mobile App Development  Company i...Responsive, Web design, Wordpress & Magento Mobile App Development  Company i...
Responsive, Web design, Wordpress & Magento Mobile App Development Company i...Sigma seo solution
 
Summer training in web designing
Summer training in web designingSummer training in web designing
Summer training in web designingDUCC Systems
 
Web designing live project training
Web designing live project trainingWeb designing live project training
Web designing live project trainingTOPS Technologies
 
Field attachment report (alie chibwe)
Field attachment report (alie chibwe)Field attachment report (alie chibwe)
Field attachment report (alie chibwe)AlieChibwe
 
Marriott International[1]
Marriott International[1]Marriott International[1]
Marriott International[1]lingris
 
F & b service introduction
F & b service introductionF & b service introduction
F & b service introductionAMARESH JHA
 
Sample Report on Food and Beverage Operations Management
Sample Report on Food and Beverage Operations Management Sample Report on Food and Beverage Operations Management
Sample Report on Food and Beverage Operations Management Instant Essay Writing
 
Internship Report on Dhaka Regency Hotel & Resort
Internship Report on Dhaka Regency Hotel & ResortInternship Report on Dhaka Regency Hotel & Resort
Internship Report on Dhaka Regency Hotel & ResortIstiak Ahmed
 

Viewers also liked (20)

internship report
internship reportinternship report
internship report
 
SIWES I.T REPORT ON WEB DESIGN
SIWES I.T REPORT ON WEB DESIGNSIWES I.T REPORT ON WEB DESIGN
SIWES I.T REPORT ON WEB DESIGN
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&T
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 
Cafe construction project report
Cafe construction project reportCafe construction project report
Cafe construction project report
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 
QUANTITY SURVEY FOR BUILDING ESTIMATION
QUANTITY SURVEY FOR BUILDING ESTIMATIONQUANTITY SURVEY FOR BUILDING ESTIMATION
QUANTITY SURVEY FOR BUILDING ESTIMATION
 
computer science internship report
computer science  internship reportcomputer science  internship report
computer science internship report
 
Attachment report IAT
Attachment report IATAttachment report IAT
Attachment report IAT
 
Attachment report
Attachment report Attachment report
Attachment report
 
Responsive, Web design, Wordpress & Magento Mobile App Development Company i...
Responsive, Web design, Wordpress & Magento Mobile App Development  Company i...Responsive, Web design, Wordpress & Magento Mobile App Development  Company i...
Responsive, Web design, Wordpress & Magento Mobile App Development Company i...
 
Summer training in web designing
Summer training in web designingSummer training in web designing
Summer training in web designing
 
Web designing live project training
Web designing live project trainingWeb designing live project training
Web designing live project training
 
Field attachment report (alie chibwe)
Field attachment report (alie chibwe)Field attachment report (alie chibwe)
Field attachment report (alie chibwe)
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 
Marriott International[1]
Marriott International[1]Marriott International[1]
Marriott International[1]
 
F & b service introduction
F & b service introductionF & b service introduction
F & b service introduction
 
Sample Report on Food and Beverage Operations Management
Sample Report on Food and Beverage Operations Management Sample Report on Food and Beverage Operations Management
Sample Report on Food and Beverage Operations Management
 
Internship Report on Dhaka Regency Hotel & Resort
Internship Report on Dhaka Regency Hotel & ResortInternship Report on Dhaka Regency Hotel & Resort
Internship Report on Dhaka Regency Hotel & Resort
 

Similar to Industrial Training Report-1

An industrial training report
An industrial training reportAn industrial training report
An industrial training reportborokinni
 
RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING Vikas Sukhwal
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)pranay kumar
 
Internship Report
Internship ReportInternship Report
Internship ReportBala Murali
 
Analysis And Design Of Multi-Storeyed Building Using STAAD PRO
Analysis And Design Of Multi-Storeyed Building Using STAAD PROAnalysis And Design Of Multi-Storeyed Building Using STAAD PRO
Analysis And Design Of Multi-Storeyed Building Using STAAD PROLisa Riley
 
Building economic
Building economicBuilding economic
Building economictfkc1212
 
DE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesDE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesMelvin Lim
 
De & be final workshop submission
De & be final workshop submissionDe & be final workshop submission
De & be final workshop submissionArthur Wilson
 
IJSRED-V2I2P21
IJSRED-V2I2P21IJSRED-V2I2P21
IJSRED-V2I2P21IJSRED
 
Multistorey residential building construction training report
Multistorey residential building construction training  reportMultistorey residential building construction training  report
Multistorey residential building construction training reportBeing Deepak
 
Report on Residential Construction
Report on Residential ConstructionReport on Residential Construction
Report on Residential ConstructionMayank Walecha
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report Poojan Patel
 
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentAr. M. Senthil [ senthilmani ]
 

Similar to Industrial Training Report-1 (20)

An industrial training report
An industrial training reportAn industrial training report
An industrial training report
 
madhu
madhumadhu
madhu
 
Final report 85,91,109
Final report 85,91,109Final report 85,91,109
Final report 85,91,109
 
RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
 
Internship Report
Internship ReportInternship Report
Internship Report
 
simplex report 2
simplex report 2simplex report 2
simplex report 2
 
Analysis And Design Of Multi-Storeyed Building Using STAAD PRO
Analysis And Design Of Multi-Storeyed Building Using STAAD PROAnalysis And Design Of Multi-Storeyed Building Using STAAD PRO
Analysis And Design Of Multi-Storeyed Building Using STAAD PRO
 
Building economic
Building economicBuilding economic
Building economic
 
DE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesDE/BE Workshop Presentation Slides
DE/BE Workshop Presentation Slides
 
De & be final workshop submission
De & be final workshop submissionDe & be final workshop submission
De & be final workshop submission
 
IJSRED-V2I2P21
IJSRED-V2I2P21IJSRED-V2I2P21
IJSRED-V2I2P21
 
D18 cl124 report_8sem
D18 cl124 report_8semD18 cl124 report_8sem
D18 cl124 report_8sem
 
Multistorey residential building construction training report
Multistorey residential building construction training  reportMultistorey residential building construction training  report
Multistorey residential building construction training report
 
Report on Residential Construction
Report on Residential ConstructionReport on Residential Construction
Report on Residential Construction
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report
 
Final report
Final reportFinal report
Final report
 
Analysis and design of five star hotel
Analysis and design of five star hotelAnalysis and design of five star hotel
Analysis and design of five star hotel
 
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
 
Training Report
Training ReportTraining Report
Training Report
 

Recently uploaded

ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEaurabinda banchhor
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsRommel Regala
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 

Recently uploaded (20)

ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSE
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World Politics
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 

Industrial Training Report-1

  • 1. AN INDUSTRIAL TRAINING REPORT – I Done by G.V.ROHIT Reg. No.:1011010072 At Simplex Infrastructures Ltd. Brigade Plaza, Anand Rao circle, Bengaluru, Karnataka. Submitted to Department of Civil Engineering Faculty of Engineering and Technology SRM University (Under section 3 of UGC Act, 1956) SRM Nagar, Kattankulathur – 603203 Kancheepuram Dist. July 2012 1
  • 2. BONAFIDE CERTIFICATE Certified that this Industrial Training Report – I is a work of G.V.ROHIT (Reg.No.1011010072) who carried out the work at SIMPLEX INFRASTRUCTURES LTD., Brigade Plaza, Anand rao circle, Bengaluru, Karnataka. Class In charge coordinator (Mr. V R PRASATH KUMAR) (Mr. K S ANANDH) 2
  • 3. 3
  • 4. Acknowledgement It is always a pleasure to remind the fine people in the Engineering program for their sincere guidance I received to uphold my practical as well as theoretical skills in engineering. Firstly I would like to thank Dr. C.Muthamizhchelvan (Director of E&T, SRM University) for meticulously planning academic curriculum in such a way that students are not only academically sound but also industry ready by including such industrial training patterns. I would also like to thanks Mr. V.R. Prasath Kumar (Class In-charge) for the positive attitude he showed for my work, always allowing me to question him and giving prompt replies for my uncertainties in all the fields including educational, social and managerial work. I would also like to acknowledge and my heartfelt gratitude to Mr.K.S.Anandh (coordinator) who continuously supported me in every possible way, from initial advice to encouragement till this date. I express my immense pleasure and deep sense of gratitude to Sri I.Nanajee (General Manager, CIVIL) and my guide and solicitor to Mr.Srinivas (Planning) for spending his valuable time with me and also helped me in completion of task. Finally, I would also like to thanks Sri Debabrata ray (Site- In charge), Mr.Srikanth (Asst.Manager) for giving me this opportunity and guiding me during the course of the training. 4
  • 5. CONTENTS Chapter No Topic Page No. 1 Introduction 1 2 Details of the project 2.1 Site location 2 2.2 Site map 3 2.3 About the project 4 3 Details of study 3.1 Detail of structure 5-6 3.2 Process of laying a slab 7-8 3.3 Batching plant 8-10 3.4 QA/QC Lab 10-11 3.5 Process of laying of columns 11-13 3.6 Model flat 14-15 3.7 Amenities provided 16 3.8 Safety 17 4 Conclusions 18 5
  • 6. CHAPTER 1 INTRODUCTION We have been assigned Hiranandini lake verandahs and Hiranandini hill crest construction sites for field study by the company. These are part of HIRANDINI UPSCALE TOWNSHIP, a 32 acred luxury residential project located in Begur village gracing hulimavu lake , off the bannerghatta road in Bengaluru .These residential projects are a premium multi storey residential towers developed by renoved developers HIRANANDINI. The construction of the structures has been assigned to SIMPLEX INFRASTRUCTURES LTD., Bengaluru. The building has been designed by Architect HAFEEZ CONTRACTOR, Mumbai and the structural consultants are MAHIMTURA CONSULTANTS, the associate engineers are WSP CANTOR SEINUK, New York. About Developer Hiranandani is one of the largest real estate developers in the country diversified into entertainment, healthcare, hospitality, retail and call centers. Hiranandani Constructions are known to incorporate a fantastic balance of space management and natural beauty in their Building Constructions. Some of the world renowned developments are Hiranandani Gardens in Powai, Meadows and Estates in Thane. COMPANY PROFILE: Simplex infrastructures limited are one of the pioneers and a total solution provider in infrastructure and construction ambit. Been in business since 1924 and present in almost all the states and in middle east It employs 8110 people and has capital equipments worth rupees 1296 crore in FY10 Ranked 7th amongst top 10 infrastructure companies by “construction week” Has present order book of over 12,000 cr rupees with over 150 site locations in india and overseas. The company reported a turnover of 4,500 cr rupees and PAT of 127 cr in FY10 The company commands a market capitalization of over 3,000 cr rupees. 6
  • 7. CHAPTER 2 DETAILS OF THE PROJECT 2.1SITE LOCATION: The Hiranandini upscale project,Located off Bannerghatta Road, in a well developed area replete with the best of social infrastructure, the project is accessible from Electronic City, to major corporates like Infosys, Wipro, Dell, Siemens, 3M & HP, and the country’s best educational institutions including IIM Bangalore, Sarala Birla Academy, Ryan International School, in addition to large Multispecialty hospitals such as Wockhardt and Apollo. Figure 2.1 peripheral view of site location 7
  • 8. 2.2SITE MAP : Figure2.2 Arial view of hiranandini upscale project, bannerghatta(from left lake verandahs, hill crest, club meadows) Thoughtfully planned, secure, easily accessible, the highlights of the development include panoramic vistas from large French decks, a plush club house, world- class gourmet restaurants, exquisite landscaping and the best internal amenities. House of Hiranandani has skills to nurture community, to connect people, to amplify the joys and happiness of togetherness. 8
  • 9. 2.3ABOUT THE PROJECT: Hiranandini lake verandahs: It is a classy project which redefines the style of living .This project gives rich detail and fine finishes of interiors and exteriors exhibiting unique design and style. It is well designed home with landscaped garden and panoramic views. It is 3BHK multi-storeyed apartment for elite class, with varying sizes of 1660, 1826 and 2061sq ft .Each flat costs ranging from 80lakh to 1.1crore rupees. Figure 2.3 view of lake verandahs after completion 9
  • 10. CHAPTER 3 DETAILS OF FIELD STUDY 3.1DETAILS OF STRUCTURE: 1. The height of the structure is 99.5mts. 2. The structure consists of 2 wings (wing-A and wing-B). 3. Two wings are separated by an inaccessible partition wall in every floor throughout the structure. 4. Each wing consists of 4 flats in each floor totalling 8 flats per floor. 5. The lake verandahs consist of 27 floors totalling 216 flats in them. 6. Apart from the 27 floors there are 2 subsurface floors designed for parking purpose. 7. These subsurface floors are well protected by retaining walls with height varying from 8-12m . 8. A stilt lobby level is also provided. 9. Each wing consists of 4 lift wells and 2 stair cases Figure 3.1 a plan describing placement of lift wells and stair cases in wing-A 10
  • 11. Out of four 3BHK flats in every floor of a wing 1, 2 no.s Flats have area of 2061 sqft and 3no has1660 sqft and 4no.has 1826 sqft. Figure 3.2 a typical floor plan of lake verandahs project Figure3.3 a plan for flat no’s 1, 2 describing positioning of various rooms 11
  • 12. 3.2PROCESS OF LAYING A SLAB: In this all the sophisticated equipments are used to finish the work in easy and simple method. The thickness of each slab is 20cm and between 2 wings a strip is not casted immediately but casted after 25 days known as Expansion strip. The steel rods used in construction are THERMAX STEEL from Germany. Also shaft spaces are provided in slab for plumbing work Figure 3.4, 3.5 views of shafts on and below the surface of the slab Figure 3.6, 3.7 describes work of electrical conduting and cup locks support After framing using shutter boards filmed with shuttering oil, electrical conduting will be done, here cup locks are used to support the frame, and then concrete is poured over the frame with the help of hydraulic jack and concrete pipes which are used to pump the concrete from transit mixer to the place where slab has to be laid. To prevent coagulation inside pipes, first a cream slurry cement paste has to be passed through pipes for smooth flow of concrete 12
  • 13. Tower cranes are used to move the required material from one place to other in site both vertically and horizontally. The tower cranes can with held the wind force up to height of 30m, beyond which they need to be clamped to nearby column of building for support.Each tower crane costs about Rs.95 lakhs Figure3.8 view of the tower crane from the site office 3.3BATCHING PLANT: M40 concrete mix is used here for the construction of structure. A separate batching plant is present near the site for the construction of lake verandahs and hill crest structures. Figure 3.9 batching plant with a transit mixer 13
  • 14. Figure 3.10, 3.11 describes the control panel and closer look to batching plant respectively. A Transit mixer is used to transfer concrete from batching plant to the work site.It carries around 7cubic mtr volume of concrete and takes about 15 min to load. The main components of batching plant are Control panel Silos Cement storage godown Small tower crane for pushing ingredients into mix using trayThe batching plant consists of silos which are used to store flyash and chemicals accelerators and retarders. M15 M20 M25 M30 M35 M40 KG KG KG KG KG KG CA I 564 538 534 526 521 494 CA II 664 576 572 564 558 529 FA II 725 738 727 710 697 636 CEMENT 256 284 304 326 351 433 FLY ASH 76 82 88 94 101 126 WATER 180 180 175 180 170 180 CH. ADMIX .8-1.2 % .8-1.2% .8-1.2% .8-1.2% .8-1.2% .8-1.2% W/B RATIO .54 .49 .44 .42 .37 .32 Table 3.1 A Table describing Mix Design Per Cubic Meter for various mix designs 14
  • 15. The ingredients used in preparation of concrete are coarse aggregate I, II and fine aggregate (pit sand, dead river sand),cement, fly ash, water ,chemical admixtures .The W/B Ratio of M40 Mix is 0.32 The chemical admixtures used are MYK Save mix SP 3.4Q/A & Q/C LAB (Quality assurance &quality control lab): In this lab the quality and strength of various building materials like cement, sand, concrete, water, coarse aggregate are tested using various testing machines and apparatus like vicat apparatus, Compression testing machine flakiness and elongation index gauges, volume measuring jars digital weighing scale(20kg max. and 2gm accuracy) sample collecting trays pycnometer Figure 3.12, 3.13 describes view of QA/QC lab and frame work for concrete cubes for testing respectively. 15
  • 16. Figure 3.14 describes the view of curing tank near qa/qc lab 3.5LAYING OF COLUMNS: Figure 3.15 represents view of various columns from below ground surface 16
  • 17. Figure 3.16, 3.17 describes frame work for column concreting and tor rings respectively. Columns are laid under utmost care. steel rods are firmly placed and these are connected using different types of TOR RINGS with the help of binding wire. About 8 Tor rings are provided at spacing in every column. Basically tor rings are of different types like rectangular, square type, triangular, trapezoidal used for connecting various amount of steel rods.tie rod, ropes are used to place the shutters firmly around the column where the concrete is to be laid. Once the shutter is firmly placed then the concrete is filled manually till 0.5 mtr in order to avoid HONEY COMBING. M40 grade concrete is used for laying columns. The date on which concreting is done to a column is written on column so that care has to be taken to cure it for 14 days 17
  • 18. Figure3.18 the checklist for column concreting Prior to concreting of a column it should fulfil all the requirements of the checklist for the column concreting ,it checks all the activities and should meet the acceptance criteria after checking the report will be signed by Foreman, Site engineer and Sector engineer before giving a nod to concreting 18
  • 19. 3.6MODEL FLAT: Figure3.19 a view of living room in model flat A Model flat is constructed near to the construction site so that the buyers can have a glance about their future house. Figure3.20 a view of master bedroom in model flat 19
  • 20. Figure3.21 a view of study room in model flat Figure3.22 a view of kitchen in model flat 20
  • 21. 3.7AMENITIES PROVIDED IN LAKE VERANDAHS: 100% Power Backup Children’s play area Gymnasium Marble flooring Swimming pool Club house Vaastu shaastra VRV central air-conditioning Wooden flooring in master bedroom Exquisitely landscaped gardens interspersed with water bodies, statues and children's play areas. Tree lined avenues and decorative iron railings set on natural stone compound wall. Grand entrance hall and well decorated corridors on all lift lobbies. High speed automatic lifts. Ample parking space. Modern fire fighting system. CCTV in entrance lobbies for security. Retail shopping. Club house features include: Swimming pool. Fully equipped, modern gymnasium. Tennis & Badminton courts. Multipurpose hall. Children's play area. Billiards room. Yoga, Meditation and Aerobics centre. 21
  • 22. 3.8SAFETY: The company has observed various safety norms as per ISO standards and A safety office is present in the construction site. Various safety measures have been taken as shown below Figure 3.23, 3.24 represents the view of safety nets tied around the building edges Figure 3.25 the following items are provided as per ISO safety norms. 22
  • 23. CHAPTER 4 CONCLUSIONS From the field study report, it is evident that the construction is going on full swing, but from according to the project monitoring chart, the project is lagging behind the schedule for a period of about 6 months. As dated on 1st june2012 the construction for slab for 3th floor is going on and still about 24 floors are to be constructed. The schedule to hand over the project is dated for January, 2014 at the earliest. To accomplish this task the work should be done in 2 batches of workforce throughout the day and the developers should lend more financial support than present. Gracing the Hulimavu Lake, this most happening realty destination for the elite will be a self-sufficient and all encompassing community where its residents will prosper forever. 23