SlideShare a Scribd company logo
1 of 45
Prakash.g
2
• Lean production focuses on eliminating waste in processes (i.e. the
waste of work in progress and finished good inventories)
• Lean production is about expanding capacity by reducing costs and
shortening cycle times between order and ship date
• Lean is about understanding what is important to the customer
• Lean production is not about eliminating people
3
4
Taiichi Ohno
(1912 †1990)
Shigeo Shingo
1909 †1990
Founders of the Lean Production System (TPS)
5
Lean Production System
• The production system developed by Toyota motor corporation to
provide best quality, lowest cost, and shortest lead time through the
eliminating of waste.
• The Lean production system was established on two concepts:
– JIDOKA: Automation with a human touch, means that when the problem
occurs, the equipment stops immediately, preventing defective product from
being produced.
– JUST-IN-TIME: In which each process produces only what is needed by the
next process in a continuous flow.
6
Toyota/Lean Production System house
7
Just-In-Time Systems
What is JIT ?
JIT is a philosophy of continuous improvement in which
non-value-adding activities (or wastes) are identified and removed for the purposes
of:
 Reducing Cost
 Improving Quality
 Improving Performance
 Improving Delivery
 Adding Flexibility
 Increase innovativeness
8
 Producing only what is needed, when it is needed
(not early, not late; not less, not more)
 Achieving high volume production using minimal
inventories
 An integrated but simplified system
 JIT’s mandate:
Elimination of all waste in production effort
Just-In-Time Systems
9
 Attacks waste (anything not adding value to the product)
 Achieves streamlined production by reducing inventory
 Exposes problems and bottlenecks caused by variability
What Does Just-in-Time Do?
10
Waste (“muda” in Japanese) is ‘anything other than the minimum
amount of equipment, materials, parts, space, and worker’s time,
which are absolutely essential to add value to the product.’
— Shoichiro Toyoda
Founder, Toyota
© 1995 Corel Corp.
What is Waste?
11
Sources of Waste
 Overproduction
 Waiting
 Unnecessary transportation
 Inventory
 Inefficient work methods
 Inefficient processing
 Unnecessary motions
 Product defects
12
Waste in Operations (1 of 3)
13
Waste in Operations (2 of 3)
14
Waste in Operations (3 of 3)
15
Main Components of JIT
 Pull System
 Continuous Flow Processing
 Takt Time
 Flexible Workforce (Shojinka)
 3 M’s
Just-In-Time
16
The Pull System
Pull System is a flexible and simple method of controlling/balancing the
flow of resources.
Produce only when your customer demands the product in the required
quantity.
Run the production according to this demand
Pull System consists of:
– Production based on actual consumption
– Small Lots
– Low inventories
– Management by Sight
– Better Communication
17
The Pull & Push System
18
Continuous/One-Piece Flow
Producing and moving one item at a time (or a small and consistent batch of
items) through a series of processing steps as continuously as possible, with
each step making just what is requested by the next step.
It is also called the one-piece flow, single-piece flow, and make one & move
one.
19
Continuous/One-Piece Flow
20
Takt time is the pace of production required to meet customer demand.
Since takt time is defined by the customer, it becomes a very important number
in a lean environment.
How:
Only 2 variables are used to calculate Takt time: Available Time &
Customer Demand (schedule):
Available time is total shift time minus meal and scheduled break times
TAKT Time
21
TAKT Time
22
Flexible Workforce (Shojinka):
Flexible workforce or shojinka means to alter (decrease or increase)
the number of operators within a shop, to equip with demand changes.
Continually optimizing the number of workers in a work center to
meet the type and volume of demand imposed on the work center. Creating
Flow and Eliminating Waste.
Flexible Workforce (Shojinka)
23
Multi-machine Handling
Type of Part
A B C D
Machine 1
Machine 2
Machine 3
Machine 4
One person handles one process, four machines
Unfinished Parts
Finished Products
Flexible Workforce (Shojinka)
24
Multi-process Handling
Type of Part
A B C D
One person handles four processes, four machines
Flexible Workforce (Shojinka)
Machine 1
Machine 2
Machine 3
Machine 4
25
3 M’s
MUDA = Non-Value Added
MURA = Overburden
MURI = Unevenness
3 M’s
26
1 TON
4 ton
Capacity : 4 tons
Muda . Mura . Muri
12 TONS
27
X
X
2 = MURI (OVERBURDEN)
6 = MUDA (NON-VALUE ADDED)
= MURA (UNEVENNESS)
Muda . Mura . Muri
28
The most efficient way to deliver 12 tons of good to the destination is:
X 3 =
NO MURI (OVERBURDEN)
NO MUDA (NO WASTAGE)
NO MURA (NO UNEVENNESS)
Muda . Mura . Muri
29
Kanban
What is Kanban?
• Card system that controls production & inventory
•Communicates demand for work or materials from the preceding station
30
Kanban is one of the Lean tools designed to reduce the idle time in a production
process. The main idea behind the Kanban system is to deliver what the process
needs exactly when it needs it.
In Japanese, the word “Kan” means “card" and "ban" means “signal," so Kanban
refers to signal cards. Lean uses visual cards as a signaling system that triggers an
action to supply the process with its needs either from an external supplier or from
a warehouse.
Kanban
31
Kanban
32
 Reduction of eliminating non-value added activities
 Reduction of floor space and warehouse space per unit of output
 Reduction of setup time and schedule delays as the factory becomes a
continuous production process.
 Reduction of waste and rework by detecting errors at the source.
 Better utilization of machines and facilities.
 Better integration of and communication between functions such as
marketing, purchasing, design, and production.
 Quality control built into the process.
Benefits of JIT
33
Providing machines and operators the ability to detect when an abnormal
condition has occurred and immediately stop work. This enables operations
to build in quality at each process and to separate men and machines for
more efficient work.
Jidoka highlights the causes of problems because work stops immediately
when a problem first occurs. This leads to improvements in the processes
that build in quality by eliminating the root causes of defects.
Jidoka - Automation
What is Jidoka/Automation?
34
Jidoka - Automation
35
Jidoka - Automation
36
Why Jidoka?
• Increase quality
• Lower costs
• Improve customer service
• Reduce lead time
1. Detect the abnormality.
2. Stop.
3. Fix or correct the immediate condition.
4. Investigate the root cause and install a countermeasure.
Jidoka Steps
Jidoka - Automation
37
Prevention Techniques
• Poka Yoke - Mistake-Proofing
– Visual control of quality
– Prevents defects from happening
• Andons
– Commonly lights to signal production line status
• Red: line stopped
• Yellow: call for help
• Green: all normal
– Andon signals require immediate attention
38
Poka Yoke – Mistake Proofing
What is it for?
• To eliminate the possibility or opportunity for passing on errors or
making mistakes in a process.
Where could we use it?
• In the development or improvement of any process.
• When you want to make wrong actions impossible or more difficult to do.
• When there is a need to make it possible to reverse actions
• When you need to make it easier to discover that errors occur.
39
Poka Yoke - Examples
Spellcheck:
40
Andon
Andon is an information tool which provides instant, visible and audible
warning to the Operations team that there is a abnormality within that
area.
When the equipment shuts down because of a quality problem, flags or light,
usually with accompanying music, signal that help is needed to solve the
problem.
This signaling system is called the andon system.
41
Visual Management Andon Lamp
• Red - line stoppage
• Yellow - call for help
• Green - normal operation
42
Benefits of Lean Production
Lean will improve:
Quality performance, fewer defects and rework.
Fewer Machine and Process Breakdowns.
Lower levels of Inventory.
Greater levels of Stock Turnover.
Less Space Required.
Higher efficiencies, more output per man hour.
Improved delivery performance.
Faster Development.
Greater Customer Satisfaction.
HIGHER PROFITS!
INCREASED BUSINESS!
43
44
45

More Related Content

What's hot

Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean5S BALAMURUGAN
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingananya0122
 
Lean Production
Lean ProductionLean Production
Lean Productiontutor2u
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingskchawla4
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overviewPruek Pinyo
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)Manoj Subedi
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowancePratibha Khemchandani
 
Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study pptBeereddy Swapna
 
Introduction to Takt time - January 2017
Introduction to Takt time - January 2017Introduction to Takt time - January 2017
Introduction to Takt time - January 2017W3 Group Canada Inc.
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineParth Patel
 
DFMA -Design For Manufacturing and Assembly
DFMA -Design For Manufacturing and AssemblyDFMA -Design For Manufacturing and Assembly
DFMA -Design For Manufacturing and AssemblySunith Guraddi
 

What's hot (20)

Poka yoke
Poka yokePoka yoke
Poka yoke
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Lean Production
Lean ProductionLean Production
Lean Production
 
Jidoka by Operational Excellence Consulting
Jidoka by Operational Excellence ConsultingJidoka by Operational Excellence Consulting
Jidoka by Operational Excellence Consulting
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
8 Wastes
8 Wastes8 Wastes
8 Wastes
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Kanban Pull System
Kanban Pull SystemKanban Pull System
Kanban Pull System
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study ppt
 
Introduction to Takt time - January 2017
Introduction to Takt time - January 2017Introduction to Takt time - January 2017
Introduction to Takt time - January 2017
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
Man and machine chart
Man and machine chartMan and machine chart
Man and machine chart
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
DFMA -Design For Manufacturing and Assembly
DFMA -Design For Manufacturing and AssemblyDFMA -Design For Manufacturing and Assembly
DFMA -Design For Manufacturing and Assembly
 

Viewers also liked

Viewers also liked (7)

Lean System
Lean SystemLean System
Lean System
 
0201B Lean Production
0201B Lean Production0201B Lean Production
0201B Lean Production
 
lean production
lean productionlean production
lean production
 
Lean system
Lean systemLean system
Lean system
 
lean production
lean productionlean production
lean production
 
Lean management
Lean managementLean management
Lean management
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 

Similar to Lean Production Principles and Tools

Lean-TAREQ.pptx
Lean-TAREQ.pptxLean-TAREQ.pptx
Lean-TAREQ.pptxfaiazjoy
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemArya Kulang
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptrahul368457
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingTimothy Wooi
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systemsAyman Aljahdali
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production SystemUdit Jain
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)Aysel Muradlı
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)Ashima Kandari
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhusashi prabhu
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhusashi prabhu
 
Lean Management & TPS Tools
Lean Management & TPS ToolsLean Management & TPS Tools
Lean Management & TPS Toolsshankar11122
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution pptAkshay Jain
 
Introduction to TPS (Toyota Production System)
Introduction to TPS (Toyota Production System)Introduction to TPS (Toyota Production System)
Introduction to TPS (Toyota Production System)MohsinAljiwala
 
PRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENTPRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENTAman Singh
 

Similar to Lean Production Principles and Tools (20)

13. lean production system pgp
13. lean production system pgp13. lean production system pgp
13. lean production system pgp
 
Lean-TAREQ.pptx
Lean-TAREQ.pptxLean-TAREQ.pptx
Lean-TAREQ.pptx
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.ppt
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
3mu
3mu3mu
3mu
 
jit
jitjit
jit
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
Lean Management & TPS Tools
Lean Management & TPS ToolsLean Management & TPS Tools
Lean Management & TPS Tools
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
Introduction to TPS (Toyota Production System)
Introduction to TPS (Toyota Production System)Introduction to TPS (Toyota Production System)
Introduction to TPS (Toyota Production System)
 
PRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENTPRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENT
 

Recently uploaded

Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 

Recently uploaded (20)

Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 

Lean Production Principles and Tools

  • 2. 2 • Lean production focuses on eliminating waste in processes (i.e. the waste of work in progress and finished good inventories) • Lean production is about expanding capacity by reducing costs and shortening cycle times between order and ship date • Lean is about understanding what is important to the customer • Lean production is not about eliminating people
  • 3. 3
  • 4. 4 Taiichi Ohno (1912 †1990) Shigeo Shingo 1909 †1990 Founders of the Lean Production System (TPS)
  • 5. 5 Lean Production System • The production system developed by Toyota motor corporation to provide best quality, lowest cost, and shortest lead time through the eliminating of waste. • The Lean production system was established on two concepts: – JIDOKA: Automation with a human touch, means that when the problem occurs, the equipment stops immediately, preventing defective product from being produced. – JUST-IN-TIME: In which each process produces only what is needed by the next process in a continuous flow.
  • 7. 7 Just-In-Time Systems What is JIT ? JIT is a philosophy of continuous improvement in which non-value-adding activities (or wastes) are identified and removed for the purposes of:  Reducing Cost  Improving Quality  Improving Performance  Improving Delivery  Adding Flexibility  Increase innovativeness
  • 8. 8  Producing only what is needed, when it is needed (not early, not late; not less, not more)  Achieving high volume production using minimal inventories  An integrated but simplified system  JIT’s mandate: Elimination of all waste in production effort Just-In-Time Systems
  • 9. 9  Attacks waste (anything not adding value to the product)  Achieves streamlined production by reducing inventory  Exposes problems and bottlenecks caused by variability What Does Just-in-Time Do?
  • 10. 10 Waste (“muda” in Japanese) is ‘anything other than the minimum amount of equipment, materials, parts, space, and worker’s time, which are absolutely essential to add value to the product.’ — Shoichiro Toyoda Founder, Toyota © 1995 Corel Corp. What is Waste?
  • 11. 11 Sources of Waste  Overproduction  Waiting  Unnecessary transportation  Inventory  Inefficient work methods  Inefficient processing  Unnecessary motions  Product defects
  • 15. 15 Main Components of JIT  Pull System  Continuous Flow Processing  Takt Time  Flexible Workforce (Shojinka)  3 M’s Just-In-Time
  • 16. 16 The Pull System Pull System is a flexible and simple method of controlling/balancing the flow of resources. Produce only when your customer demands the product in the required quantity. Run the production according to this demand Pull System consists of: – Production based on actual consumption – Small Lots – Low inventories – Management by Sight – Better Communication
  • 17. 17 The Pull & Push System
  • 18. 18 Continuous/One-Piece Flow Producing and moving one item at a time (or a small and consistent batch of items) through a series of processing steps as continuously as possible, with each step making just what is requested by the next step. It is also called the one-piece flow, single-piece flow, and make one & move one.
  • 20. 20 Takt time is the pace of production required to meet customer demand. Since takt time is defined by the customer, it becomes a very important number in a lean environment. How: Only 2 variables are used to calculate Takt time: Available Time & Customer Demand (schedule): Available time is total shift time minus meal and scheduled break times TAKT Time
  • 22. 22 Flexible Workforce (Shojinka): Flexible workforce or shojinka means to alter (decrease or increase) the number of operators within a shop, to equip with demand changes. Continually optimizing the number of workers in a work center to meet the type and volume of demand imposed on the work center. Creating Flow and Eliminating Waste. Flexible Workforce (Shojinka)
  • 23. 23 Multi-machine Handling Type of Part A B C D Machine 1 Machine 2 Machine 3 Machine 4 One person handles one process, four machines Unfinished Parts Finished Products Flexible Workforce (Shojinka)
  • 24. 24 Multi-process Handling Type of Part A B C D One person handles four processes, four machines Flexible Workforce (Shojinka) Machine 1 Machine 2 Machine 3 Machine 4
  • 25. 25 3 M’s MUDA = Non-Value Added MURA = Overburden MURI = Unevenness 3 M’s
  • 26. 26 1 TON 4 ton Capacity : 4 tons Muda . Mura . Muri 12 TONS
  • 27. 27 X X 2 = MURI (OVERBURDEN) 6 = MUDA (NON-VALUE ADDED) = MURA (UNEVENNESS) Muda . Mura . Muri
  • 28. 28 The most efficient way to deliver 12 tons of good to the destination is: X 3 = NO MURI (OVERBURDEN) NO MUDA (NO WASTAGE) NO MURA (NO UNEVENNESS) Muda . Mura . Muri
  • 29. 29 Kanban What is Kanban? • Card system that controls production & inventory •Communicates demand for work or materials from the preceding station
  • 30. 30 Kanban is one of the Lean tools designed to reduce the idle time in a production process. The main idea behind the Kanban system is to deliver what the process needs exactly when it needs it. In Japanese, the word “Kan” means “card" and "ban" means “signal," so Kanban refers to signal cards. Lean uses visual cards as a signaling system that triggers an action to supply the process with its needs either from an external supplier or from a warehouse. Kanban
  • 32. 32  Reduction of eliminating non-value added activities  Reduction of floor space and warehouse space per unit of output  Reduction of setup time and schedule delays as the factory becomes a continuous production process.  Reduction of waste and rework by detecting errors at the source.  Better utilization of machines and facilities.  Better integration of and communication between functions such as marketing, purchasing, design, and production.  Quality control built into the process. Benefits of JIT
  • 33. 33 Providing machines and operators the ability to detect when an abnormal condition has occurred and immediately stop work. This enables operations to build in quality at each process and to separate men and machines for more efficient work. Jidoka highlights the causes of problems because work stops immediately when a problem first occurs. This leads to improvements in the processes that build in quality by eliminating the root causes of defects. Jidoka - Automation What is Jidoka/Automation?
  • 36. 36 Why Jidoka? • Increase quality • Lower costs • Improve customer service • Reduce lead time 1. Detect the abnormality. 2. Stop. 3. Fix or correct the immediate condition. 4. Investigate the root cause and install a countermeasure. Jidoka Steps Jidoka - Automation
  • 37. 37 Prevention Techniques • Poka Yoke - Mistake-Proofing – Visual control of quality – Prevents defects from happening • Andons – Commonly lights to signal production line status • Red: line stopped • Yellow: call for help • Green: all normal – Andon signals require immediate attention
  • 38. 38 Poka Yoke – Mistake Proofing What is it for? • To eliminate the possibility or opportunity for passing on errors or making mistakes in a process. Where could we use it? • In the development or improvement of any process. • When you want to make wrong actions impossible or more difficult to do. • When there is a need to make it possible to reverse actions • When you need to make it easier to discover that errors occur.
  • 39. 39 Poka Yoke - Examples Spellcheck:
  • 40. 40 Andon Andon is an information tool which provides instant, visible and audible warning to the Operations team that there is a abnormality within that area. When the equipment shuts down because of a quality problem, flags or light, usually with accompanying music, signal that help is needed to solve the problem. This signaling system is called the andon system.
  • 41. 41 Visual Management Andon Lamp • Red - line stoppage • Yellow - call for help • Green - normal operation
  • 42. 42 Benefits of Lean Production Lean will improve: Quality performance, fewer defects and rework. Fewer Machine and Process Breakdowns. Lower levels of Inventory. Greater levels of Stock Turnover. Less Space Required. Higher efficiencies, more output per man hour. Improved delivery performance. Faster Development. Greater Customer Satisfaction. HIGHER PROFITS! INCREASED BUSINESS!
  • 43. 43
  • 44. 44
  • 45. 45