PROJECT CONTROL PROCESS



- What is Controlling Process
   - PM responsibility




                                2
Advanced Control: An
     Overview

  I attribute my success to
  this: I never gave or took
           an excuse.
     Florence Nightingale



                               3
PROJECT CONTROL PROCESS

Purpose : to ensure that project objectives are met by monitoring and
measuring progress and taking corrective actions when necessary




                                                                   4
Progress Measurement


    If we don’t change our
direction, we are likely to end
   up where we’re headed.
          Anonymous



                                  5
Traditional Approaches to Progress
          Measurement


• Budget vs. actual
• Percent complete
• “Trust me”



                              6
Modern Approaches

• Smaller projects or projects with unstable
  scope:
    – Weekly or biweekly deliverables
    – Done or not done
• Larger projects:
    – Earned value



                                               7
Earned Value Concepts




                        8
Earned Value Mechanics

• Build (and plot) your baseline
• Record (and plot) the actuals
• Measure (and plot) progress




                                   9
Build Your Baseline

• Information developed by planning:
    – WBS with 108 technical activities and 18
      management activities.
    – Estimates show that all 126 activities will
      require 1 person for 1 week.
    – You are constrained to have three full-time
      staffers plus one half-time project manager.
    – Staff and PM both cost $1,000 per week.

                                                     10
Build Your Baseline

Month      Staff     PM       Total
  1       $12,000    $2,000   $14,000
  2       $12,000    $2,000   $14,000
 …          …         …         …

  9       $12,000    $2,000   $14,000
          $108,00             $126,00
Total               $18,000
                0                   0

                                        11
Plot Your Baseline

                          Scheduled Cost
                            ($126,000)
Cumulative
  Values




                                    Time
                                           12
Record Your Actuals

Month # Staff   Staff $    PM      Total
                $12,00             $14,00
  1      3.5              $2,000
                     0                  0
                $12,00             $14,00
  2      3.5              $2,000
                     0                  0
                $16,00             $19,00
  3      4.7              $3,000
                     0                  0
                $16,00             $18,00
  4      4.5              $2,000
                     0                  0
         n/a    $56,00             $65,00
Total                     $9,000
                     0                  0
                                            13
Plot Your Actuals

                          Scheduled Cost
                            ($126,000)
Cumulative
  Values




                Actual
                 Cost
              ($65,000)




                                    Time
                                           14
Measure Your Progress
 Earned value = budget for completed item
Mo. Done      Not    Staff   PM      Total
                                     $12,00
 1     10+2   2     $10,000 $2,000
                                          0
                                     $11,00
 2     9+2    5      $9,000 $2,000
                                          0
                                     $15,00
 3     13+2   4     $13,000 $2,000
                                          0
                                     $18,00
 4     16+2   0     $16,000 $2,000
                                          0
                                     $56,00
Tot.   56     n/a   $48,000 $8,000            15
                                          0
Plot Your Progress

                                  Scheduled Cost
                                    ($126,000)
Cumulative
  Values




                Actual
                 Cost
              ($65,000)



                          Earned Value ($56,000)

                                             Time
                                                    16
Use Ratios to
         Estimate Completion
• Cost Performance Index (CPI) =
   Earned Value / Actual Cost
• Cost Estimate At Completion (Cost EAC) =
   Total Scheduled Cost / CPI
• Schedule Performance Index (SPI) =
   Earned Value / Scheduled Cost
• Schedule EAC = Planned Duration / SPI
                                             17
Sample Earned Value Calculations

• Cost Performance Index (CPI) =
      56,000 / 65,000 = 0.86

• Cost Estimate At Completion (Cost EAC) =
      126,000 / CPI = 126,000 / 0.86 =
       146,500

• Schedule Performance Index (SPI) =
      56,000 / 56,000 = 1.00

• Schedule EAC = 9 months / 1.0 = 9 months
                                             18
Other Earned Value Acronyms

• SC = BCWS = PV
   – Budgeted Cost of Work Scheduled
   – Planned Value
• AC = ACWP
   – Actual Cost of Work Performed
• EV = BCWP
   – Budgeted Cost of Work Performed

                                       19
More Earned Value
        Acronyms

                         Estimate
Budgeted At Completion
                             d
        (BAC)
                         Overrun
                   Estimate To
 Actual Cost
                  Complete (ETC)

  Estimate At Completion (EAC)

                                    20
Sample Values


                          Total Scheduled Cost = 3,500
Cumulative
  Values




             Actual Cost = 1,800            Duration =
                                            12 months

                                   Budgeted Cost = 900

                           Earned Value = 600

                                          Time
                                                         21
Sample Earned Value Calculations

• Cost Performance Index (CPI) =
      600 / 1,800 = 0.33

• Cost Estimate At Completion (Cost EAC) =
      3,500 / CPI = 3,500 / 0.33 = 10,500

• Schedule Performance Index (SPI) =
      600 / 900 = 0.67

• Schedule EAC = 12 months / 0.67 = 18 months

                                             22
… continued


  Budget =
                Estimated Overrun = 7,000
   3,500

Actual
         Cost Estimate To Complete (ETC) =
  =
                       8,700
1,800

Cost Estimate At Completion (EAC) = 10,500


                                             23
Interpreting Results

• Negative is bad:
    – If CV < 0, you are over budget.
    – If SV < 0, you are behind schedule.
• Less than 1.0 is bad:
    – If CPI < 1.0, you are over budget.
    – If SPI < 1.0, you are behind schedule.


                                               24
Time Variance


• Earned Schedule (ES) — the number of
  periods planned for the current Earned Value.
• Actual Time (AT) — the number of periods
  that have elapsed since the project started.
• TPI (Time Performance Index) = ES / AT


                                              25
… continued …


                                 Scheduled Cost
Cumulative
  Values




                       AT = 22
                                       PD = 52
             ES = 18



                           Earned Value


                                       Time
                                                  26
… continued

• Time to Complete (TC) =
      Planned Duration / TPI =
      52 / 0.8 = 65 = 13 weeks late
• SPI will give similar results early in the project,
  but becomes less reliable later.



                                                   27
Summary of
                Key Points
• Earned value is the most reliable approach to
  progress measurement when scope is
  reasonably stable.
• Keep work-items small and short to avoid
  measurement errors.




                                              28

More Related Content

What's hot

Introduction to Earned Value Management
Introduction to Earned Value ManagementIntroduction to Earned Value Management
Introduction to Earned Value ManagementUnanet
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value AnalysisSaqib Raza
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlM Maged Hegazy, LLM, MBA, CCP, P3O
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardJavid Hamdard
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionJohn Khateeb
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation ChecklistAnand Subramaniam
 
Earned value analysis
Earned value analysisEarned value analysis
Earned value analysisNikhil Raj
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value ManagementMansoor Shoaib
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Controlguy_davis
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project schedulingSoe Naing Win
 
Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Schedulingsslovepk
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop TeamAnand Bobade
 
Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areasguestfe6ad
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS Akash Prasanna
 

What's hot (20)

Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
Introduction to Earned Value Management
Introduction to Earned Value ManagementIntroduction to Earned Value Management
Introduction to Earned Value Management
 
Pert and cpm
Pert and cpmPert and cpm
Pert and cpm
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project Control
 
Projects Performance Analysis & Forecasting
Projects Performance Analysis & Forecasting Projects Performance Analysis & Forecasting
Projects Performance Analysis & Forecasting
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid Hamdard
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation Checklist
 
Earned value analysis
Earned value analysisEarned value analysis
Earned value analysis
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project scheduling
 
Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Scheduling
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
Project control
Project controlProject control
Project control
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areas
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 

Viewers also liked

How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013Ong-Art Sanpinit
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And ControllingTom Milner
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoringharoldtaylor1113
 
Project control. Management
Project control. ManagementProject control. Management
Project control. ManagementMarius Miron
 

Viewers also liked (8)

Chap013 4er1
Chap013 4er1Chap013 4er1
Chap013 4er1
 
ODD + Project Control 0.9
ODD + Project Control 0.9ODD + Project Control 0.9
ODD + Project Control 0.9
 
Project control
Project controlProject control
Project control
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And Controlling
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
 

Similar to Project Control Process

Figuring out where you are and does your contractor agree?
Figuring out where you are and does your contractor agree?Figuring out where you are and does your contractor agree?
Figuring out where you are and does your contractor agree?Public Technology Institute
 
Sample cba contact center upgrade project
Sample cba   contact center upgrade projectSample cba   contact center upgrade project
Sample cba contact center upgrade projectKen Hicks
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)Glen Alleman
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)Glen Alleman
 
Symposium 2016 : CONF. 401 Jonathan Shriqui EVM: Go Beyond the Numbers
Symposium 2016 : CONF. 401  Jonathan Shriqui EVM: Go Beyond the NumbersSymposium 2016 : CONF. 401  Jonathan Shriqui EVM: Go Beyond the Numbers
Symposium 2016 : CONF. 401 Jonathan Shriqui EVM: Go Beyond the NumbersPMI-Montréal
 
case study in corporate finance npv irr arr
case study in corporate finance npv irr arrcase study in corporate finance npv irr arr
case study in corporate finance npv irr arrmanjhujayakumar
 
Business Finance Chapter 8
Business Finance Chapter 8Business Finance Chapter 8
Business Finance Chapter 8Tinku Kumar
 
Capital budgeting the basics-2
Capital budgeting the basics-2Capital budgeting the basics-2
Capital budgeting the basics-2Junaid Alam
 
Module 06 Adv Project Manager Budget Mgmt.ppt
Module 06 Adv Project Manager Budget Mgmt.pptModule 06 Adv Project Manager Budget Mgmt.ppt
Module 06 Adv Project Manager Budget Mgmt.pptAsBali1
 
Financial concepts
Financial conceptsFinancial concepts
Financial conceptscebrandt
 
Capital budgeting techniques
Capital budgeting techniquesCapital budgeting techniques
Capital budgeting techniquesusman_sabir
 
Evm class 02 1to15 by upad
Evm   class 02  1to15 by upadEvm   class 02  1to15 by upad
Evm class 02 1to15 by upadhvostik
 
Chapter 8.Capital Budgeting Techniques
Chapter 8.Capital Budgeting TechniquesChapter 8.Capital Budgeting Techniques
Chapter 8.Capital Budgeting TechniquesZahraMirzayeva
 

Similar to Project Control Process (20)

Figuring out where you are and does your contractor agree?
Figuring out where you are and does your contractor agree?Figuring out where you are and does your contractor agree?
Figuring out where you are and does your contractor agree?
 
Sample cba contact center upgrade project
Sample cba   contact center upgrade projectSample cba   contact center upgrade project
Sample cba contact center upgrade project
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)
 
fm10e ch 10.pptx
fm10e ch 10.pptxfm10e ch 10.pptx
fm10e ch 10.pptx
 
Symposium 2016 : CONF. 401 Jonathan Shriqui EVM: Go Beyond the Numbers
Symposium 2016 : CONF. 401  Jonathan Shriqui EVM: Go Beyond the NumbersSymposium 2016 : CONF. 401  Jonathan Shriqui EVM: Go Beyond the Numbers
Symposium 2016 : CONF. 401 Jonathan Shriqui EVM: Go Beyond the Numbers
 
case study in corporate finance npv irr arr
case study in corporate finance npv irr arrcase study in corporate finance npv irr arr
case study in corporate finance npv irr arr
 
Business Finance Chapter 8
Business Finance Chapter 8Business Finance Chapter 8
Business Finance Chapter 8
 
Ch.11
Ch.11Ch.11
Ch.11
 
Capital budgeting the basics-2
Capital budgeting the basics-2Capital budgeting the basics-2
Capital budgeting the basics-2
 
NEDSI-2015_Final
NEDSI-2015_FinalNEDSI-2015_Final
NEDSI-2015_Final
 
Module 06 Adv PM Budget Mgmt.ppt
Module 06 Adv PM Budget Mgmt.pptModule 06 Adv PM Budget Mgmt.ppt
Module 06 Adv PM Budget Mgmt.ppt
 
Module 06 Adv Project Manager Budget Mgmt.ppt
Module 06 Adv Project Manager Budget Mgmt.pptModule 06 Adv Project Manager Budget Mgmt.ppt
Module 06 Adv Project Manager Budget Mgmt.ppt
 
Cai annual conference 2002final
Cai annual conference 2002finalCai annual conference 2002final
Cai annual conference 2002final
 
Financial concepts
Financial conceptsFinancial concepts
Financial concepts
 
EVMS Made Simple
EVMS Made SimpleEVMS Made Simple
EVMS Made Simple
 
Capital budgeting techniques
Capital budgeting techniquesCapital budgeting techniques
Capital budgeting techniques
 
Evm class 02 1to15 by upad
Evm   class 02  1to15 by upadEvm   class 02  1to15 by upad
Evm class 02 1to15 by upad
 
Chapter 8.Capital Budgeting Techniques
Chapter 8.Capital Budgeting TechniquesChapter 8.Capital Budgeting Techniques
Chapter 8.Capital Budgeting Techniques
 
Chapter 9 q&p
Chapter 9 q&pChapter 9 q&p
Chapter 9 q&p
 

More from haroldtaylor1113

Design Coordinates Incorporated
Design Coordinates IncorporatedDesign Coordinates Incorporated
Design Coordinates Incorporatedharoldtaylor1113
 
Case Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater ManagementCase Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater Managementharoldtaylor1113
 
Case Study No. 2-Lumot lake in Laguna
Case Study No. 2-Lumot lake in LagunaCase Study No. 2-Lumot lake in Laguna
Case Study No. 2-Lumot lake in Lagunaharoldtaylor1113
 
Case Study No. 1-Groundwater Supply of Cavite Province
Case Study No. 1-Groundwater Supply of Cavite ProvinceCase Study No. 1-Groundwater Supply of Cavite Province
Case Study No. 1-Groundwater Supply of Cavite Provinceharoldtaylor1113
 
Case Study No. 8-Managing Floods in Metro Manila
Case  Study No. 8-Managing Floods in Metro ManilaCase  Study No. 8-Managing Floods in Metro Manila
Case Study No. 8-Managing Floods in Metro Manilaharoldtaylor1113
 
Case Study No. 12-Presidential Decree No. 1067
Case Study No. 12-Presidential Decree No. 1067Case Study No. 12-Presidential Decree No. 1067
Case Study No. 12-Presidential Decree No. 1067haroldtaylor1113
 
Case Study No. 11- Hydroelectric Power Plant in the Philippines
Case Study No. 11- Hydroelectric Power Plant in the PhilippinesCase Study No. 11- Hydroelectric Power Plant in the Philippines
Case Study No. 11- Hydroelectric Power Plant in the Philippinesharoldtaylor1113
 
Case Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the PhilippinesCase Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the Philippinesharoldtaylor1113
 
Case Study No. 6-Road and Drainage Improvement Project in Caloocan City
Case Study No. 6-Road and Drainage Improvement Project in Caloocan CityCase Study No. 6-Road and Drainage Improvement Project in Caloocan City
Case Study No. 6-Road and Drainage Improvement Project in Caloocan Cityharoldtaylor1113
 
Case Study No. 5-Pasig River Open Channel in Aquaculture
Case Study No. 5-Pasig River Open Channel in AquacultureCase Study No. 5-Pasig River Open Channel in Aquaculture
Case Study No. 5-Pasig River Open Channel in Aquacultureharoldtaylor1113
 
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...haroldtaylor1113
 
Case Study No. 3-Molino Dam in Bacoor, Cavite
Case Study No. 3-Molino Dam in Bacoor, CaviteCase Study No. 3-Molino Dam in Bacoor, Cavite
Case Study No. 3-Molino Dam in Bacoor, Caviteharoldtaylor1113
 
Case Study 13-A Color for All Seasons & A New Variety of Success
Case Study 13-A Color for All Seasons & A New Variety of SuccessCase Study 13-A Color for All Seasons & A New Variety of Success
Case Study 13-A Color for All Seasons & A New Variety of Successharoldtaylor1113
 
Case Study 12B-The Gugo Queen
Case Study 12B-The Gugo Queen  Case Study 12B-The Gugo Queen
Case Study 12B-The Gugo Queen haroldtaylor1113
 
Case Study 12A-From Herbal Folklore to Modern Medicine
Case Study 12A-From Herbal Folklore to Modern Medicine Case Study 12A-From Herbal Folklore to Modern Medicine
Case Study 12A-From Herbal Folklore to Modern Medicine haroldtaylor1113
 
Case Study 11-Rising Above the Competition & Thriving on IP Protection
Case Study 11-Rising Above the Competition & Thriving on IP Protection Case Study 11-Rising Above the Competition & Thriving on IP Protection
Case Study 11-Rising Above the Competition & Thriving on IP Protection haroldtaylor1113
 
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...haroldtaylor1113
 
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...haroldtaylor1113
 
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...haroldtaylor1113
 
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...haroldtaylor1113
 

More from haroldtaylor1113 (20)

Design Coordinates Incorporated
Design Coordinates IncorporatedDesign Coordinates Incorporated
Design Coordinates Incorporated
 
Case Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater ManagementCase Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater Management
 
Case Study No. 2-Lumot lake in Laguna
Case Study No. 2-Lumot lake in LagunaCase Study No. 2-Lumot lake in Laguna
Case Study No. 2-Lumot lake in Laguna
 
Case Study No. 1-Groundwater Supply of Cavite Province
Case Study No. 1-Groundwater Supply of Cavite ProvinceCase Study No. 1-Groundwater Supply of Cavite Province
Case Study No. 1-Groundwater Supply of Cavite Province
 
Case Study No. 8-Managing Floods in Metro Manila
Case  Study No. 8-Managing Floods in Metro ManilaCase  Study No. 8-Managing Floods in Metro Manila
Case Study No. 8-Managing Floods in Metro Manila
 
Case Study No. 12-Presidential Decree No. 1067
Case Study No. 12-Presidential Decree No. 1067Case Study No. 12-Presidential Decree No. 1067
Case Study No. 12-Presidential Decree No. 1067
 
Case Study No. 11- Hydroelectric Power Plant in the Philippines
Case Study No. 11- Hydroelectric Power Plant in the PhilippinesCase Study No. 11- Hydroelectric Power Plant in the Philippines
Case Study No. 11- Hydroelectric Power Plant in the Philippines
 
Case Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the PhilippinesCase Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the Philippines
 
Case Study No. 6-Road and Drainage Improvement Project in Caloocan City
Case Study No. 6-Road and Drainage Improvement Project in Caloocan CityCase Study No. 6-Road and Drainage Improvement Project in Caloocan City
Case Study No. 6-Road and Drainage Improvement Project in Caloocan City
 
Case Study No. 5-Pasig River Open Channel in Aquaculture
Case Study No. 5-Pasig River Open Channel in AquacultureCase Study No. 5-Pasig River Open Channel in Aquaculture
Case Study No. 5-Pasig River Open Channel in Aquaculture
 
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
 
Case Study No. 3-Molino Dam in Bacoor, Cavite
Case Study No. 3-Molino Dam in Bacoor, CaviteCase Study No. 3-Molino Dam in Bacoor, Cavite
Case Study No. 3-Molino Dam in Bacoor, Cavite
 
Case Study 13-A Color for All Seasons & A New Variety of Success
Case Study 13-A Color for All Seasons & A New Variety of SuccessCase Study 13-A Color for All Seasons & A New Variety of Success
Case Study 13-A Color for All Seasons & A New Variety of Success
 
Case Study 12B-The Gugo Queen
Case Study 12B-The Gugo Queen  Case Study 12B-The Gugo Queen
Case Study 12B-The Gugo Queen
 
Case Study 12A-From Herbal Folklore to Modern Medicine
Case Study 12A-From Herbal Folklore to Modern Medicine Case Study 12A-From Herbal Folklore to Modern Medicine
Case Study 12A-From Herbal Folklore to Modern Medicine
 
Case Study 11-Rising Above the Competition & Thriving on IP Protection
Case Study 11-Rising Above the Competition & Thriving on IP Protection Case Study 11-Rising Above the Competition & Thriving on IP Protection
Case Study 11-Rising Above the Competition & Thriving on IP Protection
 
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...
Case Study 10-Shaping a Regional IP Tool & Folk Art and the Opportunities of ...
 
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...
Case Study 8-Electrifying Economic Development & From Heavy to Light_Accelera...
 
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...
Case Study 9-Strategic Partnership Linked to IP in the Development & Planting...
 
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...
Case Study 7- A Bold Step into the Modern Economy & A Remote Solution for a G...
 

Recently uploaded

Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 

Recently uploaded (20)

Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 

Project Control Process

  • 1. COLLEGE OF ENGINEERING Construction Management Group 3 By 1- Saleh Aladdadh 2- Naif Alharbi 3- Salman Almansor Submitted to .Dr. Tomas Ucol Ganiron, Jr
  • 2. PROJECT CONTROL PROCESS - What is Controlling Process - PM responsibility 2
  • 3. Advanced Control: An Overview I attribute my success to this: I never gave or took an excuse. Florence Nightingale 3
  • 4. PROJECT CONTROL PROCESS Purpose : to ensure that project objectives are met by monitoring and measuring progress and taking corrective actions when necessary 4
  • 5. Progress Measurement If we don’t change our direction, we are likely to end up where we’re headed. Anonymous 5
  • 6. Traditional Approaches to Progress Measurement • Budget vs. actual • Percent complete • “Trust me” 6
  • 7. Modern Approaches • Smaller projects or projects with unstable scope: – Weekly or biweekly deliverables – Done or not done • Larger projects: – Earned value 7
  • 9. Earned Value Mechanics • Build (and plot) your baseline • Record (and plot) the actuals • Measure (and plot) progress 9
  • 10. Build Your Baseline • Information developed by planning: – WBS with 108 technical activities and 18 management activities. – Estimates show that all 126 activities will require 1 person for 1 week. – You are constrained to have three full-time staffers plus one half-time project manager. – Staff and PM both cost $1,000 per week. 10
  • 11. Build Your Baseline Month Staff PM Total 1 $12,000 $2,000 $14,000 2 $12,000 $2,000 $14,000 … … … … 9 $12,000 $2,000 $14,000 $108,00 $126,00 Total $18,000 0 0 11
  • 12. Plot Your Baseline Scheduled Cost ($126,000) Cumulative Values Time 12
  • 13. Record Your Actuals Month # Staff Staff $ PM Total $12,00 $14,00 1 3.5 $2,000 0 0 $12,00 $14,00 2 3.5 $2,000 0 0 $16,00 $19,00 3 4.7 $3,000 0 0 $16,00 $18,00 4 4.5 $2,000 0 0 n/a $56,00 $65,00 Total $9,000 0 0 13
  • 14. Plot Your Actuals Scheduled Cost ($126,000) Cumulative Values Actual Cost ($65,000) Time 14
  • 15. Measure Your Progress Earned value = budget for completed item Mo. Done Not Staff PM Total $12,00 1 10+2 2 $10,000 $2,000 0 $11,00 2 9+2 5 $9,000 $2,000 0 $15,00 3 13+2 4 $13,000 $2,000 0 $18,00 4 16+2 0 $16,000 $2,000 0 $56,00 Tot. 56 n/a $48,000 $8,000 15 0
  • 16. Plot Your Progress Scheduled Cost ($126,000) Cumulative Values Actual Cost ($65,000) Earned Value ($56,000) Time 16
  • 17. Use Ratios to Estimate Completion • Cost Performance Index (CPI) = Earned Value / Actual Cost • Cost Estimate At Completion (Cost EAC) = Total Scheduled Cost / CPI • Schedule Performance Index (SPI) = Earned Value / Scheduled Cost • Schedule EAC = Planned Duration / SPI 17
  • 18. Sample Earned Value Calculations • Cost Performance Index (CPI) = 56,000 / 65,000 = 0.86 • Cost Estimate At Completion (Cost EAC) = 126,000 / CPI = 126,000 / 0.86 = 146,500 • Schedule Performance Index (SPI) = 56,000 / 56,000 = 1.00 • Schedule EAC = 9 months / 1.0 = 9 months 18
  • 19. Other Earned Value Acronyms • SC = BCWS = PV – Budgeted Cost of Work Scheduled – Planned Value • AC = ACWP – Actual Cost of Work Performed • EV = BCWP – Budgeted Cost of Work Performed 19
  • 20. More Earned Value Acronyms Estimate Budgeted At Completion d (BAC) Overrun Estimate To Actual Cost Complete (ETC) Estimate At Completion (EAC) 20
  • 21. Sample Values Total Scheduled Cost = 3,500 Cumulative Values Actual Cost = 1,800 Duration = 12 months Budgeted Cost = 900 Earned Value = 600 Time 21
  • 22. Sample Earned Value Calculations • Cost Performance Index (CPI) = 600 / 1,800 = 0.33 • Cost Estimate At Completion (Cost EAC) = 3,500 / CPI = 3,500 / 0.33 = 10,500 • Schedule Performance Index (SPI) = 600 / 900 = 0.67 • Schedule EAC = 12 months / 0.67 = 18 months 22
  • 23. … continued Budget = Estimated Overrun = 7,000 3,500 Actual Cost Estimate To Complete (ETC) = = 8,700 1,800 Cost Estimate At Completion (EAC) = 10,500 23
  • 24. Interpreting Results • Negative is bad: – If CV < 0, you are over budget. – If SV < 0, you are behind schedule. • Less than 1.0 is bad: – If CPI < 1.0, you are over budget. – If SPI < 1.0, you are behind schedule. 24
  • 25. Time Variance • Earned Schedule (ES) — the number of periods planned for the current Earned Value. • Actual Time (AT) — the number of periods that have elapsed since the project started. • TPI (Time Performance Index) = ES / AT 25
  • 26. … continued … Scheduled Cost Cumulative Values AT = 22 PD = 52 ES = 18 Earned Value Time 26
  • 27. … continued • Time to Complete (TC) = Planned Duration / TPI = 52 / 0.8 = 65 = 13 weeks late • SPI will give similar results early in the project, but becomes less reliable later. 27
  • 28. Summary of Key Points • Earned value is the most reliable approach to progress measurement when scope is reasonably stable. • Keep work-items small and short to avoid measurement errors. 28