Non / Pre Engineered Buildings
Presented By
Mr. Amrit Man Tuladhar, Senior Divisional Engineer
Government of Nepal
Ministry of Physical Planning and Works
Department of Urban Development and Building Construction
Building Code Section
Babar Mahal , Kathmandu, NEPAL
Presented on
Training Workshop on "Building Code Implementation"
Organized by : UNCRD, MHPP/DUDBC & NSET
May 19-24, 2008
Why this document ?Why this document ?
Pre-engineered (designed for averagePre engineered (designed for average
building) to engineered
• Readymade drawings and details which• Readymade drawings and details which
can easily be understood and followed
E th k l d• Ease the work load
• However, it does not replace tailor made
design specific to the building !!!
Limitations
• Applicable only for residential buildings
• Should not be more than 3 stories
• Should not have more than 6 bays in any
directiondirection
• Should have minimum two bays in any
directiondirection
• Building should not be more than 25 m in
l thlength
• No span should not be more than 4.5 m
Limitations on LayoutLimitations on Layout
• A or B < 6 bays
7 l i
POSSIBLE SINGLE
STOREY PENTHOUSE
– 7 columns in one
direction
• Maximum 25m in length
One bay <4 5m (i e 15
h2h3h4
H
• One bay <4.5m (i.e. 15
feet)
• A<3B and >B/3
• H/A or H/B <3
a4
a5
h1
CONDITIONS FOR DETAILED DIMENSIONS• H/A or H/B <3
• H < 11m or 3 stories
a1
a2
a3b3
b2
b1
A
B
CONDITIONS FOR DETAILED DIMENSIONS
A and B > 25.0 m
B/3 < A < 3 x B
a x b > 13.5 sq. m.
a b > 4.5 m
A or B > 6 bays
REINFORCED CONCRETE FRAME
What this document covers?What this document covers?
• Limitations of the StandardLimitations of the Standard
• Size of concrete sections and
reinforcementreinforcement
– Column
B– Beam
– Slab
– Foundation
• Tie up details for infill walls
MaterialsMaterials
• Concrete
N t l th M15 i 1 2 4– Not less than M15 i.e. 1:2:4
– Aggregate
F 100 thi k t d d f• For 100mm or more thick parts – graded from
20mm down
• For 40mm to 100mm thick parts – graded fromFor 40mm to 100mm thick parts graded from
12mm down
• Reinforcement
– Fe415 for main reinforcement
– Fe415 or Fe550 for stirrups and slabFe415 or Fe550 for stirrups and slab
reinforcement
Action of Infill Wall
• Infill walls move together with the columns under earthquake shaking.Infill walls move together with the columns under earthquake shaking.
• However, infill walls can fall out-of-plane and topple causing damage.
I l l l d i fill ll h t l ff t d t i• Irregularly placed infill walls cause short-column effect and torsion
as well.
Distributing Total Horizontal Seismic Base Shear
The total horizontal base shear, V, shall be distributed up the height of the
building in accordance with the formula.
Wi hi
Fi = V x ---------
Σ Wi hi
F4
i th FLOOR
: Floor Level Lateral Forces
F3
F2
F1
h1
V43
V31 V32
V43
V33
V22V21
V31 V32 V33
V23
V12V11
V21
V11 V12
V22 V23
V13
V13
Ø21 Ø22
V11 V12 V13
Ø11
a)3-storey, 3-bay frame infill b)4-storey, 3-bay frame infill
panel in two bays, panel in one bay only,
Strut Action of Infill Panels Acting with FramesStrut Action of Infill Panels Acting with Frames
230 600
Z ONE OF TO P BAR
O VERLAP PING
M IDDLE 1/3 OF SPAN
Z ONE OF BO TTO M B AR
O VERLAP PING
Beam Detail
0.3 L 0 .3 L 0.3 L
6 00 6 00
600
300
325
700
2475
M 0 6 (2L )-100 M 0 6 (2L )-150 M 0 6 (2L )-100
1 T 122 T 12
2 T 12
1 T 12
2 T 12
1 T 12
0 .3 L
2 T 12
1 T 12
M 06 (2 L )-100 M 06 (2 L )-150 M 0 6 (2L )-100
L APP ING OF TO P BARS2 T 16 2 T 16 2 T 16
6 006 001 T 12
2 T 12
100
2 T 1 2(RE GULA R TO P BAR)
1 T 12
(ADDITIONAL
T OP BAR)
M 0 6 (2 L)-100
230 X 230 230 X 230 230 X 230
3252475
6 00600
M 0 6 (2L )-100 M 0 6 (2L )-150 M 0 6 (2L )-100
1 T 10
2 T 16
1 T 12 2 T 10 1 T 10
M 06 (2 L )-100 M 06 (2 L )-150 M 06 (2 L )-100
6 00 600
L APP ING OF BO TTO M BARS
230 X 230
L AP LENGTH
0.3 L
0 .3 L
0.3 L
0 .3 L
600 6 00
2 T 16
2 T 12
25 1 80 25
2 30
2 T 12
(RE GULA R
B OT TO M BAR)
00
2 T 12 + 1 T 12
2 T 12
1 T 12
0 6 (2 ) 100 0 6 (2 ) 1 0 0 6 (2 ) 100
230 X 230 230 X 230
DETAIL AT 1
2 T 12
2 T 16
2 T 16
2 T 12
6 00
2 T 16
1 T 12
2 T 16
1 T 10
700
3252875230
1 T 10
2 T 16
10
25 1 80 25
2 30
2 T 12 + 1 T 12
M 0 6 (2 L)-100600 L AP LENGTH
230 X 230
2 T 12 2 T 12
6 00 6 00
M 0 6 (2L )-100 M 0 6 (2L )-150 M 0 6 (2L )-100
M 0 6 (2L )-150
230 X 230 230 X 230
2 T 12
2 T 16
2 T 12
600 6 00600 6 00
2 T 12
M 06 (2 L )-150
220
100
2 T 16
M 0 6 (2 L)-100
2 T 12 (LA PPED)
25275
100
M 0 6 (2L)-1 00
25275
2 T 16 + 2 T 10
2580
30
T W O LEGS
75
N ote:
1. Lapping of the bottom bar should be restricted to a region at least 500 mm
aw ay from the colum n face but excluding the middle quater length of the
beam.
2. Lapping of the to bar should be done only in middle 1
3 length of beam.
3. N ot m ore than 50 % of the bars should be spliced at one section.
4. M ain bars shall not be curtailed in the beams framing infill walls.
5. If a longer and sm aller spans exit adjacent, top bars of longer spab shall
govern.
6. C oncrete grade M 15 stands for concrete mix
1:2:4(C em ent:Sand:Aggregate).
7. Lapping of bars shall not be less than 56 Ø .
8. C urtail additional top bars 0.25L aw ay from support and additional bottom
2 T 122 T 12
4500 > > 40004 500 > > 4000
DETAIL AT 2
2 T 12 2 T 12
2 T 12
25 180 25
2 30
2 T 16 + 1 T 10
25
25 1 80 25
2 30
2 T 16 + 2 T 10
25
1825
23
25 1 80 25
2 30
bars 0.15L aw ay from support in free span beams.
9. T he bars extending through adjacent spans to any span which is less than
2.0 m shall not be curtailed and stirrups be provided same as the ends of
adjacent beam.
10. B eam s spanning along structural infill w alll shall be casted only after erection
of the w all.
11. T he exposed surfaces of concrete shall be kept continuously wet or damp
for atleast one weak.
12. In norm al circum stances form w ork can be removed after three weaks
of concreting.
13. C olum n bar not shown.DETAIL AT 3 DETAIL AT 4 DETAIL AT 5
STIRRUP DETAIL
F igure 7.3a : B eam Detail
(T w o W alls each W ay/ 100 sq.m.)
M 0 6 (2 L)-100
2 T 12
Beam Details
Beams
• Size :
– Width = 230 or 240 mm
– Depth = 325 mm overall
• Reinforcement :
Span For 4.5 m Less than 4.5m.
Reinforcement :
Bar type
/Level
Regular Additional Regular Additional
Top Bot. Top Bot. Top Bot. Top Bot.Top Bot. Top Bot. Top Bot. Top Bot.
Roof 2T12 2T12 1T12 1T12 2T12 2T12 1T12 1T12
II 2T16 2T16 1T16 1T16 2T12 2T12 2T12 1T16
I 2T16 2T16 3T12 1T16 2T16 2T16 1T16 1T16
Plinth 2T12 2T12 - - 2T12 2T12
• Beams are more critical near the supports than at
the mid-span for earthquake load.
Stirrups in BeamsStirrups in Beams
L l/S F 4 5 L th R kLevel/Span For 4.5m Less than
4.5m
Remarks
Roof End 600mm : End 600mm : In theRoof End 600mm :
M06 @100mm
End 600mm :
M06 @100mm
In the
remaining
length of all
beams use
II End 900mm :
M06 @100
End 600mm :
M06 @100 M06 @ 150mmM06 @100mm M06 @100mm
I End 0.3 L :
M06 @80mm
End 0.3 L :
M06 @80mm
Plinth M06 @100mm M06 @100mm
Foundation
100 100
tm'
500
L x B
te'
5075
SEE TEXT
Dimensions are given in the text
Foundation
PAD FOUNDATION :
Colum Column Location Foundation Thickness Maximum Reinforcem
OU O
Size and Reinforcement for Soft Soils (bearing capacity = 100 kN/m2)
n Type Cantilever side Plan Lx B
(m)
at Edge te
(mm)
Thickness
tm (mm)
ent each
way As
Corner No 1.1 x 1.1 150 325 5T10
Corner Yes 1.2 x 1.2 150 325 6T10
Face No 1 4 x 1 4 150 400 6T12Face No 1.4 x 1.4 150 400 6T12
Face Yes 1.6 x 1.6 150 425 7T12
Interior - 1.8 x 1.8 200 500 9T12
• Depth of foundation
Up to firm strata– Up to firm strata
– No Scouring
Foundation
C l C l L ti F d ti Thi k M i R i f
PAD FOUNDATION
Size and Reinforcement for Medium Soils (Safe Bearing capacity = 150 kN/m2)
Colum
n Type
Column Location
Cantilever side
Foundation
Plan LxB(m)
Thickness
at Edge te
(mm)
Maximum
Thickness
tm (mm)
Reinforcem
ent each
way As
Corner No 1 0 x 1 0 150 325 5T10Corner No 1.0 x 1.0 150 325 5T10
Corner Yes 1.0 x 1.0 150 325 6T10
Face No 1.2 x 1.2 175 425 8T10
Face Yes 1.3 x 1.3 175 450 7T12
Interior - 1.6 x 1.6 225 525 8T12
• Depth of foundation
– Up to firm strata
– No ScouringNo Scouring
Toe Wall and Plinth BeamToe Wall and Plinth Beam
• All plinth beams shall bep
constructed on the toe
walls
D th f t ll b l
250200
4 T 12
• Depth of toe wall below
ground level - 450mm or
1.5 ft or as required
150452
GROUND LEVEL
• Height of plinth – 450mm
or 1.5 ft or as required
55150
55 55 230 55 55
450
Size & Reinforcement in ColumnsSize & Reinforcement in Columns
Story Corner Columns Face Columns Interior Columnsy
Size
(mm)
Reinforc
ement
Size
(mm)
Reinforc
ement
Size
(mm)
Reinforc
ement(mm) ement (mm) ement (mm) ement
III 230 x 230 4T12 230 x 230 4T12 230 x 230 4T16
II 230 x 230 4T16 230 x 230 4T16 230 x 230 8T12II 230 x 230 4T16 230 x 230 4T16 230 x 230 8T12
I 270 X
270
4T16 270 X
270
4T16 270 X
270
8T12
Columns:325
600 5 00
5 00 5 00
600
5 00 5 00
475
600
FMAINBAR
DLE1
2OFCOLUMNHT.
T08(CT)-100CT)-125
)-125T08(CT)-100
)-125T08(CT)-100
24300
ZONEOF
OVERLAPPINGATMIDDMNHT.
600600
4 T 12
T08(CT08(CT)-100
T08(CT)T08(CT)-75
450
450
T08(CT)T08(CT)-75
700or56Ø
ICHEVERISGREATER
250000
ZONEOFMAINBAR
OVERLAPPINGATMIDDLE1
2OFCOLUM
600
T08(CT)-125CT)-100
4 T 12
500
T08(CT)-100
500450
4 T 12
CT)-75
T08(CT)-100CT)-75
WH
4 0 1 50 4 0
2 30
4 0 1 50 4 0
2 30
4 0 1 50 4 0
2 30
B AR O V E R L AP PIN G D ET AIL - A
ISO M E TR IC O F C O LU M N / B EA M
J O IN T R EIN F O R C E M E N T D ETAIL
32900
ZONEOFMAINBAR
GATMIDDLE1
2OFCOLUMNHT.
600
2 30 X 230
T08(CT08(CT)-125
4 T 12
2 30 X 230 2 30 X 230
45050000
T08(CT08(CT)-100
2 30 X 230
T08(CT08(CT)-100
4 0 1 50 4 0
4015040
230
M 06 (C T)-125
4 0 1 50 4 0
4015040
230
T 0 8 (C T)-100
4 0 1 50 4 0
4015040
230
T 0 8 (C T)-100
S E C TIO N - 1 S E C TIO N - 2 S E C TIO N - 3
8 T 1 2 (lapped)
3 T 12
3 T 12
2 T 12
4 T12
450OVERLAPPIN
600230600
T08(CT)-100
50450
8 T 12
T08(CT)-75T08(CT)-125
8 T 12
T08(CT)-75
75
N OT E:
1 . B a rs s h o u ld b e la p p e d in m id d le half of the colum n.
2 . P ro v id e s tirru p s in b e a m -c o lum n joints as specified.
3 . N o t m o re th a n 50 % o f th e b a rs s h o u ld b e s p lic e d at one section.
4 . C o n c re te g ra d e m 1 5 s ta n d s fo r c o n c re te m ix 1 :2 :4 (cem ent:sand:aggregate).
5 . C o lu m n a b u ttin g s tru c tu ra l in fill w a ll s h a ll b e c a sted onlly after erection of the
w all.
6 . E x p o s e d s u rfa c e s o f c o n c re te s h a ll b e k e p t c o n tinuously w et of dam p atleast
fo r o n e w eek.
7 . In n o rm a l c irc u m s ta n c e s fo rm w o rk c a n b e re m o v e d a fte r 24 to 48 hours of
c o n c reting.
8 . B e a m b a r b o t show n.
C LO SE D S T IR R U P S (C T ) D E TA IL
IN D EX
K 05 (C T) 100
C /C spa cing
C lo se d st irrups
D iam e ter of bar
T ypes of steel
2 T 12
N o. o f bar
D iam e ter of bar
T ypes of steel
S EC TIO N TH R O U G H IN TE R IO R FR AM E
Shear Reinforcement (Rings)Shear Reinforcement (Rings)
• At the end of columns for 600mm (2 ft)At the end of columns for 600mm (2 ft)
length – T 08 @100 mm c/c
• For remaining height – T 06 @125 mm c/cFor remaining height T 06 @125 mm c/c
Slab
• Thickness = 100mm
• Reinforcement = T08 or K07 and M06 or
K4.75
Slab DetailSlab Detail
Edge SlabEdge Slab
Chair DetailChair Detail
Interior Slab
t
3 m < b < 4.5 m
Bands in Non Load Bearing Walls
<300
Tie Beam
.2m
A
2.8m<h<3
A
BB
628
ELEVATION
A
0.36
SECTION AT A - A
COLUMN
100 500 100500
t
BEAM
SECTIONAL PLAN AT B - B
t
60 60
INDEX
M 06 (1L) 150
C/C spacing
No. of legs
Di t f B
DETAIL AT A
75
60 60
2 T 08M 06 (I-L)-150
Diameter of Bars
Type of steel
1 T 08
Diameter of bar
Type of steel
No. of bar
HAND RAIL
300
Parapets
300
A
2 T 08
300
ickness
50
2 T 08
Wallthi
50
M 06 (I-L)-150
SECTION AT A - A
75
Let’s rectify our bad practicesLet’s rectify our bad practices
and
Maintain good practices
Th k YThank You
Overview/FeaturesOverview/Features
• Effect of infill walls is considered in• Effect of infill walls is considered in
NBC 201
–Infill walls should be tied up with the
main structure to prevent the wall frommain structure to prevent the wall from
being failed in out-of-plane
Limitations: LayoutLimitations: Layout
• Wings of the structure
K1 d K2 < A/4 B/4– K1 and K2 < A/4 or B/4
– The width of wing should be greater than half
of K1 or K2of K1 or K2
<K2/2
AorB
AorBk2
AorB
<K1/2
k1
<K1/2 k1
k1
<K1/2
K1, K2 < 0.25 A or 0.25 B, whichever is less.

More Related Content

What's hot

Cembre Hydraulic Cable Cutters and Cable Cutting Tools
Cembre Hydraulic Cable Cutters and Cable Cutting ToolsCembre Hydraulic Cable Cutters and Cable Cutting Tools
Cembre Hydraulic Cable Cutters and Cable Cutting ToolsThorne & Derrick International
 
Cấu tạo và những chi tiết kỹ thuật của một vài loại bánh xe đẩy công nghiệp
Cấu tạo và những chi tiết kỹ thuật của một vài loại bánh xe đẩy công nghiệpCấu tạo và những chi tiết kỹ thuật của một vài loại bánh xe đẩy công nghiệp
Cấu tạo và những chi tiết kỹ thuật của một vài loại bánh xe đẩy công nghiệpBánh xe đẩy
 
Контейнеры и наборы инструмента
Контейнеры и наборы инструментаКонтейнеры и наборы инструмента
Контейнеры и наборы инструментаmashresurs
 
измерительный инструмент
измерительный инструментизмерительный инструмент
измерительный инструментmashresurs
 
HYDRAULIC BREAKERS SOOSAN SQ SERIES
HYDRAULIC BREAKERS SOOSAN SQ SERIESHYDRAULIC BREAKERS SOOSAN SQ SERIES
HYDRAULIC BREAKERS SOOSAN SQ SERIESAntonis Pagidas
 
NJI Portfolio Short
NJI Portfolio ShortNJI Portfolio Short
NJI Portfolio ShortNick Ivill
 
Prysmian UNI25+ Cable Sheath Removal & Stripping Tools 25mm
Prysmian UNI25+ Cable Sheath Removal & Stripping Tools 25mmPrysmian UNI25+ Cable Sheath Removal & Stripping Tools 25mm
Prysmian UNI25+ Cable Sheath Removal & Stripping Tools 25mmThorne & Derrick International
 
Ripley Utility Tool WS 76 Semi-Con Shaving Tool - Spec Sheet
Ripley Utility Tool WS 76 Semi-Con Shaving Tool - Spec SheetRipley Utility Tool WS 76 Semi-Con Shaving Tool - Spec Sheet
Ripley Utility Tool WS 76 Semi-Con Shaving Tool - Spec SheetThorne & Derrick International
 
щипцы, кусачки
щипцы, кусачкищипцы, кусачки
щипцы, кусачкиmashresurs
 
Инструмент для электротехники
Инструмент для электротехникиИнструмент для электротехники
Инструмент для электротехникиmashresurs
 
Welding symbol
Welding symbolWelding symbol
Welding symbolTori Tom
 

What's hot (20)

Cembre Hydraulic Cable Cutters and Cable Cutting Tools
Cembre Hydraulic Cable Cutters and Cable Cutting ToolsCembre Hydraulic Cable Cutters and Cable Cutting Tools
Cembre Hydraulic Cable Cutters and Cable Cutting Tools
 
Stripping Tool for Peelable Semi-Con Screens
Stripping Tool for Peelable Semi-Con ScreensStripping Tool for Peelable Semi-Con Screens
Stripping Tool for Peelable Semi-Con Screens
 
Cấu tạo và những chi tiết kỹ thuật của một vài loại bánh xe đẩy công nghiệp
Cấu tạo và những chi tiết kỹ thuật của một vài loại bánh xe đẩy công nghiệpCấu tạo và những chi tiết kỹ thuật của một vài loại bánh xe đẩy công nghiệp
Cấu tạo và những chi tiết kỹ thuật của một vài loại bánh xe đẩy công nghiệp
 
Контейнеры и наборы инструмента
Контейнеры и наборы инструментаКонтейнеры и наборы инструмента
Контейнеры и наборы инструмента
 
2009-Tooling-Manual
2009-Tooling-Manual2009-Tooling-Manual
2009-Tooling-Manual
 
измерительный инструмент
измерительный инструментизмерительный инструмент
измерительный инструмент
 
Stripping Tool for Bonded Semi-Con Screens
Stripping Tool for Bonded Semi-Con ScreensStripping Tool for Bonded Semi-Con Screens
Stripping Tool for Bonded Semi-Con Screens
 
HYDRAULIC BREAKERS SOOSAN SQ SERIES
HYDRAULIC BREAKERS SOOSAN SQ SERIESHYDRAULIC BREAKERS SOOSAN SQ SERIES
HYDRAULIC BREAKERS SOOSAN SQ SERIES
 
NJI Portfolio Short
NJI Portfolio ShortNJI Portfolio Short
NJI Portfolio Short
 
Brochure Norton Vulcan
Brochure Norton VulcanBrochure Norton Vulcan
Brochure Norton Vulcan
 
Cembre RHU231 Hydraulic Crimp Head - Pressheads
Cembre RHU231 Hydraulic Crimp Head -  PressheadsCembre RHU231 Hydraulic Crimp Head -  Pressheads
Cembre RHU231 Hydraulic Crimp Head - Pressheads
 
Prysmian UNI25+ Cable Sheath Removal & Stripping Tools 25mm
Prysmian UNI25+ Cable Sheath Removal & Stripping Tools 25mmPrysmian UNI25+ Cable Sheath Removal & Stripping Tools 25mm
Prysmian UNI25+ Cable Sheath Removal & Stripping Tools 25mm
 
WHIRLPOWER impact tools
WHIRLPOWER impact toolsWHIRLPOWER impact tools
WHIRLPOWER impact tools
 
Brochure Norton Omega range
Brochure Norton Omega rangeBrochure Norton Omega range
Brochure Norton Omega range
 
Ripley Utility Tool WS 76 Semi-Con Shaving Tool - Spec Sheet
Ripley Utility Tool WS 76 Semi-Con Shaving Tool - Spec SheetRipley Utility Tool WS 76 Semi-Con Shaving Tool - Spec Sheet
Ripley Utility Tool WS 76 Semi-Con Shaving Tool - Spec Sheet
 
щипцы, кусачки
щипцы, кусачкищипцы, кусачки
щипцы, кусачки
 
WHIRLPOWER Screwdrivers
WHIRLPOWER  ScrewdriversWHIRLPOWER  Screwdrivers
WHIRLPOWER Screwdrivers
 
WHIRLPOWER torque tools
WHIRLPOWER torque toolsWHIRLPOWER torque tools
WHIRLPOWER torque tools
 
Инструмент для электротехники
Инструмент для электротехникиИнструмент для электротехники
Инструмент для электротехники
 
Welding symbol
Welding symbolWelding symbol
Welding symbol
 

Viewers also liked

Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02hlksd
 
Royal properties sdn bhd MS
Royal properties sdn bhd MSRoyal properties sdn bhd MS
Royal properties sdn bhd MSFelix Vong
 
An over view of the high rise buildings
An over view of the high rise buildingsAn over view of the high rise buildings
An over view of the high rise buildingshlksd
 
house construction
house constructionhouse construction
house constructionAbhinav Saha
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineChong Chin Pin
 
50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyorhlksd
 
Costing for-civil-engineering-project
Costing for-civil-engineering-projectCosting for-civil-engineering-project
Costing for-civil-engineering-projecthlksd
 
Ibe quantity surveyor 2013
Ibe quantity surveyor 2013Ibe quantity surveyor 2013
Ibe quantity surveyor 2013nurun2010
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Felix Vong
 
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul LeslieModelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul LeslieRahul Leslie
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSYousuf Dinar
 

Viewers also liked (11)

Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02
 
Royal properties sdn bhd MS
Royal properties sdn bhd MSRoyal properties sdn bhd MS
Royal properties sdn bhd MS
 
An over view of the high rise buildings
An over view of the high rise buildingsAn over view of the high rise buildings
An over view of the high rise buildings
 
house construction
house constructionhouse construction
house construction
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazine
 
50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor
 
Costing for-civil-engineering-project
Costing for-civil-engineering-projectCosting for-civil-engineering-project
Costing for-civil-engineering-project
 
Ibe quantity surveyor 2013
Ibe quantity surveyor 2013Ibe quantity surveyor 2013
Ibe quantity surveyor 2013
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
 
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul LeslieModelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABS
 

Similar to Tuladhar

Busbar Supports Universal-Compact-Flat
Busbar Supports Universal-Compact-FlatBusbar Supports Universal-Compact-Flat
Busbar Supports Universal-Compact-FlatTeknomega S.r.l.
 
Arki tabulated-reviewer
Arki tabulated-reviewerArki tabulated-reviewer
Arki tabulated-reviewerFann Portento
 
BHUSHAN STEEL.pdf BROCHURE FOR STEEL TABLE
BHUSHAN STEEL.pdf BROCHURE FOR STEEL TABLEBHUSHAN STEEL.pdf BROCHURE FOR STEEL TABLE
BHUSHAN STEEL.pdf BROCHURE FOR STEEL TABLEKuberBhusal1
 
many projects shoring
many projects shoringmany projects shoring
many projects shoringSamir Salman
 
Labour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdfLabour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdfKothandaraman T
 
Mathcad 17-slab design
Mathcad   17-slab designMathcad   17-slab design
Mathcad 17-slab designmichael mutitu
 
Dos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdfDos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdfvhjadhav
 
DIN-RAILS-Manufacturer-and-Supplier-In-India.pdf
DIN-RAILS-Manufacturer-and-Supplier-In-India.pdfDIN-RAILS-Manufacturer-and-Supplier-In-India.pdf
DIN-RAILS-Manufacturer-and-Supplier-In-India.pdfTrinity Touch
 
FULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles RoucherFULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles RoucherCharles Roucher
 
Schiedel Metaloterm MFflue system
Schiedel Metaloterm MFflue systemSchiedel Metaloterm MFflue system
Schiedel Metaloterm MFflue systemSchiedel UK
 
Rcc slab design guidelines
Rcc slab design guidelinesRcc slab design guidelines
Rcc slab design guidelinesMain Uddin
 

Similar to Tuladhar (20)

CMD Couplings
CMD CouplingsCMD Couplings
CMD Couplings
 
Layout for Approval-19
Layout for Approval-19Layout for Approval-19
Layout for Approval-19
 
Busbar Supports Universal-Compact-Flat
Busbar Supports Universal-Compact-FlatBusbar Supports Universal-Compact-Flat
Busbar Supports Universal-Compact-Flat
 
Arki tabulated-reviewer
Arki tabulated-reviewerArki tabulated-reviewer
Arki tabulated-reviewer
 
BHUSHAN STEEL.pdf BROCHURE FOR STEEL TABLE
BHUSHAN STEEL.pdf BROCHURE FOR STEEL TABLEBHUSHAN STEEL.pdf BROCHURE FOR STEEL TABLE
BHUSHAN STEEL.pdf BROCHURE FOR STEEL TABLE
 
many projects shoring
many projects shoringmany projects shoring
many projects shoring
 
Labour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdfLabour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdf
 
Presentation.pptx
Presentation.pptxPresentation.pptx
Presentation.pptx
 
DESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRODESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRO
 
Mathcad 17-slab design
Mathcad   17-slab designMathcad   17-slab design
Mathcad 17-slab design
 
Dos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdfDos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdf
 
DIN-RAILS-Manufacturer-and-Supplier-In-India.pdf
DIN-RAILS-Manufacturer-and-Supplier-In-India.pdfDIN-RAILS-Manufacturer-and-Supplier-In-India.pdf
DIN-RAILS-Manufacturer-and-Supplier-In-India.pdf
 
Catalogue LMSP
Catalogue LMSPCatalogue LMSP
Catalogue LMSP
 
0 ne way slab
0 ne way slab0 ne way slab
0 ne way slab
 
FULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles RoucherFULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles Roucher
 
Z & C Purlins
Z & C PurlinsZ & C Purlins
Z & C Purlins
 
Schiedel Metaloterm MFflue system
Schiedel Metaloterm MFflue systemSchiedel Metaloterm MFflue system
Schiedel Metaloterm MFflue system
 
Rcc slab design guidelines
Rcc slab design guidelinesRcc slab design guidelines
Rcc slab design guidelines
 
I Download (1)
I Download (1)I Download (1)
I Download (1)
 
I download
I downloadI download
I download
 

More from hlksd

Write better essays in 20 minutes a day
Write better essays in 20 minutes a dayWrite better essays in 20 minutes a day
Write better essays in 20 minutes a dayhlksd
 
Research and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a dayResearch and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a dayhlksd
 
Reasonskills
ReasonskillsReasonskills
Reasonskillshlksd
 
R05420107 advancedcommunicationskills
R05420107 advancedcommunicationskillsR05420107 advancedcommunicationskills
R05420107 advancedcommunicationskillshlksd
 
Proofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a dayProofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a dayhlksd
 
R05420107 advanced-communication-skills
R05420107 advanced-communication-skillsR05420107 advanced-communication-skills
R05420107 advanced-communication-skillshlksd
 
Standard specifications
Standard specificationsStandard specifications
Standard specificationshlksd
 
Presentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.comPresentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.comhlksd
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62hlksd
 
Pre engineered buildings
Pre engineered buildingsPre engineered buildings
Pre engineered buildingshlksd
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildingshlksd
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building constructionhlksd
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteelhlksd
 
Peb structures (1)
Peb structures (1)Peb structures (1)
Peb structures (1)hlksd
 
Peb structures
Peb structuresPeb structures
Peb structureshlksd
 
As22267272
As22267272As22267272
As22267272hlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)hlksd
 

More from hlksd (20)

Write better essays in 20 minutes a day
Write better essays in 20 minutes a dayWrite better essays in 20 minutes a day
Write better essays in 20 minutes a day
 
Research and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a dayResearch and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a day
 
Reasonskills
ReasonskillsReasonskills
Reasonskills
 
R05420107 advancedcommunicationskills
R05420107 advancedcommunicationskillsR05420107 advancedcommunicationskills
R05420107 advancedcommunicationskills
 
Proofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a dayProofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a day
 
R05420107 advanced-communication-skills
R05420107 advanced-communication-skillsR05420107 advanced-communication-skills
R05420107 advanced-communication-skills
 
Standard specifications
Standard specificationsStandard specifications
Standard specifications
 
Presentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.comPresentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.com
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62
 
Pre engineered buildings
Pre engineered buildingsPre engineered buildings
Pre engineered buildings
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building construction
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteel
 
Peb
PebPeb
Peb
 
Peb structures (1)
Peb structures (1)Peb structures (1)
Peb structures (1)
 
Peb structures
Peb structuresPeb structures
Peb structures
 
As22267272
As22267272As22267272
As22267272
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)
 

Tuladhar

  • 1. Non / Pre Engineered Buildings Presented By Mr. Amrit Man Tuladhar, Senior Divisional Engineer Government of Nepal Ministry of Physical Planning and Works Department of Urban Development and Building Construction Building Code Section Babar Mahal , Kathmandu, NEPAL Presented on Training Workshop on "Building Code Implementation" Organized by : UNCRD, MHPP/DUDBC & NSET May 19-24, 2008
  • 2. Why this document ?Why this document ? Pre-engineered (designed for averagePre engineered (designed for average building) to engineered • Readymade drawings and details which• Readymade drawings and details which can easily be understood and followed E th k l d• Ease the work load • However, it does not replace tailor made design specific to the building !!!
  • 3. Limitations • Applicable only for residential buildings • Should not be more than 3 stories • Should not have more than 6 bays in any directiondirection • Should have minimum two bays in any directiondirection • Building should not be more than 25 m in l thlength • No span should not be more than 4.5 m
  • 4. Limitations on LayoutLimitations on Layout • A or B < 6 bays 7 l i POSSIBLE SINGLE STOREY PENTHOUSE – 7 columns in one direction • Maximum 25m in length One bay <4 5m (i e 15 h2h3h4 H • One bay <4.5m (i.e. 15 feet) • A<3B and >B/3 • H/A or H/B <3 a4 a5 h1 CONDITIONS FOR DETAILED DIMENSIONS• H/A or H/B <3 • H < 11m or 3 stories a1 a2 a3b3 b2 b1 A B CONDITIONS FOR DETAILED DIMENSIONS A and B > 25.0 m B/3 < A < 3 x B a x b > 13.5 sq. m. a b > 4.5 m A or B > 6 bays REINFORCED CONCRETE FRAME
  • 5. What this document covers?What this document covers? • Limitations of the StandardLimitations of the Standard • Size of concrete sections and reinforcementreinforcement – Column B– Beam – Slab – Foundation • Tie up details for infill walls
  • 6. MaterialsMaterials • Concrete N t l th M15 i 1 2 4– Not less than M15 i.e. 1:2:4 – Aggregate F 100 thi k t d d f• For 100mm or more thick parts – graded from 20mm down • For 40mm to 100mm thick parts – graded fromFor 40mm to 100mm thick parts graded from 12mm down • Reinforcement – Fe415 for main reinforcement – Fe415 or Fe550 for stirrups and slabFe415 or Fe550 for stirrups and slab reinforcement
  • 7. Action of Infill Wall • Infill walls move together with the columns under earthquake shaking.Infill walls move together with the columns under earthquake shaking. • However, infill walls can fall out-of-plane and topple causing damage. I l l l d i fill ll h t l ff t d t i• Irregularly placed infill walls cause short-column effect and torsion as well.
  • 8. Distributing Total Horizontal Seismic Base Shear The total horizontal base shear, V, shall be distributed up the height of the building in accordance with the formula. Wi hi Fi = V x --------- Σ Wi hi F4 i th FLOOR : Floor Level Lateral Forces F3 F2 F1 h1
  • 9. V43 V31 V32 V43 V33 V22V21 V31 V32 V33 V23 V12V11 V21 V11 V12 V22 V23 V13 V13 Ø21 Ø22 V11 V12 V13 Ø11 a)3-storey, 3-bay frame infill b)4-storey, 3-bay frame infill panel in two bays, panel in one bay only, Strut Action of Infill Panels Acting with FramesStrut Action of Infill Panels Acting with Frames
  • 10. 230 600 Z ONE OF TO P BAR O VERLAP PING M IDDLE 1/3 OF SPAN Z ONE OF BO TTO M B AR O VERLAP PING Beam Detail 0.3 L 0 .3 L 0.3 L 6 00 6 00 600 300 325 700 2475 M 0 6 (2L )-100 M 0 6 (2L )-150 M 0 6 (2L )-100 1 T 122 T 12 2 T 12 1 T 12 2 T 12 1 T 12 0 .3 L 2 T 12 1 T 12 M 06 (2 L )-100 M 06 (2 L )-150 M 0 6 (2L )-100 L APP ING OF TO P BARS2 T 16 2 T 16 2 T 16 6 006 001 T 12 2 T 12 100 2 T 1 2(RE GULA R TO P BAR) 1 T 12 (ADDITIONAL T OP BAR) M 0 6 (2 L)-100 230 X 230 230 X 230 230 X 230 3252475 6 00600 M 0 6 (2L )-100 M 0 6 (2L )-150 M 0 6 (2L )-100 1 T 10 2 T 16 1 T 12 2 T 10 1 T 10 M 06 (2 L )-100 M 06 (2 L )-150 M 06 (2 L )-100 6 00 600 L APP ING OF BO TTO M BARS 230 X 230 L AP LENGTH 0.3 L 0 .3 L 0.3 L 0 .3 L 600 6 00 2 T 16 2 T 12 25 1 80 25 2 30 2 T 12 (RE GULA R B OT TO M BAR) 00 2 T 12 + 1 T 12 2 T 12 1 T 12 0 6 (2 ) 100 0 6 (2 ) 1 0 0 6 (2 ) 100 230 X 230 230 X 230 DETAIL AT 1 2 T 12 2 T 16 2 T 16 2 T 12 6 00 2 T 16 1 T 12 2 T 16 1 T 10 700 3252875230 1 T 10 2 T 16 10 25 1 80 25 2 30 2 T 12 + 1 T 12 M 0 6 (2 L)-100600 L AP LENGTH 230 X 230 2 T 12 2 T 12 6 00 6 00 M 0 6 (2L )-100 M 0 6 (2L )-150 M 0 6 (2L )-100 M 0 6 (2L )-150 230 X 230 230 X 230 2 T 12 2 T 16 2 T 12 600 6 00600 6 00 2 T 12 M 06 (2 L )-150 220 100 2 T 16 M 0 6 (2 L)-100 2 T 12 (LA PPED) 25275 100 M 0 6 (2L)-1 00 25275 2 T 16 + 2 T 10 2580 30 T W O LEGS 75 N ote: 1. Lapping of the bottom bar should be restricted to a region at least 500 mm aw ay from the colum n face but excluding the middle quater length of the beam. 2. Lapping of the to bar should be done only in middle 1 3 length of beam. 3. N ot m ore than 50 % of the bars should be spliced at one section. 4. M ain bars shall not be curtailed in the beams framing infill walls. 5. If a longer and sm aller spans exit adjacent, top bars of longer spab shall govern. 6. C oncrete grade M 15 stands for concrete mix 1:2:4(C em ent:Sand:Aggregate). 7. Lapping of bars shall not be less than 56 Ø . 8. C urtail additional top bars 0.25L aw ay from support and additional bottom 2 T 122 T 12 4500 > > 40004 500 > > 4000 DETAIL AT 2 2 T 12 2 T 12 2 T 12 25 180 25 2 30 2 T 16 + 1 T 10 25 25 1 80 25 2 30 2 T 16 + 2 T 10 25 1825 23 25 1 80 25 2 30 bars 0.15L aw ay from support in free span beams. 9. T he bars extending through adjacent spans to any span which is less than 2.0 m shall not be curtailed and stirrups be provided same as the ends of adjacent beam. 10. B eam s spanning along structural infill w alll shall be casted only after erection of the w all. 11. T he exposed surfaces of concrete shall be kept continuously wet or damp for atleast one weak. 12. In norm al circum stances form w ork can be removed after three weaks of concreting. 13. C olum n bar not shown.DETAIL AT 3 DETAIL AT 4 DETAIL AT 5 STIRRUP DETAIL F igure 7.3a : B eam Detail (T w o W alls each W ay/ 100 sq.m.) M 0 6 (2 L)-100 2 T 12
  • 12. Beams • Size : – Width = 230 or 240 mm – Depth = 325 mm overall • Reinforcement : Span For 4.5 m Less than 4.5m. Reinforcement : Bar type /Level Regular Additional Regular Additional Top Bot. Top Bot. Top Bot. Top Bot.Top Bot. Top Bot. Top Bot. Top Bot. Roof 2T12 2T12 1T12 1T12 2T12 2T12 1T12 1T12 II 2T16 2T16 1T16 1T16 2T12 2T12 2T12 1T16 I 2T16 2T16 3T12 1T16 2T16 2T16 1T16 1T16 Plinth 2T12 2T12 - - 2T12 2T12 • Beams are more critical near the supports than at the mid-span for earthquake load.
  • 13. Stirrups in BeamsStirrups in Beams L l/S F 4 5 L th R kLevel/Span For 4.5m Less than 4.5m Remarks Roof End 600mm : End 600mm : In theRoof End 600mm : M06 @100mm End 600mm : M06 @100mm In the remaining length of all beams use II End 900mm : M06 @100 End 600mm : M06 @100 M06 @ 150mmM06 @100mm M06 @100mm I End 0.3 L : M06 @80mm End 0.3 L : M06 @80mm Plinth M06 @100mm M06 @100mm
  • 14. Foundation 100 100 tm' 500 L x B te' 5075 SEE TEXT Dimensions are given in the text
  • 15. Foundation PAD FOUNDATION : Colum Column Location Foundation Thickness Maximum Reinforcem OU O Size and Reinforcement for Soft Soils (bearing capacity = 100 kN/m2) n Type Cantilever side Plan Lx B (m) at Edge te (mm) Thickness tm (mm) ent each way As Corner No 1.1 x 1.1 150 325 5T10 Corner Yes 1.2 x 1.2 150 325 6T10 Face No 1 4 x 1 4 150 400 6T12Face No 1.4 x 1.4 150 400 6T12 Face Yes 1.6 x 1.6 150 425 7T12 Interior - 1.8 x 1.8 200 500 9T12 • Depth of foundation Up to firm strata– Up to firm strata – No Scouring
  • 16. Foundation C l C l L ti F d ti Thi k M i R i f PAD FOUNDATION Size and Reinforcement for Medium Soils (Safe Bearing capacity = 150 kN/m2) Colum n Type Column Location Cantilever side Foundation Plan LxB(m) Thickness at Edge te (mm) Maximum Thickness tm (mm) Reinforcem ent each way As Corner No 1 0 x 1 0 150 325 5T10Corner No 1.0 x 1.0 150 325 5T10 Corner Yes 1.0 x 1.0 150 325 6T10 Face No 1.2 x 1.2 175 425 8T10 Face Yes 1.3 x 1.3 175 450 7T12 Interior - 1.6 x 1.6 225 525 8T12 • Depth of foundation – Up to firm strata – No ScouringNo Scouring
  • 17. Toe Wall and Plinth BeamToe Wall and Plinth Beam • All plinth beams shall bep constructed on the toe walls D th f t ll b l 250200 4 T 12 • Depth of toe wall below ground level - 450mm or 1.5 ft or as required 150452 GROUND LEVEL • Height of plinth – 450mm or 1.5 ft or as required 55150 55 55 230 55 55 450
  • 18. Size & Reinforcement in ColumnsSize & Reinforcement in Columns Story Corner Columns Face Columns Interior Columnsy Size (mm) Reinforc ement Size (mm) Reinforc ement Size (mm) Reinforc ement(mm) ement (mm) ement (mm) ement III 230 x 230 4T12 230 x 230 4T12 230 x 230 4T16 II 230 x 230 4T16 230 x 230 4T16 230 x 230 8T12II 230 x 230 4T16 230 x 230 4T16 230 x 230 8T12 I 270 X 270 4T16 270 X 270 4T16 270 X 270 8T12
  • 19. Columns:325 600 5 00 5 00 5 00 600 5 00 5 00 475 600 FMAINBAR DLE1 2OFCOLUMNHT. T08(CT)-100CT)-125 )-125T08(CT)-100 )-125T08(CT)-100 24300 ZONEOF OVERLAPPINGATMIDDMNHT. 600600 4 T 12 T08(CT08(CT)-100 T08(CT)T08(CT)-75 450 450 T08(CT)T08(CT)-75 700or56Ø ICHEVERISGREATER 250000 ZONEOFMAINBAR OVERLAPPINGATMIDDLE1 2OFCOLUM 600 T08(CT)-125CT)-100 4 T 12 500 T08(CT)-100 500450 4 T 12 CT)-75 T08(CT)-100CT)-75 WH 4 0 1 50 4 0 2 30 4 0 1 50 4 0 2 30 4 0 1 50 4 0 2 30 B AR O V E R L AP PIN G D ET AIL - A ISO M E TR IC O F C O LU M N / B EA M J O IN T R EIN F O R C E M E N T D ETAIL 32900 ZONEOFMAINBAR GATMIDDLE1 2OFCOLUMNHT. 600 2 30 X 230 T08(CT08(CT)-125 4 T 12 2 30 X 230 2 30 X 230 45050000 T08(CT08(CT)-100 2 30 X 230 T08(CT08(CT)-100 4 0 1 50 4 0 4015040 230 M 06 (C T)-125 4 0 1 50 4 0 4015040 230 T 0 8 (C T)-100 4 0 1 50 4 0 4015040 230 T 0 8 (C T)-100 S E C TIO N - 1 S E C TIO N - 2 S E C TIO N - 3 8 T 1 2 (lapped) 3 T 12 3 T 12 2 T 12 4 T12 450OVERLAPPIN 600230600 T08(CT)-100 50450 8 T 12 T08(CT)-75T08(CT)-125 8 T 12 T08(CT)-75 75 N OT E: 1 . B a rs s h o u ld b e la p p e d in m id d le half of the colum n. 2 . P ro v id e s tirru p s in b e a m -c o lum n joints as specified. 3 . N o t m o re th a n 50 % o f th e b a rs s h o u ld b e s p lic e d at one section. 4 . C o n c re te g ra d e m 1 5 s ta n d s fo r c o n c re te m ix 1 :2 :4 (cem ent:sand:aggregate). 5 . C o lu m n a b u ttin g s tru c tu ra l in fill w a ll s h a ll b e c a sted onlly after erection of the w all. 6 . E x p o s e d s u rfa c e s o f c o n c re te s h a ll b e k e p t c o n tinuously w et of dam p atleast fo r o n e w eek. 7 . In n o rm a l c irc u m s ta n c e s fo rm w o rk c a n b e re m o v e d a fte r 24 to 48 hours of c o n c reting. 8 . B e a m b a r b o t show n. C LO SE D S T IR R U P S (C T ) D E TA IL IN D EX K 05 (C T) 100 C /C spa cing C lo se d st irrups D iam e ter of bar T ypes of steel 2 T 12 N o. o f bar D iam e ter of bar T ypes of steel S EC TIO N TH R O U G H IN TE R IO R FR AM E
  • 20. Shear Reinforcement (Rings)Shear Reinforcement (Rings) • At the end of columns for 600mm (2 ft)At the end of columns for 600mm (2 ft) length – T 08 @100 mm c/c • For remaining height – T 06 @125 mm c/cFor remaining height T 06 @125 mm c/c
  • 21. Slab • Thickness = 100mm • Reinforcement = T08 or K07 and M06 or K4.75
  • 22. Slab DetailSlab Detail Edge SlabEdge Slab Chair DetailChair Detail Interior Slab
  • 23. t 3 m < b < 4.5 m Bands in Non Load Bearing Walls <300 Tie Beam .2m A 2.8m<h<3 A BB 628 ELEVATION A 0.36 SECTION AT A - A COLUMN 100 500 100500 t BEAM SECTIONAL PLAN AT B - B t 60 60 INDEX M 06 (1L) 150 C/C spacing No. of legs Di t f B DETAIL AT A 75 60 60 2 T 08M 06 (I-L)-150 Diameter of Bars Type of steel 1 T 08 Diameter of bar Type of steel No. of bar
  • 24. HAND RAIL 300 Parapets 300 A 2 T 08 300 ickness 50 2 T 08 Wallthi 50 M 06 (I-L)-150 SECTION AT A - A 75
  • 25. Let’s rectify our bad practicesLet’s rectify our bad practices and Maintain good practices
  • 26. Th k YThank You
  • 27.
  • 28. Overview/FeaturesOverview/Features • Effect of infill walls is considered in• Effect of infill walls is considered in NBC 201 –Infill walls should be tied up with the main structure to prevent the wall frommain structure to prevent the wall from being failed in out-of-plane
  • 29. Limitations: LayoutLimitations: Layout • Wings of the structure K1 d K2 < A/4 B/4– K1 and K2 < A/4 or B/4 – The width of wing should be greater than half of K1 or K2of K1 or K2 <K2/2 AorB AorBk2 AorB <K1/2 k1 <K1/2 k1 k1 <K1/2 K1, K2 < 0.25 A or 0.25 B, whichever is less.