TABLE 4. UNIT 4 REACTOR, SPENT FUEL POOL: FUKUSHIMA DAIICHI NUCLEAR POWER PLANT: 18 MAY 2011
                                    ASSESSMENT OF STATUS IN TERMS OF FUNDAMENTAL SAFETY FUNCTIONS FOR ACHIEVING A SAFE STATE

                                 Necessary safety function and                                                                                                               TEPCO Roadmap
                                                                                        Observation                                 Evaluation of state
                                            conditions                                                                                                                        countermeasures
                              Spent fuel pool shall be subcritical   - According to TEPCO statement and to its            PARTIALLY ACHIEVED:                       Maintaining the geometry of spent
                              Keff < 0.95 (design value), and sub-     assessment from the water sampling of the spent    CAUTION                                   fuel pool (including aftershocks)
                              criticality shall be demonstrated        fuel pool, TEPCO assumes that the fuel             - Risk of criticality a priori excluded   reinforce by countermeasure 20,
      Control of reactivity




                              and maintained                           assemblies are ‘intact’ (sampling 26 April 2011)     by TEPCO (provided that                 21, 26
                                                                     - New sampling performed (280 mL on 7 May).            geometrically safe configuration is     Make-up/cooling of spent fuel pool
                                                                       The activity concentrations (Cs-134/Cs-137) are      maintained, etc.)                       by external water injection
                                                                       increasing compared with previous                  - Further assessment needed               (countermeasures 18, 22, 28)
                                                                       measurements. Analysis by TEPCO is                 - In order to avoid any potential         No borated water injected
                                                                       continuing                                           problem due to further aftershocks,     No countermeasure explicitly
                                                                     - Only fresh (non-borated) water is being sprayed      make-up with borated water to avoid     mentioned
                                                                       into the spent fuel pool (120 tonnes on 11 May)      any risk of criticality is advised
                                                                     - Hydrazine is being continuously injected           - Monitoring of neutrons and short
                                                                     - No neutron flux measured reported                    lived isotopes to be considered
                              Stable cooling shall be assured        Latest temperature reported: 81 °C after spraying    PARTIALLY ACHIEVED:                       Cooling of spent fuel pool by
                              - Spent fuel pool temperature          on 9 May (no updated data available)                 CAUTION                                   external water injection
                                  should be similar to the spent                                                                                                    (countermeasures 18, 22, 28)
                                  fuel pond design values                                                                                                           Sampling of steam/pool water and
      Residual heal removal




                                                                                                                          Make-up (with borated water) to be
                                  (approx. 30 °C)                                                                         continued                                 measurement of radioactive
                              - To recover the spent fuel pool                                                            Spent fuel pool temperature is not        materials (countermeasure 19)
                                  water level adequately with                                                             reported on May 16                        Circulation cooling of spent fuel
                                  (borated) water to about 7 m                                                                                                      pool
                                  above the top of active fuel.                                                                                                     (countermeasures 23, 24, 25, 27)
                              - To restore spent fuel cooling




[Type text]
Necessary safety function and                                                                                                            TEPCO Roadmap
                                                                                          Observation                               Evaluation of state
                                             conditions                                                                                                                      countermeasures
                                 - To recover the spent fuel pool      -   Fuel assemblies are covered by water           ACHIEVED:                                -   Cooling of spent fuel pool by
Confining radioactive material



                                    water level adequately to                                                             CAUTION                                      external water injection
                                    ensure some form of shielding                                                         -   to continue spraying and/or make         (countermeasures 18, 22, 28)
                                    above the top of active fuel.                                                             up                                   -   Circulation cooling of spent
                                                                                                                          -   to continue monitoring of major          fuel pool (countermeasures 23,
                                                                                                                              spent fuel pool parameters               24, 25, 27)
                                                                                                                              (temperature, water level)           -   Sampling of steam/pool water
                                                                                                                          -   to improve radiation protection          and measurement of radioactive
                                                                                                                                                                       materials (countermeasure 19)
                                                                                                                                                                   -    Reactor building cover
                                                                                                                                                                        (countermeasures 5, 50, 54,
                                                                                                                                                                        55)
                                 -   Releases shall be only within     -   Uncontrolled release are not expected so far   PARTIALLY ACHIEVED:                      -   Nos 10, 12, 29–46 cooling of
                                     the agreed allowed legal limits   -   Radiation monitoring positions are available   CAUTION                                      spent fuel pool by external
                                 -   Radiation monitoring              -   According to a TEPCO statement, fuel           - Radioactive releases to be prevented       water injection
Limiting effects of releases




                                     measurements shall be                 assemblies are assumed to be ‘intact’.           by sufficient water make-up                (countermeasures 18, 22, 28)
                                     available                             However, further assessment by TEPCO of        - Reactor building cover to be pursued   -   Circulation cooling of spent
                                 -   Leakages from the spent fuel          the latest sampling should confirm this                                                     fuel pool (countermeasures 23,
                                     pool should prevented or              statement                                                                                   24, 25, 27)
                                     controlled, or if not shall be                                                                                                -   Sampling of steam/pool water
                                     confined                                                                                                                          and measurement of radioactive
                                                                                                                                                                       material (countermeasure 19)
                                                                                                                                                                   -   Reactor building cover
                                                                                                                                                                       (countermeasures 5, 50, 54, 55)

More Related Content

Viewers also liked

Oracle UCM Security: Challenges and Best Practices
Oracle UCM Security: Challenges and Best PracticesOracle UCM Security: Challenges and Best Practices
Oracle UCM Security: Challenges and Best PracticesBrian Huff
 
Patent Risk and Countermeasures Related to Open Management in Interaction Design
Patent Risk and Countermeasures Related to Open Management in Interaction DesignPatent Risk and Countermeasures Related to Open Management in Interaction Design
Patent Risk and Countermeasures Related to Open Management in Interaction DesignYosuke Sakai
 
Antivirus Evasion Techniques and Countermeasures
Antivirus  Evasion Techniques and CountermeasuresAntivirus  Evasion Techniques and Countermeasures
Antivirus Evasion Techniques and Countermeasuressecurityxploded
 
Skyjacking A Cisco Wlan Attack Analysis And Countermeasures
Skyjacking A Cisco Wlan Attack Analysis And CountermeasuresSkyjacking A Cisco Wlan Attack Analysis And Countermeasures
Skyjacking A Cisco Wlan Attack Analysis And CountermeasuresAirTight Networks
 
Email phishing and countermeasures
Email phishing and countermeasuresEmail phishing and countermeasures
Email phishing and countermeasuresJorge Sebastiao
 
Dstl Medical Countermeasures for Dangerous Pathogens
Dstl   Medical Countermeasures for Dangerous PathogensDstl   Medical Countermeasures for Dangerous Pathogens
Dstl Medical Countermeasures for Dangerous Pathogenswarwick_amr
 
Identifying Web Servers: A First-look Into the Future of Web Server Fingerpri...
Identifying Web Servers: A First-look Into the Future of Web Server Fingerpri...Identifying Web Servers: A First-look Into the Future of Web Server Fingerpri...
Identifying Web Servers: A First-look Into the Future of Web Server Fingerpri...Jeremiah Grossman
 
Cehv8 module 01 introduction to ethical hacking
Cehv8 module 01 introduction to ethical hackingCehv8 module 01 introduction to ethical hacking
Cehv8 module 01 introduction to ethical hackingpolichen
 
VoIP: Attacks & Countermeasures in the Corporate World
VoIP: Attacks & Countermeasures in the Corporate WorldVoIP: Attacks & Countermeasures in the Corporate World
VoIP: Attacks & Countermeasures in the Corporate WorldJason Edelstein
 
Bone Loss in Long-Duration Spaceflight: Measurements and Countermeasures
Bone Loss in Long-Duration Spaceflight: Measurements and CountermeasuresBone Loss in Long-Duration Spaceflight: Measurements and Countermeasures
Bone Loss in Long-Duration Spaceflight: Measurements and CountermeasuresAmerican Astronautical Society
 
Digital Astroturfing: Definition, typology, and countermeasures.
Digital Astroturfing: Definition, typology, and countermeasures.Digital Astroturfing: Definition, typology, and countermeasures.
Digital Astroturfing: Definition, typology, and countermeasures.Marko Kovic
 
Iis Security Programming Countermeasures
Iis Security Programming CountermeasuresIis Security Programming Countermeasures
Iis Security Programming Countermeasuresguestc27cd9
 
Return oriented programming
Return oriented programmingReturn oriented programming
Return oriented programminghybr1s
 
Designing Countermeasures For Tomorrows Threats
Designing Countermeasures For Tomorrows ThreatsDesigning Countermeasures For Tomorrows Threats
Designing Countermeasures For Tomorrows ThreatsDarwish Ahmad
 
Webinar Gratuito: "Herramientas Graficas en Kali Linux 2.0"
Webinar Gratuito: "Herramientas Graficas en Kali Linux 2.0"Webinar Gratuito: "Herramientas Graficas en Kali Linux 2.0"
Webinar Gratuito: "Herramientas Graficas en Kali Linux 2.0"Alonso Caballero
 
Google Hacking for Cryptographic Secrets
Google Hacking for Cryptographic SecretsGoogle Hacking for Cryptographic Secrets
Google Hacking for Cryptographic SecretsDr. Emin İslam Tatlı
 
Irregularity Countermeasures in Massively Parallel BigData Processors
Irregularity Countermeasures in Massively Parallel BigData ProcessorsIrregularity Countermeasures in Massively Parallel BigData Processors
Irregularity Countermeasures in Massively Parallel BigData ProcessorsTokyo University of Science
 
Owasp Top 10 And Security Flaw Root Causes
Owasp Top 10 And Security Flaw Root CausesOwasp Top 10 And Security Flaw Root Causes
Owasp Top 10 And Security Flaw Root CausesMarco Morana
 
[CB16] Air-Gap security: State-of-the-art Attacks, Analysis, and Mitigation b...
[CB16] Air-Gap security: State-of-the-art Attacks, Analysis, and Mitigation b...[CB16] Air-Gap security: State-of-the-art Attacks, Analysis, and Mitigation b...
[CB16] Air-Gap security: State-of-the-art Attacks, Analysis, and Mitigation b...CODE BLUE
 

Viewers also liked (20)

Oracle UCM Security: Challenges and Best Practices
Oracle UCM Security: Challenges and Best PracticesOracle UCM Security: Challenges and Best Practices
Oracle UCM Security: Challenges and Best Practices
 
Patent Risk and Countermeasures Related to Open Management in Interaction Design
Patent Risk and Countermeasures Related to Open Management in Interaction DesignPatent Risk and Countermeasures Related to Open Management in Interaction Design
Patent Risk and Countermeasures Related to Open Management in Interaction Design
 
Antivirus Evasion Techniques and Countermeasures
Antivirus  Evasion Techniques and CountermeasuresAntivirus  Evasion Techniques and Countermeasures
Antivirus Evasion Techniques and Countermeasures
 
Skyjacking A Cisco Wlan Attack Analysis And Countermeasures
Skyjacking A Cisco Wlan Attack Analysis And CountermeasuresSkyjacking A Cisco Wlan Attack Analysis And Countermeasures
Skyjacking A Cisco Wlan Attack Analysis And Countermeasures
 
Email phishing and countermeasures
Email phishing and countermeasuresEmail phishing and countermeasures
Email phishing and countermeasures
 
Dstl Medical Countermeasures for Dangerous Pathogens
Dstl   Medical Countermeasures for Dangerous PathogensDstl   Medical Countermeasures for Dangerous Pathogens
Dstl Medical Countermeasures for Dangerous Pathogens
 
Identifying Web Servers: A First-look Into the Future of Web Server Fingerpri...
Identifying Web Servers: A First-look Into the Future of Web Server Fingerpri...Identifying Web Servers: A First-look Into the Future of Web Server Fingerpri...
Identifying Web Servers: A First-look Into the Future of Web Server Fingerpri...
 
Cehv8 module 01 introduction to ethical hacking
Cehv8 module 01 introduction to ethical hackingCehv8 module 01 introduction to ethical hacking
Cehv8 module 01 introduction to ethical hacking
 
VoIP: Attacks & Countermeasures in the Corporate World
VoIP: Attacks & Countermeasures in the Corporate WorldVoIP: Attacks & Countermeasures in the Corporate World
VoIP: Attacks & Countermeasures in the Corporate World
 
Seminar Presentation
Seminar PresentationSeminar Presentation
Seminar Presentation
 
Bone Loss in Long-Duration Spaceflight: Measurements and Countermeasures
Bone Loss in Long-Duration Spaceflight: Measurements and CountermeasuresBone Loss in Long-Duration Spaceflight: Measurements and Countermeasures
Bone Loss in Long-Duration Spaceflight: Measurements and Countermeasures
 
Digital Astroturfing: Definition, typology, and countermeasures.
Digital Astroturfing: Definition, typology, and countermeasures.Digital Astroturfing: Definition, typology, and countermeasures.
Digital Astroturfing: Definition, typology, and countermeasures.
 
Iis Security Programming Countermeasures
Iis Security Programming CountermeasuresIis Security Programming Countermeasures
Iis Security Programming Countermeasures
 
Return oriented programming
Return oriented programmingReturn oriented programming
Return oriented programming
 
Designing Countermeasures For Tomorrows Threats
Designing Countermeasures For Tomorrows ThreatsDesigning Countermeasures For Tomorrows Threats
Designing Countermeasures For Tomorrows Threats
 
Webinar Gratuito: "Herramientas Graficas en Kali Linux 2.0"
Webinar Gratuito: "Herramientas Graficas en Kali Linux 2.0"Webinar Gratuito: "Herramientas Graficas en Kali Linux 2.0"
Webinar Gratuito: "Herramientas Graficas en Kali Linux 2.0"
 
Google Hacking for Cryptographic Secrets
Google Hacking for Cryptographic SecretsGoogle Hacking for Cryptographic Secrets
Google Hacking for Cryptographic Secrets
 
Irregularity Countermeasures in Massively Parallel BigData Processors
Irregularity Countermeasures in Massively Parallel BigData ProcessorsIrregularity Countermeasures in Massively Parallel BigData Processors
Irregularity Countermeasures in Massively Parallel BigData Processors
 
Owasp Top 10 And Security Flaw Root Causes
Owasp Top 10 And Security Flaw Root CausesOwasp Top 10 And Security Flaw Root Causes
Owasp Top 10 And Security Flaw Root Causes
 
[CB16] Air-Gap security: State-of-the-art Attacks, Analysis, and Mitigation b...
[CB16] Air-Gap security: State-of-the-art Attacks, Analysis, and Mitigation b...[CB16] Air-Gap security: State-of-the-art Attacks, Analysis, and Mitigation b...
[CB16] Air-Gap security: State-of-the-art Attacks, Analysis, and Mitigation b...
 

More from International Atomic Energy Agency

Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...International Atomic Energy Agency
 
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)International Atomic Energy Agency
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)International Atomic Energy Agency
 
Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...International Atomic Energy Agency
 

More from International Atomic Energy Agency (20)

IAEA Bulletin September 2011
IAEA Bulletin September 2011IAEA Bulletin September 2011
IAEA Bulletin September 2011
 
The IAEA Legal Framework for Nuclear Safety
The IAEA Legal Framework for Nuclear SafetyThe IAEA Legal Framework for Nuclear Safety
The IAEA Legal Framework for Nuclear Safety
 
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
 
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
 
Table: Summary of reactor unit status at 4-may-0700 utc
Table:  Summary of reactor unit status at 4-may-0700 utcTable:  Summary of reactor unit status at 4-may-0700 utc
Table: Summary of reactor unit status at 4-may-0700 utc
 
Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011
 
Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011
 
Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011
 
Table summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utcTable summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utc
 
Table summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utcTable summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utc
 
Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011
 
Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011
 
Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)
 
Table summary of reactor unit status at 18-april 2011
Table  summary of reactor unit status at 18-april 2011Table  summary of reactor unit status at 18-april 2011
Table summary of reactor unit status at 18-april 2011
 
Table summary of reactor unit status at 15-april-1200 utc
Table   summary of reactor unit status at 15-april-1200 utcTable   summary of reactor unit status at 15-april-1200 utc
Table summary of reactor unit status at 15-april-1200 utc
 
Tc programme presentation UN audience
Tc programme presentation UN audienceTc programme presentation UN audience
Tc programme presentation UN audience
 
TC Programme Presentation Russian
TC Programme Presentation  RussianTC Programme Presentation  Russian
TC Programme Presentation Russian
 
Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...
 
Fukushima Marine Environment Monitoring - 12 April 2011
Fukushima Marine Environment Monitoring - 12 April 2011Fukushima Marine Environment Monitoring - 12 April 2011
Fukushima Marine Environment Monitoring - 12 April 2011
 

Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011

  • 1. TABLE 4. UNIT 4 REACTOR, SPENT FUEL POOL: FUKUSHIMA DAIICHI NUCLEAR POWER PLANT: 18 MAY 2011 ASSESSMENT OF STATUS IN TERMS OF FUNDAMENTAL SAFETY FUNCTIONS FOR ACHIEVING A SAFE STATE Necessary safety function and TEPCO Roadmap Observation Evaluation of state conditions countermeasures Spent fuel pool shall be subcritical - According to TEPCO statement and to its PARTIALLY ACHIEVED: Maintaining the geometry of spent Keff < 0.95 (design value), and sub- assessment from the water sampling of the spent CAUTION fuel pool (including aftershocks) criticality shall be demonstrated fuel pool, TEPCO assumes that the fuel - Risk of criticality a priori excluded reinforce by countermeasure 20, Control of reactivity and maintained assemblies are ‘intact’ (sampling 26 April 2011) by TEPCO (provided that 21, 26 - New sampling performed (280 mL on 7 May). geometrically safe configuration is Make-up/cooling of spent fuel pool The activity concentrations (Cs-134/Cs-137) are maintained, etc.) by external water injection increasing compared with previous - Further assessment needed (countermeasures 18, 22, 28) measurements. Analysis by TEPCO is - In order to avoid any potential No borated water injected continuing problem due to further aftershocks, No countermeasure explicitly - Only fresh (non-borated) water is being sprayed make-up with borated water to avoid mentioned into the spent fuel pool (120 tonnes on 11 May) any risk of criticality is advised - Hydrazine is being continuously injected - Monitoring of neutrons and short - No neutron flux measured reported lived isotopes to be considered Stable cooling shall be assured Latest temperature reported: 81 °C after spraying PARTIALLY ACHIEVED: Cooling of spent fuel pool by - Spent fuel pool temperature on 9 May (no updated data available) CAUTION external water injection should be similar to the spent (countermeasures 18, 22, 28) fuel pond design values Sampling of steam/pool water and Residual heal removal Make-up (with borated water) to be (approx. 30 °C) continued measurement of radioactive - To recover the spent fuel pool Spent fuel pool temperature is not materials (countermeasure 19) water level adequately with reported on May 16 Circulation cooling of spent fuel (borated) water to about 7 m pool above the top of active fuel. (countermeasures 23, 24, 25, 27) - To restore spent fuel cooling [Type text]
  • 2. Necessary safety function and TEPCO Roadmap Observation Evaluation of state conditions countermeasures - To recover the spent fuel pool - Fuel assemblies are covered by water ACHIEVED: - Cooling of spent fuel pool by Confining radioactive material water level adequately to CAUTION external water injection ensure some form of shielding - to continue spraying and/or make (countermeasures 18, 22, 28) above the top of active fuel. up - Circulation cooling of spent - to continue monitoring of major fuel pool (countermeasures 23, spent fuel pool parameters 24, 25, 27) (temperature, water level) - Sampling of steam/pool water - to improve radiation protection and measurement of radioactive materials (countermeasure 19) - Reactor building cover (countermeasures 5, 50, 54, 55) - Releases shall be only within - Uncontrolled release are not expected so far PARTIALLY ACHIEVED: - Nos 10, 12, 29–46 cooling of the agreed allowed legal limits - Radiation monitoring positions are available CAUTION spent fuel pool by external - Radiation monitoring - According to a TEPCO statement, fuel - Radioactive releases to be prevented water injection Limiting effects of releases measurements shall be assemblies are assumed to be ‘intact’. by sufficient water make-up (countermeasures 18, 22, 28) available However, further assessment by TEPCO of - Reactor building cover to be pursued - Circulation cooling of spent - Leakages from the spent fuel the latest sampling should confirm this fuel pool (countermeasures 23, pool should prevented or statement 24, 25, 27) controlled, or if not shall be - Sampling of steam/pool water confined and measurement of radioactive material (countermeasure 19) - Reactor building cover (countermeasures 5, 50, 54, 55)