1 of 30
SUBMITTED TO :
Dr. Shelly
There are two methods to estimate the need for
hospital in a population:

 Analytical method : Taking feedback and
analysis of data collected through survey e.g.
distributing questionnaire.

 Estimation method
Planning (also called forethought/forecasting) is the
process of thinking about and organizing the activities
required to achieve a desired goal.
1.What we expect to do?
        2.Why it will be done ?
        3.Where will it be done ?
        4.When we expect to do it?
        5.Who all are going to do it ?
        6.How will it be done ?

Excellent firms don’t believe in excellence – only in constant improvement and
constant change – Tom Peters
Community interest over individual interest

Preventive services over curative services

Services catering to the weaker sections of the
 community

Rural over Urban

Regionalized Planning
   Geographic Data
   Morbidity & Mortality Status
   Need & Demand
   Details of existing Facilities
   Financial Feasibility
   Demographic Details

        Population Strength
        Sex & Age Ration
        Social Status
        Educational level
Must meet the needs of the patient it is going to
 serve adequately.

It must be in a size and proportions which the
 owners or promoters will be able to build and
 operate
Sound architectural plan
Economic viability
Effective community orientation
Quality patient care
Protection from unwanted and unnecessary disturbances in
order to help speedy recovery
Separation of dissimilar activities
Control – the nurses station should be positioned strategically
to enable proper monitoring of visitors entering and leaving
the ward, infants and children should be protected from theft
and infection etc.
Circulation- all the departments of a hospital must be
properly integrated.
(“separate all departments, yet keep them all together;
separate types of traffic, yet save steps for everybody; that is
all there is to hospital planning “– Emerson Goble)
Needs of the community
       Ease of accessibility
       Range of services offered
       Availability of specialists
       Availability of technology
Study of existing hospital(if any)
Requirements of staff and services
Bed: Population = A x S x 100
                   365 x PO


A= number of inpatient
admissions/1000 population/year
S= average length of stay
PO= percentage occupancy
Planning of finances-
Funds required for constructing, furnishing
 and equipping the hospital.

Operating funds- salaries, loans and
 interest, other maintenance expenses.

Arranging financial assistance-patient fees,
 bed charges, and other modes of revenue
 generation process.
Stage A
Functional content:     Project team
Outline brief:          Assessment of functional content
                        Submission of owners( Govt,private
                        organization etc.)for approval
                        Site appraisal, gross floor areas
                        Building space. Draft master plan
                        Estimation of cost and phasing
                        Appraisal of work by owners
Stage B
Operational policies:   Operational policies
Developmental plan:     Departmental and inter related
                        activities
                        Departmental and hospital policies
                        Development control plan
                        Budget cost
                        Continuous informal discussion with
                        owners
Stage C
Schedules of accommodation, sketches,    Schedules of accommodation
Final cost estimate:                     Sketch drawing
                                         Equipment schedules component
                                         estimates
                                         Cost revenue and staffing estimates
                                         Final cost approval
Stage D
Detail design working drawings, tender   Working drawings
action:                                  Engineering details
                                         Bills of quantities
                                         Calling tenders
Stage E
Contract and construction:               Assessments of tenders
                                         Award of contract
                                         Construction
                                         Engineering commissioning
Stage F
Commissioning:                           Staff assembly and training
                                         Equipment and supplies assembly
                                         Testing of installation
Equipment planning-
Built in equipment      These include counters and cabinets in
                        laboratory, Pharmacy and other parts of
                        the hospital , elevators , incinerators ,
                        coolers , fixed sterilizing equipment etc.
                        These are usually included in the
                        construction contract and the planning of
                        these equipments is the architect's
                        responsibility.


Depreciable equipment   This includes equipment that has a life of
                        five years or more and is not purchased
                        through construction contracts. These are
                        large pieces of furniture which have a
                        relatively fixed location and are capable of
                        being moved e.g., diagnostic and
                        therapeutic equipment, laboratory
                        instruments, office furniture etc.
Non depreciable equipment   These are small items with a low unit
                            cost and life span of less than five years.
                            These are generally under the control of
                            the store room and are bought through
                            other than construction contracts. They
                            include kitchen utencils,surgical
                            instruments,linen,waste baskets etc.
Operation program
Admission             Human resource
Administration        Stores
General engineering   Purchasing
Laundry               Maintenance
Clinical services     Waste disposal plant

Pharmacy              Fire and safety
Nursing services      Disaster plan
House keeping         information
Records               Dietary services
Public relations      Clinical engineering
Employee facilities   Sanitation
Intensive critical care unit (ICCU)-

 Should preferably be located on the ground floor with convenient
 access from the operation theatre suit and emergency department and
 easy accessibility for wards.
 It consists patient area, staff area, support area.
 Four basic requirements-
          Direct observation of the patient by nursing and medical staff
          Surveillance of physiological monitoring
          Provision and efficient use of routine and emergency
          diagnostic procedures and interventions.
          Recording and maintenance of patient information
Design and Layout of ICCU
Design should take into consideration the integration
and smooth functioning of three areas

              1. The Patient Area
              2. The Staff Area
              3. The Support Area



 Total area ranges from 350 to 500 sq. feet per bed which
 includes
               1. Circulation Area
               2. Nursing Station
               3. Sanitary and Ancillary Accommodation
Ancillary & Support Services
It should be centrally air conditioned.
Overall lighting Requirement in ICCU is for subdued illumination for the patient bed with
capacity for increasing it in case of need.
Main light at the bed head should be fitted with dimmer switch.
A high intensity emergency light or spot focusing light should also be provided.
Emergency buzzer switch connected to central buzzer and location panel at central nursing
station.
Multiple electrical gadgets required.
Stand by generator is also required.
Diagnostic Support
Should have round the clock access to
Laboratory services
Radiology
Imaging
Physiotherapy.
Equipment maintenance
Visitor Lounge
Area                Sq .ft / bed
Nursing unit        250-280
Nursery             12-18
Delivery suite      15-20
Operation theatre   30-50
Physical medicine   12-18
Radiology           25-35
Laboratory          25-35
Pharmacy            4-6
CSSD                8-25
Dietary             25-35
Medical record      8-15
Area                      Sq .ft / bed
House keeping             4-5
Laundry                   12-18
Mechanical installation   50-75
Maintenance work shop     4-6

Stores                    25-35
Public areas              8-10
Staff facilities          10-15
Administration            40-50
Total                     567-751
Circulation               115-751
Total net area            682-891
Hospital administrators and staff have an ongoing
concern with controlling unwanted noise in their
facilities. Patient comfort, employee satisfaction
and environmental concerns are always at the
forefront in the continuous design and
maintenance of a wide array of systems that keep
a medical facility running efficiently.
Quantity
Price
Source
Quality
Technology requirement must be met
Clinical needs must be considered
Safety is a major factor
Standards and Guidelines are essential
Importance of the role of Hospital Staff
 in construction and design.
A hospital is a living organism, made up of
many different parts , having different
functions, but all theses must be in due
proportion and relation to each other and to
the environment to produce the desired
result - Dr S Billings
Final hospital planning and layout ppt

More Related Content

What's hot

Planning & Organizing Hospital Units & Ancillary Services (CSSD, Laundry, Lab...
Planning & Organizing Hospital Units & Ancillary Services (CSSD, Laundry, Lab...Planning & Organizing Hospital Units & Ancillary Services (CSSD, Laundry, Lab...
Planning & Organizing Hospital Units & Ancillary Services (CSSD, Laundry, Lab...Pooja Godiyal
 
Unit ii inpatient department service in mha course
Unit ii inpatient department service in mha courseUnit ii inpatient department service in mha course
Unit ii inpatient department service in mha courseanjalatchi
 
Operation theatre services
Operation theatre servicesOperation theatre services
Operation theatre servicesNc Das
 
Out patient services
Out patient servicesOut patient services
Out patient servicesNc Das
 
Inpatient services
Inpatient servicesInpatient services
Inpatient servicesNc Das
 
Out-patient Department
Out-patient DepartmentOut-patient Department
Out-patient DepartmentPushpaLatha186
 
Report on hospital design
Report on hospital designReport on hospital design
Report on hospital designBee Key Verma
 
Hm 2012 session iv opd,er, wards
Hm 2012 session iv opd,er, wardsHm 2012 session iv opd,er, wards
Hm 2012 session iv opd,er, wardsdrbhutto
 
(Hospital presentation)
(Hospital presentation)(Hospital presentation)
(Hospital presentation)Bee Key Verma
 
Hospital. engineering service
Hospital. engineering serviceHospital. engineering service
Hospital. engineering serviceNc Das
 

What's hot (20)

Planning & Organizing Hospital Units & Ancillary Services (CSSD, Laundry, Lab...
Planning & Organizing Hospital Units & Ancillary Services (CSSD, Laundry, Lab...Planning & Organizing Hospital Units & Ancillary Services (CSSD, Laundry, Lab...
Planning & Organizing Hospital Units & Ancillary Services (CSSD, Laundry, Lab...
 
Unit ii inpatient department service in mha course
Unit ii inpatient department service in mha courseUnit ii inpatient department service in mha course
Unit ii inpatient department service in mha course
 
Opd & ipd
Opd  & ipdOpd  & ipd
Opd & ipd
 
Outpatient Department (OPD)
Outpatient Department (OPD)Outpatient Department (OPD)
Outpatient Department (OPD)
 
Operation theatre services
Operation theatre servicesOperation theatre services
Operation theatre services
 
Out patient services
Out patient servicesOut patient services
Out patient services
 
Inpatient services
Inpatient servicesInpatient services
Inpatient services
 
Hospital Planning
Hospital PlanningHospital Planning
Hospital Planning
 
Ward management
Ward managementWard management
Ward management
 
Out-patient Department
Out-patient DepartmentOut-patient Department
Out-patient Department
 
Hospital Planning
Hospital PlanningHospital Planning
Hospital Planning
 
Report on hospital design
Report on hospital designReport on hospital design
Report on hospital design
 
Hospital planning
Hospital planningHospital planning
Hospital planning
 
Unit layout plan
Unit layout planUnit layout plan
Unit layout plan
 
Hm 2012 session iv opd,er, wards
Hm 2012 session iv opd,er, wardsHm 2012 session iv opd,er, wards
Hm 2012 session iv opd,er, wards
 
(Hospital presentation)
(Hospital presentation)(Hospital presentation)
(Hospital presentation)
 
IPD Hospital
IPD Hospital IPD Hospital
IPD Hospital
 
Inpatient Department
Inpatient DepartmentInpatient Department
Inpatient Department
 
Hospital. engineering service
Hospital. engineering serviceHospital. engineering service
Hospital. engineering service
 
Dietary services
Dietary servicesDietary services
Dietary services
 

Viewers also liked

Planning for New Hospital
Planning for New HospitalPlanning for New Hospital
Planning for New HospitalNc Das
 
Hospital design
Hospital designHospital design
Hospital designdhobacyare
 
Hospital Design Guide: How to Get Started
Hospital Design Guide: How to Get StartedHospital Design Guide: How to Get Started
Hospital Design Guide: How to Get StartedHussain Varawalla
 
Hospital project report
Hospital project reportHospital project report
Hospital project reportjssclinic
 
بحث خاص بتصميم المستشفيات
بحث خاص بتصميم المستشفياتبحث خاص بتصميم المستشفيات
بحث خاص بتصميم المستشفياتTaha Farwan
 
Term loan finance main ppt
Term loan finance main pptTerm loan finance main ppt
Term loan finance main pptpravinborghare
 
Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)Vipin Kumar
 
Engineering design parameters and requirement for hospitals
Engineering design parameters and requirement for hospitalsEngineering design parameters and requirement for hospitals
Engineering design parameters and requirement for hospitalsFrancis Philip Duremdes Doromal
 
Hospital Facility Design: It's Impact on the Patient Experience
Hospital Facility Design: It's Impact on the Patient ExperienceHospital Facility Design: It's Impact on the Patient Experience
Hospital Facility Design: It's Impact on the Patient ExperienceSara Marberry
 
hospital design and construction
hospital design and constructionhospital design and construction
hospital design and constructionjayconstructions1
 
Clinical Audit Overview
Clinical Audit OverviewClinical Audit Overview
Clinical Audit OverviewFastbleep
 
Root Cause Analysis By Deepak
Root Cause Analysis By DeepakRoot Cause Analysis By Deepak
Root Cause Analysis By DeepakDEEPAK SAHOO
 
Synopsis: Multispeciality 300 beded hospital
Synopsis: Multispeciality 300 beded hospitalSynopsis: Multispeciality 300 beded hospital
Synopsis: Multispeciality 300 beded hospitalTushar Kapoor
 
Unit 2 Types of Auditing
Unit 2 Types of AuditingUnit 2 Types of Auditing
Unit 2 Types of AuditingRadhika Gohel
 
Maintaining equipment
Maintaining equipmentMaintaining equipment
Maintaining equipmentNc Das
 

Viewers also liked (20)

Planning for New Hospital
Planning for New HospitalPlanning for New Hospital
Planning for New Hospital
 
Hospital design
Hospital designHospital design
Hospital design
 
Hospital Design Guide: How to Get Started
Hospital Design Guide: How to Get StartedHospital Design Guide: How to Get Started
Hospital Design Guide: How to Get Started
 
Hospital project report
Hospital project reportHospital project report
Hospital project report
 
بحث خاص بتصميم المستشفيات
بحث خاص بتصميم المستشفياتبحث خاص بتصميم المستشفيات
بحث خاص بتصميم المستشفيات
 
Term loan finance main ppt
Term loan finance main pptTerm loan finance main ppt
Term loan finance main ppt
 
Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)
 
Final thesis 2
Final thesis 2Final thesis 2
Final thesis 2
 
final thesis
final thesisfinal thesis
final thesis
 
Engineering design parameters and requirement for hospitals
Engineering design parameters and requirement for hospitalsEngineering design parameters and requirement for hospitals
Engineering design parameters and requirement for hospitals
 
Hospital Facility Design: It's Impact on the Patient Experience
Hospital Facility Design: It's Impact on the Patient ExperienceHospital Facility Design: It's Impact on the Patient Experience
Hospital Facility Design: It's Impact on the Patient Experience
 
hospital design and construction
hospital design and constructionhospital design and construction
hospital design and construction
 
Clinical Audit Overview
Clinical Audit OverviewClinical Audit Overview
Clinical Audit Overview
 
Root Cause Analysis By Deepak
Root Cause Analysis By DeepakRoot Cause Analysis By Deepak
Root Cause Analysis By Deepak
 
Synopsis: Multispeciality 300 beded hospital
Synopsis: Multispeciality 300 beded hospitalSynopsis: Multispeciality 300 beded hospital
Synopsis: Multispeciality 300 beded hospital
 
Unit 2 Types of Auditing
Unit 2 Types of AuditingUnit 2 Types of Auditing
Unit 2 Types of Auditing
 
Maintaining equipment
Maintaining equipmentMaintaining equipment
Maintaining equipment
 
Apollo Hospitals
Apollo HospitalsApollo Hospitals
Apollo Hospitals
 
Corrective Action & Preventive Action
Corrective Action & Preventive ActionCorrective Action & Preventive Action
Corrective Action & Preventive Action
 
Evaluation ppt
Evaluation pptEvaluation ppt
Evaluation ppt
 

Similar to Final hospital planning and layout ppt

Equipment Planning in Hospitals
Equipment Planning in HospitalsEquipment Planning in Hospitals
Equipment Planning in HospitalsS A Tabish
 
Medical Equipment Planner Qualifications and Requirements
Medical Equipment Planner Qualifications and RequirementsMedical Equipment Planner Qualifications and Requirements
Medical Equipment Planner Qualifications and RequirementsDr.Eng. Walid Tarawneh
 
HEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptxHEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptxArun Sebastian
 
Equipment planning
Equipment planningEquipment planning
Equipment planningS A Tabish
 
Medical equipment planning by Eng aouididi mohamed salah
Medical equipment planning by Eng aouididi mohamed salahMedical equipment planning by Eng aouididi mohamed salah
Medical equipment planning by Eng aouididi mohamed salahMohamed Salah Aouididi
 
Integrated Approach To Health Facility Planning
Integrated Approach To Health Facility PlanningIntegrated Approach To Health Facility Planning
Integrated Approach To Health Facility PlanningRick Jones
 
PMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxPMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxShashidharaTV2
 
8.healthcare construction
8.healthcare construction8.healthcare construction
8.healthcare constructionMmedsc Hahm
 
GP Hot Topics Presentation
GP Hot Topics PresentationGP Hot Topics Presentation
GP Hot Topics PresentationGP Surveyors
 
Hospital Management (2)Clive
Hospital Management (2)CliveHospital Management (2)Clive
Hospital Management (2)CliveClive Deen Nelson
 
Designing a good ivf service
Designing a good ivf serviceDesigning a good ivf service
Designing a good ivf serviceSawad thotathil
 
Tgi hospital planning
Tgi hospital planningTgi hospital planning
Tgi hospital planningPankaj Gupta
 
Biomedical department.pptx
Biomedical department.pptxBiomedical department.pptx
Biomedical department.pptxDhanush541800
 
needs assessment & equipment identification
needs assessment & equipment identificationneeds assessment & equipment identification
needs assessment & equipment identificationAashnaMalhotra8
 
Construction of Radiotherapy centre.pptx
Construction of Radiotherapy centre.pptxConstruction of Radiotherapy centre.pptx
Construction of Radiotherapy centre.pptxTaushifulHoque
 
Your Aging Patient Bed Tower - Top Ten Considerations When Renovating
Your Aging Patient Bed Tower - Top Ten Considerations When RenovatingYour Aging Patient Bed Tower - Top Ten Considerations When Renovating
Your Aging Patient Bed Tower - Top Ten Considerations When RenovatingArray Architects
 
first session - medical planning -MOHAMED ALAZAB .pptx
first session - medical planning -MOHAMED ALAZAB .pptxfirst session - medical planning -MOHAMED ALAZAB .pptx
first session - medical planning -MOHAMED ALAZAB .pptxMohamedAli242496
 

Similar to Final hospital planning and layout ppt (20)

Equipment Planning in Hospitals
Equipment Planning in HospitalsEquipment Planning in Hospitals
Equipment Planning in Hospitals
 
Medical Equipment Planner Qualifications and Requirements
Medical Equipment Planner Qualifications and RequirementsMedical Equipment Planner Qualifications and Requirements
Medical Equipment Planner Qualifications and Requirements
 
HEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptxHEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptx
 
Equipment planning
Equipment planningEquipment planning
Equipment planning
 
Medical equipment planning by Eng aouididi mohamed salah
Medical equipment planning by Eng aouididi mohamed salahMedical equipment planning by Eng aouididi mohamed salah
Medical equipment planning by Eng aouididi mohamed salah
 
Integrated Approach To Health Facility Planning
Integrated Approach To Health Facility PlanningIntegrated Approach To Health Facility Planning
Integrated Approach To Health Facility Planning
 
PMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxPMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptx
 
8.healthcare construction
8.healthcare construction8.healthcare construction
8.healthcare construction
 
GP Hot Topics Presentation
GP Hot Topics PresentationGP Hot Topics Presentation
GP Hot Topics Presentation
 
Hospital Management (2)Clive
Hospital Management (2)CliveHospital Management (2)Clive
Hospital Management (2)Clive
 
MN
MNMN
MN
 
Mata ppt
Mata pptMata ppt
Mata ppt
 
Designing a good ivf service
Designing a good ivf serviceDesigning a good ivf service
Designing a good ivf service
 
Tgi hospital planning
Tgi hospital planningTgi hospital planning
Tgi hospital planning
 
Biomedical department.pptx
Biomedical department.pptxBiomedical department.pptx
Biomedical department.pptx
 
needs assessment & equipment identification
needs assessment & equipment identificationneeds assessment & equipment identification
needs assessment & equipment identification
 
Construction of Radiotherapy centre.pptx
Construction of Radiotherapy centre.pptxConstruction of Radiotherapy centre.pptx
Construction of Radiotherapy centre.pptx
 
Your Aging Patient Bed Tower - Top Ten Considerations When Renovating
Your Aging Patient Bed Tower - Top Ten Considerations When RenovatingYour Aging Patient Bed Tower - Top Ten Considerations When Renovating
Your Aging Patient Bed Tower - Top Ten Considerations When Renovating
 
first session - medical planning -MOHAMED ALAZAB .pptx
first session - medical planning -MOHAMED ALAZAB .pptxfirst session - medical planning -MOHAMED ALAZAB .pptx
first session - medical planning -MOHAMED ALAZAB .pptx
 
IVF program design
IVF program designIVF program design
IVF program design
 

More from Sandeep Singh

Gender,HIV/AIDs Transmission: Socio Economic And Socio Cultural Impact in Tan...
Gender,HIV/AIDs Transmission: Socio Economic And Socio Cultural Impact in Tan...Gender,HIV/AIDs Transmission: Socio Economic And Socio Cultural Impact in Tan...
Gender,HIV/AIDs Transmission: Socio Economic And Socio Cultural Impact in Tan...Sandeep Singh
 
Problems being faced by Patients and staff in hospital
Problems being faced by Patients and staff in hospitalProblems being faced by Patients and staff in hospital
Problems being faced by Patients and staff in hospitalSandeep Singh
 
Hospitality in hospital
Hospitality in hospitalHospitality in hospital
Hospitality in hospitalSandeep Singh
 
Managerial activities for effective hospital functioning
Managerial activities for effective hospital functioningManagerial activities for effective hospital functioning
Managerial activities for effective hospital functioningSandeep Singh
 
Bombay nursing home registration act
Bombay nursing home registration actBombay nursing home registration act
Bombay nursing home registration actSandeep Singh
 
Importantce of motivation
Importantce of motivationImportantce of motivation
Importantce of motivationSandeep Singh
 
Layout for medicine store
Layout for medicine storeLayout for medicine store
Layout for medicine storeSandeep Singh
 

More from Sandeep Singh (7)

Gender,HIV/AIDs Transmission: Socio Economic And Socio Cultural Impact in Tan...
Gender,HIV/AIDs Transmission: Socio Economic And Socio Cultural Impact in Tan...Gender,HIV/AIDs Transmission: Socio Economic And Socio Cultural Impact in Tan...
Gender,HIV/AIDs Transmission: Socio Economic And Socio Cultural Impact in Tan...
 
Problems being faced by Patients and staff in hospital
Problems being faced by Patients and staff in hospitalProblems being faced by Patients and staff in hospital
Problems being faced by Patients and staff in hospital
 
Hospitality in hospital
Hospitality in hospitalHospitality in hospital
Hospitality in hospital
 
Managerial activities for effective hospital functioning
Managerial activities for effective hospital functioningManagerial activities for effective hospital functioning
Managerial activities for effective hospital functioning
 
Bombay nursing home registration act
Bombay nursing home registration actBombay nursing home registration act
Bombay nursing home registration act
 
Importantce of motivation
Importantce of motivationImportantce of motivation
Importantce of motivation
 
Layout for medicine store
Layout for medicine storeLayout for medicine store
Layout for medicine store
 

Recently uploaded

IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 

Recently uploaded (20)

Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 

Final hospital planning and layout ppt

  • 2. There are two methods to estimate the need for hospital in a population:  Analytical method : Taking feedback and analysis of data collected through survey e.g. distributing questionnaire.  Estimation method
  • 3. Planning (also called forethought/forecasting) is the process of thinking about and organizing the activities required to achieve a desired goal.
  • 4. 1.What we expect to do? 2.Why it will be done ? 3.Where will it be done ? 4.When we expect to do it? 5.Who all are going to do it ? 6.How will it be done ? Excellent firms don’t believe in excellence – only in constant improvement and constant change – Tom Peters
  • 5. Community interest over individual interest Preventive services over curative services Services catering to the weaker sections of the community Rural over Urban Regionalized Planning
  • 6. Geographic Data  Morbidity & Mortality Status  Need & Demand  Details of existing Facilities  Financial Feasibility  Demographic Details Population Strength Sex & Age Ration Social Status Educational level
  • 7. Must meet the needs of the patient it is going to serve adequately. It must be in a size and proportions which the owners or promoters will be able to build and operate
  • 8. Sound architectural plan Economic viability Effective community orientation Quality patient care
  • 9. Protection from unwanted and unnecessary disturbances in order to help speedy recovery Separation of dissimilar activities Control – the nurses station should be positioned strategically to enable proper monitoring of visitors entering and leaving the ward, infants and children should be protected from theft and infection etc. Circulation- all the departments of a hospital must be properly integrated. (“separate all departments, yet keep them all together; separate types of traffic, yet save steps for everybody; that is all there is to hospital planning “– Emerson Goble)
  • 10. Needs of the community Ease of accessibility Range of services offered Availability of specialists Availability of technology Study of existing hospital(if any) Requirements of staff and services
  • 11. Bed: Population = A x S x 100 365 x PO A= number of inpatient admissions/1000 population/year S= average length of stay PO= percentage occupancy
  • 12. Planning of finances- Funds required for constructing, furnishing and equipping the hospital. Operating funds- salaries, loans and interest, other maintenance expenses. Arranging financial assistance-patient fees, bed charges, and other modes of revenue generation process.
  • 13.
  • 14. Stage A Functional content: Project team Outline brief: Assessment of functional content Submission of owners( Govt,private organization etc.)for approval Site appraisal, gross floor areas Building space. Draft master plan Estimation of cost and phasing Appraisal of work by owners Stage B Operational policies: Operational policies Developmental plan: Departmental and inter related activities Departmental and hospital policies Development control plan Budget cost Continuous informal discussion with owners
  • 15. Stage C Schedules of accommodation, sketches, Schedules of accommodation Final cost estimate: Sketch drawing Equipment schedules component estimates Cost revenue and staffing estimates Final cost approval Stage D Detail design working drawings, tender Working drawings action: Engineering details Bills of quantities Calling tenders Stage E Contract and construction: Assessments of tenders Award of contract Construction Engineering commissioning Stage F Commissioning: Staff assembly and training Equipment and supplies assembly Testing of installation
  • 16. Equipment planning- Built in equipment These include counters and cabinets in laboratory, Pharmacy and other parts of the hospital , elevators , incinerators , coolers , fixed sterilizing equipment etc. These are usually included in the construction contract and the planning of these equipments is the architect's responsibility. Depreciable equipment This includes equipment that has a life of five years or more and is not purchased through construction contracts. These are large pieces of furniture which have a relatively fixed location and are capable of being moved e.g., diagnostic and therapeutic equipment, laboratory instruments, office furniture etc.
  • 17. Non depreciable equipment These are small items with a low unit cost and life span of less than five years. These are generally under the control of the store room and are bought through other than construction contracts. They include kitchen utencils,surgical instruments,linen,waste baskets etc.
  • 18. Operation program Admission Human resource Administration Stores General engineering Purchasing Laundry Maintenance Clinical services Waste disposal plant Pharmacy Fire and safety Nursing services Disaster plan House keeping information Records Dietary services Public relations Clinical engineering Employee facilities Sanitation
  • 19. Intensive critical care unit (ICCU)- Should preferably be located on the ground floor with convenient access from the operation theatre suit and emergency department and easy accessibility for wards. It consists patient area, staff area, support area. Four basic requirements- Direct observation of the patient by nursing and medical staff Surveillance of physiological monitoring Provision and efficient use of routine and emergency diagnostic procedures and interventions. Recording and maintenance of patient information
  • 20. Design and Layout of ICCU Design should take into consideration the integration and smooth functioning of three areas 1. The Patient Area 2. The Staff Area 3. The Support Area Total area ranges from 350 to 500 sq. feet per bed which includes 1. Circulation Area 2. Nursing Station 3. Sanitary and Ancillary Accommodation
  • 21.
  • 22.
  • 23. Ancillary & Support Services It should be centrally air conditioned. Overall lighting Requirement in ICCU is for subdued illumination for the patient bed with capacity for increasing it in case of need. Main light at the bed head should be fitted with dimmer switch. A high intensity emergency light or spot focusing light should also be provided. Emergency buzzer switch connected to central buzzer and location panel at central nursing station. Multiple electrical gadgets required. Stand by generator is also required. Diagnostic Support Should have round the clock access to Laboratory services Radiology Imaging Physiotherapy. Equipment maintenance Visitor Lounge
  • 24. Area Sq .ft / bed Nursing unit 250-280 Nursery 12-18 Delivery suite 15-20 Operation theatre 30-50 Physical medicine 12-18 Radiology 25-35 Laboratory 25-35 Pharmacy 4-6 CSSD 8-25 Dietary 25-35 Medical record 8-15
  • 25. Area Sq .ft / bed House keeping 4-5 Laundry 12-18 Mechanical installation 50-75 Maintenance work shop 4-6 Stores 25-35 Public areas 8-10 Staff facilities 10-15 Administration 40-50 Total 567-751 Circulation 115-751 Total net area 682-891
  • 26. Hospital administrators and staff have an ongoing concern with controlling unwanted noise in their facilities. Patient comfort, employee satisfaction and environmental concerns are always at the forefront in the continuous design and maintenance of a wide array of systems that keep a medical facility running efficiently.
  • 28. Technology requirement must be met Clinical needs must be considered Safety is a major factor Standards and Guidelines are essential Importance of the role of Hospital Staff in construction and design.
  • 29. A hospital is a living organism, made up of many different parts , having different functions, but all theses must be in due proportion and relation to each other and to the environment to produce the desired result - Dr S Billings