SlideShare a Scribd company logo
1 of 30
Office 5S Implementation




       Ian Seath
       Improvement Skills Consulting Ltd.
1                © 2013 Copyright ISC Ltd.
Workshop Aims

   To introduce the Lean 5S technique
   To decide how and where it can be applied
    within the office
   To begin implementation so we can achieve
    some quick wins
   To plan for sustaining 5S
   To commit to developing 5S


2                   © 2013 Copyright ISC Ltd.
5S Approach

 Two     days of “learning by doing”
       Approximately 20% learning/80% doing
 Applicationof principles on your work process
 Focused on immediate implementation

 Immediate tangible benefits




3                       © 2013 Copyright ISC Ltd.
What is 5S?

   An easy way of achieving major change in an office
    environment
   A structure for establishing an orderly, clean and
    organised working environment
   A way of identifying new problems and wastes that can
    then be resolved by staff and managers
   A way of encouraging everyone to be involved in
    improvement activities
   A process for creating the best working environment to
    carry out your work and run your business


4                        © 2013 Copyright ISC Ltd.
What is 5S?
   Based on Japanese words that begin with
    “S”, the 5S philosophy focuses on effective
    workplace organisation and standardised
    work procedures
   Problems cannot be clearly seen when the
    workplace is disorganised
   Cleaning and organising the workplace helps
    the team to uncover problems
   Making problems visible is the first step of
    improvement
5                    © 2013 Copyright ISC Ltd.
What is 5S?
1) SORT:
   Seiri – Eliminate unnecessary items
2) SET IN ORDER:
   Seiton – Order: everything in its place
3) SHINE:
   Seisu - Clean, check and return to original
   state
4) STANDARDISE:
   Seiketsu - Define procedures and standardise
5) SUSTAIN:
   Shitsuke - Respect and improve standards
6                  © 2013 Copyright ISC Ltd.
The ideas of 5S are NOT new . . .

   Henry Ford described how he
    implemented them in the early
    1900s:

    “Put all machinery in the best
    possible condition, keep it that
    way, and insist upon absolute
    cleanliness everywhere in
    order that he may learn to
    respect his tools, his
    surroundings, and himself.”




7                            © 2013 Copyright ISC Ltd.
Office: Before and after 5S…




8              © 2013 Copyright ISC Ltd.
Before and after 5S…




9             © 2013 Copyright ISC Ltd.
5S Leads to a Visual Office
     When anyone can walk into the office and
     visually understand the processes and
     performance.

                   Visual Office

                    5S System



                 Staff Involvement

10                   © 2013 Copyright ISC Ltd.
The Seven Wastes:
        Waiting: People waiting for work (e.g. waiting for papers)
        Over-production: Producing more than is needed (e.g.
         taking extra copies)
        Re-work: Dealing with failures and correcting problems
         (e.g. re-booking appointments)
        Motion: People moving (e.g. to get files, papers,
         approvals)
        Over-processing: Unnecessary activities (e.g. collecting
         duplicate information, multiple levels of approvals)
        Inventory: Work in progress (e.g. case files “sat on desks”)
        Transportation: Moving stuff around (e.g. files to/from
         archives)
    11                           © 2013 Copyright ISC Ltd.
Benefits to you?

    What examples of the 7 Wastes can you
     identify in the office?




    What do you think the benefits of applying 5S
     might be here?



12                    © 2013 Copyright ISC Ltd.
Implementation:

     5S APPROACH


13                     © 2013 Copyright ISC Ltd.
5S: SORT - What is it?

    SORTING does not mean rearranging the items
     in your workplace...
    It means separating the necessary from the
     unnecessary, and only keeping the necessary
    Why?
        Your work area is crowded and hard to work in
        Time is wasted looking for papers and equipment
        Untidiness hides other problems
        Cabinets, shelves and cupboards get in the way and
         put barriers between people

14                         © 2013 Copyright ISC Ltd.
5S: SORT - How do we do it?
        Identify the area we are SORTING
        Define the criteria for attaching Red Tags
        Allocate a holding area for all dubious items
            This should be in the 5S area, but marked as being the
             “quarantine” holding area
        Take lots of “before” photos
        Prepare a Red Tag Board in the 5S area:
            To note tags produced, actions outstanding, and a summary of
             the total numbers of tags
        Red Tag all items meeting the criteria (aim for 4 Tags
         minimum per person)
        Look everywhere - “waste” is all around the office!
        Get an “independent” person to go around and challenge the
         team on what they have tagged and not tagged
15                               © 2013 Copyright ISC Ltd.
5S: SORT – Red Tagging

    An effective visual method to
     identify un-needed items is
     called red tagging
        A red tag is placed on all items
         not required to complete your
         job
    These items are then moved to
     a central holding area for later
     evaluation of their value
    Occasionally-needed items are
     moved to a more organised
     storage location away from the
     immediate work area
    Un-needed items are
     discarded/disposed of
16                                 © 2013 Copyright ISC Ltd.
Red Tag Criteria
Priority    Frequency of use                    Action required

High        Daily                               Store at the workplace,
                                                where it is needed
Medium      Once per week, once per Store together, near the
            month                   workplace
Low         Less than once per year             Throw away, or store
                                                away from the workplace
            Unusable items                      Throw away


                             This applies to:
                             - Paperwork (incl. files & books)
                             - Equipment (incl. furniture)
                             - Facilities (e.g. storage)

17                  © 2013 Copyright ISC Ltd.
5S: SORT - Documents

    Look at:                                            Look for:
        Client paperwork                                    Out of date?
        Policy documents                                    Correct version?
        Letters/correspondence                              Required for the job?
        Memos                                                 how often?
        Specifications                                      Kept updated?
                                                               by whom?
        Procedures
                                                               how often?
        Checklists
        Notice Boards


18                        © 2013 Copyright ISC Ltd.
5S: SORT - How do we do it?

    Evaluate the Red Tag items:
        The team looks at the items tagged to check:
          Have we tagged anything we definitely need?
          Have we tagged anything that belongs to another
           department, section or organisation?
          What is useless, unclear or useful?
          Are some things useful, but on a longer time-scale?
          How do we dispose of the items tagged that we don’t
           want?
          Have we challenged what we really need and don’t
           need?

19                           © 2013 Copyright ISC Ltd.
5S: SET IN ORDER – What is it?

    Everything in its place and a place for
     everything
    Arrange the things you need to do your job so
     that they are easy to find, easy to use, and
     label them so that anyone can find them and
     put them away




20                    © 2013 Copyright ISC Ltd.
5S: SET IN ORDER – How do we do it?

    Area by area, get the team to put all the items
     they need in what they consider the best
     place
    If we need the same item in two different
     places get two of them, or make it very easy
     to move
    Take photos “after” and display them to show
     what “good” looks like and where everything
     should be (the new “Standard”)

21                    © 2013 Copyright ISC Ltd.
5S: SET-IN-ORDER – How do we do it?
        Place items in the workplace according to their
         frequency of use:
            Frequently used items close to place of work
                Used every hour, within arms reach
                Used several times a day within one pace
                Used once a day, in the work area
                Used less than once a day, out of the work area
        Keep similar equipment and materials together
        Use signs or colour-coding to indicate where
         things should be stored
        Make it as easy as possible to put things back
         (big holes and labelled gaps!)
22                                © 2013 Copyright ISC Ltd.
5S: SHINE – What is it?
    We get everything clean and looking like new, and we
     keep everything clean and looking like new
    A standardised method for cleaning and tidying any
     operational area so that nothing is out of place, nothing
     is dirty longer than a day, and anyone visiting the office
     cannot fail to be impressed with the cleanliness of the
     work area
    Keeping the work area clean and tidy is the responsibility
     of the people working in that area, not the responsibility
     of a cleaner coming round at the end of the day
    A clean work area helps you to identify emerging
     problems so you can take corrective action more quickly

23                         © 2013 Copyright ISC Ltd.
5S: SHINE – How do we do it?
    Decide if the work area needs a major clean-
     up and if so, how that can be done
    Put in a major effort over a short period of
     time to get the whole area up to the required
     standard
    Take photos of the newly cleaned area and
     put them up in the area to show the standard
    Agree what needs to be cleaned daily and by
     whom (produce a rota)
    Carry out regular cleanliness inspections
24                    © 2013 Copyright ISC Ltd.
5S: STANDARDISE – What is it?

    The state that exists when SORT, SET-IN-
     ORDER and SHINE are properly maintained
    Writing, displaying and making visual simple
     procedures that ensure that all can see
     whether an area is keeping up with its targets
     on the 5S
    The place will degenerate back to where we
     were pre-5S if we don’t standardise


25                    © 2013 Copyright ISC Ltd.
5S: STANDARDISE – How do we do it?

    Decide who is responsible for keeping each element of
     the first 3S up to the required standard and ensure they
     do it
    Integrate the 3S duties into everyone’s day to day work:
        We should each have regular daily or weekly 3S activities as part
         of our job, irrespective of grade or function
    Instigate regular audits on the office’s 5S performance
    Keep applying the Seven Wastes to drive waste out of
     the process as this usually impacts positively on 5S




26                              © 2013 Copyright ISC Ltd.
5S: SUSTAIN – What is it?

    Sustain is basically about enforcing and accepting the
     discipline of 5S – make 5S a habit
    Not letting external factors influence the application of
     the 5S principles
    Being critical of those not respecting the standards, or
     not following the set procedures
    Emphasising the visual aspect of all the stages, ask
     yourself, could a stranger walk in and understand the
     situation?
        Can they tell if we are doing it right or doing it wrong? If the
         answer is no, then improve the standard


27                                © 2013 Copyright ISC Ltd.
5S: SUSTAIN – How do we do it?

    Inspect before and after working
    Keep encouraging and recognising those who participate
     and never ignore those who slacken
    Use Information Boards to provide recognition to the
     team and to show visitors what has been achieved
    Keep talking about the 5S, don’t let them become a low
     status activity
    Use the results of 5S audits to drive continuous
     improvement
    Always be ready to “Red Tag”, or run further Red Tag
     events
    Invite “critical friends” to visit
28                       © 2013 Copyright ISC Ltd.
5S at home?




29            © 2013 Copyright ISC Ltd.
ian.seath@improvement-skills.co.uk

07850 728506

@ianjseath

uk.linkedin.com/in/ianjseath




© 2013 Copyright ISC Ltd.

More Related Content

What's hot

Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5SJan Sabat
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvementAdrian Oprea
 
How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 sZakir Husain
 
5S basic training ppt
5S basic training ppt5S basic training ppt
5S basic training pptbeskidek
 
5 S Presentation Basic Training
5 S Presentation   Basic Training5 S Presentation   Basic Training
5 S Presentation Basic Trainingflevko
 
5 S – A Program To Improve Project
5 S – A Program To Improve Project5 S – A Program To Improve Project
5 S – A Program To Improve ProjectIsidro Sid Calayag
 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentationClive Sury
 
5S & Visual Management in Office & Service Environments
5S & Visual Management in Office & Service Environments 5S & Visual Management in Office & Service Environments
5S & Visual Management in Office & Service Environments TKMG, Inc.
 
Presentation 5 S workplace organization methodology
Presentation 5 S workplace organization methodologyPresentation 5 S workplace organization methodology
Presentation 5 S workplace organization methodologyViet Nguyen
 
6s overview in production floor
6s overview in production floor6s overview in production floor
6s overview in production floorAzizurRahmanRohan
 
5S: A Workplace Organization Method
5S: A Workplace Organization Method5S: A Workplace Organization Method
5S: A Workplace Organization MethodNanette Bajador
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementationsudarshan jadwal
 
5 s training shop floor 4
5 s training shop floor 45 s training shop floor 4
5 s training shop floor 4dottinger
 

What's hot (20)

Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5S
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement
 
5S For The Office by Operational Excellence Consulting
5S For The Office by Operational Excellence Consulting5S For The Office by Operational Excellence Consulting
5S For The Office by Operational Excellence Consulting
 
How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 s
 
5S basic training ppt
5S basic training ppt5S basic training ppt
5S basic training ppt
 
5 S Presentation Basic Training
5 S Presentation   Basic Training5 S Presentation   Basic Training
5 S Presentation Basic Training
 
5 S – A Program To Improve Project
5 S – A Program To Improve Project5 S – A Program To Improve Project
5 S – A Program To Improve Project
 
6S training presentation
6S training presentation6S training presentation
6S training presentation
 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentation
 
5S Audit Checklists for Manufacturing & Office
5S Audit Checklists for Manufacturing & Office5S Audit Checklists for Manufacturing & Office
5S Audit Checklists for Manufacturing & Office
 
5S & Visual Management in Office & Service Environments
5S & Visual Management in Office & Service Environments 5S & Visual Management in Office & Service Environments
5S & Visual Management in Office & Service Environments
 
5 S
5 S5 S
5 S
 
implementation of 5s
implementation of 5simplementation of 5s
implementation of 5s
 
Presentation 5 S workplace organization methodology
Presentation 5 S workplace organization methodologyPresentation 5 S workplace organization methodology
Presentation 5 S workplace organization methodology
 
6s overview in production floor
6s overview in production floor6s overview in production floor
6s overview in production floor
 
5 s training pack
5 s training pack5 s training pack
5 s training pack
 
5S: A Workplace Organization Method
5S: A Workplace Organization Method5S: A Workplace Organization Method
5S: A Workplace Organization Method
 
5 s
5 s5 s
5 s
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
 
5 s training shop floor 4
5 s training shop floor 45 s training shop floor 4
5 s training shop floor 4
 

Viewers also liked

Viewers also liked (20)

Daily 15 minute office 5S
Daily 15 minute office 5SDaily 15 minute office 5S
Daily 15 minute office 5S
 
1s and 2s complement
1s and 2s complement1s and 2s complement
1s and 2s complement
 
Modul 5 R
Modul 5 RModul 5 R
Modul 5 R
 
5S - Seiri, Seiton, Seiso, Seiketsu, Shitsuke
5S - Seiri, Seiton, Seiso, Seiketsu, Shitsuke5S - Seiri, Seiton, Seiso, Seiketsu, Shitsuke
5S - Seiri, Seiton, Seiso, Seiketsu, Shitsuke
 
Quality Policy in Raymond
Quality Policy in RaymondQuality Policy in Raymond
Quality Policy in Raymond
 
5 S
5 S5 S
5 S
 
Presentasi 5s
Presentasi 5sPresentasi 5s
Presentasi 5s
 
5S Training Presentation (Beginner)
5S Training Presentation (Beginner)5S Training Presentation (Beginner)
5S Training Presentation (Beginner)
 
Poka Yoka
Poka Yoka Poka Yoka
Poka Yoka
 
5s and kaizen
5s and kaizen5s and kaizen
5s and kaizen
 
5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Poka Yoke Final Ppt
Poka Yoke  Final PptPoka Yoke  Final Ppt
Poka Yoke Final Ppt
 
Business Case ~ Formulation
Business Case ~  FormulationBusiness Case ~  Formulation
Business Case ~ Formulation
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
Poka Yoka Techniques
Poka Yoka TechniquesPoka Yoka Techniques
Poka Yoka Techniques
 
Idea Management & Systems
Idea Management & SystemsIdea Management & Systems
Idea Management & Systems
 
Innovation – What, Why, How…
Innovation – What, Why, How…Innovation – What, Why, How…
Innovation – What, Why, How…
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure Report
 

Similar to Office 5S implementation workshop

Similar to Office 5S implementation workshop (20)

5s handbook
5s handbook5s handbook
5s handbook
 
5 s handbook
5 s handbook5 s handbook
5 s handbook
 
Brady 5S_HandBook - Project Sales Corp
 Brady 5S_HandBook - Project Sales Corp Brady 5S_HandBook - Project Sales Corp
Brady 5S_HandBook - Project Sales Corp
 
5 s
5 s5 s
5 s
 
What is 5S.docx
What is 5S.docxWhat is 5S.docx
What is 5S.docx
 
5 s in public dealing service industry
5 s in public dealing service industry5 s in public dealing service industry
5 s in public dealing service industry
 
5S Facilitator Guide
5S  Facilitator Guide5S  Facilitator Guide
5S Facilitator Guide
 
Qcl 14-v3 [5-s college canteen]_[banasthali university]_[akanksha]
Qcl 14-v3 [5-s college canteen]_[banasthali university]_[akanksha]Qcl 14-v3 [5-s college canteen]_[banasthali university]_[akanksha]
Qcl 14-v3 [5-s college canteen]_[banasthali university]_[akanksha]
 
Introduction to 5 s management
Introduction to 5 s managementIntroduction to 5 s management
Introduction to 5 s management
 
5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology 5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology
 
5s.presentation akash
5s.presentation akash5s.presentation akash
5s.presentation akash
 
KAIZEN Updated 030507
KAIZEN Updated 030507KAIZEN Updated 030507
KAIZEN Updated 030507
 
5s training
5s training5s training
5s training
 
5 S Sample
5 S Sample5 S Sample
5 S Sample
 
5s Philosophy
5s Philosophy5s Philosophy
5s Philosophy
 
Introduction to 6S
Introduction to 6SIntroduction to 6S
Introduction to 6S
 
5S Step by Step Guide.pdf
5S Step by Step Guide.pdf5S Step by Step Guide.pdf
5S Step by Step Guide.pdf
 
5 s step by step guide
5 s   step by step guide5 s   step by step guide
5 s step by step guide
 
5 s 2
5 s 25 s 2
5 s 2
 
All about housekeeping
All about housekeepingAll about housekeeping
All about housekeeping
 

More from Improvement Skills Consulting Ltd.

Monitoring, Evaluation and Learning - services for Third Sector organisations
Monitoring, Evaluation and Learning - services for Third Sector organisationsMonitoring, Evaluation and Learning - services for Third Sector organisations
Monitoring, Evaluation and Learning - services for Third Sector organisationsImprovement Skills Consulting Ltd.
 
Not all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projectsNot all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projectsImprovement Skills Consulting Ltd.
 

More from Improvement Skills Consulting Ltd. (20)

Pro bono OR webinar - Making sense of data
Pro bono OR webinar - Making sense of data Pro bono OR webinar - Making sense of data
Pro bono OR webinar - Making sense of data
 
Making sense of data - Learning Lab 2021
Making sense of data - Learning Lab 2021Making sense of data - Learning Lab 2021
Making sense of data - Learning Lab 2021
 
Quantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning LabQuantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning Lab
 
Quantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning LabQuantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning Lab
 
Pro Bono OR: Making a difference for dogs
Pro Bono OR: Making a difference for dogsPro Bono OR: Making a difference for dogs
Pro Bono OR: Making a difference for dogs
 
Behavioural change - a few thoughts, a model and a case study
Behavioural change - a few thoughts, a model and a case studyBehavioural change - a few thoughts, a model and a case study
Behavioural change - a few thoughts, a model and a case study
 
Making sense of data - Learning Lab slides
Making sense of data - Learning Lab slidesMaking sense of data - Learning Lab slides
Making sense of data - Learning Lab slides
 
Making Sense of Data - 3rd Sector Learning Lab
Making Sense of Data - 3rd Sector Learning LabMaking Sense of Data - 3rd Sector Learning Lab
Making Sense of Data - 3rd Sector Learning Lab
 
Are your processes obvious, complicated or complex?
Are your processes obvious, complicated or complex?Are your processes obvious, complicated or complex?
Are your processes obvious, complicated or complex?
 
Monitoring, Evaluation and Learning - services for Third Sector organisations
Monitoring, Evaluation and Learning - services for Third Sector organisationsMonitoring, Evaluation and Learning - services for Third Sector organisations
Monitoring, Evaluation and Learning - services for Third Sector organisations
 
Workshop design and facilitation
Workshop design and facilitationWorkshop design and facilitation
Workshop design and facilitation
 
Data4Good Conference 2018 Pro Bono OR and Statistics
Data4Good Conference 2018 Pro Bono OR and StatisticsData4Good Conference 2018 Pro Bono OR and Statistics
Data4Good Conference 2018 Pro Bono OR and Statistics
 
Writing Skills for Scientists - workshop
Writing Skills for Scientists - workshopWriting Skills for Scientists - workshop
Writing Skills for Scientists - workshop
 
Getting started with Digital Transformation in your Charity
Getting started with Digital Transformation in your CharityGetting started with Digital Transformation in your Charity
Getting started with Digital Transformation in your Charity
 
50 Creativity and Change Cards
50 Creativity and Change Cards50 Creativity and Change Cards
50 Creativity and Change Cards
 
Charities: why bother with digital transformation?
Charities: why bother with digital transformation?Charities: why bother with digital transformation?
Charities: why bother with digital transformation?
 
Control Charts: their use and benefits
Control Charts: their use and benefitsControl Charts: their use and benefits
Control Charts: their use and benefits
 
Digital transformation and you: a seminar for Charites
Digital transformation and you: a seminar for CharitesDigital transformation and you: a seminar for Charites
Digital transformation and you: a seminar for Charites
 
OR58 Conference: Pro bono OR and a case study
OR58 Conference: Pro bono OR and a case studyOR58 Conference: Pro bono OR and a case study
OR58 Conference: Pro bono OR and a case study
 
Not all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projectsNot all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projects
 

Recently uploaded

Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 

Recently uploaded (20)

Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 

Office 5S implementation workshop

  • 1. Office 5S Implementation Ian Seath Improvement Skills Consulting Ltd. 1 © 2013 Copyright ISC Ltd.
  • 2. Workshop Aims  To introduce the Lean 5S technique  To decide how and where it can be applied within the office  To begin implementation so we can achieve some quick wins  To plan for sustaining 5S  To commit to developing 5S 2 © 2013 Copyright ISC Ltd.
  • 3. 5S Approach  Two days of “learning by doing”  Approximately 20% learning/80% doing  Applicationof principles on your work process  Focused on immediate implementation  Immediate tangible benefits 3 © 2013 Copyright ISC Ltd.
  • 4. What is 5S?  An easy way of achieving major change in an office environment  A structure for establishing an orderly, clean and organised working environment  A way of identifying new problems and wastes that can then be resolved by staff and managers  A way of encouraging everyone to be involved in improvement activities  A process for creating the best working environment to carry out your work and run your business 4 © 2013 Copyright ISC Ltd.
  • 5. What is 5S?  Based on Japanese words that begin with “S”, the 5S philosophy focuses on effective workplace organisation and standardised work procedures  Problems cannot be clearly seen when the workplace is disorganised  Cleaning and organising the workplace helps the team to uncover problems  Making problems visible is the first step of improvement 5 © 2013 Copyright ISC Ltd.
  • 6. What is 5S? 1) SORT: Seiri – Eliminate unnecessary items 2) SET IN ORDER: Seiton – Order: everything in its place 3) SHINE: Seisu - Clean, check and return to original state 4) STANDARDISE: Seiketsu - Define procedures and standardise 5) SUSTAIN: Shitsuke - Respect and improve standards 6 © 2013 Copyright ISC Ltd.
  • 7. The ideas of 5S are NOT new . . .  Henry Ford described how he implemented them in the early 1900s: “Put all machinery in the best possible condition, keep it that way, and insist upon absolute cleanliness everywhere in order that he may learn to respect his tools, his surroundings, and himself.” 7 © 2013 Copyright ISC Ltd.
  • 8. Office: Before and after 5S… 8 © 2013 Copyright ISC Ltd.
  • 9. Before and after 5S… 9 © 2013 Copyright ISC Ltd.
  • 10. 5S Leads to a Visual Office When anyone can walk into the office and visually understand the processes and performance. Visual Office 5S System Staff Involvement 10 © 2013 Copyright ISC Ltd.
  • 11. The Seven Wastes:  Waiting: People waiting for work (e.g. waiting for papers)  Over-production: Producing more than is needed (e.g. taking extra copies)  Re-work: Dealing with failures and correcting problems (e.g. re-booking appointments)  Motion: People moving (e.g. to get files, papers, approvals)  Over-processing: Unnecessary activities (e.g. collecting duplicate information, multiple levels of approvals)  Inventory: Work in progress (e.g. case files “sat on desks”)  Transportation: Moving stuff around (e.g. files to/from archives) 11 © 2013 Copyright ISC Ltd.
  • 12. Benefits to you?  What examples of the 7 Wastes can you identify in the office?  What do you think the benefits of applying 5S might be here? 12 © 2013 Copyright ISC Ltd.
  • 13. Implementation: 5S APPROACH 13 © 2013 Copyright ISC Ltd.
  • 14. 5S: SORT - What is it?  SORTING does not mean rearranging the items in your workplace...  It means separating the necessary from the unnecessary, and only keeping the necessary  Why?  Your work area is crowded and hard to work in  Time is wasted looking for papers and equipment  Untidiness hides other problems  Cabinets, shelves and cupboards get in the way and put barriers between people 14 © 2013 Copyright ISC Ltd.
  • 15. 5S: SORT - How do we do it?  Identify the area we are SORTING  Define the criteria for attaching Red Tags  Allocate a holding area for all dubious items  This should be in the 5S area, but marked as being the “quarantine” holding area  Take lots of “before” photos  Prepare a Red Tag Board in the 5S area:  To note tags produced, actions outstanding, and a summary of the total numbers of tags  Red Tag all items meeting the criteria (aim for 4 Tags minimum per person)  Look everywhere - “waste” is all around the office!  Get an “independent” person to go around and challenge the team on what they have tagged and not tagged 15 © 2013 Copyright ISC Ltd.
  • 16. 5S: SORT – Red Tagging  An effective visual method to identify un-needed items is called red tagging  A red tag is placed on all items not required to complete your job  These items are then moved to a central holding area for later evaluation of their value  Occasionally-needed items are moved to a more organised storage location away from the immediate work area  Un-needed items are discarded/disposed of 16 © 2013 Copyright ISC Ltd.
  • 17. Red Tag Criteria Priority Frequency of use Action required High Daily Store at the workplace, where it is needed Medium Once per week, once per Store together, near the month workplace Low Less than once per year Throw away, or store away from the workplace Unusable items Throw away This applies to: - Paperwork (incl. files & books) - Equipment (incl. furniture) - Facilities (e.g. storage) 17 © 2013 Copyright ISC Ltd.
  • 18. 5S: SORT - Documents  Look at:  Look for:  Client paperwork  Out of date?  Policy documents  Correct version?  Letters/correspondence  Required for the job?  Memos  how often?  Specifications  Kept updated?  by whom?  Procedures  how often?  Checklists  Notice Boards 18 © 2013 Copyright ISC Ltd.
  • 19. 5S: SORT - How do we do it?  Evaluate the Red Tag items:  The team looks at the items tagged to check:  Have we tagged anything we definitely need?  Have we tagged anything that belongs to another department, section or organisation?  What is useless, unclear or useful?  Are some things useful, but on a longer time-scale?  How do we dispose of the items tagged that we don’t want?  Have we challenged what we really need and don’t need? 19 © 2013 Copyright ISC Ltd.
  • 20. 5S: SET IN ORDER – What is it?  Everything in its place and a place for everything  Arrange the things you need to do your job so that they are easy to find, easy to use, and label them so that anyone can find them and put them away 20 © 2013 Copyright ISC Ltd.
  • 21. 5S: SET IN ORDER – How do we do it?  Area by area, get the team to put all the items they need in what they consider the best place  If we need the same item in two different places get two of them, or make it very easy to move  Take photos “after” and display them to show what “good” looks like and where everything should be (the new “Standard”) 21 © 2013 Copyright ISC Ltd.
  • 22. 5S: SET-IN-ORDER – How do we do it?  Place items in the workplace according to their frequency of use:  Frequently used items close to place of work  Used every hour, within arms reach  Used several times a day within one pace  Used once a day, in the work area  Used less than once a day, out of the work area  Keep similar equipment and materials together  Use signs or colour-coding to indicate where things should be stored  Make it as easy as possible to put things back (big holes and labelled gaps!) 22 © 2013 Copyright ISC Ltd.
  • 23. 5S: SHINE – What is it?  We get everything clean and looking like new, and we keep everything clean and looking like new  A standardised method for cleaning and tidying any operational area so that nothing is out of place, nothing is dirty longer than a day, and anyone visiting the office cannot fail to be impressed with the cleanliness of the work area  Keeping the work area clean and tidy is the responsibility of the people working in that area, not the responsibility of a cleaner coming round at the end of the day  A clean work area helps you to identify emerging problems so you can take corrective action more quickly 23 © 2013 Copyright ISC Ltd.
  • 24. 5S: SHINE – How do we do it?  Decide if the work area needs a major clean- up and if so, how that can be done  Put in a major effort over a short period of time to get the whole area up to the required standard  Take photos of the newly cleaned area and put them up in the area to show the standard  Agree what needs to be cleaned daily and by whom (produce a rota)  Carry out regular cleanliness inspections 24 © 2013 Copyright ISC Ltd.
  • 25. 5S: STANDARDISE – What is it?  The state that exists when SORT, SET-IN- ORDER and SHINE are properly maintained  Writing, displaying and making visual simple procedures that ensure that all can see whether an area is keeping up with its targets on the 5S  The place will degenerate back to where we were pre-5S if we don’t standardise 25 © 2013 Copyright ISC Ltd.
  • 26. 5S: STANDARDISE – How do we do it?  Decide who is responsible for keeping each element of the first 3S up to the required standard and ensure they do it  Integrate the 3S duties into everyone’s day to day work:  We should each have regular daily or weekly 3S activities as part of our job, irrespective of grade or function  Instigate regular audits on the office’s 5S performance  Keep applying the Seven Wastes to drive waste out of the process as this usually impacts positively on 5S 26 © 2013 Copyright ISC Ltd.
  • 27. 5S: SUSTAIN – What is it?  Sustain is basically about enforcing and accepting the discipline of 5S – make 5S a habit  Not letting external factors influence the application of the 5S principles  Being critical of those not respecting the standards, or not following the set procedures  Emphasising the visual aspect of all the stages, ask yourself, could a stranger walk in and understand the situation?  Can they tell if we are doing it right or doing it wrong? If the answer is no, then improve the standard 27 © 2013 Copyright ISC Ltd.
  • 28. 5S: SUSTAIN – How do we do it?  Inspect before and after working  Keep encouraging and recognising those who participate and never ignore those who slacken  Use Information Boards to provide recognition to the team and to show visitors what has been achieved  Keep talking about the 5S, don’t let them become a low status activity  Use the results of 5S audits to drive continuous improvement  Always be ready to “Red Tag”, or run further Red Tag events  Invite “critical friends” to visit 28 © 2013 Copyright ISC Ltd.
  • 29. 5S at home? 29 © 2013 Copyright ISC Ltd.