SUI  SOUTHERN  GAS  COMPANY  LIMITED Karachi, 15 June 2007 PAKISTAN'S POWER CRISIS MUNAWAR BASEER AHMAD P.E. MANAGING DIRECTOR by
 
 
 
 
PAKISTAN POWER SECTOR PRESENTATION SEQUENCE ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1. Inadequate Energy demand forecasts 2. No integrated Energy or Power Planning 3. Lack of effective implementation modalities, and project development 4. Lack of Financing Plan, Structure or Vehicle 5. Lack of coordination between sectoral entities i.e. Hydel, Electric, Oil/Gas 6. Primary Energy supply chain development, enhancement and security issues not addressed 7. Regulatory framework out of focus with ground realities and supply constraints CRISIS OF POWER SEVEN CRUCIAL ASPECTS
INDIA AFGHANISTAN IRAN CHINA ARABIAN SEA Sindh Balochistan Punjab Islamabad NWFP JAMMU & KASHMIR (DISPUTED TERRITORY) (MW) PAKISTAN POWER SECTOR – INSTALLED CAPACITY Source: Power System Statistic, Feb 2007 by NTDC 220 Total 200 Hydel 20 Thermal  1947-1960 2,808 Total 1,450 Hydel 1,358 Thermal  1961-1980 325 Nuclear 10,652 Total 4,813 Hydel 5,514 Thermal  1981-2006 2,068.5 Total 420 Retired 1,648.5 Privatized Retired / Privatized 5,783 Total 30 Hydel 5,753 Thermal  IPP’s upto June 06 19,549.5 Grand Total 2,108 3,064 7,426.5 3,766 1,030 KESC 2,155 137 NUCLEAR 2,155 Total 1,756 KESC 262 IPP  KARACHI
PAKISTAN POWER SECTOR – GROWTH AT A GLANCE ACGR: 8.8% (MW) Source:  1. Power System Statistic, Feb 2007 by NTDC  2. Pakistan energy Year Book 2006 1,582.41 384.97 % INCREASE 1951 4,879 163.63 2006 ACGR % GDP  (RS BILLION) POPULATION (Million) 8.8 TOTAL 325 3.5 NUCLEAR (1972-2006) 7.5 THERMAL (1960-2006) 33.74 8.5 HYDRO (1925-2006)
Source:  BP Statistical Review of World Energy June 2006, ENERGY CONSUMPTION PER CAPITA, 2005-06
PAKISTAN POWER SECTOR – INSTALLED CAPACITY (MW) Source: Power System Statistic, Feb 2007 by NTDC 33.8 % increase
PAKISTAN POWER SECTOR ADDITIONAL GENERATION (MW) (Ghazi Brotha Shahddra Thermal  NOTE:  1. GBHP FULL UTILIZATION IN 2004 2. ESSENTIALLY NO NEW POWER GENERATION ADDITION AFTER 2001  Source: Power System Statistic, Feb 2007 by NTDC HUBCO Kot Addu Uch Japan Fauji Chashma Liberty AES Habibullah
PAKISTAN POWER SECTOR  KESC – ADDITIONAL GENERATION (MW) NOTE: NO NEW ADDITION FOR 9 YEARS Source: Power System Statistic, Feb 2007 by NTDC IPPs : 262 MW Thermal KESC: 231 MW  Nuclear
PAKISTAN POWER SECTOR ENERGY GENERATION BY FUEL TYPE - FY 2006 (WAPDA) (KESC) Source:   1.  BP Statistical Review of World Energy June 2006,   2.  Power System Statistic, Feb 2007 by NTDC 24.38% USA 56.16% India 70.17% China Indigenous Coal
FUEL COST AND AVERAGE SALE PRICE (Rs /kWh) ACGR: 5.6% ACGR: 6.2% ACGR%:  GAS: 8.6 FURNACE OIL: 14.8   AVERAGE FUEL PRICE INCREASED: 11.70% CGAR Source:  1. Power System Statistic, Feb 2007 by NTDC  2. Pakistan energy Year Book 2006
PAKISTAN POWER SECTOR - SYSTEM LOSSES (%)  Source: Power System Statistic, Feb 2007 by NTDC NOTE:  * ASSUMING A MINIMUM OF 6% TECHNICAL LOSSES, ADDITIONAL THEFT/LEAKAGE FOR KESC  AMOUNT TO RS. 11,120 MILLION  ** ASSUMING A MINIMUM OF 10% TECHNICAL LOSSES, ADDITIONAL THEFT/LEAKAGE FOR WAPDA  AMOUNT TO RS. 50 BILLION * **
ROLE OF NEPRA  ?? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
CASE STUDY OF EFFECTIVE  PLANNING AND IMPLEMENTATION SUI SOUTHERN GAS COMPANY LIMITED
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],OUR ISSUES
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],CONSEQUENCES
STRATEGIC MANAGEMENT OBJECTIVES;  TO MAKE SSGC THE BEST PUBLIC SECTOR COMPANY IN PAKISTAN   (SET AS PART OF 5 YEARS PLAN FOR 2003-2008) ,[object Object],[object Object],[object Object],[object Object]
STRATEGIC MANAGEMENT OBJECTIVES;  TO MAKE SSGC THE BEST PUBLIC SECTOR COMPANY IN PAKISTAN   ,[object Object],[object Object],[object Object]
SSGC CORE INVESTMENT PROGRAMME RUPEES MILLION 368.8 501.1 640.1 800.3 271.2 25.6 296.4 OTHERS 6,488.5  1,897.4  2,046.8  592.7 235.6 1218.5 - 2,544.3  256.6 - 208.8 1,782.5 2004-05 359.2 348.1 375.6 279.3 331.4 121.0 REHABILITATION 1,536.0 1,577.2 1,768.4 1,945.6 - 509.8 UNDER PLANNING/ APPROVAL 1,904.8 2,560.9 3,913.7 4,329.0 3,382.0 1,978.2  SUB TOTAL (A) - - - 240.8 173.8 25.6 LEFTOVER PROJECTS - 482.6 1,505.2 1,001.1 648.1 338.7 ONGOING OTHER PROJECTS - - - 341.2 2,288.9 1,078.5 ONGOING- GIREP II  A) TRANSMISSION PROJECTS: 885.5  853.3  823.3  1,725.1 864.7 497.1  C) OTHER CAPITAL  EXPENDITURE 5,398.9  2,608.6  460.2 2,233.0 - 2010-11 6,414.9  3,000.7 670.1 1,971.4 - 2009-10 TOTAL (A+B+C) SUB TOTAL (B) NEW TOWNS NORMAL EXPANSION DISTRIBUTION PROJECTS B) DISTRIBUTION SYSTEM: PROJECT DESCRIPTION - 816.5 238.2 648.3 1,729.7 2,468.1 1,770.2 1761.1 1,040.2 1,618.1 1,258.1 533.3 3,118.0  5,182.0 3,597.9 3,063.7  7,855.0  11,236.1 7,844.7 5,539.0  2008-09 2007-08 2006-07 2005-06
GAS INFRASTRUCTURE REHABILITATION AND EXPANSION PROJECTS Quetta Sibi Pirkoh Loti Dera Bugti Sui Jacobabad Shikarpur Larkana Dadu Zamzama Sari Hyderabad Nawabshah Sawan Kadanwari Miano Badin Karachi Bhit Hasan Sukkur FJFC Pesh Bogi GAS INFRASTRUCTURE  REHABILITATION AND EXPANSION PROJECTS  2006-08 Mazarani Zarghun SNGPL transmission line Naimat Basal 42” Ø 13 Km Bin Qasim Distribution  Pipeline Rs.807 million 18” Ø 15 Km Mach – Kolpur And 31 Km Dingra – Sibi Loop line + Sibi Compressor  Rs. 1,138 Million 18” Ø 15 Km Re – routing  in Dingra Nala  Rs. 272 Million 18” Ø 18 Km Abegum – Mach  Loopline  Rs. 306 Million 24” Ø 66 Km Bajara to Karchat 134 Km Karchat to Karachi Rs. 2795 million 30” Ø 9 Km By-pass HQ3 to SMS Sindh University Rs. 364 Million 24” Ø 116 km Snaghar – Nawabshah – Karachi  Pipelinepahse -1 Rs. 2,262 million 24” Ø 14 Km loop  Line Pahse-2 HQ3-Masu Rs. 323 Million 48 Km Shahdadpur to Masu 24” Ø 140  Km Sanghar –  Nawabshah – Hyderabad Karachi loopline  50 Km Shahadpur –  MVA Karam Jamali 12” ø 64 Km Zarghun  Pipeline Rs. 900 million Compressor Bin Qasim Masu MVA Karam Jamali Shahdadpur  Bajara Karchat HQ2
Proposed LNG setup KARACHI GAS DEVELOPMENT MASTER PLAN 92 MMCFD SMS KT 242 MMCFD SMS MALIR 95 MMCFD SMS STEEL 36 MMCFD 250 MMCFD KTPS BQPS Proposed 36”x30Km (140 mmcfd) Distribution main * LNG not included * * TOTAL :  1,200 ADDL 2010 :  410 EXISTING : 750-790 LOAD MMCFD
SIX YEARS PERFORMANCE HIGHLIGHTS Estimated
KEY PERFORMANCE INDICATORS Estimated
KEY PERFORMANCE INDICATORS ,[object Object],[object Object],Estimated
KEY PERFORMANCE INDICATORS Estimated
KEY PERFORMANCE INDICATORS Estimated
IMPERATIVES OF SUSTAINABLE ENERGY SUPPLY 1. ENERGY IS PRIMARY VEHICLE FOR ECONOMIC GROWTH AND SOCIAL DEVELOPMENT AND MUST BE MADE AVAILABLE FOR MANAGED GROWTH 2. DEVELOPING SOCIETIES REQUIRE MORE ENERGY TO MAKE THE TRANSITION OUT OF LOW INCOME ECONOMIES (AND POVERTY) 3. INDIGENOUS SOURCES MUST BE MAXIMIZED WITH MORE HYDEL CONTENT 4. LONG TERM ENERGY SUPPLIES MUST BE SECURED (OIL, GAS, COAL) FROM MULTIPLE SOURCES (BOTH INDIGENOUS AND OVERSEAS) 5. ENERGY MIX TO HAVE INCREASING SHARE OF RENEWABLE (WIND, SOLAR) WITH UP TO 10% OVER THE NEXT 20 YEARS 6. ENERGY CONSERVATION EFFICIENCY IMPROVEMENT AND LOSS REDUCTION MUST BE ENFORCED 7. UTILITIES MUST UNDERTAKE EFFECTIVE LOAD CYCLE MANAGEMENT FOR MAXIMUM CAPACITY UTILIZATION
ENERGY MIX PLAN  ,[object Object],Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad 2.9 6.3 2.6 4.5 2.7 3.6 2.6 2.5 0.6 0.4 1.0 0.6 NUCLEAR 1.1 2.4 1.1 1.8 0.9 1.2 0.6 0.6 0.4 0.3 - - RENEWABLE 13.8 30.0 13.2 22.4 13.7 17.9 13.9 13.6 12.9 9.3 12.7 7.4 HYDEL 15.0 32.7 13.0 22.1 11.5 15.1 10.0 9.8 8.1 5.8 7.0 4.0 COAL 48.6 106.0 49.9 84.8 47.7 62.5 48.3 47.3 49.4 35.6 50.4 29.2 NATURAL GAS 18.6 40.6 20.2 34.4 23.4 30.7 24.7 24.2 28.6 20.6 28.4 16.4 OIL % 218 * % 170 % 131 % 98 % 72 % 57.7 TOTAL ENERGY 2030 2025 2020 2015 2010 2005-06 LONG TERM  MEDIUM TERM SHORT TERM CURRENT     % MTOE
PROJECTED HYDEL POWER PROJECTS Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad MW 19,200 5,000 “  UPTO 2030 14,200 6,800 “  UPTO 2020 7,400 1,200 ADDITION UPTO 2010 6,200 6,200 EXISTING  INCLUDING GHAZI BAROTHA (FULL) CUMULATIVE CAPACITY 5,000 6,877 1,206 3,000 3,877 2,000 3,000 600 120 740 655 649 240 133 740 19 121 130 72 81 96 130 106 79 132 84 97 60 Small projects Large Project TOTAL UPTO 2030 NEW POWER PROJECTS (CAPACITY IN MW) Neelam Jhelum Taunsa Munda Suki Kinari Swat Cascade Karot Partind Kohala TOTAL Large Project TOTAL Pehur Allai Khwar Duber Khwar Khan Khwar Malakand-III Jinnah Barrage Keyal Khwar Golen Gol New Bong Hydro power Rajdhani Power Project Matiltan Distt Swat Kotli Hydro Power Project Gulpur Hydro Project TOTAL UPTO 2020 UPTO 2010
PROJECTED NUCLEAR POWER PROJECTS Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad MW 8,000 1,000 x 5 “  UPTO 2030 3,000 600 x 4 “  UPTO 2020 600 300 ADDITION UPTO 2010 360 360 EXISTING  CUMULATIVE CAPACITY 7,400 600 360 * TO BE RETIRED BY 2010 1200 1200 2000 2000 1000 300 300 60 300 NPP-4  NPP-5 NPP-6 NPP-7 NPP-8 NPP-9 UPTO 2030 NEW POWER PROJECTS (CAPACITY IN MW) CHASNUPP-2 NPP-3 KANUPP-1* CHASNUPP-1 UPTO 2020 UPTO 2010
GENERATION EXPANSION PLAN  ( WAPDA SYSTEM) 1 Rental :150 MW 1 Renta : 136 MW 1 Hydel :  81 MW 3 Hydel   :  323 MW  14 Thermal : 2927 MW 1 Alt. Energy:  100 MW 1  Hydel :  96 MW  8 Thermal : 1209 MW  2 Hydel : 184 MW  1 Thermal : 150 MW 1 Nuclear : 325 MW
PROJECTED COAL POWER PROJECTS Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad 26 (58) 11 (24.9) 2.1 (4.7) 0.09 (0.2) 36 (80) 17 (38) 6.1 (13.6) 2.69  (6) TOTAL MTOE (MT) MTOE (MT) MW 8.0 (18.0) 2.0 (4.5) 14,500 “  2030 4.0 (9.0) 2.0 (4.5) 5,800 “  2020 2.0 (4.5) 2.0 (4.5) 1,050 UPTO 2010 1.6 (3.6) 1.0 (2.2) 150 EXISTING CEMENT / BRICKS STEEL POWER 20 15 10 6 % IN ENERGY MIX 150 150 Existing  1,050 900 TOTAL 300  450 150 ,[object Object],[object Object],[object Object],ADDITION UPTO 2010 MW 14,500 8,700 “  UPTO 2030 5,800 4,750 “  UPTO 2020 CUMULATIVE CAPACITY
THE WAY FORWARD 1. GOP TO SET-UP  NATIONAL ENERGY COMMISSION  OR  NATIONAL ENERGY PLAN   AUTHORITY  TO ACT AS CENTRAL STATUTORY BODY FOR ENERGY PLANNING AND PROJECT MANAGEMENT. 2. GOP TO SET-UP  COAL POWER DEVELOPMENT AUTHORITY  WITH MANDATE AND FUNDS TO SET-UP COAL POWER PROJECTS BASED ON LOCAL COAL. 3. TRANSITION OF OIL, GAS AND POWER COMPANIES TO FULLY EMPOWERED  CORPORATE STRUCTURE  WITH  PROFESSIONAL MANAGEMENT . 4. ARRANGE FOR GOP FUNDING, DONOR SUPPORT ETC FOR  MEGA PROJECTS  IN  HYDEL, COAL AND NUCLEAR SECTORS. 5. SECURE LONG TERM SUPPLIES  OF  OIL & GAS  FROM MID EAST AND CAS THROUGH UPSTREAM INVOLVEMENT AND GOVERNMENT TO GOVERNMENT LEVEL COOPERATION. 6. FAST TRACK AGREEMENTS AND IMPLEMENTATION OF  TRANS NATIONAL OIL AND GAS PIPELINES . 7. DEVELOP  PRESIDENT’S VISION OF PAKISTAN AS “ASIAN ENERGY CORRIDOR”,  THUS SECURING PAKISTAN’S STRATEGIC ROLE IN REGION AND ENSURING SUSTAINABLE ENERGY SUPPLIES FOR THE FUTURE. For Pakistan’s Energy –  Security,   Sustainability   Sovereignty
MOVING AHEAD ….. TOGETHER FOR PAKISTAN’S POWER SECURITY, SOVEREIGNTY, SUSTAINABILITY. THANK YOU
BACKUP SLIDES
 
FUEL MIX IN ENERGY GENERATION (GENCOs) 1.33 0.88 0.77 0.66 0.63 0.61 0.59 0.67 0.94 0.81 Cost/kWh (Rs) 12.68 11.03 9.91 11.28 9.49 9.51 3.56 3.40 2.27 3.15 Cost/kWh (Rs) 5.04 3.27 2.71 2.89 2.49 2.62 1.74 1.40 1.61 1.46 Cost/kWh (Rs) 2.35 1.97 1.82 1.75 1.74 1.64 1.27 1.24 1.16 1.12 Cost/kWh (Rs) Generation (GWh) Generation (GWh) Generation (GWh) Generation (GWh) 129 2 4976 17402 2006 175 198 231 284 240 410 501 406 375 Coal 5 26 76 64 65 43 79 84 139 H.S.D. 3213 2734 6619 6631 4824 5274 4191 4966 6276 Furnace Oil 1879 18053 12648 11680 11711 13417 11121 12003 12303 GAS 2005 2004 2003 2002 2001 2000 1999 1998 1997 FUEL
AVERAGE FUEL COST AND SALE PRICE KESC ( Paisa) / kWh)
AVERAGE FUEL COST AND SALE PRICE WAPDA (GENCOs) ( Paisa) / kWh)

More Related Content

Viewers also liked

Enda connolly - HRB Strategic Business Plan 2010-2014 - 2009
Enda connolly - HRB Strategic Business Plan 2010-2014 - 2009Enda connolly - HRB Strategic Business Plan 2010-2014 - 2009
Enda connolly - HRB Strategic Business Plan 2010-2014 - 2009ipposi
 
Sales business development account plan ahnna w
Sales business development account plan ahnna wSales business development account plan ahnna w
Sales business development account plan ahnna wAhnna Weber
 
MERGER,ACQUISITION AND CORPORATE RESTRUCTURING
MERGER,ACQUISITION AND CORPORATE RESTRUCTURINGMERGER,ACQUISITION AND CORPORATE RESTRUCTURING
MERGER,ACQUISITION AND CORPORATE RESTRUCTURINGAugustin Bangalore
 
TOWN OF BERTHOUD BUSINESS DEVELOPMENT STRATEGIC PLAN 2016
TOWN OF BERTHOUD BUSINESS DEVELOPMENT STRATEGIC PLAN 2016TOWN OF BERTHOUD BUSINESS DEVELOPMENT STRATEGIC PLAN 2016
TOWN OF BERTHOUD BUSINESS DEVELOPMENT STRATEGIC PLAN 2016Michael Masciola
 
Session Two Projects And Activities To Create A Strategic Plan And A Supporti...
Session Two Projects And Activities To Create A Strategic Plan And A Supporti...Session Two Projects And Activities To Create A Strategic Plan And A Supporti...
Session Two Projects And Activities To Create A Strategic Plan And A Supporti...Peterj1953
 
Strategic Business Plan - Starting A Small Business
Strategic Business Plan - Starting A Small BusinessStrategic Business Plan - Starting A Small Business
Strategic Business Plan - Starting A Small BusinessGirlie Villadarez
 
5 Paradigms And Kingdom Business For Alict August 2009
5 Paradigms And Kingdom Business For Alict August 20095 Paradigms And Kingdom Business For Alict August 2009
5 Paradigms And Kingdom Business For Alict August 2009Dion Forster
 
Get Strategic Business Development Plan
Get Strategic Business Development PlanGet Strategic Business Development Plan
Get Strategic Business Development Planmillennialpartners
 
Brand Merger & Acquisition Lenovo Acquisiion Of Ibm Pc(Final Version)
Brand Merger & Acquisition  Lenovo Acquisiion Of Ibm Pc(Final Version)Brand Merger & Acquisition  Lenovo Acquisiion Of Ibm Pc(Final Version)
Brand Merger & Acquisition Lenovo Acquisiion Of Ibm Pc(Final Version)Johnny Ji
 
2030 Strategic Plan and 2014-25018 Business Plan
2030 Strategic Plan and 2014-25018 Business Plan2030 Strategic Plan and 2014-25018 Business Plan
2030 Strategic Plan and 2014-25018 Business PlanPetrobras
 
Real Estate Development Business Plan
Real Estate Development Business PlanReal Estate Development Business Plan
Real Estate Development Business Plankambanis
 
Business plan writing power point
Business plan writing power pointBusiness plan writing power point
Business plan writing power pointRichard Lindfield
 
Best Practices In Business Development
Best Practices In Business DevelopmentBest Practices In Business Development
Best Practices In Business DevelopmentDavid Fatlowitz
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringKavindra Singh
 
Business Process Reengineering Complete
Business Process Reengineering   CompleteBusiness Process Reengineering   Complete
Business Process Reengineering CompleteRoy Antony Arnold G
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringAniket Verma
 
Business Development Presentation
Business Development PresentationBusiness Development Presentation
Business Development PresentationStephen Simpson
 

Viewers also liked (20)

Enda connolly - HRB Strategic Business Plan 2010-2014 - 2009
Enda connolly - HRB Strategic Business Plan 2010-2014 - 2009Enda connolly - HRB Strategic Business Plan 2010-2014 - 2009
Enda connolly - HRB Strategic Business Plan 2010-2014 - 2009
 
Sales business development account plan ahnna w
Sales business development account plan ahnna wSales business development account plan ahnna w
Sales business development account plan ahnna w
 
MERGER,ACQUISITION AND CORPORATE RESTRUCTURING
MERGER,ACQUISITION AND CORPORATE RESTRUCTURINGMERGER,ACQUISITION AND CORPORATE RESTRUCTURING
MERGER,ACQUISITION AND CORPORATE RESTRUCTURING
 
TOWN OF BERTHOUD BUSINESS DEVELOPMENT STRATEGIC PLAN 2016
TOWN OF BERTHOUD BUSINESS DEVELOPMENT STRATEGIC PLAN 2016TOWN OF BERTHOUD BUSINESS DEVELOPMENT STRATEGIC PLAN 2016
TOWN OF BERTHOUD BUSINESS DEVELOPMENT STRATEGIC PLAN 2016
 
Session Two Projects And Activities To Create A Strategic Plan And A Supporti...
Session Two Projects And Activities To Create A Strategic Plan And A Supporti...Session Two Projects And Activities To Create A Strategic Plan And A Supporti...
Session Two Projects And Activities To Create A Strategic Plan And A Supporti...
 
Bpr ppt
Bpr pptBpr ppt
Bpr ppt
 
Strategic Business Plan - Starting A Small Business
Strategic Business Plan - Starting A Small BusinessStrategic Business Plan - Starting A Small Business
Strategic Business Plan - Starting A Small Business
 
Advanced strategic planning
Advanced strategic planningAdvanced strategic planning
Advanced strategic planning
 
5 Paradigms And Kingdom Business For Alict August 2009
5 Paradigms And Kingdom Business For Alict August 20095 Paradigms And Kingdom Business For Alict August 2009
5 Paradigms And Kingdom Business For Alict August 2009
 
Get Strategic Business Development Plan
Get Strategic Business Development PlanGet Strategic Business Development Plan
Get Strategic Business Development Plan
 
Brand Merger & Acquisition Lenovo Acquisiion Of Ibm Pc(Final Version)
Brand Merger & Acquisition  Lenovo Acquisiion Of Ibm Pc(Final Version)Brand Merger & Acquisition  Lenovo Acquisiion Of Ibm Pc(Final Version)
Brand Merger & Acquisition Lenovo Acquisiion Of Ibm Pc(Final Version)
 
Gepco
GepcoGepco
Gepco
 
2030 Strategic Plan and 2014-25018 Business Plan
2030 Strategic Plan and 2014-25018 Business Plan2030 Strategic Plan and 2014-25018 Business Plan
2030 Strategic Plan and 2014-25018 Business Plan
 
Real Estate Development Business Plan
Real Estate Development Business PlanReal Estate Development Business Plan
Real Estate Development Business Plan
 
Business plan writing power point
Business plan writing power pointBusiness plan writing power point
Business plan writing power point
 
Best Practices In Business Development
Best Practices In Business DevelopmentBest Practices In Business Development
Best Practices In Business Development
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Business Process Reengineering Complete
Business Process Reengineering   CompleteBusiness Process Reengineering   Complete
Business Process Reengineering Complete
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Business Development Presentation
Business Development PresentationBusiness Development Presentation
Business Development Presentation
 

Similar to Presentation By Munawar Baseer Ahmed

Presentation By Mukhtar Ahmed
Presentation By Mukhtar AhmedPresentation By Mukhtar Ahmed
Presentation By Mukhtar AhmedIEEEP Karachi
 
KS-1647-DP042A-Investing-for-Productivity-in-the-GCC-Financing-the-Transition
KS-1647-DP042A-Investing-for-Productivity-in-the-GCC-Financing-the-TransitionKS-1647-DP042A-Investing-for-Productivity-in-the-GCC-Financing-the-Transition
KS-1647-DP042A-Investing-for-Productivity-in-the-GCC-Financing-the-TransitionNicholas Howarth
 
Hydropower in-india-key-enablers-for-better-tomorrow
Hydropower in-india-key-enablers-for-better-tomorrowHydropower in-india-key-enablers-for-better-tomorrow
Hydropower in-india-key-enablers-for-better-tomorrowPriya Zadu
 
Ambrosini_IFC - SEF Market Potential in Pakistan v01.pptx
Ambrosini_IFC - SEF Market Potential in Pakistan v01.pptxAmbrosini_IFC - SEF Market Potential in Pakistan v01.pptx
Ambrosini_IFC - SEF Market Potential in Pakistan v01.pptxiqrajavaid300
 
Corporate Presentation CPFL Energia - March 2017
Corporate Presentation CPFL Energia - March 2017Corporate Presentation CPFL Energia - March 2017
Corporate Presentation CPFL Energia - March 2017CPFL RI
 
Indian Power Sector - Marching towards a new paradigm
Indian Power Sector - Marching towards a new paradigmIndian Power Sector - Marching towards a new paradigm
Indian Power Sector - Marching towards a new paradigmDivya Liz George
 
Summer Internship and Project Report on Power System Operation Corporation Li...
Summer Internship and Project Report on Power System Operation Corporation Li...Summer Internship and Project Report on Power System Operation Corporation Li...
Summer Internship and Project Report on Power System Operation Corporation Li...Pratap Bhunia
 
IFC - Solar Developer's Guide - Web
IFC - Solar Developer's Guide - WebIFC - Solar Developer's Guide - Web
IFC - Solar Developer's Guide - WebSohail Alam
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanIBRAR AHMAD
 
Energy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forwardEnergy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forwardZAINI ABDUL WAHAB
 
Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...WriteKraft Dissertations
 
Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...WriteKraft Dissertations
 
Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...WriteKraft Dissertations
 
Overview of solar power generation in india
Overview of solar power generation in indiaOverview of solar power generation in india
Overview of solar power generation in indiaBinit Das
 
Energy productivity as a new paradigm for sustainable energy transitions
Energy productivity as a new paradigm for sustainable energy transitionsEnergy productivity as a new paradigm for sustainable energy transitions
Energy productivity as a new paradigm for sustainable energy transitionsRCREEE
 

Similar to Presentation By Munawar Baseer Ahmed (20)

Presentation By Mukhtar Ahmed
Presentation By Mukhtar AhmedPresentation By Mukhtar Ahmed
Presentation By Mukhtar Ahmed
 
SELCO & CSTEP-2016-REPORT
SELCO & CSTEP-2016-REPORTSELCO & CSTEP-2016-REPORT
SELCO & CSTEP-2016-REPORT
 
KS-1647-DP042A-Investing-for-Productivity-in-the-GCC-Financing-the-Transition
KS-1647-DP042A-Investing-for-Productivity-in-the-GCC-Financing-the-TransitionKS-1647-DP042A-Investing-for-Productivity-in-the-GCC-Financing-the-Transition
KS-1647-DP042A-Investing-for-Productivity-in-the-GCC-Financing-the-Transition
 
Presentation1
Presentation1Presentation1
Presentation1
 
Hydropower in-india-key-enablers-for-better-tomorrow
Hydropower in-india-key-enablers-for-better-tomorrowHydropower in-india-key-enablers-for-better-tomorrow
Hydropower in-india-key-enablers-for-better-tomorrow
 
Report Energy Efficiency in India: PAT Scheme - The Way Ahead
Report Energy Efficiency in India: PAT Scheme - The Way AheadReport Energy Efficiency in India: PAT Scheme - The Way Ahead
Report Energy Efficiency in India: PAT Scheme - The Way Ahead
 
Ambrosini_IFC - SEF Market Potential in Pakistan v01.pptx
Ambrosini_IFC - SEF Market Potential in Pakistan v01.pptxAmbrosini_IFC - SEF Market Potential in Pakistan v01.pptx
Ambrosini_IFC - SEF Market Potential in Pakistan v01.pptx
 
Corporate Presentation CPFL Energia - March 2017
Corporate Presentation CPFL Energia - March 2017Corporate Presentation CPFL Energia - March 2017
Corporate Presentation CPFL Energia - March 2017
 
Indian Power Sector - Marching towards a new paradigm
Indian Power Sector - Marching towards a new paradigmIndian Power Sector - Marching towards a new paradigm
Indian Power Sector - Marching towards a new paradigm
 
Indian power
Indian powerIndian power
Indian power
 
Summer Internship and Project Report on Power System Operation Corporation Li...
Summer Internship and Project Report on Power System Operation Corporation Li...Summer Internship and Project Report on Power System Operation Corporation Li...
Summer Internship and Project Report on Power System Operation Corporation Li...
 
IFC - Solar Developer's Guide - Web
IFC - Solar Developer's Guide - WebIFC - Solar Developer's Guide - Web
IFC - Solar Developer's Guide - Web
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistan
 
Energy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forwardEnergy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forward
 
Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...
 
Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...
 
Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...Energy management in small and medium enterprises a case of tile industry in ...
Energy management in small and medium enterprises a case of tile industry in ...
 
177683808 case-study
177683808 case-study177683808 case-study
177683808 case-study
 
Overview of solar power generation in india
Overview of solar power generation in indiaOverview of solar power generation in india
Overview of solar power generation in india
 
Energy productivity as a new paradigm for sustainable energy transitions
Energy productivity as a new paradigm for sustainable energy transitionsEnergy productivity as a new paradigm for sustainable energy transitions
Energy productivity as a new paradigm for sustainable energy transitions
 

More from IEEEP Karachi

Wi-Fi 802.11n Based Access Network for IPTV Service Delivery in Pakistan
Wi-Fi 802.11n Based Access Network for IPTV Service Delivery in PakistanWi-Fi 802.11n Based Access Network for IPTV Service Delivery in Pakistan
Wi-Fi 802.11n Based Access Network for IPTV Service Delivery in PakistanIEEEP Karachi
 
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...IEEEP Karachi
 
Uncertain Times Can Bring New Opportunities
Uncertain Times Can Bring New OpportunitiesUncertain Times Can Bring New Opportunities
Uncertain Times Can Bring New OpportunitiesIEEEP Karachi
 
Total Quality & Organizational Change
Total Quality & Organizational ChangeTotal Quality & Organizational Change
Total Quality & Organizational ChangeIEEEP Karachi
 
An Autonomous Robot for NERC Contest
An Autonomous Robot for NERC ContestAn Autonomous Robot for NERC Contest
An Autonomous Robot for NERC ContestIEEEP Karachi
 
Electronic Hand Glove for Speed Impaired and Paralyzed Patients
Electronic Hand Glove for Speed Impaired and Paralyzed PatientsElectronic Hand Glove for Speed Impaired and Paralyzed Patients
Electronic Hand Glove for Speed Impaired and Paralyzed PatientsIEEEP Karachi
 
Ocean Based Power and its Huge Potential as a Renewable Energy Source
Ocean Based Power and its Huge Potential as a Renewable Energy SourceOcean Based Power and its Huge Potential as a Renewable Energy Source
Ocean Based Power and its Huge Potential as a Renewable Energy SourceIEEEP Karachi
 
Intelligent Heart Disease Recognition using Neural Networks
Intelligent Heart Disease Recognition using Neural NetworksIntelligent Heart Disease Recognition using Neural Networks
Intelligent Heart Disease Recognition using Neural NetworksIEEEP Karachi
 
Towards an Efficient and Robust Wireless Disaster Management Architecture for...
Towards an Efficient and Robust Wireless Disaster Management Architecture for...Towards an Efficient and Robust Wireless Disaster Management Architecture for...
Towards an Efficient and Robust Wireless Disaster Management Architecture for...IEEEP Karachi
 
Spectrum Measurements for IEEE 802.22 Wireless Regional Area Networks
Spectrum Measurements for IEEE 802.22 Wireless Regional Area NetworksSpectrum Measurements for IEEE 802.22 Wireless Regional Area Networks
Spectrum Measurements for IEEE 802.22 Wireless Regional Area NetworksIEEEP Karachi
 
Indoor Radio Positioning Systems
Indoor Radio Positioning SystemsIndoor Radio Positioning Systems
Indoor Radio Positioning SystemsIEEEP Karachi
 
Design & Fabrication of a Ground Survellance Robot
Design & Fabrication of a Ground Survellance RobotDesign & Fabrication of a Ground Survellance Robot
Design & Fabrication of a Ground Survellance RobotIEEEP Karachi
 
Impact of the Extensive Usage of Energy Savers on Power Quality
Impact of the Extensive Usage of Energy Savers on Power QualityImpact of the Extensive Usage of Energy Savers on Power Quality
Impact of the Extensive Usage of Energy Savers on Power QualityIEEEP Karachi
 
Engineering Excellence - IEEEP
Engineering Excellence - IEEEPEngineering Excellence - IEEEP
Engineering Excellence - IEEEPIEEEP Karachi
 
Wind & Solar Energy By Mayura Botejeu
Wind & Solar Energy By Mayura BotejeuWind & Solar Energy By Mayura Botejeu
Wind & Solar Energy By Mayura BotejeuIEEEP Karachi
 
Wamicon 2005 1 G Hz Clearwater Florida
Wamicon 2005 1 G Hz Clearwater FloridaWamicon 2005 1 G Hz Clearwater Florida
Wamicon 2005 1 G Hz Clearwater FloridaIEEEP Karachi
 
Tidal Energy By Majida Islam
Tidal Energy By Majida IslamTidal Energy By Majida Islam
Tidal Energy By Majida IslamIEEEP Karachi
 
Quality Model By Riffat Ali
Quality Model By Riffat AliQuality Model By Riffat Ali
Quality Model By Riffat AliIEEEP Karachi
 
Power Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By WajidPower Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By WajidIEEEP Karachi
 
Plc Paper Presentation By Durreshahwar
Plc Paper Presentation By DurreshahwarPlc Paper Presentation By Durreshahwar
Plc Paper Presentation By DurreshahwarIEEEP Karachi
 

More from IEEEP Karachi (20)

Wi-Fi 802.11n Based Access Network for IPTV Service Delivery in Pakistan
Wi-Fi 802.11n Based Access Network for IPTV Service Delivery in PakistanWi-Fi 802.11n Based Access Network for IPTV Service Delivery in Pakistan
Wi-Fi 802.11n Based Access Network for IPTV Service Delivery in Pakistan
 
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
 
Uncertain Times Can Bring New Opportunities
Uncertain Times Can Bring New OpportunitiesUncertain Times Can Bring New Opportunities
Uncertain Times Can Bring New Opportunities
 
Total Quality & Organizational Change
Total Quality & Organizational ChangeTotal Quality & Organizational Change
Total Quality & Organizational Change
 
An Autonomous Robot for NERC Contest
An Autonomous Robot for NERC ContestAn Autonomous Robot for NERC Contest
An Autonomous Robot for NERC Contest
 
Electronic Hand Glove for Speed Impaired and Paralyzed Patients
Electronic Hand Glove for Speed Impaired and Paralyzed PatientsElectronic Hand Glove for Speed Impaired and Paralyzed Patients
Electronic Hand Glove for Speed Impaired and Paralyzed Patients
 
Ocean Based Power and its Huge Potential as a Renewable Energy Source
Ocean Based Power and its Huge Potential as a Renewable Energy SourceOcean Based Power and its Huge Potential as a Renewable Energy Source
Ocean Based Power and its Huge Potential as a Renewable Energy Source
 
Intelligent Heart Disease Recognition using Neural Networks
Intelligent Heart Disease Recognition using Neural NetworksIntelligent Heart Disease Recognition using Neural Networks
Intelligent Heart Disease Recognition using Neural Networks
 
Towards an Efficient and Robust Wireless Disaster Management Architecture for...
Towards an Efficient and Robust Wireless Disaster Management Architecture for...Towards an Efficient and Robust Wireless Disaster Management Architecture for...
Towards an Efficient and Robust Wireless Disaster Management Architecture for...
 
Spectrum Measurements for IEEE 802.22 Wireless Regional Area Networks
Spectrum Measurements for IEEE 802.22 Wireless Regional Area NetworksSpectrum Measurements for IEEE 802.22 Wireless Regional Area Networks
Spectrum Measurements for IEEE 802.22 Wireless Regional Area Networks
 
Indoor Radio Positioning Systems
Indoor Radio Positioning SystemsIndoor Radio Positioning Systems
Indoor Radio Positioning Systems
 
Design & Fabrication of a Ground Survellance Robot
Design & Fabrication of a Ground Survellance RobotDesign & Fabrication of a Ground Survellance Robot
Design & Fabrication of a Ground Survellance Robot
 
Impact of the Extensive Usage of Energy Savers on Power Quality
Impact of the Extensive Usage of Energy Savers on Power QualityImpact of the Extensive Usage of Energy Savers on Power Quality
Impact of the Extensive Usage of Energy Savers on Power Quality
 
Engineering Excellence - IEEEP
Engineering Excellence - IEEEPEngineering Excellence - IEEEP
Engineering Excellence - IEEEP
 
Wind & Solar Energy By Mayura Botejeu
Wind & Solar Energy By Mayura BotejeuWind & Solar Energy By Mayura Botejeu
Wind & Solar Energy By Mayura Botejeu
 
Wamicon 2005 1 G Hz Clearwater Florida
Wamicon 2005 1 G Hz Clearwater FloridaWamicon 2005 1 G Hz Clearwater Florida
Wamicon 2005 1 G Hz Clearwater Florida
 
Tidal Energy By Majida Islam
Tidal Energy By Majida IslamTidal Energy By Majida Islam
Tidal Energy By Majida Islam
 
Quality Model By Riffat Ali
Quality Model By Riffat AliQuality Model By Riffat Ali
Quality Model By Riffat Ali
 
Power Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By WajidPower Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By Wajid
 
Plc Paper Presentation By Durreshahwar
Plc Paper Presentation By DurreshahwarPlc Paper Presentation By Durreshahwar
Plc Paper Presentation By Durreshahwar
 

Recently uploaded

SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 

Recently uploaded (20)

SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 

Presentation By Munawar Baseer Ahmed

  • 1. SUI SOUTHERN GAS COMPANY LIMITED Karachi, 15 June 2007 PAKISTAN'S POWER CRISIS MUNAWAR BASEER AHMAD P.E. MANAGING DIRECTOR by
  • 2.  
  • 3.  
  • 4.  
  • 5.  
  • 6.
  • 7.
  • 8. 1. Inadequate Energy demand forecasts 2. No integrated Energy or Power Planning 3. Lack of effective implementation modalities, and project development 4. Lack of Financing Plan, Structure or Vehicle 5. Lack of coordination between sectoral entities i.e. Hydel, Electric, Oil/Gas 6. Primary Energy supply chain development, enhancement and security issues not addressed 7. Regulatory framework out of focus with ground realities and supply constraints CRISIS OF POWER SEVEN CRUCIAL ASPECTS
  • 9. INDIA AFGHANISTAN IRAN CHINA ARABIAN SEA Sindh Balochistan Punjab Islamabad NWFP JAMMU & KASHMIR (DISPUTED TERRITORY) (MW) PAKISTAN POWER SECTOR – INSTALLED CAPACITY Source: Power System Statistic, Feb 2007 by NTDC 220 Total 200 Hydel 20 Thermal 1947-1960 2,808 Total 1,450 Hydel 1,358 Thermal 1961-1980 325 Nuclear 10,652 Total 4,813 Hydel 5,514 Thermal 1981-2006 2,068.5 Total 420 Retired 1,648.5 Privatized Retired / Privatized 5,783 Total 30 Hydel 5,753 Thermal IPP’s upto June 06 19,549.5 Grand Total 2,108 3,064 7,426.5 3,766 1,030 KESC 2,155 137 NUCLEAR 2,155 Total 1,756 KESC 262 IPP KARACHI
  • 10. PAKISTAN POWER SECTOR – GROWTH AT A GLANCE ACGR: 8.8% (MW) Source: 1. Power System Statistic, Feb 2007 by NTDC 2. Pakistan energy Year Book 2006 1,582.41 384.97 % INCREASE 1951 4,879 163.63 2006 ACGR % GDP (RS BILLION) POPULATION (Million) 8.8 TOTAL 325 3.5 NUCLEAR (1972-2006) 7.5 THERMAL (1960-2006) 33.74 8.5 HYDRO (1925-2006)
  • 11. Source: BP Statistical Review of World Energy June 2006, ENERGY CONSUMPTION PER CAPITA, 2005-06
  • 12. PAKISTAN POWER SECTOR – INSTALLED CAPACITY (MW) Source: Power System Statistic, Feb 2007 by NTDC 33.8 % increase
  • 13. PAKISTAN POWER SECTOR ADDITIONAL GENERATION (MW) (Ghazi Brotha Shahddra Thermal NOTE: 1. GBHP FULL UTILIZATION IN 2004 2. ESSENTIALLY NO NEW POWER GENERATION ADDITION AFTER 2001 Source: Power System Statistic, Feb 2007 by NTDC HUBCO Kot Addu Uch Japan Fauji Chashma Liberty AES Habibullah
  • 14. PAKISTAN POWER SECTOR KESC – ADDITIONAL GENERATION (MW) NOTE: NO NEW ADDITION FOR 9 YEARS Source: Power System Statistic, Feb 2007 by NTDC IPPs : 262 MW Thermal KESC: 231 MW Nuclear
  • 15. PAKISTAN POWER SECTOR ENERGY GENERATION BY FUEL TYPE - FY 2006 (WAPDA) (KESC) Source: 1. BP Statistical Review of World Energy June 2006, 2. Power System Statistic, Feb 2007 by NTDC 24.38% USA 56.16% India 70.17% China Indigenous Coal
  • 16. FUEL COST AND AVERAGE SALE PRICE (Rs /kWh) ACGR: 5.6% ACGR: 6.2% ACGR%: GAS: 8.6 FURNACE OIL: 14.8 AVERAGE FUEL PRICE INCREASED: 11.70% CGAR Source: 1. Power System Statistic, Feb 2007 by NTDC 2. Pakistan energy Year Book 2006
  • 17. PAKISTAN POWER SECTOR - SYSTEM LOSSES (%) Source: Power System Statistic, Feb 2007 by NTDC NOTE: * ASSUMING A MINIMUM OF 6% TECHNICAL LOSSES, ADDITIONAL THEFT/LEAKAGE FOR KESC AMOUNT TO RS. 11,120 MILLION ** ASSUMING A MINIMUM OF 10% TECHNICAL LOSSES, ADDITIONAL THEFT/LEAKAGE FOR WAPDA AMOUNT TO RS. 50 BILLION * **
  • 18.
  • 19. CASE STUDY OF EFFECTIVE PLANNING AND IMPLEMENTATION SUI SOUTHERN GAS COMPANY LIMITED
  • 20.
  • 21.
  • 22.
  • 23.
  • 24. SSGC CORE INVESTMENT PROGRAMME RUPEES MILLION 368.8 501.1 640.1 800.3 271.2 25.6 296.4 OTHERS 6,488.5 1,897.4 2,046.8 592.7 235.6 1218.5 - 2,544.3 256.6 - 208.8 1,782.5 2004-05 359.2 348.1 375.6 279.3 331.4 121.0 REHABILITATION 1,536.0 1,577.2 1,768.4 1,945.6 - 509.8 UNDER PLANNING/ APPROVAL 1,904.8 2,560.9 3,913.7 4,329.0 3,382.0 1,978.2 SUB TOTAL (A) - - - 240.8 173.8 25.6 LEFTOVER PROJECTS - 482.6 1,505.2 1,001.1 648.1 338.7 ONGOING OTHER PROJECTS - - - 341.2 2,288.9 1,078.5 ONGOING- GIREP II A) TRANSMISSION PROJECTS: 885.5 853.3 823.3 1,725.1 864.7 497.1 C) OTHER CAPITAL EXPENDITURE 5,398.9 2,608.6 460.2 2,233.0 - 2010-11 6,414.9 3,000.7 670.1 1,971.4 - 2009-10 TOTAL (A+B+C) SUB TOTAL (B) NEW TOWNS NORMAL EXPANSION DISTRIBUTION PROJECTS B) DISTRIBUTION SYSTEM: PROJECT DESCRIPTION - 816.5 238.2 648.3 1,729.7 2,468.1 1,770.2 1761.1 1,040.2 1,618.1 1,258.1 533.3 3,118.0 5,182.0 3,597.9 3,063.7 7,855.0 11,236.1 7,844.7 5,539.0 2008-09 2007-08 2006-07 2005-06
  • 25. GAS INFRASTRUCTURE REHABILITATION AND EXPANSION PROJECTS Quetta Sibi Pirkoh Loti Dera Bugti Sui Jacobabad Shikarpur Larkana Dadu Zamzama Sari Hyderabad Nawabshah Sawan Kadanwari Miano Badin Karachi Bhit Hasan Sukkur FJFC Pesh Bogi GAS INFRASTRUCTURE REHABILITATION AND EXPANSION PROJECTS 2006-08 Mazarani Zarghun SNGPL transmission line Naimat Basal 42” Ø 13 Km Bin Qasim Distribution Pipeline Rs.807 million 18” Ø 15 Km Mach – Kolpur And 31 Km Dingra – Sibi Loop line + Sibi Compressor Rs. 1,138 Million 18” Ø 15 Km Re – routing in Dingra Nala Rs. 272 Million 18” Ø 18 Km Abegum – Mach Loopline Rs. 306 Million 24” Ø 66 Km Bajara to Karchat 134 Km Karchat to Karachi Rs. 2795 million 30” Ø 9 Km By-pass HQ3 to SMS Sindh University Rs. 364 Million 24” Ø 116 km Snaghar – Nawabshah – Karachi Pipelinepahse -1 Rs. 2,262 million 24” Ø 14 Km loop Line Pahse-2 HQ3-Masu Rs. 323 Million 48 Km Shahdadpur to Masu 24” Ø 140 Km Sanghar – Nawabshah – Hyderabad Karachi loopline 50 Km Shahadpur – MVA Karam Jamali 12” ø 64 Km Zarghun Pipeline Rs. 900 million Compressor Bin Qasim Masu MVA Karam Jamali Shahdadpur Bajara Karchat HQ2
  • 26. Proposed LNG setup KARACHI GAS DEVELOPMENT MASTER PLAN 92 MMCFD SMS KT 242 MMCFD SMS MALIR 95 MMCFD SMS STEEL 36 MMCFD 250 MMCFD KTPS BQPS Proposed 36”x30Km (140 mmcfd) Distribution main * LNG not included * * TOTAL : 1,200 ADDL 2010 : 410 EXISTING : 750-790 LOAD MMCFD
  • 27. SIX YEARS PERFORMANCE HIGHLIGHTS Estimated
  • 29.
  • 32. IMPERATIVES OF SUSTAINABLE ENERGY SUPPLY 1. ENERGY IS PRIMARY VEHICLE FOR ECONOMIC GROWTH AND SOCIAL DEVELOPMENT AND MUST BE MADE AVAILABLE FOR MANAGED GROWTH 2. DEVELOPING SOCIETIES REQUIRE MORE ENERGY TO MAKE THE TRANSITION OUT OF LOW INCOME ECONOMIES (AND POVERTY) 3. INDIGENOUS SOURCES MUST BE MAXIMIZED WITH MORE HYDEL CONTENT 4. LONG TERM ENERGY SUPPLIES MUST BE SECURED (OIL, GAS, COAL) FROM MULTIPLE SOURCES (BOTH INDIGENOUS AND OVERSEAS) 5. ENERGY MIX TO HAVE INCREASING SHARE OF RENEWABLE (WIND, SOLAR) WITH UP TO 10% OVER THE NEXT 20 YEARS 6. ENERGY CONSERVATION EFFICIENCY IMPROVEMENT AND LOSS REDUCTION MUST BE ENFORCED 7. UTILITIES MUST UNDERTAKE EFFECTIVE LOAD CYCLE MANAGEMENT FOR MAXIMUM CAPACITY UTILIZATION
  • 33.
  • 34. PROJECTED HYDEL POWER PROJECTS Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad MW 19,200 5,000 “ UPTO 2030 14,200 6,800 “ UPTO 2020 7,400 1,200 ADDITION UPTO 2010 6,200 6,200 EXISTING INCLUDING GHAZI BAROTHA (FULL) CUMULATIVE CAPACITY 5,000 6,877 1,206 3,000 3,877 2,000 3,000 600 120 740 655 649 240 133 740 19 121 130 72 81 96 130 106 79 132 84 97 60 Small projects Large Project TOTAL UPTO 2030 NEW POWER PROJECTS (CAPACITY IN MW) Neelam Jhelum Taunsa Munda Suki Kinari Swat Cascade Karot Partind Kohala TOTAL Large Project TOTAL Pehur Allai Khwar Duber Khwar Khan Khwar Malakand-III Jinnah Barrage Keyal Khwar Golen Gol New Bong Hydro power Rajdhani Power Project Matiltan Distt Swat Kotli Hydro Power Project Gulpur Hydro Project TOTAL UPTO 2020 UPTO 2010
  • 35. PROJECTED NUCLEAR POWER PROJECTS Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad MW 8,000 1,000 x 5 “ UPTO 2030 3,000 600 x 4 “ UPTO 2020 600 300 ADDITION UPTO 2010 360 360 EXISTING CUMULATIVE CAPACITY 7,400 600 360 * TO BE RETIRED BY 2010 1200 1200 2000 2000 1000 300 300 60 300 NPP-4 NPP-5 NPP-6 NPP-7 NPP-8 NPP-9 UPTO 2030 NEW POWER PROJECTS (CAPACITY IN MW) CHASNUPP-2 NPP-3 KANUPP-1* CHASNUPP-1 UPTO 2020 UPTO 2010
  • 36. GENERATION EXPANSION PLAN ( WAPDA SYSTEM) 1 Rental :150 MW 1 Renta : 136 MW 1 Hydel : 81 MW 3 Hydel : 323 MW 14 Thermal : 2927 MW 1 Alt. Energy: 100 MW 1 Hydel : 96 MW 8 Thermal : 1209 MW 2 Hydel : 184 MW 1 Thermal : 150 MW 1 Nuclear : 325 MW
  • 37.
  • 38. THE WAY FORWARD 1. GOP TO SET-UP NATIONAL ENERGY COMMISSION OR NATIONAL ENERGY PLAN AUTHORITY TO ACT AS CENTRAL STATUTORY BODY FOR ENERGY PLANNING AND PROJECT MANAGEMENT. 2. GOP TO SET-UP COAL POWER DEVELOPMENT AUTHORITY WITH MANDATE AND FUNDS TO SET-UP COAL POWER PROJECTS BASED ON LOCAL COAL. 3. TRANSITION OF OIL, GAS AND POWER COMPANIES TO FULLY EMPOWERED CORPORATE STRUCTURE WITH PROFESSIONAL MANAGEMENT . 4. ARRANGE FOR GOP FUNDING, DONOR SUPPORT ETC FOR MEGA PROJECTS IN HYDEL, COAL AND NUCLEAR SECTORS. 5. SECURE LONG TERM SUPPLIES OF OIL & GAS FROM MID EAST AND CAS THROUGH UPSTREAM INVOLVEMENT AND GOVERNMENT TO GOVERNMENT LEVEL COOPERATION. 6. FAST TRACK AGREEMENTS AND IMPLEMENTATION OF TRANS NATIONAL OIL AND GAS PIPELINES . 7. DEVELOP PRESIDENT’S VISION OF PAKISTAN AS “ASIAN ENERGY CORRIDOR”, THUS SECURING PAKISTAN’S STRATEGIC ROLE IN REGION AND ENSURING SUSTAINABLE ENERGY SUPPLIES FOR THE FUTURE. For Pakistan’s Energy – Security, Sustainability Sovereignty
  • 39. MOVING AHEAD ….. TOGETHER FOR PAKISTAN’S POWER SECURITY, SOVEREIGNTY, SUSTAINABILITY. THANK YOU
  • 41.  
  • 42. FUEL MIX IN ENERGY GENERATION (GENCOs) 1.33 0.88 0.77 0.66 0.63 0.61 0.59 0.67 0.94 0.81 Cost/kWh (Rs) 12.68 11.03 9.91 11.28 9.49 9.51 3.56 3.40 2.27 3.15 Cost/kWh (Rs) 5.04 3.27 2.71 2.89 2.49 2.62 1.74 1.40 1.61 1.46 Cost/kWh (Rs) 2.35 1.97 1.82 1.75 1.74 1.64 1.27 1.24 1.16 1.12 Cost/kWh (Rs) Generation (GWh) Generation (GWh) Generation (GWh) Generation (GWh) 129 2 4976 17402 2006 175 198 231 284 240 410 501 406 375 Coal 5 26 76 64 65 43 79 84 139 H.S.D. 3213 2734 6619 6631 4824 5274 4191 4966 6276 Furnace Oil 1879 18053 12648 11680 11711 13417 11121 12003 12303 GAS 2005 2004 2003 2002 2001 2000 1999 1998 1997 FUEL
  • 43. AVERAGE FUEL COST AND SALE PRICE KESC ( Paisa) / kWh)
  • 44. AVERAGE FUEL COST AND SALE PRICE WAPDA (GENCOs) ( Paisa) / kWh)