Solar Photovoltaic Proposal Page 1
50 KVA ON GRID SOLAR PV SYSTEM
PROPOSAL
Ref: EXALTA-SOLAR/16-17/PV/8566687
Date15 Jan‘17
Sub: Comprehensive Proposal for 50 KVAp Solar PV System.
With referencetoyour query,wearepleasedtosubmitherewithourcomprehensiveproposaloftheTechnical&Commercialoverview,foryourkindp
A. System Definition
Size
41 KW total DC capacity
136 nos.300-wattpanels (To be procured globally from leading MNRE GOVT OF INDIA CERTIFIED vendors like Radical solar, Waree ,Euro Solar etc .)
Energy Production
Site location: Mumbai
Site Co-ordinates:…
Tilt Angle: South30.3o
Average dradiation:5.62 kW-hours/m2/day
Number of full production days assumed per year:320
PV System Based Statistics:-
Expected Annual production:100,800-kw hours/year(As per simulations)
Note: Energy production projections are reason ably accurate estimates based on site’s solar data and our experience with similar
systems.Energy makes no guarantees as to actual production output from this system.
Grid/Load Interfacing
Solar system outputs hall be connected to a suitable load bus capable of taking the input. This input point’s hall be selected infield.
In consultation with client’s Executive Engineer.
Solar Photovoltaic Proposal Page 2
B. System Components
Solar Panels
Note: Subject to availability at installation time, a different panel from
a Leading vendor may be selected without affecting system size and
Performance.
Make: RADICAL solar / Euro/Waree/Taxim/Silicon
Model: SSI-M6-300
Quantity: 136
Wattage: 300W No. of Cells:60
Voc:40V
Isc: 8.28 A
Vmp: 37V
Imp: 7.6A
Dimensions:
Weight:25kg
Operating Conditions:- 40to+90CMaximum
SystemVoltage:600Vdc
Inverter
Note: Subject to availability at installation time, a different inverter may
Be selected without affecting system size and performance.
German - Livint Hybrid Solar MPPT Inverter
Quantity: 5
AC maximum output: 25KVA/20 KW MPPT voltage range:360–750V
Maximum current input DC/String:33A Maximum efficiency:>98.1%
Power connection : 3-phase
We may take any other reputed make with efficiency> 95%.
Mounting Structures Panels shall be mounted on galvanized frames inclined at 30.3degrees to the
South. The structure is designed in such a manner that module can be replaced eas
to install and service in future. The frames will be supported by angle legs of
Suitable length stop provide the pre-determined inclination. All fasteners, nut
and bolts are made of Stainlesssteel-SS304 5.4.6 PCC. The structures shall be
pre-engineered to meet special requirements of placing the modules on the
Corrugated roof tops.
FOUNDATION BASE: The legs of the structures made with GI angles
are made of fixed and grouted in the PCC foundation Columns made with
1:2:4 cement concrete.
Electrical Accessories Cables will conform to IS694 and shall be of 650V/1.1k V grade.
Inter connections, array to junction boxes,
junction boxes to DCDB, DCDB to PCU
etc will be selected to keep voltage drop and
losses to the minimum. The bright annealed
99.97% pure bare copper conductors offer low
Conductor resistance,
Solar Photovoltaic Proposal Page 3
Result in lower heating thereby increasing cable life and efficiency. These
Wires are insulated with a special grade PVC compound formulated and
Manufactured in-house.
Working voltage: up to 1100 V Temperature range:-15 deg Cto+70degC
Sizes: Suitable sizes
Color codes: Red, Yellow, Black, Blue, Green
Combiner DC combiner
Energy Meter The Inverter shall have a built-in meter that tracks energy production and
Display sit on a small LED screen. The display can be used to determine
Real-time production, daily production, and yearly production. For more
sophisticated analysis and visual data management, Solar Access modules
Can be included.
Remote Monitoring System(Optional) The web box continuously records and stores all avails able data of
about 50 inverters in real time, in addition the inverter parameter scan be
requested and modified. It provides you with various modern data
processing options for professional data Management .These are save din
conventional CSV or XML file formats. The ability to exchange data by
FTP allows you to easily transfer these values to your. To your PC you can
Just as easily use an SD card to save your data any such feature of remote
monitoring shall be made available through additional costs.
Stringing Design 8 strings of 17 panels each, however a detailed engineering might Change
the stringing design. Incase Inverter configuration needs any modifications,
based on its availability, the string layout may be Modified accordingly.
Solar Photovoltaic Proposal Page 4
C. Bill of Material
S.No. Component Type/Model No
Specifications
Quantity
1 PV Modules SSI-M6-300 136
2 GROWT on grid Solar Inverter 25KVA (two mode ) 2
3 Mounting Structure Custom made
MShotdipIRON
1 Set
4 Combiner DC
IP65standards
8
5 Main Junction Box ABB Junction Boxes
IP65standards
As per stringing design
6 Earthling Kit Reputed make 1 set
7 AC & DC cables Conforming to BOS As per site requirements
D. Solar PV Plot Plan
Solar Photovoltaic Proposal Page 5
E. Installation Details
Area required:
The Total Area required for the System Installation shall be approx 2800 sq feet, without any shades, facing south.
Structural Anchoring:
Panels shall be mounted on galvanized frames inclined at 30.3 degrees to the south or 6 degree in movable structure. The structure is designed in such a m
be replaced easily and in line with site requirements and it is easy to install and service in future. The frames will be Supported by angle legs of
suitable lengths to provide the pre-determined inclination. All fasteners, nutand bolts are made of Stainless steel-SS304 5.4.6 PCC.
Foundation Base:
The legs of the structures made with GI angles are made of fixed and grouted in the PCC foundation columns made with 1:2:4 Cement concrete.
Actual frame and other structural dimensions will be determined during a more detailed site visit by specialists during full design phase.
Inverter Installation
This space provides sample accessibility and good air circulation. The inverter is available in IP54housing, however, an enclosed Space has to be
Provided for the same. Actual installation location and methods will be determined during full design phase.
Electrical
Proposed fire hoses haft will be used for running electrical cables down to the electrical panel room. A detailed electrical design with Single-line
Diagram and specifications will be prepared during full design phase after receiving the PO, for the client’s approval.
Solar Photovoltaic Proposal Page 6
F. Scope of Work
1. We shall conduct a detailed site visit with specialists to take accurate measurements, photographs, another site-specific in Formation
for full design.
2. Procure equipment and materials and deliver to site.
3. Perform complete system installation.
4. Test all electrical components in accordance with manufacturer instructions.
5. Commission the system to full operability.
G. Client Scope
Site-specific considerations will require assistance and cooperation from the client, as outlined below:
1. Provide access to work site for delivery of equipment and materials prior to and during project implementation.
2. Prepare full system design to include civil, structural, electrical and mechanical components, with construction drawings and
Specifications.
3. Provide a suitable and secure space for storage of equipment and materials.
4. Facilitate access of work crew to the work site 7 days a week.
5. Facilitate interfacing with the client’s resident engineering staff for consultation as needed.
6. Separate electrical loads as discussed in Part A (Grid Interfacing)and connect solar output to building load system.
7. All the Statutory clearances, if any, required for the Project.
8. Dealer has to give Annual maintenance to customer as a perodic check of battery water level(if offgrid), solar direction, dusting etc.
H. Delivery Schedule & Project Cost
Installation & Commissioning
All the Systems except Inverter will be installed within 2- 16 weeks from the date of receipt of advance and approval of the “SLD”.
Warranty
The Solar modules are warranted by the solar panel manufacturer for a period of 25 years. The details areas below.
1. Panels:
Manufacturing Warrantee for the System: 3yrs after installation and commissioning. Performance Warrantee:
a. 90% efficiency up to 12 yrs
b. 80% efficiency up to 25 yrs
2. Inverter: 2yrs manufacturing warranty
3. Balance of the Systems: Standard 12 months warrantee against manufacturing defects. We shall also ensure supply of Spares for
the System if required.
Solar Photovoltaic Proposal Page 7
Details:-
• Prices: Price quoted are Delhi site only, for other reason transportation charges will be extra.
• Freight & Insurance: Not Included
• System Installation: System will be supplied and same will be installed by us. Installation Charges included.
• Excise Duty/Service Tax: Currently, under present rules, Solar Photo Voltaic system is exempted from Excise Duty. However, rate
Prevalent at the time of dispatch will be applicable extra, at actual.
• Service Tax extra at Actual will be charged, Presently Applicable @NA
• Octroi: Any Octroi /Entry tax, if any, will be pay able will be extra
• Sales Tax: VAT @5% will be charged extra without Form-C OR CST@2%
• Delivery : Dispatch will be effected in 1-8 weeks from the date of acceptance of your Purchase order.(P.O) .System
• Installation will be completed in 3 week’s time from date of receipt of materials at site, provided site is ready for installation.
• Payment Terms:
Total cost of the project is :- 24 Lakh/-INR (Inclusive Taxes )
- First delivery of Solar panels against amount paid in advance.and start preparing for next order
i.e 15Lakh
Structure with Panel fitting :- 5 Lakh.
- Inverter and rest of the matterial against rest of the payment.3.5lakh
- Remaining 50000/+ taxes against successful installation. (Prior Cheque needed )
Technical Director : Er. Ashutosh Verma
9999890192
Whatsapp No: 9807465570
Date: 15 Jan, 2017
Version:#1
Contact:
Address :- A117 Atul chok Dwarika Mor Delhi 110059
Registered Office:-D734 Kamla Nagar Agra-282005
E:sales@exalta.inW:www.exlata.in
www.exalta.co.in
EXALTA LED
Insparc Technologies Pvt Ltd

More Related Content

What's hot

Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard template
Saurabh Parihar
 
Integration of Renewable Energy In Grid
Integration of Renewable Energy In GridIntegration of Renewable Energy In Grid
Integration of Renewable Energy In Grid
Tejaswi Shukla
 

What's hot (20)

Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
 
POWER SYSTEM PLANNING
POWER SYSTEM PLANNINGPOWER SYSTEM PLANNING
POWER SYSTEM PLANNING
 
Solar pv connected to grid
Solar pv connected to gridSolar pv connected to grid
Solar pv connected to grid
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard template
 
Solar photovoltaic system design
Solar photovoltaic system designSolar photovoltaic system design
Solar photovoltaic system design
 
Power System Planning
Power System PlanningPower System Planning
Power System Planning
 
Integration of Renewable Energy In Grid
Integration of Renewable Energy In GridIntegration of Renewable Energy In Grid
Integration of Renewable Energy In Grid
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plant
 
Environmental impacts of renewable energy generation systems (cost ghg emission)
Environmental impacts of renewable energy generation systems (cost ghg emission)Environmental impacts of renewable energy generation systems (cost ghg emission)
Environmental impacts of renewable energy generation systems (cost ghg emission)
 
Rooftop solar power plant components
Rooftop solar power plant   componentsRooftop solar power plant   components
Rooftop solar power plant components
 
Distributed generation b 3
Distributed generation b 3Distributed generation b 3
Distributed generation b 3
 
Solar energy(Renewable source)
Solar energy(Renewable source)Solar energy(Renewable source)
Solar energy(Renewable source)
 
Smart grid in india
Smart grid in indiaSmart grid in india
Smart grid in india
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV system
 
Solar inverter Selection guide
Solar inverter Selection guideSolar inverter Selection guide
Solar inverter Selection guide
 
Solar Power Project Development
Solar Power Project DevelopmentSolar Power Project Development
Solar Power Project Development
 
Hybrid inverter
Hybrid inverterHybrid inverter
Hybrid inverter
 
Micro grid
Micro gridMicro grid
Micro grid
 
Grid Integration of PV
Grid Integration of PVGrid Integration of PV
Grid Integration of PV
 

Similar to Quotation 50 kva_std_ongrid

DPR - 500KWp Solar PV Grid Connected Plant for CUJ june 2023.pdf
DPR - 500KWp Solar PV Grid Connected Plant for CUJ june 2023.pdfDPR - 500KWp Solar PV Grid Connected Plant for CUJ june 2023.pdf
DPR - 500KWp Solar PV Grid Connected Plant for CUJ june 2023.pdf
smsksolar
 
Presentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxPresentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptx
HafizAsimKhayyam
 

Similar to Quotation 50 kva_std_ongrid (20)

Quotation 10 kw_std_offgrid_nareshji
Quotation 10 kw_std_offgrid_nareshjiQuotation 10 kw_std_offgrid_nareshji
Quotation 10 kw_std_offgrid_nareshji
 
Quotation 10 kw_ongrid_rajkot_std
Quotation 10 kw_ongrid_rajkot_stdQuotation 10 kw_ongrid_rajkot_std
Quotation 10 kw_ongrid_rajkot_std
 
Exalta Quotation 10 kw_ongrid_rajkot_std
Exalta Quotation 10 kw_ongrid_rajkot_stdExalta Quotation 10 kw_ongrid_rajkot_std
Exalta Quotation 10 kw_ongrid_rajkot_std
 
Rooftop pro
Rooftop proRooftop pro
Rooftop pro
 
DPR - 500KWp Solar PV Grid Connected Plant for CUJ june 2023.pdf
DPR - 500KWp Solar PV Grid Connected Plant for CUJ june 2023.pdfDPR - 500KWp Solar PV Grid Connected Plant for CUJ june 2023.pdf
DPR - 500KWp Solar PV Grid Connected Plant for CUJ june 2023.pdf
 
SORALITE POWER
SORALITE POWERSORALITE POWER
SORALITE POWER
 
Design & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemDesign & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic System
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
 
BOQ _UN.pptx
BOQ _UN.pptxBOQ _UN.pptx
BOQ _UN.pptx
 
Inspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_complianceInspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_compliance
 
Inspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code ComplianceInspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code Compliance
 
Mohamed Abou mesalem updated CV
Mohamed Abou mesalem  updated CVMohamed Abou mesalem  updated CV
Mohamed Abou mesalem updated CV
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
structure
structurestructure
structure
 
Solar rooftop projects primotech
Solar rooftop projects primotechSolar rooftop projects primotech
Solar rooftop projects primotech
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
IC Adapters & Interposers | Interconnect Systems ISI - a Molex company
IC Adapters & Interposers | Interconnect Systems ISI - a Molex companyIC Adapters & Interposers | Interconnect Systems ISI - a Molex company
IC Adapters & Interposers | Interconnect Systems ISI - a Molex company
 
Presentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxPresentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptx
 
Specifications of Solar Power system (Issue-II).pdf
Specifications of Solar Power system (Issue-II).pdfSpecifications of Solar Power system (Issue-II).pdf
Specifications of Solar Power system (Issue-II).pdf
 
Solar street light technical specification solar lighting & street lamp man...
Solar street light technical specification   solar lighting & street lamp man...Solar street light technical specification   solar lighting & street lamp man...
Solar street light technical specification solar lighting & street lamp man...
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 

Quotation 50 kva_std_ongrid

  • 1. Solar Photovoltaic Proposal Page 1 50 KVA ON GRID SOLAR PV SYSTEM PROPOSAL Ref: EXALTA-SOLAR/16-17/PV/8566687 Date15 Jan‘17 Sub: Comprehensive Proposal for 50 KVAp Solar PV System. With referencetoyour query,wearepleasedtosubmitherewithourcomprehensiveproposaloftheTechnical&Commercialoverview,foryourkindp A. System Definition Size 41 KW total DC capacity 136 nos.300-wattpanels (To be procured globally from leading MNRE GOVT OF INDIA CERTIFIED vendors like Radical solar, Waree ,Euro Solar etc .) Energy Production Site location: Mumbai Site Co-ordinates:… Tilt Angle: South30.3o Average dradiation:5.62 kW-hours/m2/day Number of full production days assumed per year:320 PV System Based Statistics:- Expected Annual production:100,800-kw hours/year(As per simulations) Note: Energy production projections are reason ably accurate estimates based on site’s solar data and our experience with similar systems.Energy makes no guarantees as to actual production output from this system. Grid/Load Interfacing Solar system outputs hall be connected to a suitable load bus capable of taking the input. This input point’s hall be selected infield. In consultation with client’s Executive Engineer.
  • 2. Solar Photovoltaic Proposal Page 2 B. System Components Solar Panels Note: Subject to availability at installation time, a different panel from a Leading vendor may be selected without affecting system size and Performance. Make: RADICAL solar / Euro/Waree/Taxim/Silicon Model: SSI-M6-300 Quantity: 136 Wattage: 300W No. of Cells:60 Voc:40V Isc: 8.28 A Vmp: 37V Imp: 7.6A Dimensions: Weight:25kg Operating Conditions:- 40to+90CMaximum SystemVoltage:600Vdc Inverter Note: Subject to availability at installation time, a different inverter may Be selected without affecting system size and performance. German - Livint Hybrid Solar MPPT Inverter Quantity: 5 AC maximum output: 25KVA/20 KW MPPT voltage range:360–750V Maximum current input DC/String:33A Maximum efficiency:>98.1% Power connection : 3-phase We may take any other reputed make with efficiency> 95%. Mounting Structures Panels shall be mounted on galvanized frames inclined at 30.3degrees to the South. The structure is designed in such a manner that module can be replaced eas to install and service in future. The frames will be supported by angle legs of Suitable length stop provide the pre-determined inclination. All fasteners, nut and bolts are made of Stainlesssteel-SS304 5.4.6 PCC. The structures shall be pre-engineered to meet special requirements of placing the modules on the Corrugated roof tops. FOUNDATION BASE: The legs of the structures made with GI angles are made of fixed and grouted in the PCC foundation Columns made with 1:2:4 cement concrete. Electrical Accessories Cables will conform to IS694 and shall be of 650V/1.1k V grade. Inter connections, array to junction boxes, junction boxes to DCDB, DCDB to PCU etc will be selected to keep voltage drop and losses to the minimum. The bright annealed 99.97% pure bare copper conductors offer low Conductor resistance,
  • 3. Solar Photovoltaic Proposal Page 3 Result in lower heating thereby increasing cable life and efficiency. These Wires are insulated with a special grade PVC compound formulated and Manufactured in-house. Working voltage: up to 1100 V Temperature range:-15 deg Cto+70degC Sizes: Suitable sizes Color codes: Red, Yellow, Black, Blue, Green Combiner DC combiner Energy Meter The Inverter shall have a built-in meter that tracks energy production and Display sit on a small LED screen. The display can be used to determine Real-time production, daily production, and yearly production. For more sophisticated analysis and visual data management, Solar Access modules Can be included. Remote Monitoring System(Optional) The web box continuously records and stores all avails able data of about 50 inverters in real time, in addition the inverter parameter scan be requested and modified. It provides you with various modern data processing options for professional data Management .These are save din conventional CSV or XML file formats. The ability to exchange data by FTP allows you to easily transfer these values to your. To your PC you can Just as easily use an SD card to save your data any such feature of remote monitoring shall be made available through additional costs. Stringing Design 8 strings of 17 panels each, however a detailed engineering might Change the stringing design. Incase Inverter configuration needs any modifications, based on its availability, the string layout may be Modified accordingly.
  • 4. Solar Photovoltaic Proposal Page 4 C. Bill of Material S.No. Component Type/Model No Specifications Quantity 1 PV Modules SSI-M6-300 136 2 GROWT on grid Solar Inverter 25KVA (two mode ) 2 3 Mounting Structure Custom made MShotdipIRON 1 Set 4 Combiner DC IP65standards 8 5 Main Junction Box ABB Junction Boxes IP65standards As per stringing design 6 Earthling Kit Reputed make 1 set 7 AC & DC cables Conforming to BOS As per site requirements D. Solar PV Plot Plan
  • 5. Solar Photovoltaic Proposal Page 5 E. Installation Details Area required: The Total Area required for the System Installation shall be approx 2800 sq feet, without any shades, facing south. Structural Anchoring: Panels shall be mounted on galvanized frames inclined at 30.3 degrees to the south or 6 degree in movable structure. The structure is designed in such a m be replaced easily and in line with site requirements and it is easy to install and service in future. The frames will be Supported by angle legs of suitable lengths to provide the pre-determined inclination. All fasteners, nutand bolts are made of Stainless steel-SS304 5.4.6 PCC. Foundation Base: The legs of the structures made with GI angles are made of fixed and grouted in the PCC foundation columns made with 1:2:4 Cement concrete. Actual frame and other structural dimensions will be determined during a more detailed site visit by specialists during full design phase. Inverter Installation This space provides sample accessibility and good air circulation. The inverter is available in IP54housing, however, an enclosed Space has to be Provided for the same. Actual installation location and methods will be determined during full design phase. Electrical Proposed fire hoses haft will be used for running electrical cables down to the electrical panel room. A detailed electrical design with Single-line Diagram and specifications will be prepared during full design phase after receiving the PO, for the client’s approval.
  • 6. Solar Photovoltaic Proposal Page 6 F. Scope of Work 1. We shall conduct a detailed site visit with specialists to take accurate measurements, photographs, another site-specific in Formation for full design. 2. Procure equipment and materials and deliver to site. 3. Perform complete system installation. 4. Test all electrical components in accordance with manufacturer instructions. 5. Commission the system to full operability. G. Client Scope Site-specific considerations will require assistance and cooperation from the client, as outlined below: 1. Provide access to work site for delivery of equipment and materials prior to and during project implementation. 2. Prepare full system design to include civil, structural, electrical and mechanical components, with construction drawings and Specifications. 3. Provide a suitable and secure space for storage of equipment and materials. 4. Facilitate access of work crew to the work site 7 days a week. 5. Facilitate interfacing with the client’s resident engineering staff for consultation as needed. 6. Separate electrical loads as discussed in Part A (Grid Interfacing)and connect solar output to building load system. 7. All the Statutory clearances, if any, required for the Project. 8. Dealer has to give Annual maintenance to customer as a perodic check of battery water level(if offgrid), solar direction, dusting etc. H. Delivery Schedule & Project Cost Installation & Commissioning All the Systems except Inverter will be installed within 2- 16 weeks from the date of receipt of advance and approval of the “SLD”. Warranty The Solar modules are warranted by the solar panel manufacturer for a period of 25 years. The details areas below. 1. Panels: Manufacturing Warrantee for the System: 3yrs after installation and commissioning. Performance Warrantee: a. 90% efficiency up to 12 yrs b. 80% efficiency up to 25 yrs 2. Inverter: 2yrs manufacturing warranty 3. Balance of the Systems: Standard 12 months warrantee against manufacturing defects. We shall also ensure supply of Spares for the System if required.
  • 7. Solar Photovoltaic Proposal Page 7 Details:- • Prices: Price quoted are Delhi site only, for other reason transportation charges will be extra. • Freight & Insurance: Not Included • System Installation: System will be supplied and same will be installed by us. Installation Charges included. • Excise Duty/Service Tax: Currently, under present rules, Solar Photo Voltaic system is exempted from Excise Duty. However, rate Prevalent at the time of dispatch will be applicable extra, at actual. • Service Tax extra at Actual will be charged, Presently Applicable @NA • Octroi: Any Octroi /Entry tax, if any, will be pay able will be extra • Sales Tax: VAT @5% will be charged extra without Form-C OR CST@2% • Delivery : Dispatch will be effected in 1-8 weeks from the date of acceptance of your Purchase order.(P.O) .System • Installation will be completed in 3 week’s time from date of receipt of materials at site, provided site is ready for installation. • Payment Terms: Total cost of the project is :- 24 Lakh/-INR (Inclusive Taxes ) - First delivery of Solar panels against amount paid in advance.and start preparing for next order i.e 15Lakh Structure with Panel fitting :- 5 Lakh. - Inverter and rest of the matterial against rest of the payment.3.5lakh - Remaining 50000/+ taxes against successful installation. (Prior Cheque needed ) Technical Director : Er. Ashutosh Verma 9999890192 Whatsapp No: 9807465570 Date: 15 Jan, 2017 Version:#1 Contact: Address :- A117 Atul chok Dwarika Mor Delhi 110059 Registered Office:-D734 Kamla Nagar Agra-282005 E:sales@exalta.inW:www.exlata.in www.exalta.co.in EXALTA LED Insparc Technologies Pvt Ltd