T01-006 : COMPLEXITY OF PROJECT AND IMPACTS ON PRELIMINARIES OF CONSTRUCTION
PROJECT AT TENDER STAGE
METHODOLOGY
INTRODUCTION & PROBLEM STATEMENT RESULTS AND DSCUSSION
CONCLUSION
OBJECTIVE
Preliminaries and contractual matters are in
fact the risks that deal with non-trade
elements.
To establish reliable Preliminaries i.e. accurate, reasonable,
conclusive and yet easy to be priced by Contractors
Reliable Preliminaries are crucial. The finding suggests the Preliminaries items to be
broken down into smaller items and adopt several sum
approaches for accuracy reason. Preliminaries are imperative in nature,
thus expected to be comprehensive, easy to understand, practical
and effective.
Project Cost
Construction Cost
Preliminaries
< 10%
Bills of
Quantities
Preliminaries
Trade
Bills
•  Information
•  Instruction
•  Obligation
Competitive cost Without risking
project performance
Project Constraints
Complexity Direct costs
Indirect costs
Underestimation of price would lead to
abandonment of the project, possible lawsuit and
contract difficulty. Overestimation would
overshoot the allocation and deferment of the
project (Azman 2013).
LITERATURE REVIEW
Theoretical
Analysis
Synthesized
Complexity
Uncertainties
CONCLUSION
PROBLEM STATEMENT
Establish Gaps
OBJECTIVE
RESULTS & DISCUSSION
Preliminaries Uncertainty Complexity
Risks & Problems
To Arrive
Contractors are facing a great deal of
arbitration, exaggeration of risks and unseen
problems to arrive to a competitive price.
Lump Sum
Quantity
Lump Sums
Provisional Sum
•  Ability to anticipate present & future risks - experience
•  Miscalculation, not competitive / cost overrun
•  Large lump sum creates larger inaccuracy
•  Broken down into smaller items
•  Indirect costs require sound anticipations
Time-base
One-off
Researchers’
findings related to
costs are crucial
Complexity is part of the uncertainties exists in
the construction project and directly influences
the Preliminaries at Tender Stage.
(Turner et al. 2013)

More Related Content

What's hot

PreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroupPreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroupTodd Sullivan
 
How BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction projectHow BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction projectJacob Ostwald
 
BIM for health and safety - Its a No-Brainer
BIM for health and safety - Its a No-BrainerBIM for health and safety - Its a No-Brainer
BIM for health and safety - Its a No-BrainerStefan Mordue RIBA
 
3D and bim technology for construction safety morning section final version...
3D and bim technology for construction safety   morning section final version...3D and bim technology for construction safety   morning section final version...
3D and bim technology for construction safety morning section final version...Stephen Au
 
3D and bim technology for construction safety - track 2
3D and bim technology for construction safety  -  track 23D and bim technology for construction safety  -  track 2
3D and bim technology for construction safety - track 2Stephen Au
 
Mci sr 2011report_summary_lit
Mci sr 2011report_summary_litMci sr 2011report_summary_lit
Mci sr 2011report_summary_litMCI Brasil
 
The Role of Building Information Modeling in Construction Project Management
The Role of Building Information Modeling in Construction Project ManagementThe Role of Building Information Modeling in Construction Project Management
The Role of Building Information Modeling in Construction Project ManagementKerry Carey
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIMCCT International
 
Introduction to BIM and business case of BIM
Introduction to BIM and business case of BIMIntroduction to BIM and business case of BIM
Introduction to BIM and business case of BIMreem-yousef
 
Role of bim in modular construction converted
 Role of bim in modular construction converted Role of bim in modular construction converted
Role of bim in modular construction convertedTesla Outsourcing
 
Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...IRJET Journal
 
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPSDr Fereidoun Dejahang
 
BIM for Health & Safety: Virtually Sorted
BIM for Health & Safety: Virtually SortedBIM for Health & Safety: Virtually Sorted
BIM for Health & Safety: Virtually SortedThe NBS
 
Sustainable design &amp; bim technology
Sustainable design &amp; bim technologySustainable design &amp; bim technology
Sustainable design &amp; bim technologyOmar Selim
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
 
Bim presentation km 21-10-2011
Bim presentation km 21-10-2011Bim presentation km 21-10-2011
Bim presentation km 21-10-2011KarinSundberg
 
Adopting BIM - An Architect's Perspective (07 May 2014)
Adopting BIM - An Architect's Perspective (07 May 2014)Adopting BIM - An Architect's Perspective (07 May 2014)
Adopting BIM - An Architect's Perspective (07 May 2014)Elrond Burrell
 
Virtual design and construction
Virtual design and constructionVirtual design and construction
Virtual design and constructionAnkit Singhai
 

What's hot (19)

PreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroupPreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroup
 
How BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction projectHow BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction project
 
BIM for health and safety - Its a No-Brainer
BIM for health and safety - Its a No-BrainerBIM for health and safety - Its a No-Brainer
BIM for health and safety - Its a No-Brainer
 
3D and bim technology for construction safety morning section final version...
3D and bim technology for construction safety   morning section final version...3D and bim technology for construction safety   morning section final version...
3D and bim technology for construction safety morning section final version...
 
3D and bim technology for construction safety - track 2
3D and bim technology for construction safety  -  track 23D and bim technology for construction safety  -  track 2
3D and bim technology for construction safety - track 2
 
Mci sr 2011report_summary_lit
Mci sr 2011report_summary_litMci sr 2011report_summary_lit
Mci sr 2011report_summary_lit
 
The Role of Building Information Modeling in Construction Project Management
The Role of Building Information Modeling in Construction Project ManagementThe Role of Building Information Modeling in Construction Project Management
The Role of Building Information Modeling in Construction Project Management
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIM
 
Introduction to BIM and business case of BIM
Introduction to BIM and business case of BIMIntroduction to BIM and business case of BIM
Introduction to BIM and business case of BIM
 
Role of bim in modular construction converted
 Role of bim in modular construction converted Role of bim in modular construction converted
Role of bim in modular construction converted
 
Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...
 
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
 
BIM for Health & Safety: Virtually Sorted
BIM for Health & Safety: Virtually SortedBIM for Health & Safety: Virtually Sorted
BIM for Health & Safety: Virtually Sorted
 
Sustainable design &amp; bim technology
Sustainable design &amp; bim technologySustainable design &amp; bim technology
Sustainable design &amp; bim technology
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
 
Bim presentation km 21-10-2011
Bim presentation km 21-10-2011Bim presentation km 21-10-2011
Bim presentation km 21-10-2011
 
Adopting BIM - An Architect's Perspective (07 May 2014)
Adopting BIM - An Architect's Perspective (07 May 2014)Adopting BIM - An Architect's Perspective (07 May 2014)
Adopting BIM - An Architect's Perspective (07 May 2014)
 
Corporate Members Event June 2015
Corporate Members Event June 2015Corporate Members Event June 2015
Corporate Members Event June 2015
 
Virtual design and construction
Virtual design and constructionVirtual design and construction
Virtual design and construction
 

Viewers also liked

35 days bid procedure for construction project
35 days bid procedure for construction project35 days bid procedure for construction project
35 days bid procedure for construction projectMarvin M Gamboa
 
Lecture 2: Preliminaries (Understanding and Preprocessing data)
Lecture 2: Preliminaries (Understanding and Preprocessing data)Lecture 2: Preliminaries (Understanding and Preprocessing data)
Lecture 2: Preliminaries (Understanding and Preprocessing data)Marina Santini
 
Building contracts and the JCT
Building contracts and the JCTBuilding contracts and the JCT
Building contracts and the JCTJulian Swindell
 
Tender notice Drafting Procedure
Tender notice Drafting ProcedureTender notice Drafting Procedure
Tender notice Drafting ProcedureSachin1385
 
CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2Est
 
Construction Project Process Flow
Construction Project Process FlowConstruction Project Process Flow
Construction Project Process FlowRajasekar M
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Controlnik kin
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Ir. Abdul Aziz Abas
 
Repair and Rehabilitation of Historical Structures
Repair and Rehabilitation of Historical StructuresRepair and Rehabilitation of Historical Structures
Repair and Rehabilitation of Historical StructuresAravind Samala
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingAnkit Patel
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Dhaval Jadhav
 

Viewers also liked (20)

Construction tender process
Construction tender processConstruction tender process
Construction tender process
 
35 days bid procedure for construction project
35 days bid procedure for construction project35 days bid procedure for construction project
35 days bid procedure for construction project
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Lecture 2: Preliminaries (Understanding and Preprocessing data)
Lecture 2: Preliminaries (Understanding and Preprocessing data)Lecture 2: Preliminaries (Understanding and Preprocessing data)
Lecture 2: Preliminaries (Understanding and Preprocessing data)
 
fidic , jct and nec contracts
fidic , jct and nec contractsfidic , jct and nec contracts
fidic , jct and nec contracts
 
Building contracts and the JCT
Building contracts and the JCTBuilding contracts and the JCT
Building contracts and the JCT
 
Tender notice Drafting Procedure
Tender notice Drafting ProcedureTender notice Drafting Procedure
Tender notice Drafting Procedure
 
CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2
 
Tenders for construction
Tenders for constructionTenders for construction
Tenders for construction
 
Construction Project Process Flow
Construction Project Process FlowConstruction Project Process Flow
Construction Project Process Flow
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)
 
Repair and Rehabilitation of Historical Structures
Repair and Rehabilitation of Historical StructuresRepair and Rehabilitation of Historical Structures
Repair and Rehabilitation of Historical Structures
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Earthwork
EarthworkEarthwork
Earthwork
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiiting
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
 
ACH 216 Lecture 04b (Bidding) Part 1
ACH 216 Lecture 04b (Bidding) Part 1ACH 216 Lecture 04b (Bidding) Part 1
ACH 216 Lecture 04b (Bidding) Part 1
 
ACH 231 Lecture 07 (Contract Documents) Part 3
ACH 231 Lecture 07 (Contract Documents) Part 3ACH 231 Lecture 07 (Contract Documents) Part 3
ACH 231 Lecture 07 (Contract Documents) Part 3
 
Repair and Rehabilitation
Repair and RehabilitationRepair and Rehabilitation
Repair and Rehabilitation
 

Similar to Complexity of Project And Impacts on Preliminaries of Construction Project At Tender Stage

A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 Pang Khai Shuen
 
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...IRJET Journal
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 Pang Khai Shuen
 
043 integrating risk management
043 integrating risk management043 integrating risk management
043 integrating risk managementdrdej19
 
7. article azojete vol 11 77 88 alhassan
7. article azojete vol 11 77 88 alhassan7. article azojete vol 11 77 88 alhassan
7. article azojete vol 11 77 88 alhassanOyeniyi Samuel
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriaNewman Jonathan
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...IRJET Journal
 
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET Journal
 
Risk Management and Cost Overruns due to delays in Construction Project using...
Risk Management and Cost Overruns due to delays in Construction Project using...Risk Management and Cost Overruns due to delays in Construction Project using...
Risk Management and Cost Overruns due to delays in Construction Project using...IRJET Journal
 
Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...IRJET Journal
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET Journal
 
A Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project ManagementA Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project Managementijsrd.com
 
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Nurhazman Abdul Aziz
 

Similar to Complexity of Project And Impacts on Preliminaries of Construction Project At Tender Stage (20)

PP1 report
PP1 reportPP1 report
PP1 report
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
 
Pp1 final
Pp1 finalPp1 final
Pp1 final
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
043 Integrating Risk Management
043 Integrating Risk Management043 Integrating Risk Management
043 Integrating Risk Management
 
043 integrating risk management
043 integrating risk management043 integrating risk management
043 integrating risk management
 
Aiab089228
Aiab089228Aiab089228
Aiab089228
 
7. article azojete vol 11 77 88 alhassan
7. article azojete vol 11 77 88 alhassan7. article azojete vol 11 77 88 alhassan
7. article azojete vol 11 77 88 alhassan
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeria
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
 
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
 
Risk Management and Cost Overruns due to delays in Construction Project using...
Risk Management and Cost Overruns due to delays in Construction Project using...Risk Management and Cost Overruns due to delays in Construction Project using...
Risk Management and Cost Overruns due to delays in Construction Project using...
 
Pp report
Pp reportPp report
Pp report
 
Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...
 
Practitioner class 3: Contract strategy
Practitioner class 3: Contract strategyPractitioner class 3: Contract strategy
Practitioner class 3: Contract strategy
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
 
A Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project ManagementA Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project Management
 
PASBA 2010 presentation
PASBA 2010 presentationPASBA 2010 presentation
PASBA 2010 presentation
 
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
 

More from Ir. Abdul Aziz Abas

More from Ir. Abdul Aziz Abas (8)

Standard Operating Procedure (SOP) proposal for flood preparedness in shah al...
Standard Operating Procedure (SOP) proposal for flood preparedness in shah al...Standard Operating Procedure (SOP) proposal for flood preparedness in shah al...
Standard Operating Procedure (SOP) proposal for flood preparedness in shah al...
 
Building maintenance
Building maintenanceBuilding maintenance
Building maintenance
 
Structure & Infrastructure Planning
Structure & Infrastructure PlanningStructure & Infrastructure Planning
Structure & Infrastructure Planning
 
Water Supply - Design Approach And Methodologies
Water  Supply - Design Approach And MethodologiesWater  Supply - Design Approach And Methodologies
Water Supply - Design Approach And Methodologies
 
Earth Comp
Earth CompEarth Comp
Earth Comp
 
Adap Alquran
Adap AlquranAdap Alquran
Adap Alquran
 
Doa Awal Kerja
Doa  Awal  KerjaDoa  Awal  Kerja
Doa Awal Kerja
 
Code Of Hammurabi
Code Of  HammurabiCode Of  Hammurabi
Code Of Hammurabi
 

Recently uploaded

Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 

Recently uploaded (16)

Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 

Complexity of Project And Impacts on Preliminaries of Construction Project At Tender Stage

  • 1. T01-006 : COMPLEXITY OF PROJECT AND IMPACTS ON PRELIMINARIES OF CONSTRUCTION PROJECT AT TENDER STAGE METHODOLOGY INTRODUCTION & PROBLEM STATEMENT RESULTS AND DSCUSSION CONCLUSION OBJECTIVE Preliminaries and contractual matters are in fact the risks that deal with non-trade elements. To establish reliable Preliminaries i.e. accurate, reasonable, conclusive and yet easy to be priced by Contractors Reliable Preliminaries are crucial. The finding suggests the Preliminaries items to be broken down into smaller items and adopt several sum approaches for accuracy reason. Preliminaries are imperative in nature, thus expected to be comprehensive, easy to understand, practical and effective. Project Cost Construction Cost Preliminaries < 10% Bills of Quantities Preliminaries Trade Bills •  Information •  Instruction •  Obligation Competitive cost Without risking project performance Project Constraints Complexity Direct costs Indirect costs Underestimation of price would lead to abandonment of the project, possible lawsuit and contract difficulty. Overestimation would overshoot the allocation and deferment of the project (Azman 2013). LITERATURE REVIEW Theoretical Analysis Synthesized Complexity Uncertainties CONCLUSION PROBLEM STATEMENT Establish Gaps OBJECTIVE RESULTS & DISCUSSION Preliminaries Uncertainty Complexity Risks & Problems To Arrive Contractors are facing a great deal of arbitration, exaggeration of risks and unseen problems to arrive to a competitive price. Lump Sum Quantity Lump Sums Provisional Sum •  Ability to anticipate present & future risks - experience •  Miscalculation, not competitive / cost overrun •  Large lump sum creates larger inaccuracy •  Broken down into smaller items •  Indirect costs require sound anticipations Time-base One-off Researchers’ findings related to costs are crucial Complexity is part of the uncertainties exists in the construction project and directly influences the Preliminaries at Tender Stage. (Turner et al. 2013)