Hydro electric power

LEE-MALAK 7 years ago

[0] final - report hydroelectric power plant

U.E.T Lahore Pakistan 12 years ago

Hydro Power In Pakistan

Farooq Saeed 11 years ago

Three Gorges Dam

Ajmal Afzal 8 years ago

Pak china economic corridor

Abdul Haseeb 8 years ago

China Pakistan Economic Corridor (CPEC)

shahroze11 8 years ago

Wapda house

Tayyaba Naseer 7 years ago

VSC based HVDC system

mdhsudhan 9 years ago

Transformer testing

ajayknows 11 years ago

1. Starting & speed control of motors

Nageswar Rao 8 years ago

Starter of an induction motor

sbpatel199688 9 years ago

33/11 KV TRANSMISSION LINE

Lalit Kumar 8 years ago

Power sector of pakistan

USMAN TARIQ 8 years ago

Grid Station Construction (GSC) NTDCL

MUDASSAR AFZAL 7 years ago

Gis substation

Asif Eqbal 9 years ago

IEEE substation design

Vincent Wedelich, PE MBA 9 years ago

switchgear and protection by vala kamlesh

Kamlesh Vala 10 years ago