SlideShare a Scribd company logo
1 of 7
Download to read offline
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072
Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2196
Study of Seismic Retrofitting Techniques
Chetan Jaiprakash Chitte
Department of Civil Engineering, R. C. Patel Institute of Technology, Shirpur-425405 Dist. Dhule, Maharashtra,
India,
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - Many parts of the country have suffered
earthquake in last three decades. Seismic protection of
buildings is a need-based concept aimed to improve the
performance of any structure under future earthquakes.
Earthquakes of varyingmagnitudehaveoccurredintherecent
past in India, causing extensive damage to life and property.
Some recently developed materials and techniques can play
vital role in structural repairs, seismic strengthening and
retrofitting of existing buildings, whether damaged or
undamaged. The primaryconcernofastructuralengineer isto
successfully restore the structures as quickly as possible.
Selection of right materials, techniques and procedures to be
employed for the repair of a given structures have been a
major challenges. Innovative techniques of the structural
repairs have many advantages over the conventional
techniques. The benefits of retrofitting includethereductionin
the loss of lives and damage of the essential facilities, and
functional continuity of the life line structures. For an existing
structure of good condition, the cost of retrofitting tends to be
smaller than the replacement cost. Thus, the retrofitting of
structures is an essential component of long term disaster
mitigation. In present study, global and local retrofitting
techniques are discussed. Conventional techniques (Local and
global) of retrofitting are compared with modern technique
(Fiber Reinforced Polymers).
Key Words: Retrofitting, seismic, FRP ,inertia force,
1. INTRODUCTION
Damages caused by recent earthquakes have exposed the
vulnerability of buildings in India. Many of the non-
engineeredandsemi-engineeredconstructions lack thebasic
features required for seismic resistance. Many of the so-
called ‘engineered’ constructions, such as multi-storeyed
apartments, are not adequately designed, detailed and
constructed to providethedesiredresistanceagainstseismic
forces. This may be attributed largely to a lack of awareness
of seismic resistant design and code requirements. In recent
years, particularly after the devastating Gujarat earthquake
in 2001, there has been a concerted effort nation-wide to
provide for increased awareness, in education and practice,
with regard to seismic resistant design of buildings. Thereis
now a greater awareness and insistence on adherence to
design code requirements, with regard to new buildings,
especially those constructed by major organizations in the
public and private sectors. It is hoped that this healthy
practice becomes mandatory and adopted by all builders.
Mechanisms need to be evolved by local approving bodies
(corporations, municipalities, development authorities) to
ensure that the buildings conform to the National Building
Code. In particular, the structural design has to be proof-
checked by a competent third party for code compliance.
Ordinary people, investingtheirlifesavingsinbuildings such
as apartment complexes, should also insist on this, in their
own interest. All this is possible with buildings to be built in
the future. But, what is to be done about existing buildings?
Many of these will be found to lack compliance with the
current codes of practice, especially in terms of earthquake
resistance. This is partly attributable to the increased
seismic demand and up-gradation of some seismic zones in
the country, as reflected in the recently revised code of
practice for seismic analysis (IS 1893 Part 1: 2016. Even
‘engineered’ buildings built in the past are likely to lack the
seismic strength and detailing requirements of the current
design codes, such as IS 1893: 2016 and IS 13920: 2016,
because they were built prior to the implementationofthese
codes.
2. SEISMIC EFFECTS ON STRUCTURES
2.1 Inertia forces in Structure
Earthquake causes shaking of the ground. So a building
resting on it will experience motion at its base. From
Newton’s First Law of Motion, even though the base of the
building moves with the ground, the roof has a tendency to
stay in its original position. But since the walls and columns
are connected to it, they drag the roof along with them. This
is much like the situation that you are faced with when the
bus you are standing in suddenly starts; your feetmovewith
the bus, but your upper body tends to stay back making you
fall backwards!! This tendency to continue to remain in the
previous position is known as inertia. In the building, since
the walls or columns are flexible, the motion of the roof is
different from that of the ground. (Fig.1)
Fig. 1 Effect of Inertia in a building when shaken at its base
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072
Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2197
Fig. 2 Inertia force and relative motion within a building
Consider a building whose roof is supported on columns
(Fig. 2). Coming back to the analogy of yourself on the bus,
when the bus suddenly starts, you are thrown backwards as
if someone has applied a force on the upper body. Similarly,
when the ground moves, even the building is thrown
backwards, and the roof experiences a force, called inertia
force. If the roof has a mass M and experiences an
acceleration a, then from Newton’s Second Law of Motion,
the inertia force FI is mass M times acceleration a, and its
direction is opposite to that oftheacceleration.Clearly,more
mass means higher inertia force. Therefore,lighterbuildings
sustain the earthquake shaking better.
3. SEISMIC RETROFITTING
3.1 Earthquake Risk of Housing in India
The projected aggregate effect of expected number of lives
likely to be lost, persons injured, property damaged and
economic activity disrupted due to an expected strong
earthquake in an area, is the earthquake risk of that area.
India has experienced several major earthquakes in thepast
few decades and according to IS 1893 (Part I:2016), around
56% (12% in Zone V, 18% in Zone IV, 26% in Zone III) and
44% in Zone II of its landmass is prone to moderate to
severe earthquake shaking intensity. Especially, in the last
25 years, several large to moderate earthquakes have
occurred in the country (Table 1) (Bihar-Nepal border
(M6.4) in 1988, Uttarkashi (M6.6) in 1991, Killari (M6.3) in
1993, Jabalpur (M6.0) in 1997, Chamoli (M6.8)in1999,Bhuj
(M6.9) in 2001, and Kashmir (M7.6) in 2005, which have
caused more than 25,000 fatalities due to collapse of
buildings.
3.2 Need for Seismic Evaluation of Existing
Buildings
On a priority basis, seismic evaluation and retrofit are
undertaken for the life-line buildings, such as hospitals,
police stations, fire stations, telephone exchanges, broad
casting stations, television stations, railway stations, bus
stations, airports (including control towers), major
administrative buildings, relief co-ordination centres and
other buildings for emergency operations. The next set of
important buildings includes schools, educational
institutions, places of worship, stadia, auditoria, shopping
complexes and any other place of mass congregation. High
rise multistoreyed buildings, major industrial and
commercial buildings, historical and heritage buildings are
also among the important buildings.
Seismic vulnerability of an existing building is indicated
under the following situations:
i. The building may not have been designed and
detailed to resist seismic forces.
ii. The building may have been designed for seismic
forces, but before the publication of the current
seismic codes. The lateral strength of the building
does not satisfy the seismic forcesaspertherevised
seismic zones or the increased design base shear.
The detailing does not satisfy the requirements of
the current codes to ensure ductility and integral
action of the components.
iii. The construction is apparently of poor quality.
iv. The condition of the building has visibly
deteriorated with time.
v. There have been additions or modifications or
change of use of the building, which has increased
the vulnerability. For example, additional storeys
have been built.
vi. The soil has a high liquefaction potential.
3.3 Goals of Seismic Retrofit
The goals of seismic retrofit refer to the actions to be taken
with reference to the attributes for seismic design, in
qualitative terms. They can be summarized as follows:
i. To increase the lateral strength and stiffness of the
building
ii. To increase the ductility in the behaviour of the
building, this aims to avoid the brittle modes of
failure.
iii. To increase the integral action and continuity ofthe
members in a building
iv. To eliminate or reduce the effects of irregularities
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072
Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2198
v. To enhance redundancy in the lateral load resisting
system, this aims to eliminate the possibility of
progressive collapse.
vi. To ensure adequate stability against overturning
and sliding
3.4 Objectives of Seismic Retrofit
The objectives of seismic retrofit are quantitative
expressions to achieve the goals of retrofit. Of course for a
non-engineered building, the objective may not be
quantifiable. The implicit objective is to provide adequate
lateral strength by strategies thathavebeentestedorproved
to be effective in past earthquakes. The retrofitted building
should not collapse during a severe earthquake.
Objectives of seismic retrofit can be summarized as follows:
i. Public safety only: The goal is to protect human life,
ensuring that the structure will not collapse upon its
occupants or passersby, and thatthestructurecanbe
safely exited. Under severe seismic conditions the
structure may be a total economic write- off,
requiring tear-down and replacement.
ii. Structure survivability: The goal isthatthestructure,
while remaining safe for exit, may require extensive
repair (but not replacement) before it is generally
useful or considered safe for occupation. This is
typically the lowest level of retrofit applied to
bridges.
iii. Structure functionality: Primary structure
undamaged and the structure is undiminished in
utility for its primary application.
iv. Structure unaffected: This level of retrofit is
preferred for historic structures of high cultural
significance.
3.5 Steps of Seismic Retrofit
A retrofit steps for a building refers to the complete process
of retrofitting. For a systematic approach, it is necessary to
be aware of the steps of a retrofitting beforeundertakingthe
retrofit project. The implementation of each step requires a
certain time schedule and finance. All the listed steps may
not be applicable for all projects. Similarly, there may be
detailed sub-divisions of one step for a particular project.
The steps of a retrofit are shown as a flow chart in Fig. 3
4. SEISMIC RETROFIT STRATEGIES/TECHNIQUES
This section presents an overview of the process used to
develop a retrofit strategy once deficiencies of the existing
buildings have been detected and performance objectives
have been apparently determined.Theretrofitstrategies can
be grouped under global and local strategies. A global
retrofit strategy targets the seismic resistance of the
building. A local retrofit strategy targets the seismic
resistance of a member, without significantly affecting the
overall resistance of the building. It may be necessary to
combine both local and global retrofit strategies under a
feasible and economical retrofit scheme.
Fig. 3 Flow chart showing Steps of Seismic Retrofit
4.1 Global Retrofit Strategies
4.1.1 Adding Shear Wall
Shear walls can be introduced in buildings with frames or in
buildings with flat slabs or flat plates. In the latter type of
buildings, since there are no conventional frames,thelateral
strength and stiffness canbe substantiallyinadequate.A new
shear wall should be provided with an adequate foundation.
The reinforcing bars of the wall shouldbeproperlyanchored
to the bounding frame (Fig.4).
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072
Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2199
Shear walls resist two types of forces: shear forcesanduplift
forces. Connections to the structure above transfer
horizontal forces to the shear wall. This transfer creates
shear forces throughout the height of the wall between the
top and bottom shear wall connections. The strength of the
lumber, sheathing and fasteners must resist these shear
forces or the wall will tear or “shear” apart.
Fig. 4 Addition of a shear wall
4.1.2 Adding Infill Wall
Addition of infill walls in the ground storey is a viable option
to retrofit buildings with open ground storeys. In absence of
plinth beam, the new foundation of the infill wall should be
tied to the existing footings of the adjacent columns (Fig. 5).
Else, a plinth beam can be introduced to support the wall.
The lateral load resistance and the energy dissipation
capability of a frame increase with infill. This is a viable
option for the building (withopengroundstorey)addressed.
Infill walls with reinforced concrete masonryunitscanactas
shear walls.
Fig. 5 Addition of a masonry infill wall
4.1.3 Adding Bracing
Steel braces can be inserted in a frame to provide lateral
stiffness, strength, ductility, energy dissipation, or any
combination of these (Fig.6). The braces can be added at the
exterior frames with least disruption of the buildinguse.For
an open ground storey, the braces can be placed in
appropriate bays to retainthefunctional use.Theconnection
between the braces and the existing frame is an important
consideration. One technique of installing braces is to
provide a steel frame within the designated bay. Else, the
braces can be connected directly to the frame with plates
and bolts.
Fig. 6 Addition of a Steel braces
4.1.4 Base Isolation
Base isolation is a collection structural elements of building
that should substantially decouple the buildings‟ structure
from the shaking ground thus protecting the buildings
integrity and enhancing its seismic performance. The base
isolation tends to restrict the transmission of the ground
motion to the building; it also keeps the building positioned
properly over the foundation.
Base isolation systems have become a significant element to
enhance reliability during an earthquake. Seismic isolation
can be an effective tool for the earthquakeresistantdesignof
structures that can be used in both new construction and
retrofit. One type of base isolation system is Friction
Pendulum Bearing in which the superstructure is isolated
from the foundation using specially designed concave
surfaces and bearings to allow sway under its own natural
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072
Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2200
period during the seismic events. Friction Pendulum
Bearings are seismic isolation systems that have been as a
kind of bridge, and building retrofit in numerous cases
around the world. To assess their impact on structure
performance, models are needed to capture the behavior of
these highly nonlinear elements.
Fig. 7 Behavior of building structure with base isolation
system
Base isolation is generally suitable for low to medium rise
buildings, usually up to 10- 12 stories high, which have their
fundamental frequencies in the range of expected dominant
frequencies of earthquakes. Superstructure characteristics
such as height, width, aspect ratio, and stiffness are
important in determining the applicability and effectiveness
of seismic isolation. The seismic base isolation technology
involves placing flexible isolation systems between the
foundation and the superstructure.
A comparative evaluation of the different global retrofit
strategies is provided in Table 1
Table 1 Comparative evaluation of the global retrofit
strategies
Global
Retrofit
strategy
Merits Demerits Comments
Addition
of infill
walls
(i) Increases
lateral
stiffness of a
storey
(ii) Can
support
vertical load
if adjacent
column fails
(i) May have
premature
failure due
to crushing
of corners or
dislodging
(ii) Does not
increase
ductility
(iii)
Increases
weight
(i) Low cost
(ii) Low
disruption
(iii) Easy to
implement
Addition
of shear
walls
(i) Increases
lateral
strength and
stiffness
of the
building
substantially
(ii) May
increase
ductility
(i) May
increase
design
base shear
(ii) Increase
in lateral
resistance is
concentrated
near the
walls
(iii) Needs
adequate
foundation
(i) Needs
integration
of
the walls to
the
building
(ii) High
disruption
based on
location,
involves
drilling of
holes in the
existing
members
Addition
of
braces
(i) Increases
lateral
strength and
stiffness
of a storey
substantially
(ii)
Increases
ductility
(i)
Connection
of
braces to an
existing
frame can be
difficult
(i) Passive
energy
dissipation
devices
can be
incorporated
to
increase
damping /
stiffness or
both
5. LOCAL RETROFIT STRATEGIES
Local retrofit strategies refer to retrofitting of columns,
beams, joints, slabs, walls and foundations. The local retrofit
strategies fall under three types: concrete jacketing, steel
jacketing (or use of steel plates) and fibre-reinforced
polymer (FRP) sheet wrapping.
Table 2 Comparative evaluation of the local retrofit
strategies
Local
Retrofit
strategy
Merits Demerits Comments
Concrete
jacketing
•Increases
flexural and
shear
strengths
and ductility
of the
member
• Easy to
analyse
•Compatible
with
original
substrate
•Size of
member
increases
•
Anchoring
of bars
for flexural
strength;
involves
drilling of
holes in the
existing
concrete
•Needs
preparation
• Low cost
•High
disruption
•Experience
of
traditional RC
construction
is
adequate
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072
Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2201
of the
surface of
existing
member
Steel
jacketing
of
columns
• Increases
shear
strength and
ductility
•Minimal
increase in
size
•Cannot be
used for
increasing
the flexural
strength
•Needs
protection
against
corrosion
and
fire
•Can be used
as a
temporary
measure
after an
earthquake
• Cost can be
high
•Low
disruption
• Needs
skilled labour
Bonding
steel
plates
to beams
•Increases
either
flexural or
shear
strengths
•Minimal
increase in
size
• Use of
bolts
involves
drilling in
the existing
concrete
•Needs
protection
against
corrosion
and
fire
•More
suitable for
strengthening
against
gravity loads
• Cost can be
high
•Low
disruption
• Needs
skilled labour
Fibre
Reinforced
Polymer
wrapping
•Increases
ductility
• May
increase
flexural or
shear
strengths
•Minimal
increase in
size
•Rapid
installation
•Needs
protection
against fire
• Cost can be
high
•Low
disruption
• Needs
skilled labour
5.1 Retrofit Using Fibre Reinforced Polymer
Composites (FRP)
A comparative evaluation of the conventional
techniques with FRP is provided in Table 3
Table 3 Comparison of FRP system with Conventional
Technique
Description Concrete
Jacketing
Steel
Jacketing
FRP
Wrapping
Remarks
Mode of
strengtheni
ng
Increase
in
concrete
and steel
area
Confineme
nt
Confineme
nt
Preparatio
n
of column
for
strengtheni
ng
Significan
t
dismantli
ng of
cover
concrete.
At least
40 mm
cover
concrete
to be
removed.
Epoxy
primer to
be
applied
on
exposed
surface.
Not major
dismantlin
g work
involved.
Mainly
plaster to
be
removed
and epoxy
primer to
be applied
on
exposed
surface
Only
plaster to
be
removed
and epoxy
primer to
be applied
on
exposed
surface.
For
rectangula
r
columns,
corners to
be
rounded
off.
FRP
involves
minimum
surface
preparati
on.
Drilling of
holes
Large
amount
of
drilling is
required
Large
amount of
drilling is
required
Large
amount of
Drilling is
required
FRP
involves
minimum
work
since
no drilling
is
required.
Additional
weight
Extremel
y high
Very high Negligible.
No
increase in
weight at
all.
FRP does
not
increase
the dead
weight of
the
structure.
6. CONCLUSIONS
Conventional techniques (Local and global) of retrofitting
are compared with modern technique (Fiber Reinforced
Polymers). Following observations are concluded from the
study:
1. Seismic resistant design of new buildings and
seismic retrofit of existing buildings are essential to
reduce the vulnerability of the buildings during an
earthquake.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072
Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2202
2. Before undertaking seismic retrofit, itisessential to
determine the condition and diagnose the
deficiencies in a building.
3. Seismic evaluation helps to identify the deficiencies
of the building with respect to resistance to seismic
forces.
4. Based on the condition and deficiencies, repair and
retrofit strategies are selected.
5. When a building is severely deficient for the design
seismic forces, it is preferred to select a global
retrofit strategy to strengthen and stiffen the
structure.
6. If deficiencies still exist in the members, local
retrofit strategies are to be selected.
7. A retrofit strategy is to be selected after careful
considerations of the cost and constructability.
Proper design of a retrofit strategy is essential.
8. The failure mode in a member after retrofitting
should not become brittle.
9. A global retrofit strategy that involves a shift in
either of the centre of mass or centre of rigidity
should be checked for torsional irregularity.
10. FRP involves minimum surface preparation,
minimum work since no drilling is required.
11. FRP does not increase the dead weight of the
structure.
REFERENCES
[1]. Handbook on Seismic RetrofitOfBuildings,(April 2007),
By Central Public Works Department & Indian Building
Congress In Association With Indian Institute of
Technology – Madras
[2]. National Disaster Management Guidelines, Seismic
Retrofitting of Deficient Buildings and Structures, June
2014 by National Disaster Management Guidelines –
Seismic Retrofitting of Deficient Buildings and
Structures
[3]. Guidelines For Retrofit Of Concrete Structures - Draft,
(Translation From The Concrete Library No.95
Published By Jsce, September 1999)
[4]. Bhavar Dadasaheb O. , Dhake Pravinchandra D. , Ogale
ramesh A. “Retrofitting of existing R.C.C building by
method of jacketing.” International journal of research
in modern engineering and emerging technology vol 1,
issue:5-2013
[5]. Different Strengthening Techniques for RC Columns by
Dr. Gopal L. Rai R&M International Pvt. Ltd.
[6]. Minakshi V. VaghaniČŚ, Sandip A. VasanwalaČŚandAtul K.
Desai, “ Advanced Retrofitting Techniques for RC
Building: A State of an Art Review” International Journal
of Current Engineering and Technology, E-ISSN 2277 –
4106, P-ISSN 2347 – 5161
[7]. N. Lakshmanan, “Seismic Evaluation and Retrofitting Of
Buildings and Structures”, ISET Journal of Earthquake
Technology, Paper No. 469, Vol. 43, No. 1-2, March-June
2006, pp. 31-48
BIOGRAPHIES
Chetan J. Chitte obtained his
M.Tech. in Structural Dynamics &
Earthquake Engineering from
VNIT, Nagpur and B.E. Civil from
Sardar Patel College of
Engineering, Mumbai. He has 4.5
Years experience in Structural
Designing and 9 Years experience
in area of teaching.

More Related Content

What's hot

SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...
SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...
SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...
shankar kumar
 
RVS: Lecture ppt
RVS: Lecture pptRVS: Lecture ppt
RVS: Lecture ppt
Mohd Danish
 
Seismic Performance of Reinforced Cement Concrete Structures with and Without...
Seismic Performance of Reinforced Cement Concrete Structures with and Without...Seismic Performance of Reinforced Cement Concrete Structures with and Without...
Seismic Performance of Reinforced Cement Concrete Structures with and Without...
ijtsrd
 
Effects in Buildings Due To Seismic Pounding
Effects in Buildings Due To Seismic PoundingEffects in Buildings Due To Seismic Pounding
Effects in Buildings Due To Seismic Pounding
inventionjournals
 

What's hot (20)

SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...
SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...
SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...
 
RVS
RVSRVS
RVS
 
IRJET-Earthquake Resistant Structure using Seismic Cloaked FoundationC
IRJET-Earthquake Resistant Structure using Seismic Cloaked FoundationCIRJET-Earthquake Resistant Structure using Seismic Cloaked FoundationC
IRJET-Earthquake Resistant Structure using Seismic Cloaked FoundationC
 
IRJET- Analysis of Irregular Structure under Linear Time History
IRJET- Analysis of Irregular Structure under Linear Time HistoryIRJET- Analysis of Irregular Structure under Linear Time History
IRJET- Analysis of Irregular Structure under Linear Time History
 
RVS: Lecture ppt
RVS: Lecture pptRVS: Lecture ppt
RVS: Lecture ppt
 
Seismic Performance Evaluation of Mivan Structural System v/s Conventional St...
Seismic Performance Evaluation of Mivan Structural System v/s Conventional St...Seismic Performance Evaluation of Mivan Structural System v/s Conventional St...
Seismic Performance Evaluation of Mivan Structural System v/s Conventional St...
 
Parametric study on an industrial structure for various dynamic loads
Parametric study on an industrial structure for various dynamic loadsParametric study on an industrial structure for various dynamic loads
Parametric study on an industrial structure for various dynamic loads
 
IRJET- Comparative Study of R.C.C and Steel (G+4 Storey) Building
IRJET-  	  Comparative Study of R.C.C and Steel (G+4 Storey) BuildingIRJET-  	  Comparative Study of R.C.C and Steel (G+4 Storey) Building
IRJET- Comparative Study of R.C.C and Steel (G+4 Storey) Building
 
International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER)International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER)
 
IRJET - Graphical Presentation of Structural Parameters for RCC Multistorey B...
IRJET - Graphical Presentation of Structural Parameters for RCC Multistorey B...IRJET - Graphical Presentation of Structural Parameters for RCC Multistorey B...
IRJET - Graphical Presentation of Structural Parameters for RCC Multistorey B...
 
IRJET- Seismic Analysis of Shear Wall Optimization for Multi-Storey Building
IRJET- Seismic Analysis of Shear Wall Optimization for Multi-Storey BuildingIRJET- Seismic Analysis of Shear Wall Optimization for Multi-Storey Building
IRJET- Seismic Analysis of Shear Wall Optimization for Multi-Storey Building
 
IRJET- Seismic Analysis and Retrofitting of Reinforced Concrete Building ...
IRJET-  	  Seismic Analysis and Retrofitting of Reinforced Concrete Building ...IRJET-  	  Seismic Analysis and Retrofitting of Reinforced Concrete Building ...
IRJET- Seismic Analysis and Retrofitting of Reinforced Concrete Building ...
 
IRJET- Seismic Analysis of G+12 Residential Building in Lucknow (Zone 3) Regi...
IRJET- Seismic Analysis of G+12 Residential Building in Lucknow (Zone 3) Regi...IRJET- Seismic Analysis of G+12 Residential Building in Lucknow (Zone 3) Regi...
IRJET- Seismic Analysis of G+12 Residential Building in Lucknow (Zone 3) Regi...
 
Rapid Visual Screening of existing residential building of Agartala City
Rapid Visual Screening of existing residential building of Agartala CityRapid Visual Screening of existing residential building of Agartala City
Rapid Visual Screening of existing residential building of Agartala City
 
Seismic Performance of Reinforced Cement Concrete Structures with and Without...
Seismic Performance of Reinforced Cement Concrete Structures with and Without...Seismic Performance of Reinforced Cement Concrete Structures with and Without...
Seismic Performance of Reinforced Cement Concrete Structures with and Without...
 
Effects in Buildings Due To Seismic Pounding
Effects in Buildings Due To Seismic PoundingEffects in Buildings Due To Seismic Pounding
Effects in Buildings Due To Seismic Pounding
 
2974 2
2974 22974 2
2974 2
 
Analysis of a RCC frame Tall Structure using Staad Pro on Different Seismic Z...
Analysis of a RCC frame Tall Structure using Staad Pro on Different Seismic Z...Analysis of a RCC frame Tall Structure using Staad Pro on Different Seismic Z...
Analysis of a RCC frame Tall Structure using Staad Pro on Different Seismic Z...
 
IRJET- Comparative Analysis of Seismic Performance of R.C Building Restin...
IRJET-  	  Comparative Analysis of Seismic Performance of R.C Building Restin...IRJET-  	  Comparative Analysis of Seismic Performance of R.C Building Restin...
IRJET- Comparative Analysis of Seismic Performance of R.C Building Restin...
 
IRJET- Comparative Study on CFST and Steel Diagrid Structural System for High...
IRJET- Comparative Study on CFST and Steel Diagrid Structural System for High...IRJET- Comparative Study on CFST and Steel Diagrid Structural System for High...
IRJET- Comparative Study on CFST and Steel Diagrid Structural System for High...
 

Similar to IRJET - Study of Seismic Retrofitting Techniques

Similar to IRJET - Study of Seismic Retrofitting Techniques (20)

IRJET- Analysis and Design of Multi Storey Building Subjected to Seismic Load...
IRJET- Analysis and Design of Multi Storey Building Subjected to Seismic Load...IRJET- Analysis and Design of Multi Storey Building Subjected to Seismic Load...
IRJET- Analysis and Design of Multi Storey Building Subjected to Seismic Load...
 
IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...
IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...
IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...
 
SEISMIC ANALYSIS AND DESIGN OF MULTI-STOREY BUILDING IN STAAD PRO FOR ZONE II
SEISMIC ANALYSIS AND DESIGN OF MULTI-STOREY BUILDING IN STAAD PRO FOR ZONE IISEISMIC ANALYSIS AND DESIGN OF MULTI-STOREY BUILDING IN STAAD PRO FOR ZONE II
SEISMIC ANALYSIS AND DESIGN OF MULTI-STOREY BUILDING IN STAAD PRO FOR ZONE II
 
IRJET- Comparative Study of Vertically Irregular Buildings Subjected to S...
IRJET-  	  Comparative Study of Vertically Irregular Buildings Subjected to S...IRJET-  	  Comparative Study of Vertically Irregular Buildings Subjected to S...
IRJET- Comparative Study of Vertically Irregular Buildings Subjected to S...
 
IRJET- Comparative Seismic Analysis of RC G+13 Multistorey Building Frame
IRJET-  	  Comparative Seismic Analysis of RC G+13 Multistorey Building FrameIRJET-  	  Comparative Seismic Analysis of RC G+13 Multistorey Building Frame
IRJET- Comparative Seismic Analysis of RC G+13 Multistorey Building Frame
 
IRJET- Evaluation of Ductility Demand in a Multi Storey Building having Symme...
IRJET- Evaluation of Ductility Demand in a Multi Storey Building having Symme...IRJET- Evaluation of Ductility Demand in a Multi Storey Building having Symme...
IRJET- Evaluation of Ductility Demand in a Multi Storey Building having Symme...
 
IRJET- Seismic Analysis of a Multi-Storey Building using Steel Braced Frames
IRJET- Seismic Analysis of a Multi-Storey Building using Steel Braced FramesIRJET- Seismic Analysis of a Multi-Storey Building using Steel Braced Frames
IRJET- Seismic Analysis of a Multi-Storey Building using Steel Braced Frames
 
IRJET- Seismic Analysis and Design of Regular and Irregular Framed Commer...
IRJET-  	  Seismic Analysis and Design of Regular and Irregular Framed Commer...IRJET-  	  Seismic Analysis and Design of Regular and Irregular Framed Commer...
IRJET- Seismic Analysis and Design of Regular and Irregular Framed Commer...
 
“STUDY ON SEISMIC BEHAVIOR OF IRREGULAR BUILDING WITH AND WITHOUT SHEAR WALL ...
“STUDY ON SEISMIC BEHAVIOR OF IRREGULAR BUILDING WITH AND WITHOUT SHEAR WALL ...“STUDY ON SEISMIC BEHAVIOR OF IRREGULAR BUILDING WITH AND WITHOUT SHEAR WALL ...
“STUDY ON SEISMIC BEHAVIOR OF IRREGULAR BUILDING WITH AND WITHOUT SHEAR WALL ...
 
IRJET- Effective Location of Shear Wall on Performance of Building Frame ...
IRJET-  	  Effective Location of Shear Wall on Performance of Building Frame ...IRJET-  	  Effective Location of Shear Wall on Performance of Building Frame ...
IRJET- Effective Location of Shear Wall on Performance of Building Frame ...
 
STUDY OF PUSHOVER ANALYSIS OF G+10 RCC BUILDING WITH SHEAR WALL
STUDY OF PUSHOVER ANALYSIS OF G+10 RCC BUILDING WITH SHEAR WALLSTUDY OF PUSHOVER ANALYSIS OF G+10 RCC BUILDING WITH SHEAR WALL
STUDY OF PUSHOVER ANALYSIS OF G+10 RCC BUILDING WITH SHEAR WALL
 
COMPARATIVE SEISMIC ANALYSIS OF A MULTI-STOREY RCC STRUCTURE WITH & WITHOUT F...
COMPARATIVE SEISMIC ANALYSIS OF A MULTI-STOREY RCC STRUCTURE WITH & WITHOUT F...COMPARATIVE SEISMIC ANALYSIS OF A MULTI-STOREY RCC STRUCTURE WITH & WITHOUT F...
COMPARATIVE SEISMIC ANALYSIS OF A MULTI-STOREY RCC STRUCTURE WITH & WITHOUT F...
 
A Study on the Impact of Seismic Performance on RCC Frames
A Study on the Impact of Seismic Performance on RCC FramesA Study on the Impact of Seismic Performance on RCC Frames
A Study on the Impact of Seismic Performance on RCC Frames
 
Literature review on Seismic Pounding of Adjacent Buildings
Literature review on Seismic Pounding of Adjacent BuildingsLiterature review on Seismic Pounding of Adjacent Buildings
Literature review on Seismic Pounding of Adjacent Buildings
 
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...Comparative Study of Seismic Analysis of RC Frame Structure with and without ...
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...
 
Seismic Pounding Of Adjacent Buildings
Seismic Pounding Of Adjacent BuildingsSeismic Pounding Of Adjacent Buildings
Seismic Pounding Of Adjacent Buildings
 
Seismic Analysis of Fixed Base and Base Isolated RC Buildings Having Diaphrag...
Seismic Analysis of Fixed Base and Base Isolated RC Buildings Having Diaphrag...Seismic Analysis of Fixed Base and Base Isolated RC Buildings Having Diaphrag...
Seismic Analysis of Fixed Base and Base Isolated RC Buildings Having Diaphrag...
 
IRJET- Seismic Study of Multi-Storey Structure with Fluid Viscous Dampers...
IRJET-  	  Seismic Study of Multi-Storey Structure with Fluid Viscous Dampers...IRJET-  	  Seismic Study of Multi-Storey Structure with Fluid Viscous Dampers...
IRJET- Seismic Study of Multi-Storey Structure with Fluid Viscous Dampers...
 
Advanced Earthquake Resistant Building Techniques
Advanced Earthquake Resistant Building TechniquesAdvanced Earthquake Resistant Building Techniques
Advanced Earthquake Resistant Building Techniques
 
IRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABS
IRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABSIRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABS
IRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABS
 

More from IRJET Journal

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 

IRJET - Study of Seismic Retrofitting Techniques

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072 Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2196 Study of Seismic Retrofitting Techniques Chetan Jaiprakash Chitte Department of Civil Engineering, R. C. Patel Institute of Technology, Shirpur-425405 Dist. Dhule, Maharashtra, India, ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - Many parts of the country have suffered earthquake in last three decades. Seismic protection of buildings is a need-based concept aimed to improve the performance of any structure under future earthquakes. Earthquakes of varyingmagnitudehaveoccurredintherecent past in India, causing extensive damage to life and property. Some recently developed materials and techniques can play vital role in structural repairs, seismic strengthening and retrofitting of existing buildings, whether damaged or undamaged. The primaryconcernofastructuralengineer isto successfully restore the structures as quickly as possible. Selection of right materials, techniques and procedures to be employed for the repair of a given structures have been a major challenges. Innovative techniques of the structural repairs have many advantages over the conventional techniques. The benefits of retrofitting includethereductionin the loss of lives and damage of the essential facilities, and functional continuity of the life line structures. For an existing structure of good condition, the cost of retrofitting tends to be smaller than the replacement cost. Thus, the retrofitting of structures is an essential component of long term disaster mitigation. In present study, global and local retrofitting techniques are discussed. Conventional techniques (Local and global) of retrofitting are compared with modern technique (Fiber Reinforced Polymers). Key Words: Retrofitting, seismic, FRP ,inertia force, 1. INTRODUCTION Damages caused by recent earthquakes have exposed the vulnerability of buildings in India. Many of the non- engineeredandsemi-engineeredconstructions lack thebasic features required for seismic resistance. Many of the so- called ‘engineered’ constructions, such as multi-storeyed apartments, are not adequately designed, detailed and constructed to providethedesiredresistanceagainstseismic forces. This may be attributed largely to a lack of awareness of seismic resistant design and code requirements. In recent years, particularly after the devastating Gujarat earthquake in 2001, there has been a concerted effort nation-wide to provide for increased awareness, in education and practice, with regard to seismic resistant design of buildings. Thereis now a greater awareness and insistence on adherence to design code requirements, with regard to new buildings, especially those constructed by major organizations in the public and private sectors. It is hoped that this healthy practice becomes mandatory and adopted by all builders. Mechanisms need to be evolved by local approving bodies (corporations, municipalities, development authorities) to ensure that the buildings conform to the National Building Code. In particular, the structural design has to be proof- checked by a competent third party for code compliance. Ordinary people, investingtheirlifesavingsinbuildings such as apartment complexes, should also insist on this, in their own interest. All this is possible with buildings to be built in the future. But, what is to be done about existing buildings? Many of these will be found to lack compliance with the current codes of practice, especially in terms of earthquake resistance. This is partly attributable to the increased seismic demand and up-gradation of some seismic zones in the country, as reflected in the recently revised code of practice for seismic analysis (IS 1893 Part 1: 2016. Even ‘engineered’ buildings built in the past are likely to lack the seismic strength and detailing requirements of the current design codes, such as IS 1893: 2016 and IS 13920: 2016, because they were built prior to the implementationofthese codes. 2. SEISMIC EFFECTS ON STRUCTURES 2.1 Inertia forces in Structure Earthquake causes shaking of the ground. So a building resting on it will experience motion at its base. From Newton’s First Law of Motion, even though the base of the building moves with the ground, the roof has a tendency to stay in its original position. But since the walls and columns are connected to it, they drag the roof along with them. This is much like the situation that you are faced with when the bus you are standing in suddenly starts; your feetmovewith the bus, but your upper body tends to stay back making you fall backwards!! This tendency to continue to remain in the previous position is known as inertia. In the building, since the walls or columns are flexible, the motion of the roof is different from that of the ground. (Fig.1) Fig. 1 Effect of Inertia in a building when shaken at its base
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072 Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2197 Fig. 2 Inertia force and relative motion within a building Consider a building whose roof is supported on columns (Fig. 2). Coming back to the analogy of yourself on the bus, when the bus suddenly starts, you are thrown backwards as if someone has applied a force on the upper body. Similarly, when the ground moves, even the building is thrown backwards, and the roof experiences a force, called inertia force. If the roof has a mass M and experiences an acceleration a, then from Newton’s Second Law of Motion, the inertia force FI is mass M times acceleration a, and its direction is opposite to that oftheacceleration.Clearly,more mass means higher inertia force. Therefore,lighterbuildings sustain the earthquake shaking better. 3. SEISMIC RETROFITTING 3.1 Earthquake Risk of Housing in India The projected aggregate effect of expected number of lives likely to be lost, persons injured, property damaged and economic activity disrupted due to an expected strong earthquake in an area, is the earthquake risk of that area. India has experienced several major earthquakes in thepast few decades and according to IS 1893 (Part I:2016), around 56% (12% in Zone V, 18% in Zone IV, 26% in Zone III) and 44% in Zone II of its landmass is prone to moderate to severe earthquake shaking intensity. Especially, in the last 25 years, several large to moderate earthquakes have occurred in the country (Table 1) (Bihar-Nepal border (M6.4) in 1988, Uttarkashi (M6.6) in 1991, Killari (M6.3) in 1993, Jabalpur (M6.0) in 1997, Chamoli (M6.8)in1999,Bhuj (M6.9) in 2001, and Kashmir (M7.6) in 2005, which have caused more than 25,000 fatalities due to collapse of buildings. 3.2 Need for Seismic Evaluation of Existing Buildings On a priority basis, seismic evaluation and retrofit are undertaken for the life-line buildings, such as hospitals, police stations, fire stations, telephone exchanges, broad casting stations, television stations, railway stations, bus stations, airports (including control towers), major administrative buildings, relief co-ordination centres and other buildings for emergency operations. The next set of important buildings includes schools, educational institutions, places of worship, stadia, auditoria, shopping complexes and any other place of mass congregation. High rise multistoreyed buildings, major industrial and commercial buildings, historical and heritage buildings are also among the important buildings. Seismic vulnerability of an existing building is indicated under the following situations: i. The building may not have been designed and detailed to resist seismic forces. ii. The building may have been designed for seismic forces, but before the publication of the current seismic codes. The lateral strength of the building does not satisfy the seismic forcesaspertherevised seismic zones or the increased design base shear. The detailing does not satisfy the requirements of the current codes to ensure ductility and integral action of the components. iii. The construction is apparently of poor quality. iv. The condition of the building has visibly deteriorated with time. v. There have been additions or modifications or change of use of the building, which has increased the vulnerability. For example, additional storeys have been built. vi. The soil has a high liquefaction potential. 3.3 Goals of Seismic Retrofit The goals of seismic retrofit refer to the actions to be taken with reference to the attributes for seismic design, in qualitative terms. They can be summarized as follows: i. To increase the lateral strength and stiffness of the building ii. To increase the ductility in the behaviour of the building, this aims to avoid the brittle modes of failure. iii. To increase the integral action and continuity ofthe members in a building iv. To eliminate or reduce the effects of irregularities
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072 Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2198 v. To enhance redundancy in the lateral load resisting system, this aims to eliminate the possibility of progressive collapse. vi. To ensure adequate stability against overturning and sliding 3.4 Objectives of Seismic Retrofit The objectives of seismic retrofit are quantitative expressions to achieve the goals of retrofit. Of course for a non-engineered building, the objective may not be quantifiable. The implicit objective is to provide adequate lateral strength by strategies thathavebeentestedorproved to be effective in past earthquakes. The retrofitted building should not collapse during a severe earthquake. Objectives of seismic retrofit can be summarized as follows: i. Public safety only: The goal is to protect human life, ensuring that the structure will not collapse upon its occupants or passersby, and thatthestructurecanbe safely exited. Under severe seismic conditions the structure may be a total economic write- off, requiring tear-down and replacement. ii. Structure survivability: The goal isthatthestructure, while remaining safe for exit, may require extensive repair (but not replacement) before it is generally useful or considered safe for occupation. This is typically the lowest level of retrofit applied to bridges. iii. Structure functionality: Primary structure undamaged and the structure is undiminished in utility for its primary application. iv. Structure unaffected: This level of retrofit is preferred for historic structures of high cultural significance. 3.5 Steps of Seismic Retrofit A retrofit steps for a building refers to the complete process of retrofitting. For a systematic approach, it is necessary to be aware of the steps of a retrofitting beforeundertakingthe retrofit project. The implementation of each step requires a certain time schedule and finance. All the listed steps may not be applicable for all projects. Similarly, there may be detailed sub-divisions of one step for a particular project. The steps of a retrofit are shown as a flow chart in Fig. 3 4. SEISMIC RETROFIT STRATEGIES/TECHNIQUES This section presents an overview of the process used to develop a retrofit strategy once deficiencies of the existing buildings have been detected and performance objectives have been apparently determined.Theretrofitstrategies can be grouped under global and local strategies. A global retrofit strategy targets the seismic resistance of the building. A local retrofit strategy targets the seismic resistance of a member, without significantly affecting the overall resistance of the building. It may be necessary to combine both local and global retrofit strategies under a feasible and economical retrofit scheme. Fig. 3 Flow chart showing Steps of Seismic Retrofit 4.1 Global Retrofit Strategies 4.1.1 Adding Shear Wall Shear walls can be introduced in buildings with frames or in buildings with flat slabs or flat plates. In the latter type of buildings, since there are no conventional frames,thelateral strength and stiffness canbe substantiallyinadequate.A new shear wall should be provided with an adequate foundation. The reinforcing bars of the wall shouldbeproperlyanchored to the bounding frame (Fig.4).
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072 Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2199 Shear walls resist two types of forces: shear forcesanduplift forces. Connections to the structure above transfer horizontal forces to the shear wall. This transfer creates shear forces throughout the height of the wall between the top and bottom shear wall connections. The strength of the lumber, sheathing and fasteners must resist these shear forces or the wall will tear or “shear” apart. Fig. 4 Addition of a shear wall 4.1.2 Adding Infill Wall Addition of infill walls in the ground storey is a viable option to retrofit buildings with open ground storeys. In absence of plinth beam, the new foundation of the infill wall should be tied to the existing footings of the adjacent columns (Fig. 5). Else, a plinth beam can be introduced to support the wall. The lateral load resistance and the energy dissipation capability of a frame increase with infill. This is a viable option for the building (withopengroundstorey)addressed. Infill walls with reinforced concrete masonryunitscanactas shear walls. Fig. 5 Addition of a masonry infill wall 4.1.3 Adding Bracing Steel braces can be inserted in a frame to provide lateral stiffness, strength, ductility, energy dissipation, or any combination of these (Fig.6). The braces can be added at the exterior frames with least disruption of the buildinguse.For an open ground storey, the braces can be placed in appropriate bays to retainthefunctional use.Theconnection between the braces and the existing frame is an important consideration. One technique of installing braces is to provide a steel frame within the designated bay. Else, the braces can be connected directly to the frame with plates and bolts. Fig. 6 Addition of a Steel braces 4.1.4 Base Isolation Base isolation is a collection structural elements of building that should substantially decouple the buildings‟ structure from the shaking ground thus protecting the buildings integrity and enhancing its seismic performance. The base isolation tends to restrict the transmission of the ground motion to the building; it also keeps the building positioned properly over the foundation. Base isolation systems have become a significant element to enhance reliability during an earthquake. Seismic isolation can be an effective tool for the earthquakeresistantdesignof structures that can be used in both new construction and retrofit. One type of base isolation system is Friction Pendulum Bearing in which the superstructure is isolated from the foundation using specially designed concave surfaces and bearings to allow sway under its own natural
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072 Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2200 period during the seismic events. Friction Pendulum Bearings are seismic isolation systems that have been as a kind of bridge, and building retrofit in numerous cases around the world. To assess their impact on structure performance, models are needed to capture the behavior of these highly nonlinear elements. Fig. 7 Behavior of building structure with base isolation system Base isolation is generally suitable for low to medium rise buildings, usually up to 10- 12 stories high, which have their fundamental frequencies in the range of expected dominant frequencies of earthquakes. Superstructure characteristics such as height, width, aspect ratio, and stiffness are important in determining the applicability and effectiveness of seismic isolation. The seismic base isolation technology involves placing flexible isolation systems between the foundation and the superstructure. A comparative evaluation of the different global retrofit strategies is provided in Table 1 Table 1 Comparative evaluation of the global retrofit strategies Global Retrofit strategy Merits Demerits Comments Addition of infill walls (i) Increases lateral stiffness of a storey (ii) Can support vertical load if adjacent column fails (i) May have premature failure due to crushing of corners or dislodging (ii) Does not increase ductility (iii) Increases weight (i) Low cost (ii) Low disruption (iii) Easy to implement Addition of shear walls (i) Increases lateral strength and stiffness of the building substantially (ii) May increase ductility (i) May increase design base shear (ii) Increase in lateral resistance is concentrated near the walls (iii) Needs adequate foundation (i) Needs integration of the walls to the building (ii) High disruption based on location, involves drilling of holes in the existing members Addition of braces (i) Increases lateral strength and stiffness of a storey substantially (ii) Increases ductility (i) Connection of braces to an existing frame can be difficult (i) Passive energy dissipation devices can be incorporated to increase damping / stiffness or both 5. LOCAL RETROFIT STRATEGIES Local retrofit strategies refer to retrofitting of columns, beams, joints, slabs, walls and foundations. The local retrofit strategies fall under three types: concrete jacketing, steel jacketing (or use of steel plates) and fibre-reinforced polymer (FRP) sheet wrapping. Table 2 Comparative evaluation of the local retrofit strategies Local Retrofit strategy Merits Demerits Comments Concrete jacketing •Increases flexural and shear strengths and ductility of the member • Easy to analyse •Compatible with original substrate •Size of member increases • Anchoring of bars for flexural strength; involves drilling of holes in the existing concrete •Needs preparation • Low cost •High disruption •Experience of traditional RC construction is adequate
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072 Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2201 of the surface of existing member Steel jacketing of columns • Increases shear strength and ductility •Minimal increase in size •Cannot be used for increasing the flexural strength •Needs protection against corrosion and fire •Can be used as a temporary measure after an earthquake • Cost can be high •Low disruption • Needs skilled labour Bonding steel plates to beams •Increases either flexural or shear strengths •Minimal increase in size • Use of bolts involves drilling in the existing concrete •Needs protection against corrosion and fire •More suitable for strengthening against gravity loads • Cost can be high •Low disruption • Needs skilled labour Fibre Reinforced Polymer wrapping •Increases ductility • May increase flexural or shear strengths •Minimal increase in size •Rapid installation •Needs protection against fire • Cost can be high •Low disruption • Needs skilled labour 5.1 Retrofit Using Fibre Reinforced Polymer Composites (FRP) A comparative evaluation of the conventional techniques with FRP is provided in Table 3 Table 3 Comparison of FRP system with Conventional Technique Description Concrete Jacketing Steel Jacketing FRP Wrapping Remarks Mode of strengtheni ng Increase in concrete and steel area Confineme nt Confineme nt Preparatio n of column for strengtheni ng Significan t dismantli ng of cover concrete. At least 40 mm cover concrete to be removed. Epoxy primer to be applied on exposed surface. Not major dismantlin g work involved. Mainly plaster to be removed and epoxy primer to be applied on exposed surface Only plaster to be removed and epoxy primer to be applied on exposed surface. For rectangula r columns, corners to be rounded off. FRP involves minimum surface preparati on. Drilling of holes Large amount of drilling is required Large amount of drilling is required Large amount of Drilling is required FRP involves minimum work since no drilling is required. Additional weight Extremel y high Very high Negligible. No increase in weight at all. FRP does not increase the dead weight of the structure. 6. CONCLUSIONS Conventional techniques (Local and global) of retrofitting are compared with modern technique (Fiber Reinforced Polymers). Following observations are concluded from the study: 1. Seismic resistant design of new buildings and seismic retrofit of existing buildings are essential to reduce the vulnerability of the buildings during an earthquake.
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 04 | Apr 2020 www.irjet.net p-ISSN: 2395-0072 Š 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2202 2. Before undertaking seismic retrofit, itisessential to determine the condition and diagnose the deficiencies in a building. 3. Seismic evaluation helps to identify the deficiencies of the building with respect to resistance to seismic forces. 4. Based on the condition and deficiencies, repair and retrofit strategies are selected. 5. When a building is severely deficient for the design seismic forces, it is preferred to select a global retrofit strategy to strengthen and stiffen the structure. 6. If deficiencies still exist in the members, local retrofit strategies are to be selected. 7. A retrofit strategy is to be selected after careful considerations of the cost and constructability. Proper design of a retrofit strategy is essential. 8. The failure mode in a member after retrofitting should not become brittle. 9. A global retrofit strategy that involves a shift in either of the centre of mass or centre of rigidity should be checked for torsional irregularity. 10. FRP involves minimum surface preparation, minimum work since no drilling is required. 11. FRP does not increase the dead weight of the structure. REFERENCES [1]. Handbook on Seismic RetrofitOfBuildings,(April 2007), By Central Public Works Department & Indian Building Congress In Association With Indian Institute of Technology – Madras [2]. National Disaster Management Guidelines, Seismic Retrofitting of Deficient Buildings and Structures, June 2014 by National Disaster Management Guidelines – Seismic Retrofitting of Deficient Buildings and Structures [3]. Guidelines For Retrofit Of Concrete Structures - Draft, (Translation From The Concrete Library No.95 Published By Jsce, September 1999) [4]. Bhavar Dadasaheb O. , Dhake Pravinchandra D. , Ogale ramesh A. “Retrofitting of existing R.C.C building by method of jacketing.” International journal of research in modern engineering and emerging technology vol 1, issue:5-2013 [5]. Different Strengthening Techniques for RC Columns by Dr. Gopal L. Rai R&M International Pvt. Ltd. [6]. Minakshi V. VaghaniČŚ, Sandip A. VasanwalaČŚandAtul K. Desai, “ Advanced Retrofitting Techniques for RC Building: A State of an Art Review” International Journal of Current Engineering and Technology, E-ISSN 2277 – 4106, P-ISSN 2347 – 5161 [7]. N. Lakshmanan, “Seismic Evaluation and Retrofitting Of Buildings and Structures”, ISET Journal of Earthquake Technology, Paper No. 469, Vol. 43, No. 1-2, March-June 2006, pp. 31-48 BIOGRAPHIES Chetan J. Chitte obtained his M.Tech. in Structural Dynamics & Earthquake Engineering from VNIT, Nagpur and B.E. Civil from Sardar Patel College of Engineering, Mumbai. He has 4.5 Years experience in Structural Designing and 9 Years experience in area of teaching.