There are 5 phases and 4 check points in NPI process
From concept&planning->EVT->DVT->PVT->MP
Between two phases have a check point,
The new product should pass all the test , then could pass to the next phase.
All process will record in PLM system
This part represent which department take care the process.
For example,
The RD and DQA department are responsible for EVT process.
==========
(2)進入下一流程需經過以下幾個測試並以PLM系統管制
(3)下面則是負責的單位 ex:RD
Next, let me point out Advantech’s NPI process.
There are 5 phases and 4 check points in this process.
Planning: Feasibility review and test plan
Technical feasibility study: New technology platform, SW, HW, FirmW, Mechanical, Thermal or special environmental spec requirement
Financial analysis: Target profit margin
Supply Chain feasibility study: Evaluation suitable Manufacturing site, Key components evaluation, Lead time analysis and Service model
EVT: Mockup sample, Mould making and debug
DVT: QA lab for certification and EMI, DQA, small modification
PVT: after design freeze, technical transfer and small qty pilot run for MFG validation
MP: weekly and monthly review
-------
How to say: Please highlight “simultaneous同步的 engineering” in NPI process.
-------------------------------------------------------------------------------------
Next, let me point out Advantech’s NPI process.
There are 5 phases and 4 check points in this process. It also shows what engineer involves in both design and factory site.
---------------------------------------------------------------------------------------
New Product Introduction is a process used at Advantech where a series of tasks need to be completed before the product can be introduced into the market.
NPI is divided into 5 stages: Planning, Engineering, Design, Production Validation and finally Mass Production.
Each stage is closely guarded by responsible parties ensuring all documentation is in place before the product can move on to the next stage.
A group of R&D, lab and quality engineers are involved during NPI to ensure Advantech’s standard is always met.
There are 5 phases and 4 check points in NPI process
From concept&planning->EVT->DVT->PVT->MP
Between two phases have a check point,
The new product should pass all the test , then could pass to the next phase.
All process will record in PLM system
This part represent which department take care the process.
For example,
The RD and DQA department are responsible for EVT process.
==========
(2)進入下一流程需經過以下幾個測試並以PLM系統管制
(3)下面則是負責的單位 ex:RD
Next, let me point out Advantech’s NPI process.
There are 5 phases and 4 check points in this process.
Planning: Feasibility review and test plan
Technical feasibility study: New technology platform, SW, HW, FirmW, Mechanical, Thermal or special environmental spec requirement
Financial analysis: Target profit margin
Supply Chain feasibility study: Evaluation suitable Manufacturing site, Key components evaluation, Lead time analysis and Service model
EVT: Mockup sample, Mould making and debug
DVT: QA lab for certification and EMI, DQA, small modification
PVT: after design freeze, technical transfer and small qty pilot run for MFG validation
MP: weekly and monthly review
-------
How to say: Please highlight “simultaneous同步的 engineering” in NPI process.
-------------------------------------------------------------------------------------
Next, let me point out Advantech’s NPI process.
There are 5 phases and 4 check points in this process. It also shows what engineer involves in both design and factory site.
---------------------------------------------------------------------------------------
New Product Introduction is a process used at Advantech where a series of tasks need to be completed before the product can be introduced into the market.
NPI is divided into 5 stages: Planning, Engineering, Design, Production Validation and finally Mass Production.
Each stage is closely guarded by responsible parties ensuring all documentation is in place before the product can move on to the next stage.
A group of R&D, lab and quality engineers are involved during NPI to ensure Advantech’s standard is always met.