SlideShare a Scribd company logo
1 of 32
Transforming Operations with
the Lean Six Sigma Toolkit
Leading Lean Six Sigma
Agenda
• Objectives & Introductions
• The process improvement toolkit
• What is Lean Six Sigma?
• Two paths to better business
• What can you expect to accomplish?
• Q & A
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 2
Session Objectives
• Do we really need to explain why?
• Lean Six Sigma in an improvement framework
• The Lean Six Sigma purpose and process
• Two paths to implementing Lean Six Sigma
• What you should expect from a LSS program
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 3
Who is Avocus Group LLC?
• Simply stated, we provide the best value in
terms of experience, cost and results
• Results-driven business improvement
• Lean Six Sigma certification training, mentoring,
execution and program management
• We are change agents, delivering tangible
benefits to our clients
• Chicago-Based, founded in 2000
• Global client base, global solution delivery
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 4
Our Clients include leading Fortune
1000 and middle-market firms
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 5 T
O
S
IT Services
Operations
Strategy
TO
TO
TOS
TOS
T
OS
TO
TOS
TO
O S
TO
OS
S TO
T
OS
TO
S O
Small savings create big profits
Before After % Improvement
Sales $1,000 $1,000
Variable Costs 600 540 10%
Operating Margin 400 460 15%
Fixed Costs 300 300
Net Profit (Loss) $100 $160 60%
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 6
Our Operations Improvement Toolkit
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 7
Leadership
and
Execution
Activity-
Based
Costing
Lean
Six Sigma
Theory of
Constraints
Lean and Six Sigma have
complimentary goals and approaches
Lean
• Efficient operation of the
entire value chain
• Eliminate Waste
• Align production with
demand
• Reduce inventory
• Increase flexibility
• Improve process safety
and efficiency
Six Sigma
• Rigorous analysis of
individual activities
• Eliminate Variability
• Broadly define quality, but
closely define metrics
• Statistical analysis of root
causes and effects
• Formal hypothesis testing
• Ongoing data monitoring
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 8
Lean focuses on standardization,
improvement and sustainability
Stability
Process
Improvement
Cultural
Change
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 9
• 5S To improve and maintain cleanliness
and orderliness
• 7W Eliminate wastes in a structured way
• Standardized Work Instructions for work
operations
• Increase safety and ergonomics in
working places
• Visual Management Use standard
approaches in ground markings, info-
boards, clothes
• Key Performance Indicators Provide
performance indicators and targets to all
levels
Lean strives to make processes
repeatable, simple and safe
Stability
Process
Improvement
Cultural
Change
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 10
• Value Stream Mapping to identify
improvement opportunities
• Set-Up Reduction to minimize
changeover time and increase flexibility
• Productive Maintenance increasing
equipment efficiency and availability
• Quality improvements with a goal of Zero
defects as the quality standard
• Zero Inventory and Pull Production
Produce what is needed, when it’s
needed and nothing else
Lean focuses on standardization,
improvement and sustainability
Process
Improvement
Cultural
Change
Stability
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 11
• Continuous Improvement Sustain
improvements with continuous search for
new internal and external opportunities
• Continuous development Involves
developing and training employees in
improvement techniques and required
behaviors
• Ongoing Management Focus Supporting
team work and responsibility assumption
at all levels
• Work Teams Delegate work to teams and
reduce non-value-added oversight
• Leader Development Promote leadership
and coaching capabilities and encourage
initiative
Lean focuses on standardization,
improvement and sustainability
Cultural
Change
Stability
Process
Improvement
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 12
5-S and 7 W's are at the core of Lean
Implement 5-S
• Sort
• Systemize
• Sweep & Clean
• Standardize
• Self-Discipline
Eliminate 7 Wastes
• Overproduction
• Inventory
• Transportation
• Over-processing
• Idle Time
• Operator Movements
• Poor Quality
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 13
What is a Value Stream Map?
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 14
Six Sigma
• Overall objective is to reduce process variation
• Detailed analytical, data-driven methodology for
eliminating waste and defects from discrete
activities
• Based on established statistical process control
techniques, data analysis methods and systematic
thinking
• Ultimately strives for 3.4 defects per million
events
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 15
So who is the better golfer?
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 16
Graphical View of Six Sigma
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 17
USL = 6σLSL = - 6σ Target +3σ
Measured Process
Customer Requirements (USL, LSL) defined at ±
Six Sigma from the measured Process Mean
How do Sigma Levels relate to
real-world defect rates?
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 18
1,000,000
100,000
10,000
1,000
10
1
0.1 1 2 3 4 5 6 7
IRS Tax Advice
Bogie Golf
Baggage HandlingBurglary Case Closure
Tech Center Wait Time
Order Processing
Airline FatalityFlight Delays
Sigma Level
The Six Sigma DMAIC Methodology
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 19
Define
•DPO
•Cost of Poor
Quality
•Surveys
•Warranty
•Pareto Charts
•Flow Charts
•SIPOC
•VOC
•Kano Model
•CTQ Trees
•Project Charter
Measure
•Blueprints
•Process
Sheets
•Metrics
•Flow
Charts
•Linkage
Matrices
•FMEAs
•Measurement
System
Analysis
•Capability
Analysis
Analyze
•Multivariate
Analysis
•SPC &
Charting
•Basic Stats
- Hypothesis
- Basic DoE
•Check Sheets
•Histograms
•Scatter
Diagrams
•Regression
Improve
•Designed
Experiments
- Full Factorial
- Fractional
- Comparison
•Measurement
System
Analysis
•Capability
•Statistical
Tolerance
of Process
Control
•Control
Plan
•Operator
Illustrations
•Operator
Instructions
•Error Proofing
•Automated
Control
•QMS
•Variation
Monitoring
Your best implementation path
depends on where you are
“The High Road”
“The Low Road”
• Top-Down Approach
• Executive Sponsorship
• Big-Picture Authority
• Appropriate Budget
• Bottom-Up Approach
• Usually Mid-Level Sponsor
• Process or Functional
Authority
• Minimal Budget
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 20
Implement
Projects
Implement
Projects
The "High Road" Implementation
Process Overview
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 21
Build
Project
Portfolio
Plan & Staff
Projects
Implement
Projects
Implement
Quick Hit
Projects
Transition to
Process
Owners
Monitor &
Control
The "High Road" Implementation
Process Overview
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 22
BuildProjectPortfolio Select Program
Champion
Confirm Strategy &
Goals
Conduct ABC Analysis
Conduct TOC Analysis
Identify Opportunities
Analyze Benefits and
Returns
Select Projects
Form PMO
Plan&StaffProjects
Identify Project
Champions
Create Project Plans
Determine Staff
Requirements
Select Staff for Belt
Assignments
Conduct Belt training
Conduct Manager
Training
The "High Road" Implementation
Process Overview
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 23
ImplementProjects Implement Metrics
Rapid Improvement
Workshops
Visual Management
Standard Work for
Operators &
Managers
DMAIC / Reduce
Variation
Assess Management
Capability
IdentifyQuickHitProjects
Kaizen Blitz
5S
7W
Supplier Improvement
Visual Management
Implement Standard
Work
Assess Management
Capability
The "High Road" Implementation
Process Overview
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 24
TransitiontoProcessOwners
Confirm Standard
Work for Managers
in place
Complete manager
assessments
Transition staff
where needed
Conduct additional
training
Coach and shadow Monitor&Control
Implement Balanced
Scorecard
Establish
management by
exception
Control chart reviews
Stress the system –
schedule goal
increases
Confirm correlation
to financial results
The "Low Road" Implementation
Process Overview
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 25
Implement
Projects
Implement
Projects
Identify
Opportunities
Plan Projects
Implement
Quick Hit
Projects
Monitor &
Control
Communicate
Results
Each approach has
benefits and challenges
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 26
Challenges Benefits
High-Road
• Visibility to pilot projects
• Lower-level buy-in
• High visibility from the start
• Executive exposure
• Focus on results
• Company-wide opportunities
• Program funding
• Broad authority to direct support
• Access to the best talent
• Scale opportunities
Low-Road
• Managerial support for projects
• Limited funds
• Narrow opportunity set
• Upper-level buy-in
• Diversion of resources
• Communicating wins
• Selling the program
• Low exposure
• Autonomy
• Close proximity to pilot projects
• You know your team
• Low-Hanging Fruit
• Direct Accountability for results
• Personal satisfaction
A basic 5-S initiative saves a $1 billion
retailer over $1 million annually
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 27
25%
Improvement
Target
15% due to
Admin Error
2% Shrink
Total Retail
Turnover
$1 Billion
$30 Million
$4.5 Million $1.1 Million
Theft &
FraudProfit &
Other Costs
A "small" project will save one retail
distributor over $1 million
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 28
High-Tech Company: $500,000 annual
savings per Black Belt
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 29
Each Black Belt
completes two $250k
projects per year
Up to 90 people will
have Black Belt by end
of year 1
Expected annual savings
between $15 million and
$45 million
Let's look at the economics
Costs Benefits
LSS Green Belt • 1 Week Certification Training
• About $2,000 training cost
$75,000/yr savings per Green Belt:
• Complete one $50,000 project for
certification
• Approx. 2-3 projects per year
• Est. $25,000 per project
LSS Black Belt • 4 Weeks Certification Training
• About $5,000 training cost
$300,000/yr savings per Black Belt:
• Complete one $50,000 project for
certification
• Approx. 2-3 projects per year
• Est. $150,000 per project
• Mentor and lead Green Belts on
additional projects
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 30
Some final thoughts
• Lean Six Sigma is a bottom-up process. At
every stage, request as little as possible from
above.
• Start with small wins, not big programs
• Don’t hand this off to the Junior Varsity. It
takes leaders to drive change.
• It also takes leaders to sustain change.
Evaluate managers as you fix your processes.
• Remember, nothing succeeds like success.
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 31
Thank you and good luck on your
Lean Six Sigma Journey!
Great Lakes Office West Chicago, Illinois
West Coast Office Lafayette, California
Jack Kahler (630) 621-4659 Direct
jkahler@avocusgroup.com
Visit our website at www.avocusgroup.com
AVOCUS GROUP LLC
Descartes EVOLUTION 2009 User Conference
© 2009 Avocus Group LLC. All Rights Reserved.
Page 32

More Related Content

What's hot

ITIL compliant Open Source tools
ITIL compliant Open Source toolsITIL compliant Open Source tools
ITIL compliant Open Source toolsBruno Cornec
 
Primavera Unifier: How to Tame Complexity and Achieve Success
Primavera Unifier: How to Tame Complexity and Achieve SuccessPrimavera Unifier: How to Tame Complexity and Achieve Success
Primavera Unifier: How to Tame Complexity and Achieve Successp6academy
 
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe Generale
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe GeneraleSociete Generale - The Clock is Ticking - Duncan Hartree, Societe Generale
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe GeneraleCedar Consulting
 
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010ARC Advisory Group
 
Scrum for Global-Scale Development
Scrum for Global-Scale DevelopmentScrum for Global-Scale Development
Scrum for Global-Scale DevelopmentTechWell
 
Enterprise agile Framework
Enterprise agile FrameworkEnterprise agile Framework
Enterprise agile FrameworkAgile Club
 
NetCom Learning : How to Improve Business Processes using Agile
NetCom Learning : How to Improve Business Processes using AgileNetCom Learning : How to Improve Business Processes using Agile
NetCom Learning : How to Improve Business Processes using AgileSwati Chhabra
 
REALTECH SmartChange solutions ppt
REALTECH SmartChange solutions pptREALTECH SmartChange solutions ppt
REALTECH SmartChange solutions pptDavid Milano
 
Why er ps maybe magic dust
Why er ps maybe magic dustWhy er ps maybe magic dust
Why er ps maybe magic dustAppchemi
 
Proposed Project Office Strategy
Proposed Project Office StrategyProposed Project Office Strategy
Proposed Project Office StrategyJosh Folgado
 
PIT Solutions - An IT services provider with operations in Switzerland and India
PIT Solutions - An IT services provider with operations in Switzerland and IndiaPIT Solutions - An IT services provider with operations in Switzerland and India
PIT Solutions - An IT services provider with operations in Switzerland and Indiapitsinfo
 
Cloud Streaming & Financial Close: Streamline Your Financial Processes
Cloud Streaming & Financial Close:  Streamline Your Financial ProcessesCloud Streaming & Financial Close:  Streamline Your Financial Processes
Cloud Streaming & Financial Close: Streamline Your Financial ProcessesAlithya
 
Dedicated Computing Implmenting Aras
Dedicated Computing Implmenting ArasDedicated Computing Implmenting Aras
Dedicated Computing Implmenting ArasAras
 
White paper tailoring togaf for SAFe delivery v1.0
White paper   tailoring togaf for SAFe delivery v1.0White paper   tailoring togaf for SAFe delivery v1.0
White paper tailoring togaf for SAFe delivery v1.0Dinesh Panwar
 

What's hot (20)

ITIL compliant Open Source tools
ITIL compliant Open Source toolsITIL compliant Open Source tools
ITIL compliant Open Source tools
 
Oracle Open World Presentation 2012
Oracle Open World Presentation 2012Oracle Open World Presentation 2012
Oracle Open World Presentation 2012
 
Primavera Unifier: How to Tame Complexity and Achieve Success
Primavera Unifier: How to Tame Complexity and Achieve SuccessPrimavera Unifier: How to Tame Complexity and Achieve Success
Primavera Unifier: How to Tame Complexity and Achieve Success
 
Architecting Core Bus Ops 18 Nov 14
Architecting Core Bus Ops 18 Nov 14Architecting Core Bus Ops 18 Nov 14
Architecting Core Bus Ops 18 Nov 14
 
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe Generale
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe GeneraleSociete Generale - The Clock is Ticking - Duncan Hartree, Societe Generale
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe Generale
 
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
 
Lean IT Transformation
Lean IT TransformationLean IT Transformation
Lean IT Transformation
 
Scrum for Global-Scale Development
Scrum for Global-Scale DevelopmentScrum for Global-Scale Development
Scrum for Global-Scale Development
 
Enterprise agile Framework
Enterprise agile FrameworkEnterprise agile Framework
Enterprise agile Framework
 
Prudence Technology Company Profile
Prudence Technology Company ProfilePrudence Technology Company Profile
Prudence Technology Company Profile
 
NetCom Learning : How to Improve Business Processes using Agile
NetCom Learning : How to Improve Business Processes using AgileNetCom Learning : How to Improve Business Processes using Agile
NetCom Learning : How to Improve Business Processes using Agile
 
REALTECH SmartChange solutions ppt
REALTECH SmartChange solutions pptREALTECH SmartChange solutions ppt
REALTECH SmartChange solutions ppt
 
Cutover Plan V2
Cutover Plan V2Cutover Plan V2
Cutover Plan V2
 
Why er ps maybe magic dust
Why er ps maybe magic dustWhy er ps maybe magic dust
Why er ps maybe magic dust
 
Proposed Project Office Strategy
Proposed Project Office StrategyProposed Project Office Strategy
Proposed Project Office Strategy
 
PIT Solutions - An IT services provider with operations in Switzerland and India
PIT Solutions - An IT services provider with operations in Switzerland and IndiaPIT Solutions - An IT services provider with operations in Switzerland and India
PIT Solutions - An IT services provider with operations in Switzerland and India
 
Cloud Streaming & Financial Close: Streamline Your Financial Processes
Cloud Streaming & Financial Close:  Streamline Your Financial ProcessesCloud Streaming & Financial Close:  Streamline Your Financial Processes
Cloud Streaming & Financial Close: Streamline Your Financial Processes
 
Dedicated Computing Implmenting Aras
Dedicated Computing Implmenting ArasDedicated Computing Implmenting Aras
Dedicated Computing Implmenting Aras
 
Sudhan MBB Resume
Sudhan MBB ResumeSudhan MBB Resume
Sudhan MBB Resume
 
White paper tailoring togaf for SAFe delivery v1.0
White paper   tailoring togaf for SAFe delivery v1.0White paper   tailoring togaf for SAFe delivery v1.0
White paper tailoring togaf for SAFe delivery v1.0
 

Viewers also liked

Slideshare hidden values 1.0
Slideshare hidden values 1.0Slideshare hidden values 1.0
Slideshare hidden values 1.0Britta Bouma-Blok
 
Socrates and Lean Six Sigma: The Art of Driving Retention & Fun by Tracy O'Ro...
Socrates and Lean Six Sigma: The Art of Driving Retention & Fun by Tracy O'Ro...Socrates and Lean Six Sigma: The Art of Driving Retention & Fun by Tracy O'Ro...
Socrates and Lean Six Sigma: The Art of Driving Retention & Fun by Tracy O'Ro...GoLeanSixSigma.com
 
The Right Game For Your Need, presentation from the Serious Play 2014 conference
The Right Game For Your Need, presentation from the Serious Play 2014 conferenceThe Right Game For Your Need, presentation from the Serious Play 2014 conference
The Right Game For Your Need, presentation from the Serious Play 2014 conferenceKingdaddy8
 
the shortest version of #MINDSHIFT
the shortest version of #MINDSHIFTthe shortest version of #MINDSHIFT
the shortest version of #MINDSHIFTFrits Oukes
 
Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Lean Startup & Innovation Games
Lean Startup & Innovation GamesLean Startup & Innovation Games
Lean Startup & Innovation GamesMichael Tarnowski
 
Introduction to Lean Startup » Lean Startup Barcelona
Introduction to Lean Startup » Lean Startup BarcelonaIntroduction to Lean Startup » Lean Startup Barcelona
Introduction to Lean Startup » Lean Startup BarcelonaJaume Teixi
 
The Lean Training Game Exchange
The Lean Training Game ExchangeThe Lean Training Game Exchange
The Lean Training Game Exchange5S Supply
 
Eric Ries, Author/Speaker/Consultant, The Lean Startup
Eric Ries, Author/Speaker/Consultant, The Lean StartupEric Ries, Author/Speaker/Consultant, The Lean Startup
Eric Ries, Author/Speaker/Consultant, The Lean Startup500 Startups
 

Viewers also liked (10)

Slideshare hidden values 1.0
Slideshare hidden values 1.0Slideshare hidden values 1.0
Slideshare hidden values 1.0
 
Socrates and Lean Six Sigma: The Art of Driving Retention & Fun by Tracy O'Ro...
Socrates and Lean Six Sigma: The Art of Driving Retention & Fun by Tracy O'Ro...Socrates and Lean Six Sigma: The Art of Driving Retention & Fun by Tracy O'Ro...
Socrates and Lean Six Sigma: The Art of Driving Retention & Fun by Tracy O'Ro...
 
The Right Game For Your Need, presentation from the Serious Play 2014 conference
The Right Game For Your Need, presentation from the Serious Play 2014 conferenceThe Right Game For Your Need, presentation from the Serious Play 2014 conference
The Right Game For Your Need, presentation from the Serious Play 2014 conference
 
the shortest version of #MINDSHIFT
the shortest version of #MINDSHIFTthe shortest version of #MINDSHIFT
the shortest version of #MINDSHIFT
 
Six sigma quiz
Six sigma quiz Six sigma quiz
Six sigma quiz
 
Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Lean Startup & Innovation Games
Lean Startup & Innovation GamesLean Startup & Innovation Games
Lean Startup & Innovation Games
 
Introduction to Lean Startup » Lean Startup Barcelona
Introduction to Lean Startup » Lean Startup BarcelonaIntroduction to Lean Startup » Lean Startup Barcelona
Introduction to Lean Startup » Lean Startup Barcelona
 
The Lean Training Game Exchange
The Lean Training Game ExchangeThe Lean Training Game Exchange
The Lean Training Game Exchange
 
Eric Ries, Author/Speaker/Consultant, The Lean Startup
Eric Ries, Author/Speaker/Consultant, The Lean StartupEric Ries, Author/Speaker/Consultant, The Lean Startup
Eric Ries, Author/Speaker/Consultant, The Lean Startup
 

Similar to Leading Lean Six Sigma

Roadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformRoadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformSheetal Kale
 
Roadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformRoadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformSheetal Kale
 
Grom Capabilities 2016
Grom Capabilities 2016Grom Capabilities 2016
Grom Capabilities 2016Sue Linder
 
Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Imaginet
 
Continous Integration Webinar
Continous Integration WebinarContinous Integration Webinar
Continous Integration WebinarPaul Senatillaka
 
Key Business Processes And Activities For Excellence PowerPoint Presentation ...
Key Business Processes And Activities For Excellence PowerPoint Presentation ...Key Business Processes And Activities For Excellence PowerPoint Presentation ...
Key Business Processes And Activities For Excellence PowerPoint Presentation ...SlideTeam
 
125 Introduction_to_Lean_and_Lean_Thinking Rev6.pdf
125 Introduction_to_Lean_and_Lean_Thinking Rev6.pdf125 Introduction_to_Lean_and_Lean_Thinking Rev6.pdf
125 Introduction_to_Lean_and_Lean_Thinking Rev6.pdfssuserc0c38b
 
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?Edunomica
 
iOG Corporate Presentation_for distribution
iOG Corporate Presentation_for distributioniOG Corporate Presentation_for distribution
iOG Corporate Presentation_for distributionPankaj Zawar
 
Blaine Wolff Resume
Blaine Wolff ResumeBlaine Wolff Resume
Blaine Wolff Resumebwolff52
 
Marlabs Capability Overview: Insurance
Marlabs Capability Overview: Insurance Marlabs Capability Overview: Insurance
Marlabs Capability Overview: Insurance Marlabs
 
Oracle Service Cloud - Fixed Scope Implementation Presentation
Oracle Service Cloud - Fixed Scope Implementation PresentationOracle Service Cloud - Fixed Scope Implementation Presentation
Oracle Service Cloud - Fixed Scope Implementation PresentationDelivery Centric
 
Andrew phillips resume jan102013
Andrew phillips resume  jan102013Andrew phillips resume  jan102013
Andrew phillips resume jan102013parsigma
 
Clover Infotech Corporate PPT
Clover Infotech Corporate PPTClover Infotech Corporate PPT
Clover Infotech Corporate PPTSwetha Elias
 
From Waterfall to Agile - Managing Disruptive Change Without Disrupting the B...
From Waterfall to Agile - Managing Disruptive Change Without Disrupting the B...From Waterfall to Agile - Managing Disruptive Change Without Disrupting the B...
From Waterfall to Agile - Managing Disruptive Change Without Disrupting the B...ADVA
 
OpenSymmetry Corporate Presentation
OpenSymmetry Corporate PresentationOpenSymmetry Corporate Presentation
OpenSymmetry Corporate PresentationOpenSymmetry
 
Agile Automotive (Final)
Agile Automotive (Final)Agile Automotive (Final)
Agile Automotive (Final)James Janisse
 
SAPience UserDay 2015 TheValueChain UMICORE sap_building_blocks
SAPience UserDay 2015 TheValueChain UMICORE sap_building_blocksSAPience UserDay 2015 TheValueChain UMICORE sap_building_blocks
SAPience UserDay 2015 TheValueChain UMICORE sap_building_blocksTheValueChain
 

Similar to Leading Lean Six Sigma (20)

Roadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformRoadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platform
 
Roadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformRoadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platform
 
Ensuring Success in the Cloud (1)
Ensuring Success in the Cloud (1)Ensuring Success in the Cloud (1)
Ensuring Success in the Cloud (1)
 
Grom Capabilities 2016
Grom Capabilities 2016Grom Capabilities 2016
Grom Capabilities 2016
 
Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)
 
Continous Integration Webinar
Continous Integration WebinarContinous Integration Webinar
Continous Integration Webinar
 
Key Business Processes And Activities For Excellence PowerPoint Presentation ...
Key Business Processes And Activities For Excellence PowerPoint Presentation ...Key Business Processes And Activities For Excellence PowerPoint Presentation ...
Key Business Processes And Activities For Excellence PowerPoint Presentation ...
 
125 Introduction_to_Lean_and_Lean_Thinking Rev6.pdf
125 Introduction_to_Lean_and_Lean_Thinking Rev6.pdf125 Introduction_to_Lean_and_Lean_Thinking Rev6.pdf
125 Introduction_to_Lean_and_Lean_Thinking Rev6.pdf
 
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?
 
iOG Corporate Presentation_for distribution
iOG Corporate Presentation_for distributioniOG Corporate Presentation_for distribution
iOG Corporate Presentation_for distribution
 
Rise of agile v1
Rise of agile v1Rise of agile v1
Rise of agile v1
 
Blaine Wolff Resume
Blaine Wolff ResumeBlaine Wolff Resume
Blaine Wolff Resume
 
Marlabs Capability Overview: Insurance
Marlabs Capability Overview: Insurance Marlabs Capability Overview: Insurance
Marlabs Capability Overview: Insurance
 
Oracle Service Cloud - Fixed Scope Implementation Presentation
Oracle Service Cloud - Fixed Scope Implementation PresentationOracle Service Cloud - Fixed Scope Implementation Presentation
Oracle Service Cloud - Fixed Scope Implementation Presentation
 
Andrew phillips resume jan102013
Andrew phillips resume  jan102013Andrew phillips resume  jan102013
Andrew phillips resume jan102013
 
Clover Infotech Corporate PPT
Clover Infotech Corporate PPTClover Infotech Corporate PPT
Clover Infotech Corporate PPT
 
From Waterfall to Agile - Managing Disruptive Change Without Disrupting the B...
From Waterfall to Agile - Managing Disruptive Change Without Disrupting the B...From Waterfall to Agile - Managing Disruptive Change Without Disrupting the B...
From Waterfall to Agile - Managing Disruptive Change Without Disrupting the B...
 
OpenSymmetry Corporate Presentation
OpenSymmetry Corporate PresentationOpenSymmetry Corporate Presentation
OpenSymmetry Corporate Presentation
 
Agile Automotive (Final)
Agile Automotive (Final)Agile Automotive (Final)
Agile Automotive (Final)
 
SAPience UserDay 2015 TheValueChain UMICORE sap_building_blocks
SAPience UserDay 2015 TheValueChain UMICORE sap_building_blocksSAPience UserDay 2015 TheValueChain UMICORE sap_building_blocks
SAPience UserDay 2015 TheValueChain UMICORE sap_building_blocks
 

Leading Lean Six Sigma

  • 1. Transforming Operations with the Lean Six Sigma Toolkit Leading Lean Six Sigma
  • 2. Agenda • Objectives & Introductions • The process improvement toolkit • What is Lean Six Sigma? • Two paths to better business • What can you expect to accomplish? • Q & A Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 2
  • 3. Session Objectives • Do we really need to explain why? • Lean Six Sigma in an improvement framework • The Lean Six Sigma purpose and process • Two paths to implementing Lean Six Sigma • What you should expect from a LSS program Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 3
  • 4. Who is Avocus Group LLC? • Simply stated, we provide the best value in terms of experience, cost and results • Results-driven business improvement • Lean Six Sigma certification training, mentoring, execution and program management • We are change agents, delivering tangible benefits to our clients • Chicago-Based, founded in 2000 • Global client base, global solution delivery Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 4
  • 5. Our Clients include leading Fortune 1000 and middle-market firms Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 5 T O S IT Services Operations Strategy TO TO TOS TOS T OS TO TOS TO O S TO OS S TO T OS TO S O
  • 6. Small savings create big profits Before After % Improvement Sales $1,000 $1,000 Variable Costs 600 540 10% Operating Margin 400 460 15% Fixed Costs 300 300 Net Profit (Loss) $100 $160 60% Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 6
  • 7. Our Operations Improvement Toolkit Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 7 Leadership and Execution Activity- Based Costing Lean Six Sigma Theory of Constraints
  • 8. Lean and Six Sigma have complimentary goals and approaches Lean • Efficient operation of the entire value chain • Eliminate Waste • Align production with demand • Reduce inventory • Increase flexibility • Improve process safety and efficiency Six Sigma • Rigorous analysis of individual activities • Eliminate Variability • Broadly define quality, but closely define metrics • Statistical analysis of root causes and effects • Formal hypothesis testing • Ongoing data monitoring Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 8
  • 9. Lean focuses on standardization, improvement and sustainability Stability Process Improvement Cultural Change Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 9
  • 10. • 5S To improve and maintain cleanliness and orderliness • 7W Eliminate wastes in a structured way • Standardized Work Instructions for work operations • Increase safety and ergonomics in working places • Visual Management Use standard approaches in ground markings, info- boards, clothes • Key Performance Indicators Provide performance indicators and targets to all levels Lean strives to make processes repeatable, simple and safe Stability Process Improvement Cultural Change Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 10
  • 11. • Value Stream Mapping to identify improvement opportunities • Set-Up Reduction to minimize changeover time and increase flexibility • Productive Maintenance increasing equipment efficiency and availability • Quality improvements with a goal of Zero defects as the quality standard • Zero Inventory and Pull Production Produce what is needed, when it’s needed and nothing else Lean focuses on standardization, improvement and sustainability Process Improvement Cultural Change Stability Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 11
  • 12. • Continuous Improvement Sustain improvements with continuous search for new internal and external opportunities • Continuous development Involves developing and training employees in improvement techniques and required behaviors • Ongoing Management Focus Supporting team work and responsibility assumption at all levels • Work Teams Delegate work to teams and reduce non-value-added oversight • Leader Development Promote leadership and coaching capabilities and encourage initiative Lean focuses on standardization, improvement and sustainability Cultural Change Stability Process Improvement Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 12
  • 13. 5-S and 7 W's are at the core of Lean Implement 5-S • Sort • Systemize • Sweep & Clean • Standardize • Self-Discipline Eliminate 7 Wastes • Overproduction • Inventory • Transportation • Over-processing • Idle Time • Operator Movements • Poor Quality Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 13
  • 14. What is a Value Stream Map? Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 14
  • 15. Six Sigma • Overall objective is to reduce process variation • Detailed analytical, data-driven methodology for eliminating waste and defects from discrete activities • Based on established statistical process control techniques, data analysis methods and systematic thinking • Ultimately strives for 3.4 defects per million events Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 15
  • 16. So who is the better golfer? Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 16
  • 17. Graphical View of Six Sigma Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 17 USL = 6σLSL = - 6σ Target +3σ Measured Process Customer Requirements (USL, LSL) defined at ± Six Sigma from the measured Process Mean
  • 18. How do Sigma Levels relate to real-world defect rates? Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 18 1,000,000 100,000 10,000 1,000 10 1 0.1 1 2 3 4 5 6 7 IRS Tax Advice Bogie Golf Baggage HandlingBurglary Case Closure Tech Center Wait Time Order Processing Airline FatalityFlight Delays Sigma Level
  • 19. The Six Sigma DMAIC Methodology Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 19 Define •DPO •Cost of Poor Quality •Surveys •Warranty •Pareto Charts •Flow Charts •SIPOC •VOC •Kano Model •CTQ Trees •Project Charter Measure •Blueprints •Process Sheets •Metrics •Flow Charts •Linkage Matrices •FMEAs •Measurement System Analysis •Capability Analysis Analyze •Multivariate Analysis •SPC & Charting •Basic Stats - Hypothesis - Basic DoE •Check Sheets •Histograms •Scatter Diagrams •Regression Improve •Designed Experiments - Full Factorial - Fractional - Comparison •Measurement System Analysis •Capability •Statistical Tolerance of Process Control •Control Plan •Operator Illustrations •Operator Instructions •Error Proofing •Automated Control •QMS •Variation Monitoring
  • 20. Your best implementation path depends on where you are “The High Road” “The Low Road” • Top-Down Approach • Executive Sponsorship • Big-Picture Authority • Appropriate Budget • Bottom-Up Approach • Usually Mid-Level Sponsor • Process or Functional Authority • Minimal Budget Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 20
  • 21. Implement Projects Implement Projects The "High Road" Implementation Process Overview Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 21 Build Project Portfolio Plan & Staff Projects Implement Projects Implement Quick Hit Projects Transition to Process Owners Monitor & Control
  • 22. The "High Road" Implementation Process Overview Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 22 BuildProjectPortfolio Select Program Champion Confirm Strategy & Goals Conduct ABC Analysis Conduct TOC Analysis Identify Opportunities Analyze Benefits and Returns Select Projects Form PMO Plan&StaffProjects Identify Project Champions Create Project Plans Determine Staff Requirements Select Staff for Belt Assignments Conduct Belt training Conduct Manager Training
  • 23. The "High Road" Implementation Process Overview Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 23 ImplementProjects Implement Metrics Rapid Improvement Workshops Visual Management Standard Work for Operators & Managers DMAIC / Reduce Variation Assess Management Capability IdentifyQuickHitProjects Kaizen Blitz 5S 7W Supplier Improvement Visual Management Implement Standard Work Assess Management Capability
  • 24. The "High Road" Implementation Process Overview Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 24 TransitiontoProcessOwners Confirm Standard Work for Managers in place Complete manager assessments Transition staff where needed Conduct additional training Coach and shadow Monitor&Control Implement Balanced Scorecard Establish management by exception Control chart reviews Stress the system – schedule goal increases Confirm correlation to financial results
  • 25. The "Low Road" Implementation Process Overview Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 25 Implement Projects Implement Projects Identify Opportunities Plan Projects Implement Quick Hit Projects Monitor & Control Communicate Results
  • 26. Each approach has benefits and challenges Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 26 Challenges Benefits High-Road • Visibility to pilot projects • Lower-level buy-in • High visibility from the start • Executive exposure • Focus on results • Company-wide opportunities • Program funding • Broad authority to direct support • Access to the best talent • Scale opportunities Low-Road • Managerial support for projects • Limited funds • Narrow opportunity set • Upper-level buy-in • Diversion of resources • Communicating wins • Selling the program • Low exposure • Autonomy • Close proximity to pilot projects • You know your team • Low-Hanging Fruit • Direct Accountability for results • Personal satisfaction
  • 27. A basic 5-S initiative saves a $1 billion retailer over $1 million annually Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 27 25% Improvement Target 15% due to Admin Error 2% Shrink Total Retail Turnover $1 Billion $30 Million $4.5 Million $1.1 Million Theft & FraudProfit & Other Costs
  • 28. A "small" project will save one retail distributor over $1 million Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 28
  • 29. High-Tech Company: $500,000 annual savings per Black Belt Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 29 Each Black Belt completes two $250k projects per year Up to 90 people will have Black Belt by end of year 1 Expected annual savings between $15 million and $45 million
  • 30. Let's look at the economics Costs Benefits LSS Green Belt • 1 Week Certification Training • About $2,000 training cost $75,000/yr savings per Green Belt: • Complete one $50,000 project for certification • Approx. 2-3 projects per year • Est. $25,000 per project LSS Black Belt • 4 Weeks Certification Training • About $5,000 training cost $300,000/yr savings per Black Belt: • Complete one $50,000 project for certification • Approx. 2-3 projects per year • Est. $150,000 per project • Mentor and lead Green Belts on additional projects Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 30
  • 31. Some final thoughts • Lean Six Sigma is a bottom-up process. At every stage, request as little as possible from above. • Start with small wins, not big programs • Don’t hand this off to the Junior Varsity. It takes leaders to drive change. • It also takes leaders to sustain change. Evaluate managers as you fix your processes. • Remember, nothing succeeds like success. Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 31
  • 32. Thank you and good luck on your Lean Six Sigma Journey! Great Lakes Office West Chicago, Illinois West Coast Office Lafayette, California Jack Kahler (630) 621-4659 Direct jkahler@avocusgroup.com Visit our website at www.avocusgroup.com AVOCUS GROUP LLC Descartes EVOLUTION 2009 User Conference © 2009 Avocus Group LLC. All Rights Reserved. Page 32