MARILLAC SOCIAL CENTER
                                                    STRATEGIC PLANNING PROCESS WORKPLAN

                                                               Phase 1 – Preparation
Action Steps
1.1    Identify reasons for planning
1.2    Set up planning process for success
1.3    Initiate discussions on how to involve internal and external stakeholders
1.4    Design a planning process to meet Marillac’s needs
1.5    Develop a Planning Workplan that articulates the outcome(s) of the planning process, strategic issues to address, roles,
       planning activities, and time frame

          Action Steps Processes                          Estimated Consultant Hours or                          Phase 1 Outcomes
                                                                    Meetings
Consultant meet with CEO, follow-up                  Series of meetings and discussions with CEO,   1. Agreement on who to involve in the
meetings with senior management and                  representatives of the Board, and senior          planning process and what their
representatives of the Board (or Strategic           management                                        involvement might be
Planning Committee (SPC)) to:
                                                                                                    2. Agreement on a Planning Workplan
    Identify reasons for planning, criteria for a
    successful planning process, and issues to                                                      3. Articulation of initial strategic issues
    be addressed as part of the planning                                                                facing Marillac
    process
    Clarify consultant and Marillac Social
    Center’s (“Marillac”) Board and staff’s
    roles and responsibilities, processes to
    keep all Board and staff informed of
    planning activities, products to be
    delivered, and time frame
    Agree on what background information
    consultant needs to be able to facilitate the
    process and what information needs to be
    gathered that will help inform strategic
    decisions (i.e. online surveys, etc.)
    Decide on whether to use existing
    structures and/or establish a SPC to
    coordinate the planning work
    Consultant revises initial workplan for
    review and approval by CEO and Board
Estimated Consultant Hours for Phase 1:                                                                                                5-10 hours1
                                                                           1                  Prepared by GilCorp, LLC for Marillac Social Center
Phase 2 – Mission, Vision, Core Values, and Guiding Principles
Action Steps
2.1 Revisit mission statement
2.2 Draft a vision statement
2.3 Articulate or affirm core values and guiding principles

          Action Steps Processes                     Estimated Consultant Hours or                         Phase 2 Outcomes
                                                               Meetings
Discussion(s) of mission statement, vision of   (Process to be agreed upon after Phase 1       1. Agreed upon mission, vision, and core
an ideal future and core values and guiding     discussions completed.) Discussions may take      values statements
principles                                      place at a retreat, special Board and staff
                                                meetings, or strategic planning committee
                                                meetings.
Estimated Consultant Hours for Phase 2:                                                                                        5-15 hours1




                                                                     2                   Prepared by GilCorp, LLC for Marillac Social Center
Phase 3 – Assessment
Action Steps
3.1    Summarize Marillac’s history and what has or has not been accomplished since last planning process
3.2    Articulate previous and current strategies
3.3    Collect perceptions of internal and external stakeholders regarding Marillac’s strengths, weaknesses, opportunities
       and threats (SWOT); collect empirical data to better understand the choices to be made during the strategic planning process
3.4    Summarize findings from data gathered from internal and external sources, Marillac’s strengths and weaknesses; trends in
       the environment that are or will impact Marillac; competitive advantage, needs in the community; start to make sense of data;
       emerging themes and priorities

                       Action Steps Processes                                  Estimated Consultant Hours or             Phase 3 Outcomes
                                                                                         Meetings
Marillac’s staff to assemble pertinent documents regarding agency’s        The number of meetings and hours will      1. Data to inform the
budget, service statistics, organizational charts, previous mission        vary widely, depending on extent of data      setting of priorities in
statements and planning documents, and other documents clarifying          collection required and consultant role.      Phase 4.
Marillac’s mandates, history, and operating trends. This information
should be available to the consultant and members of the SPC.

SPC to articulate previous and current strategies and discuss
effectiveness of these strategies to date and relevance of strategies as
we move forward.

Extent of data collection from external and internal stakeholders,
appropriate processes to use, and extent of consultant involvement to
be decided upon after discussions with SPC. Consultant available for
phone consultation, development and implementation of survey
instruments, design of evaluation instruments, assistance in
interviewing external and internal stakeholders, and facilitation of
meetings.

    Option A: Staff and Board complete online organizational
    assessment
    Option B: Board completes online self assessment in preparation
    for their discussion of future Board priorities (governance and
    support roles, membership, committees, expectations, etc.)
    Option C: External stakeholders’ involvement may be through:
    surveys, interviews, focus groups, meetings, etc.
Estimated Consultant Hours for Phase 3:                                                                                             20-60 hours1


                                                                           3                   Prepared by GilCorp, LLC for Marillac Social Center
Phase 4 – Priorities
Action Steps
4.1    Make sense of collected data: review emerging themes, priority considerations derived from data collection
4.2    Business Planning—assess program portfolio and agree on competitive growth strategies
4.3    Develop a program portfolio that summarizes the proposed scope and scale of programs, resources required, and revenue
       potential. Do scenario planning if necessary.
4.4    Agree on core future strategies
4.5    Agree on administrative, financial, and governance priorities. Summarize the revenue potential and resources required to
       support Marillac’s long-term vision.

          Action Steps Processes                       Estimated Consultant Hours or                         Phase 4 Outcomes
                                                                 Meetings
SPC discuss and agree on strategies and           The number of meetings and hours will vary    1. Agreement on core future strategies and
overall program and administrative priorities.    widely, depending on extent of meetings           longer term program, governance,
                                                  required and degree of consensus regarding        financial and administrative priorities.
Based on discussions, staff develops and          scenarios, core strategies and priorities.
presents to SPC a suggested future program
portfolio (scope and scale of future programs
including identification of resources needed to
support the achievement of program
objectives) and long term administrative
priorities.
Estimated Consultant Hours for Phase 4:                                                                                          15-50 hours1




                                                                       4                   Prepared by GilCorp, LLC for Marillac Social Center
Phase 5 – Drafting the Plan
Action Steps
5.1    Create goals and objectives. Components may include: introduction/executive summary; mission, vision, and core values
       statement; core future strategies; program goals and objectives; financial, administrative, and governance goals and objectives.
5.2    Develop long-range financial projections
5.3    Write the strategic plan
5.4    Adopt the strategic plan

          Action Steps Processes                        Estimated Consultant Hours or                         Phase 5 Outcomes
                                                                  Meetings
Designated drafts written of strategic plan,       The number of meetings and hours will vary    1. Approval of a Strategic Plan
with assistance of consultant if necessary. Plan   widely, depending on extent of consultant
reviewed by SPC, circulated to appropriate         involvement in writing the plan.              2. Executive Summary of the Plan for
stakeholders. Feedback incorporated into final                                                       distribution to internal and external key
draft.                                                                                               stakeholders

Final draft submitted to the Board for final
approval.

Executive summary of plan developed by CEO
and/or designated writer and distributed to
internal and external key stakeholders.
Estimated Consultant Hours for Phase 5:                                                                                             5-30 hours1




                                                                        5                   Prepared by GilCorp, LLC for Marillac Social Center
Phase 6 – Implementation
Action Steps
6.1    Manage the transition period between the old and new: assess the changes that need to happen (skills, systems and structures,
       and culture) to support the strategic plan
6.2    Develop a detailed operation plan for upcoming year (first year’s goals and objectives)

    Action Steps             Time   Estimated Consultant Hours                                      Phase 6 Outcomes
     Processes              Frame           or Meetings
Staff discuss key           TBD     The number of meetings and              1. Detailed operational plan and implementation timeline including
changes in skills,                  hours will vary widely, depending          goals and objectives, action steps, and implementation schedule.
systems and structures,             on the extent of consultant
and culture that need to            involvement in facilitation of
happen sooner rather                annual operating plan.
than later to support the
strategic plan

CEO and appropriate
staff develop detailed
annual operating plans
to ensure the successful
implementation of the
strategic plan during
the upcoming year.
Estimated Consultant Hours for Phase 6:                                                                                                0-5 hours1




                                                                        6                    Prepared by GilCorp, LLC for Marillac Social Center
Phase 7 – Evaluation and Monitoring
Action Steps
7.1    Evaluate the strategic plan and the planning process
7.2    Monitor the strategic plan (at least once a year) and affirm/update/revise as needed. Develop next year’s detailed
       implementation plan.

     Action Steps Processes                 Time          Estimated Consultant Hours                            Phase 7 Outcomes
                                           Frame                  or Meetings
SPC and consultant meet to:              TBD             The number of meetings and hours      1. An in-depth system to monitor and evaluate
                                                         will vary widely, depending on the        implementation of the plan(s) and achievement of
    Evaluate completed strategic                         extent of consultant involvement in       success factors = best practices for future planning
    planning process; if necessary,                      facilitation of annual operating
    identifying benchmarks,                              plan.                                 2. Processes in place to ensure that the plan(s) are
    milestones, and key factors                                                                    modified as needed and that the Strategic Plan
    Discuss processes to monitor and                                                               continues to provide guidance for the setting of
    evaluate implementation of plans                                                               current priorities for the following year

SPC coordinates a yearly strategic       At least
planning meeting to assess and           once a year
validate current strategies and ensure
that the current strategic plan gives
guidance to the development of
upcoming annual operating plan. The
planning committee may decide that
the current strategic plan needs to be
modified or significantly changed.

Determine if the strategic planning      Once every
process needs to happen again            three to
                                         five years
Estimated Consultant Hours for Phase 7:                                                                                                   0-5 hours1




                                                                           7                   Prepared by GilCorp, LLC for Marillac Social Center
Workplan Summary

Estimated Consultant Hours for Phase 1:                                                                           5-10 hours
Estimated Consultant Hours for Phase 2:                                                                           5-10 hours
Estimated Consultant Hours for Phase 3:                                                                          20-60 hours
Estimated Consultant Hours for Phase 4:                                                                          15-50 hours
Estimated Consultant Hours for Phase 5:                                                                           5-30 hours
Estimated Consultant Hours for Phase 6:                                                                            0-5 hours
Estimated Consultant Hours for Phase 7:                                                                            0-5 hours

TOTAL ESTIMATED CONSULTANT HOURS (50-1701):
TOTAL ESTIMATED CONSULTANT COSTS @$75.00/hour2:                                                                           TBD




1
  Consulting hours will vary widely depending on: amount of work done by staff or Strategic Planning Committee versus using a consultant; extent of data that
needs to be collected; the number of issues that need to be discussed; and degree of consensus regarding core strategies and priorities.
2
  Plus mileage and other travel-related expenses
                                                                               8                     Prepared by GilCorp, LLC for Marillac Social Center

More Related Content

What's hot

Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process GroupsVanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groupsvanessahartsfield
 
Best Practices Frameworks 101
Best Practices Frameworks 101Best Practices Frameworks 101
Best Practices Frameworks 101shailsood
 
Managing Organizational Change Aug04
Managing Organizational Change   Aug04Managing Organizational Change   Aug04
Managing Organizational Change Aug04lalowder
 
Schedule levels-as-presented 02-may11
Schedule levels-as-presented  02-may11Schedule levels-as-presented  02-may11
Schedule levels-as-presented 02-may11PMA Consultants
 
Pmbok 4th edition chapter 6 - Project Time Management
Pmbok 4th edition   chapter 6 - Project Time Management Pmbok 4th edition   chapter 6 - Project Time Management
Pmbok 4th edition chapter 6 - Project Time Management Ahmad Maharma, PMP,RMP
 
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
Pmbok 4th edition   chapter 3 - Project Management Processes for a Project Pmbok 4th edition   chapter 3 - Project Management Processes for a Project
Pmbok 4th edition chapter 3 - Project Management Processes for a Project Ahmad Maharma, PMP,RMP
 
Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3Loren Schwappach
 
Schedule Design AACE
Schedule Design AACESchedule Design AACE
Schedule Design AACEChris Carson
 
Understand PMBOK 6TH GUIDE
Understand PMBOK 6TH GUIDEUnderstand PMBOK 6TH GUIDE
Understand PMBOK 6TH GUIDEAmr Miqdadi
 
Pmbok 4th edition chapter 10 - Project Communication Management
Pmbok 4th edition   chapter 10 - Project Communication ManagementPmbok 4th edition   chapter 10 - Project Communication Management
Pmbok 4th edition chapter 10 - Project Communication ManagementAhmad Maharma, PMP,RMP
 
Brescia program management_dame-na-pre-0030
Brescia program management_dame-na-pre-0030Brescia program management_dame-na-pre-0030
Brescia program management_dame-na-pre-0030INAF-OAC
 

What's hot (20)

P mat mcorientation
P mat mcorientationP mat mcorientation
P mat mcorientation
 
PMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration managementPMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration management
 
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process GroupsVanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
 
Best Practices Frameworks 101
Best Practices Frameworks 101Best Practices Frameworks 101
Best Practices Frameworks 101
 
Resolving TIAs
Resolving TIAsResolving TIAs
Resolving TIAs
 
Managing Organizational Change Aug04
Managing Organizational Change   Aug04Managing Organizational Change   Aug04
Managing Organizational Change Aug04
 
Schedule levels-as-presented 02-may11
Schedule levels-as-presented  02-may11Schedule levels-as-presented  02-may11
Schedule levels-as-presented 02-may11
 
Project Human Resource Management
Project Human Resource ManagementProject Human Resource Management
Project Human Resource Management
 
PMP_Project Time Management
PMP_Project Time ManagementPMP_Project Time Management
PMP_Project Time Management
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope Management
 
Pmbok 4th edition chapter 6 - Project Time Management
Pmbok 4th edition   chapter 6 - Project Time Management Pmbok 4th edition   chapter 6 - Project Time Management
Pmbok 4th edition chapter 6 - Project Time Management
 
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
Pmbok 4th edition   chapter 3 - Project Management Processes for a Project Pmbok 4th edition   chapter 3 - Project Management Processes for a Project
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
 
Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3
 
project dev't cycle
project dev't cycleproject dev't cycle
project dev't cycle
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Aaqib
AaqibAaqib
Aaqib
 
Schedule Design AACE
Schedule Design AACESchedule Design AACE
Schedule Design AACE
 
Understand PMBOK 6TH GUIDE
Understand PMBOK 6TH GUIDEUnderstand PMBOK 6TH GUIDE
Understand PMBOK 6TH GUIDE
 
Pmbok 4th edition chapter 10 - Project Communication Management
Pmbok 4th edition   chapter 10 - Project Communication ManagementPmbok 4th edition   chapter 10 - Project Communication Management
Pmbok 4th edition chapter 10 - Project Communication Management
 
Brescia program management_dame-na-pre-0030
Brescia program management_dame-na-pre-0030Brescia program management_dame-na-pre-0030
Brescia program management_dame-na-pre-0030
 

Viewers also liked

Strategic Business Transformation & BA Role in Design Thinking
Strategic Business Transformation & BA Role in Design ThinkingStrategic Business Transformation & BA Role in Design Thinking
Strategic Business Transformation & BA Role in Design ThinkingAparna Ramesh K
 
Visual Design Thinking Workshop
Visual Design Thinking WorkshopVisual Design Thinking Workshop
Visual Design Thinking WorkshopAlli McKee
 
25 Trend Trigger card to use in your brainstorm session - by @boardofinno
25 Trend Trigger card to use in your brainstorm session - by @boardofinno25 Trend Trigger card to use in your brainstorm session - by @boardofinno
25 Trend Trigger card to use in your brainstorm session - by @boardofinnoBoard of Innovation
 
Design Thinking - Bootcamp
Design Thinking - BootcampDesign Thinking - Bootcamp
Design Thinking - BootcampJan Schmiedgen
 
IDEO's design thinking.
IDEO's design thinking. IDEO's design thinking.
IDEO's design thinking. BeeCanvas
 
The role of Design Thinking
The role of Design ThinkingThe role of Design Thinking
The role of Design ThinkingPieter Baert
 
Business Plan Powerpoint 1
Business Plan Powerpoint 1Business Plan Powerpoint 1
Business Plan Powerpoint 1haleydawn
 

Viewers also liked (10)

IDEO - Design thinking workshop 2016
IDEO - Design thinking workshop 2016IDEO - Design thinking workshop 2016
IDEO - Design thinking workshop 2016
 
Strategic Business Transformation & BA Role in Design Thinking
Strategic Business Transformation & BA Role in Design ThinkingStrategic Business Transformation & BA Role in Design Thinking
Strategic Business Transformation & BA Role in Design Thinking
 
Business Plan For Innovation Business
Business Plan For Innovation BusinessBusiness Plan For Innovation Business
Business Plan For Innovation Business
 
Visual Design Thinking Workshop
Visual Design Thinking WorkshopVisual Design Thinking Workshop
Visual Design Thinking Workshop
 
25 Trend Trigger card to use in your brainstorm session - by @boardofinno
25 Trend Trigger card to use in your brainstorm session - by @boardofinno25 Trend Trigger card to use in your brainstorm session - by @boardofinno
25 Trend Trigger card to use in your brainstorm session - by @boardofinno
 
Design Thinking Method Cards
Design Thinking Method CardsDesign Thinking Method Cards
Design Thinking Method Cards
 
Design Thinking - Bootcamp
Design Thinking - BootcampDesign Thinking - Bootcamp
Design Thinking - Bootcamp
 
IDEO's design thinking.
IDEO's design thinking. IDEO's design thinking.
IDEO's design thinking.
 
The role of Design Thinking
The role of Design ThinkingThe role of Design Thinking
The role of Design Thinking
 
Business Plan Powerpoint 1
Business Plan Powerpoint 1Business Plan Powerpoint 1
Business Plan Powerpoint 1
 

Similar to MARILLAC SOCIAl CENTER STRATEGIC PLANNING PROCESS

PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OneHossam Maghrabi
 
2.04 integration management
2.04 integration management2.04 integration management
2.04 integration managementreddvise
 
Planning process group
Planning process groupPlanning process group
Planning process groupMudassir Iqbal
 
Chapter#7 planning & decision making process
Chapter#7 planning & decision making processChapter#7 planning & decision making process
Chapter#7 planning & decision making processSikander Sardar
 
TOC 2012: ICF Strategic Planning Presentation 04.2012
TOC 2012: ICF Strategic Planning Presentation 04.2012TOC 2012: ICF Strategic Planning Presentation 04.2012
TOC 2012: ICF Strategic Planning Presentation 04.2012joshjk
 
Operational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and FocusOperational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and Focus4Good.org
 
Achieving successbriefingslides
Achieving successbriefingslidesAchieving successbriefingslides
Achieving successbriefingslidesmin chan myae
 
J.S. Daniel presentation on planning
J.S. Daniel presentation on planningJ.S. Daniel presentation on planning
J.S. Daniel presentation on planningJ.S. Daniel
 
A project portfolio management capability framework
A project portfolio management capability frameworkA project portfolio management capability framework
A project portfolio management capability frameworkRobert Greca, PMP, SA
 
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...Wayne Tarken, CSM, SPHR
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptxAtulBhagwat6
 
Better release planning for Feature Teams
Better release planning for Feature TeamsBetter release planning for Feature Teams
Better release planning for Feature TeamsAmit Singh
 
Topic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdfTopic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdfHuyNguyen657394
 
Pc 2011 Epmo Plan
Pc 2011 Epmo PlanPc 2011 Epmo Plan
Pc 2011 Epmo Plantigcap
 
PC 2012 PMO plan
PC 2012 PMO planPC 2012 PMO plan
PC 2012 PMO plandrewboy07
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management FrameworkAarti Dahiya PMP
 
Chapter 6 Planning MICE Events
Chapter 6  Planning MICE EventsChapter 6  Planning MICE Events
Chapter 6 Planning MICE EventsPavit Tansakul
 

Similar to MARILLAC SOCIAl CENTER STRATEGIC PLANNING PROCESS (20)

PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part One
 
Pm training 1 18
Pm training 1 18Pm training 1 18
Pm training 1 18
 
2.04 integration management
2.04 integration management2.04 integration management
2.04 integration management
 
Planning process group
Planning process groupPlanning process group
Planning process group
 
Chapter#7 planning & decision making process
Chapter#7 planning & decision making processChapter#7 planning & decision making process
Chapter#7 planning & decision making process
 
TOC 2012: ICF Strategic Planning Presentation 04.2012
TOC 2012: ICF Strategic Planning Presentation 04.2012TOC 2012: ICF Strategic Planning Presentation 04.2012
TOC 2012: ICF Strategic Planning Presentation 04.2012
 
Operational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and FocusOperational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and Focus
 
Achieving successbriefingslides
Achieving successbriefingslidesAchieving successbriefingslides
Achieving successbriefingslides
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
J.S. Daniel presentation on planning
J.S. Daniel presentation on planningJ.S. Daniel presentation on planning
J.S. Daniel presentation on planning
 
A project portfolio management capability framework
A project portfolio management capability frameworkA project portfolio management capability framework
A project portfolio management capability framework
 
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 
Better release planning for Feature Teams
Better release planning for Feature TeamsBetter release planning for Feature Teams
Better release planning for Feature Teams
 
Topic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdfTopic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdf
 
Pc 2011 Epmo Plan
Pc 2011 Epmo PlanPc 2011 Epmo Plan
Pc 2011 Epmo Plan
 
PC 2012 PMO plan
PC 2012 PMO planPC 2012 PMO plan
PC 2012 PMO plan
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management Framework
 
Chapter 6 Planning MICE Events
Chapter 6  Planning MICE EventsChapter 6  Planning MICE Events
Chapter 6 Planning MICE Events
 

More from jasongilmore

Closing The Gap Pilot Project Overview
Closing The Gap Pilot Project OverviewClosing The Gap Pilot Project Overview
Closing The Gap Pilot Project Overviewjasongilmore
 
HomeGain Action Plan
HomeGain Action PlanHomeGain Action Plan
HomeGain Action Planjasongilmore
 
D-Tech Presentation
D-Tech PresentationD-Tech Presentation
D-Tech Presentationjasongilmore
 
Housing First For Families Overview
Housing First For Families OverviewHousing First For Families Overview
Housing First For Families Overviewjasongilmore
 

More from jasongilmore (7)

Overview
OverviewOverview
Overview
 
Closing The Gap Pilot Project Overview
Closing The Gap Pilot Project OverviewClosing The Gap Pilot Project Overview
Closing The Gap Pilot Project Overview
 
HPRP Action Plan
HPRP Action PlanHPRP Action Plan
HPRP Action Plan
 
HomeGain Proposal
HomeGain ProposalHomeGain Proposal
HomeGain Proposal
 
HomeGain Action Plan
HomeGain Action PlanHomeGain Action Plan
HomeGain Action Plan
 
D-Tech Presentation
D-Tech PresentationD-Tech Presentation
D-Tech Presentation
 
Housing First For Families Overview
Housing First For Families OverviewHousing First For Families Overview
Housing First For Families Overview
 

MARILLAC SOCIAl CENTER STRATEGIC PLANNING PROCESS

  • 1. MARILLAC SOCIAL CENTER STRATEGIC PLANNING PROCESS WORKPLAN Phase 1 – Preparation Action Steps 1.1 Identify reasons for planning 1.2 Set up planning process for success 1.3 Initiate discussions on how to involve internal and external stakeholders 1.4 Design a planning process to meet Marillac’s needs 1.5 Develop a Planning Workplan that articulates the outcome(s) of the planning process, strategic issues to address, roles, planning activities, and time frame Action Steps Processes Estimated Consultant Hours or Phase 1 Outcomes Meetings Consultant meet with CEO, follow-up Series of meetings and discussions with CEO, 1. Agreement on who to involve in the meetings with senior management and representatives of the Board, and senior planning process and what their representatives of the Board (or Strategic management involvement might be Planning Committee (SPC)) to: 2. Agreement on a Planning Workplan Identify reasons for planning, criteria for a successful planning process, and issues to 3. Articulation of initial strategic issues be addressed as part of the planning facing Marillac process Clarify consultant and Marillac Social Center’s (“Marillac”) Board and staff’s roles and responsibilities, processes to keep all Board and staff informed of planning activities, products to be delivered, and time frame Agree on what background information consultant needs to be able to facilitate the process and what information needs to be gathered that will help inform strategic decisions (i.e. online surveys, etc.) Decide on whether to use existing structures and/or establish a SPC to coordinate the planning work Consultant revises initial workplan for review and approval by CEO and Board Estimated Consultant Hours for Phase 1: 5-10 hours1 1 Prepared by GilCorp, LLC for Marillac Social Center
  • 2. Phase 2 – Mission, Vision, Core Values, and Guiding Principles Action Steps 2.1 Revisit mission statement 2.2 Draft a vision statement 2.3 Articulate or affirm core values and guiding principles Action Steps Processes Estimated Consultant Hours or Phase 2 Outcomes Meetings Discussion(s) of mission statement, vision of (Process to be agreed upon after Phase 1 1. Agreed upon mission, vision, and core an ideal future and core values and guiding discussions completed.) Discussions may take values statements principles place at a retreat, special Board and staff meetings, or strategic planning committee meetings. Estimated Consultant Hours for Phase 2: 5-15 hours1 2 Prepared by GilCorp, LLC for Marillac Social Center
  • 3. Phase 3 – Assessment Action Steps 3.1 Summarize Marillac’s history and what has or has not been accomplished since last planning process 3.2 Articulate previous and current strategies 3.3 Collect perceptions of internal and external stakeholders regarding Marillac’s strengths, weaknesses, opportunities and threats (SWOT); collect empirical data to better understand the choices to be made during the strategic planning process 3.4 Summarize findings from data gathered from internal and external sources, Marillac’s strengths and weaknesses; trends in the environment that are or will impact Marillac; competitive advantage, needs in the community; start to make sense of data; emerging themes and priorities Action Steps Processes Estimated Consultant Hours or Phase 3 Outcomes Meetings Marillac’s staff to assemble pertinent documents regarding agency’s The number of meetings and hours will 1. Data to inform the budget, service statistics, organizational charts, previous mission vary widely, depending on extent of data setting of priorities in statements and planning documents, and other documents clarifying collection required and consultant role. Phase 4. Marillac’s mandates, history, and operating trends. This information should be available to the consultant and members of the SPC. SPC to articulate previous and current strategies and discuss effectiveness of these strategies to date and relevance of strategies as we move forward. Extent of data collection from external and internal stakeholders, appropriate processes to use, and extent of consultant involvement to be decided upon after discussions with SPC. Consultant available for phone consultation, development and implementation of survey instruments, design of evaluation instruments, assistance in interviewing external and internal stakeholders, and facilitation of meetings. Option A: Staff and Board complete online organizational assessment Option B: Board completes online self assessment in preparation for their discussion of future Board priorities (governance and support roles, membership, committees, expectations, etc.) Option C: External stakeholders’ involvement may be through: surveys, interviews, focus groups, meetings, etc. Estimated Consultant Hours for Phase 3: 20-60 hours1 3 Prepared by GilCorp, LLC for Marillac Social Center
  • 4. Phase 4 – Priorities Action Steps 4.1 Make sense of collected data: review emerging themes, priority considerations derived from data collection 4.2 Business Planning—assess program portfolio and agree on competitive growth strategies 4.3 Develop a program portfolio that summarizes the proposed scope and scale of programs, resources required, and revenue potential. Do scenario planning if necessary. 4.4 Agree on core future strategies 4.5 Agree on administrative, financial, and governance priorities. Summarize the revenue potential and resources required to support Marillac’s long-term vision. Action Steps Processes Estimated Consultant Hours or Phase 4 Outcomes Meetings SPC discuss and agree on strategies and The number of meetings and hours will vary 1. Agreement on core future strategies and overall program and administrative priorities. widely, depending on extent of meetings longer term program, governance, required and degree of consensus regarding financial and administrative priorities. Based on discussions, staff develops and scenarios, core strategies and priorities. presents to SPC a suggested future program portfolio (scope and scale of future programs including identification of resources needed to support the achievement of program objectives) and long term administrative priorities. Estimated Consultant Hours for Phase 4: 15-50 hours1 4 Prepared by GilCorp, LLC for Marillac Social Center
  • 5. Phase 5 – Drafting the Plan Action Steps 5.1 Create goals and objectives. Components may include: introduction/executive summary; mission, vision, and core values statement; core future strategies; program goals and objectives; financial, administrative, and governance goals and objectives. 5.2 Develop long-range financial projections 5.3 Write the strategic plan 5.4 Adopt the strategic plan Action Steps Processes Estimated Consultant Hours or Phase 5 Outcomes Meetings Designated drafts written of strategic plan, The number of meetings and hours will vary 1. Approval of a Strategic Plan with assistance of consultant if necessary. Plan widely, depending on extent of consultant reviewed by SPC, circulated to appropriate involvement in writing the plan. 2. Executive Summary of the Plan for stakeholders. Feedback incorporated into final distribution to internal and external key draft. stakeholders Final draft submitted to the Board for final approval. Executive summary of plan developed by CEO and/or designated writer and distributed to internal and external key stakeholders. Estimated Consultant Hours for Phase 5: 5-30 hours1 5 Prepared by GilCorp, LLC for Marillac Social Center
  • 6. Phase 6 – Implementation Action Steps 6.1 Manage the transition period between the old and new: assess the changes that need to happen (skills, systems and structures, and culture) to support the strategic plan 6.2 Develop a detailed operation plan for upcoming year (first year’s goals and objectives) Action Steps Time Estimated Consultant Hours Phase 6 Outcomes Processes Frame or Meetings Staff discuss key TBD The number of meetings and 1. Detailed operational plan and implementation timeline including changes in skills, hours will vary widely, depending goals and objectives, action steps, and implementation schedule. systems and structures, on the extent of consultant and culture that need to involvement in facilitation of happen sooner rather annual operating plan. than later to support the strategic plan CEO and appropriate staff develop detailed annual operating plans to ensure the successful implementation of the strategic plan during the upcoming year. Estimated Consultant Hours for Phase 6: 0-5 hours1 6 Prepared by GilCorp, LLC for Marillac Social Center
  • 7. Phase 7 – Evaluation and Monitoring Action Steps 7.1 Evaluate the strategic plan and the planning process 7.2 Monitor the strategic plan (at least once a year) and affirm/update/revise as needed. Develop next year’s detailed implementation plan. Action Steps Processes Time Estimated Consultant Hours Phase 7 Outcomes Frame or Meetings SPC and consultant meet to: TBD The number of meetings and hours 1. An in-depth system to monitor and evaluate will vary widely, depending on the implementation of the plan(s) and achievement of Evaluate completed strategic extent of consultant involvement in success factors = best practices for future planning planning process; if necessary, facilitation of annual operating identifying benchmarks, plan. 2. Processes in place to ensure that the plan(s) are milestones, and key factors modified as needed and that the Strategic Plan Discuss processes to monitor and continues to provide guidance for the setting of evaluate implementation of plans current priorities for the following year SPC coordinates a yearly strategic At least planning meeting to assess and once a year validate current strategies and ensure that the current strategic plan gives guidance to the development of upcoming annual operating plan. The planning committee may decide that the current strategic plan needs to be modified or significantly changed. Determine if the strategic planning Once every process needs to happen again three to five years Estimated Consultant Hours for Phase 7: 0-5 hours1 7 Prepared by GilCorp, LLC for Marillac Social Center
  • 8. Workplan Summary Estimated Consultant Hours for Phase 1: 5-10 hours Estimated Consultant Hours for Phase 2: 5-10 hours Estimated Consultant Hours for Phase 3: 20-60 hours Estimated Consultant Hours for Phase 4: 15-50 hours Estimated Consultant Hours for Phase 5: 5-30 hours Estimated Consultant Hours for Phase 6: 0-5 hours Estimated Consultant Hours for Phase 7: 0-5 hours TOTAL ESTIMATED CONSULTANT HOURS (50-1701): TOTAL ESTIMATED CONSULTANT COSTS @$75.00/hour2: TBD 1 Consulting hours will vary widely depending on: amount of work done by staff or Strategic Planning Committee versus using a consultant; extent of data that needs to be collected; the number of issues that need to be discussed; and degree of consensus regarding core strategies and priorities. 2 Plus mileage and other travel-related expenses 8 Prepared by GilCorp, LLC for Marillac Social Center