Project Appraisal and Financing<br />Analyzing the Financial Feasibility of<br />Solar Power Plants in India<br />September 9th, 2011<br />Akash Jauhari<br />Institute of Management Technology<br />Ghaziabad<br />Table of Contents<br />1. Background for Solar Power related Industries in India………..................................................3-4<br />               1.1 National Solar Mission................................................................................................3<br />               1.2 Tax, Fiscal & Other Incentives.....................................................................................3<br />               1.3 Photovoltaic Cell & Module Production in India........................................................4<br />               1.4 Solar Power Value Chain & presence in India............................................................4<br />               <br />2. Analyzing Financial Feasibility of Solar PV Power Plant...........................................................5-8<br />               2.1 Specifications of the Project.......................................................................................5<br />               2.2 Cost Structure.............................................................................................................5<br />               2.3 Expected Cash Flows & NPV.......................................................................................6<br />               2.4 Sensitivity Analysis…………………………………………………………………….…………………………6-7<br />               2.5 Scenario Analysis…………………………………………………………………………………………………..7<br />               2.6 Foreign Investment in this Sector........................................................................…...8<br />               2.7 Appropriate time for investment…………………………………………………………………………..8<br />3. Economics for Solar Power in India.......................................................................................9-12<br />               3.1 Present cost levels & comparisons...........................................................................9<br />               3.2 Key drivers for cost reduction................................................................................9-10<br /> 3.3 Grid parity with conventional power....................................................................10-11<br />               3.4 PPA revising policy for government........................................................................12<br />4. Globally operational Solar Power Plants………………………………………………………………………….13-15<br />              4.1 Solar Power in Germany…………………………………………………………………………….……..14-15<br />5. Key Findings & Recommendations……………………………………………………………………………………..16<br />6. Appendix…………………………………………………………………………………………………………………………17-18<br />1. Background for Solar Power related Industries in India<br />1.1 National Solar Mission<br />The National Solar Mission program was initiated by the Government as one of the 8 programs under the National Action Plan for Climate Change by the Prime Minister of India in 2008. In the month of November 2009, the Mission document was released as Jawaharlal Nehru National Solar Mission (JNNSM) and the Mission was formally launched by the Prime Minister on January 11 2010. The JNNSM is neutral to solar technologies and has provision for the development of all viable technologies. Apart from solar PV (crystalline and Thin Film), the already existing technology in India, JNNSM has the provision to develop solar thermal technology for large scale grid connected power plants. . The document emphasizes on the development of grid-connected applications, by offering feed-in tariffs for the power producers. The feed-in tariff is proposed to be extended to 25 years from the earlier duration of 10 years under the GBI Scheme.<br /> PeriodTarget Capacity   Phase I2009-121 - 1.5 GW          Phase II2013-176 - 7 GW       Phase III2017-2220 GW<br />1.2 Tax, Fiscal and other Incentives<br />Current cost structure for solar power makes it impossible to compete in open market. But to develop the technology for the future, government provides certain incentives and rebates to the industry. Such promises are necessary till the PV sector achieves parity with the conventional sources of energy. These are briefly described below:<br />,[object Object]
Tax holidays for first 10 years of operation for power producing firms.
Exemptions on custom and excise for goods imported required in power plants.
Levy of VAT at a discounted rate of 5%
 Provision for accelerated depreciation.1.3 Photovoltaic cell and module production in India<br />According to data obtained from MNRE, during 2009-10, 15 companies were actively engaged in the manufacture of solar cells and 20 companies in the manufacture of PV modules. In addition, about 50 companies were actively engaged in manufacturing a variety of PV systems. The overall production in the country during 2008-09 is estimated to be over 175 MWh of solar cells and 240 MWp of PV modules. According to data obtained from MNRE, during 2008-09, 15 companies were actively engaged in the manufacture of solar cells and 20 companies in the manufacture of PV modules<br />,[object Object],Source: MNRE annual Presentation 2010<br />1.4 Solar power Value chain & presence in India<br />Power PlantModulesCellsWafer&IngotPolysilicon<br />Poly Silicon Wafer & Ingot Cells Modules/ Utilities Power Plants Intermediate Technology Value Stack 18 33 48 60 100 Embedded Presence in India No No Yes Yes Yes No Suppliers China China X X X USA <br />Source: EAI research, published Mar 2010<br />As clear from above table initial two steps in value chain are non-existent in India. Hence cost of setting up a Photovoltaic Power Plant in India has a higher cost. <br />2. Analyzing Financial Feasibility of Solar PV Power Plant <br />2.1 Specifications of the project<br />,[object Object]
Life of the project is expected to be 12 years, since the technology will become obsolete after that time period
The cost of equity is assumed to be 15% with 50% weight age. The cost of debt is taken to be 11.5% (as per IREDA norms) with 50% weight age. Hence, the cost of capital is calculated to be 13.25%.
For discounting purpose, hurdle rate is taken to be 14%.
Power Purchase Agreement of Rs. 15.3/KWh is taken to be constant for the period of 12 years.
A Capacity Utilization Factor of 19% is expected from the power plant.2.2 Cost Structure<br />Central Electricity Regulatory Commission (CERC) has proposed the benchmark cost for PV power plants in India as following:<br />ParticularCapital cost (Rs. Cr./MWh)Percentage of total costPV Module8.3358Land0.151Civil & General0.957Mounting Structure1.057Conditioning1.611Evacuation Cost0.96Pre Operative cost1.4410Total Capital Cost14.421<br />Based on the above facts and figures, the initial setup cost for the power plant comes out to be Rs. 1220.85 million.<br />2.3 Expected Cash Flows and NPV<br />Our detailed calculations are mentioned in the appendix 1 of this report. Based on the calculations, following figures are obtained.<br />,[object Object]
The NPV value is $64.36
NPV as a percentage of initial outlay is 0.05%.
Return on Equity is 0.11.
Looking at these values, we conclude that the project offers low return on investment (considering the risk). To make the solar power more financially viable, conversion efficiency needs to be substantially increased. Also, the PV power plant should not be considered as a standalone project.2.4 Sensitivity Analysis:<br />We attempt to determine the deviation in NPV when following three factors are changed individually: PPA, Tax and Conversion Efficiency.<br />Case 1:<br />Changing PPAs<br />PPAsProbabilityNPVsProb.*NPVOptimistic180.15304.0045.60Most Likely15.30.7064.3645.05Pessimistic100.15-407.00-61.05Expected NPV29.60<br />Case 2:<br />Changing Tax<br />TaxProbabilityNPVsProb.*NPVTax Holidays0%0.7564.3648.27Reduce incentive15%0.15-49.22-7.383Eliminate incentive30%0.10-162.79-16.279Expected NPV24.608<br />Case 3:<br />Changing Conversion Efficiency<br />EfficiencyProbabilityNPVsProb.*NPVExpected0.190.7564.3648.27Below Expected0.140.25-294.3-73.575Expected NPV-23.305<br />From the above three cases, we conclude the following:<br />1) Solar Power Projects are majorly dependent on Govt. policies/incentive. Hence some amount of risk always exists with it.<br />2) NPV or returns are highly sensitive to Conversion factor.<br />2.5 Scenario Analysis:<br />As the sector is highly dependent on government incentives, we consider three scenarios, namely, govt. Incentive continued, govt. Incentive reduced and govt. Incentive minimized. We then determine the change in the target function NPV.<br />Scenario 1Govt. Incentive continuedScenario 2Govt. Incentive reducedScenario 3Govt. Incentive minimizedPPAs15.31210Tax00.150.30Capacity Purchased (fraction of max. Capacity)10.750.50NPV64.36-528.6-811.59Probability0.80.150.05NPV*Prob.51.488-78.29-40.5795<br />Expected NPV = -68.3815  <br />From the scenario analysis, we conclude that the existence of solar power sector will be driven by Government policies; at least in the initial stages.<br />2.6 Foreign Investment in this sector:<br />To determine the return for a Spanish Firm investing in Indian Solar Power Project, we follow the foreign currency approach.<br />The required rate of return for the Spanish firm is taken to be 14%.<br />The risk free rate in Spain is assumed to be 11.5%.<br />The risk free rate in India is taken to be 11%.<br />Equation for Spain:  (1 + Risk free rate in Spain)*(1 + Risk Premium) = (1 + Risk Adjusted rate in Spain)<br />Risk Premium is calculated to be 2%.<br />For India, the discounting rate is calculated to be 1.13%.<br />The NPV calculated from above data = $119.89<br />From above calculations, we conclude that the Indian Solar Power sector will be a good investment (FDI) for the European players.   <br />2.7 Appropriate time for Investment<br />Following three assumptions are considered:<br />1. Poly-silicon prices coming down by 20%, thus Initial setup cost down by 12%.<br />2. CUF (conversion efficiency) going up-to 22%.<br />3. Rest of the factors remaining unchanged.<br />Calculated Values: (see appendix 2 for detailed calculations)<br />Old NPV$64.36New NPV$504.45Old IRR15%New IRR21%<br />On the basis of above assumptions and values, the appropriate time for investment would be in the next 3-4 years.<br />3. Economics for Solar Power in India<br />3.1 Present cost levels and Comparisons<br />Solar power is expensive when compared to conventional sources of power and hence, the solar market development is currently dependent on Government support.<br />During the last few years, there has explored cost reduction possibilities for been significant cost reduction in solar power. Power and the cost curves of solar power are declining. On the other hand, while there are multiple solar costs of power from conventional technology options, particularly two sources are increasing due to higher technologies viz. solar crystalline and fixed costs and rising fuel prices. Solar parabolic trough are considered<br />Moreover, there is considerable mature and likely to reach grid parity research that is underway to further faster.<br />3.2 Key Drivers for Cost reduction <br />,[object Object]
Improving Efficiency (CUF)
Economies of Scale
Shifting of production units to Cheaper Cost Centers (China & India)The solar crystalline PV technology dominates the market for solar PV installations globally. Dynamic cost reductions have accelerated deployment of Solar C-Si (crystalline silicon) technology in the recent past. The module prices have dropped from around USD 3-4 per W about two years back to under USD 1.5-1.8 per W today. Consequently, the proportion of module prices in the total system price has come down significantly. The corresponding price of electricity which was upwards of INR 25 has dropped to around INR 13per unit.<br />Source: KPMG sector report May 2011<br />3.3 Grid Parity with Conventional power<br />Base scenario – Conventional Energy<br />The historical year-on-year growth rate in LCP for India in the last decade has been more than 4 percent. Going forward, the rate of increase in LCP for States would depend on internal efficiency drives towards reducing losses. Hence, States with very high loss levels today will see a relatively lower increase in LCP growth, assuming that they will improve their efficiency levels. Accordingly, we have assumed the LCP for states with low AT & C losses (less than India’s loss levels (~29 percent)) to grow at 4 percent, with moderate AT & C losses (greater than India’s loss levels but less than 50 percent) to grow at 3 percent, and for others with high AT & C losses (greater than 50 percent) at 2 percent.<br />[Source: PFC report on performance of state power utilities]<br />Level zed Cost Comparison of Utility-scale PV and Conventional Power at Grid-<br />As shown in the exhibit above, the grid from solar power with the level zed parity is likely to happen between 2019 and 20. Here, the solar utility corresponding year. Similar to what we band represents the margins –  have shown in the grid parity difference between cost and price - that projections for small-scale applications, are likely to vary depending on the we expect certain states like Rajasthan bargaining power of the developers. We to achieve grid parity well before the have compared the level zed tariffs rest of India.<br />3.4 PPA Revising Policy for Government<br />Current PPA of Rs 15.3 per unit is unrealistic, and thus cannot be sustained forever. As the cost for producing Solar PV power comes down, there is a probability that government will revise its PPA policy. Eventually when PV power achieves parity with conventional energy, PPA policy will be taken back. Looking at global scenario, PPAs stand at about 25% margin to cost of producing power. Taking the concept forward we calculate expected PPA from government<br /> 2011201220132014201520162017201820192020PV Cost (INR/Watt)11.610.749.959.218.527.887.266.696.165.67PPA expected 13.412.411.510.79.99.18.47.77.1<br />4. Globally Operational Solar Power Plants<br />Globally, Europe has taken the lead and has already installed significant solar based capacity. Germany is the largest solar market globally with total installations of around 17,000 MW. In fact, solar PV provided 12 T-Wh (billion kilowatt-hours) of electricity in Germany in 2010, about 2 percent of total electricity in that country2. A point to note is the fact that the solar isolation in Germany, at about 3.15 units per sq. meter per day, is very low when compared to India’s average of 5.50 units per sq. meter per day<br />Source: KPMG sector report, May 2011<br />Global annual installations - Germany is the market leader Globally, the solar PV market had installations of more than 17,000 MW in 2010 recording a growth of more than 3 130 percent over 2009 . While India’s share at around 1 percent is very low at present, it is likely to increase substantially in the future.<br />4.1 Solar Power in Germany <br />German Renewable Energy Act<br />(DENA, 2011) reports that as of January 2011, around 17% of electricity, 8% of heat and 6% of fuel used in Germany is generated from renewable sources, further reducing Germany’s energy imports. In addition, 110 million metric tons of CO2 emissions were cut due to the use of renewable energies only during 2010. The renewable energy industry employs today more than 350,000 people in Germany (up from 30,000 people in the year 1998) and is home to several world market leaders like Enercon, Nordex and Repower in the wind industry and Q-Cells, Schott Solar and SolarWorld in the solar industry. Germany is today among the world’s three major renewable energy economies (Renewable Energy Network 21, 2011). Due to its success, the German Renewable Energy Act can serve as an archetype of similar legislation in other countries<br />The three main principles<br />The three main principles of the EEG are:<br />Investment protection through guaranteed feed-in tariffs and connection requirement: Every kilowatt-hour that is generated from renewable energy facilities receives a fixed feed-in tariff. Furthermore, the network operators must feed in this electricity into the grid preferentially to the electricity generated by conventional sources (nuclear power, coal and gas). Renewable energy plant operators receive a 20 year, technology specific, guaranteed payment for their produced electricity. In particular, small and medium-sized enterprises SMEs have been given new access to the electricity market, along with private land owners. The Federal Ministry for Environment, Nature Conservation and Nuclear Safety (2010) argues that anyone who produces renewable energy can now sell his ‘product’ for a 20-year fixed price.<br />No charge to Germany’s public purse: as of today, the promotion of renewable electricity is still necessary. The EEG rates of remuneration clearly show what electricity from wind, hydro, solar, bio and geothermal energy actually cost. Unlike fossil fuels, there are no external costs such as damages to the environment, the climate or human health. The remuneration rates are not subsidies as such since they are not paid for by taxes. On the contrary, the “polluter pays principle” (OECD, 2006) is distributed to the consumer: who consumes more pays more. The remuneration rates are paid for by every consumer with the electricity bill.<br /> Innovation by falling feed-in-tariffs: periodically lowering rates of remuneration for new plants (digression of 1% per year) exerts cost pressure on manufacturers. Thus, technologies are becoming more efficient and less costly<br />Payment scheme<br />The EEG also differentiates between technologies such that each renewable energy source (RES) receives a different payment guaranteed price according to its generation cost, ranging from 3.58 - 9.67 €-Cents per kilowatt-hour for hydropower to 35.49 – 51.7 €-Cents per kilowatt-hour for solar power (Rickerson, et al., 2007; Hirschl, 2008). Solar power recompense in the first half of 2011 ranges from 21.11 - 28,74 €ct/ kWh depending on installation size and form, with a further decrease of 9% to 15% foreseen in June, 2011<br />Largest German photovoltaic power stations (20 MW or larger)PV Power stationNominal Power(M-Wh)Production(AnnualG-Wh)CapacityfactorNotesFinsterwalde Solar Park80.7Phase I completed 2009,phase II and III 2010 Strasskirchen Solar Park54570.12Lieberose Photovoltaic Park53530.112009Kothen Solar Park452009<br />5. Key Findings & Recommendations<br />,[object Object]
The Sector is highly driven by Government support, hence any Scenario where Government reduces or minimizes the incentives proves to be destructive to return & risk profile of the project. However, possibility of such a development is expected to be low.

More Related Content

What's hot

Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuidePrivate Consultants
 
Residential Solar Presentation
Residential Solar PresentationResidential Solar Presentation
Residential Solar PresentationKevin Ricer
 
Basic Introduction to solar PV System.
Basic Introduction to solar PV System.Basic Introduction to solar PV System.
Basic Introduction to solar PV System.Urval Chotalia
 
Rooftop solar power plant components
Rooftop solar power plant   componentsRooftop solar power plant   components
Rooftop solar power plant componentsNeha Pathak Kher
 
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Nilam Shah
 
Battery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basicsBattery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basicsBushveld Energy
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsGensol Engineering Limited
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Gensol Engineering Limited
 
Photovoltaic Training - Session 1 - Design
Photovoltaic Training - Session 1 - DesignPhotovoltaic Training - Session 1 - Design
Photovoltaic Training - Session 1 - DesignLeonardo ENERGY
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Gensol Engineering Limited
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantL'Obel Solar Power System
 
Webinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsystWebinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsystsolpowerpeople
 
Solar PV and Battery Storage Systems
Solar PV and Battery Storage SystemsSolar PV and Battery Storage Systems
Solar PV and Battery Storage SystemsRavinder Soin
 
Mini grid and Solar home system
Mini grid and Solar home systemMini grid and Solar home system
Mini grid and Solar home systemTuong Do
 

What's hot (20)

Analysis of PVSyst Loss Diagram
Analysis of PVSyst Loss DiagramAnalysis of PVSyst Loss Diagram
Analysis of PVSyst Loss Diagram
 
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
 
Residential Solar Presentation
Residential Solar PresentationResidential Solar Presentation
Residential Solar Presentation
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
 
Basic Introduction to solar PV System.
Basic Introduction to solar PV System.Basic Introduction to solar PV System.
Basic Introduction to solar PV System.
 
Rooftop solar power plant components
Rooftop solar power plant   componentsRooftop solar power plant   components
Rooftop solar power plant components
 
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
 
List of Clearances for Solar Project
List of Clearances for Solar ProjectList of Clearances for Solar Project
List of Clearances for Solar Project
 
Battery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basicsBattery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basics
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
 
Photovoltaic Training - Session 1 - Design
Photovoltaic Training - Session 1 - DesignPhotovoltaic Training - Session 1 - Design
Photovoltaic Training - Session 1 - Design
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
 
Financial Analysis
Financial AnalysisFinancial Analysis
Financial Analysis
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plant
 
Webinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsystWebinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsyst
 
Solar PV and Battery Storage Systems
Solar PV and Battery Storage SystemsSolar PV and Battery Storage Systems
Solar PV and Battery Storage Systems
 
Mini grid and Solar home system
Mini grid and Solar home systemMini grid and Solar home system
Mini grid and Solar home system
 
Solar Training 20100208
Solar Training 20100208Solar Training 20100208
Solar Training 20100208
 

Viewers also liked

10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, DesignVignesh Sekar
 
Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Abhay Ocean India ltd.
 
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...Luis Ram Rojas-Sol
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantShahbaz Makandar A.
 
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Maxpromotion
 
Graphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataGraphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataCupertinoElectric
 
Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantAvish Thakral
 
OHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdOHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdAjay Yadav
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantVignesh Sekar
 

Viewers also liked (9)

10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
 
Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015
 
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
 
Graphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataGraphical Analysis of PV Plant Data
Graphical Analysis of PV Plant Data
 
Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid Plant
 
OHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdOHMS Energy Pvt. Ltd
OHMS Energy Pvt. Ltd
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
 

Similar to Financial Feasibility of Solar Power Plant in India

Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
Potential of Solar Power in India
Potential of Solar Power in IndiaPotential of Solar Power in India
Potential of Solar Power in IndiaAkash Jauhari
 
Repowering the Indian Discoms
Repowering the Indian DiscomsRepowering the Indian Discoms
Repowering the Indian DiscomsAditya Parchure
 
India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015Varun Sethi
 
XYZ solar power Global IPO
XYZ solar power   Global IPOXYZ solar power   Global IPO
XYZ solar power Global IPOVarun Sethi
 
India Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets CandidateIndia Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets CandidateVarun Sethi
 
NCI Report on Maryland Wind and Biomass Implementation 101211r1-clean
NCI Report on Maryland Wind and Biomass Implementation 101211r1-cleanNCI Report on Maryland Wind and Biomass Implementation 101211r1-clean
NCI Report on Maryland Wind and Biomass Implementation 101211r1-cleanPaul Maxwell
 
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...IRJET Journal
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010Headway Solar
 
WP_SiPV Manufacturing_0.pdf
WP_SiPV Manufacturing_0.pdfWP_SiPV Manufacturing_0.pdf
WP_SiPV Manufacturing_0.pdfekosudarmanto4
 
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Ajjay Kumar Gupta
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBanaDurga
 
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...Ashish Verma
 
Primotech news letter ppt RE-INVEST
Primotech news letter ppt RE-INVESTPrimotech news letter ppt RE-INVEST
Primotech news letter ppt RE-INVESTHimanshu Bansal
 

Similar to Financial Feasibility of Solar Power Plant in India (20)

Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
Potential of Solar Power in India
Potential of Solar Power in IndiaPotential of Solar Power in India
Potential of Solar Power in India
 
FICCI Solar Energy Task Force Report on Financing Solar Energy
FICCI Solar Energy Task Force Report on Financing Solar EnergyFICCI Solar Energy Task Force Report on Financing Solar Energy
FICCI Solar Energy Task Force Report on Financing Solar Energy
 
Repowering the Indian Discoms
Repowering the Indian DiscomsRepowering the Indian Discoms
Repowering the Indian Discoms
 
SEC Final
SEC FinalSEC Final
SEC Final
 
SEC Final
SEC FinalSEC Final
SEC Final
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015
 
XYZ solar power Global IPO
XYZ solar power   Global IPOXYZ solar power   Global IPO
XYZ solar power Global IPO
 
India Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets CandidateIndia Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets Candidate
 
NCI Report on Maryland Wind and Biomass Implementation 101211r1-clean
NCI Report on Maryland Wind and Biomass Implementation 101211r1-cleanNCI Report on Maryland Wind and Biomass Implementation 101211r1-clean
NCI Report on Maryland Wind and Biomass Implementation 101211r1-clean
 
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010
 
WP_SiPV Manufacturing_0.pdf
WP_SiPV Manufacturing_0.pdfWP_SiPV Manufacturing_0.pdf
WP_SiPV Manufacturing_0.pdf
 
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptx
 
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...
 
Discussion paper 16.11.2015
Discussion paper 16.11.2015Discussion paper 16.11.2015
Discussion paper 16.11.2015
 
Small Power Generation Plant
Small Power Generation PlantSmall Power Generation Plant
Small Power Generation Plant
 
Primotech news letter ppt RE-INVEST
Primotech news letter ppt RE-INVESTPrimotech news letter ppt RE-INVEST
Primotech news letter ppt RE-INVEST
 

More from Akash Jauhari

Engineering services outsourcing_unraveling myths
Engineering services outsourcing_unraveling mythsEngineering services outsourcing_unraveling myths
Engineering services outsourcing_unraveling mythsAkash Jauhari
 
State of Indian Economy & Budget Proposals 2012
State of Indian Economy & Budget Proposals 2012 State of Indian Economy & Budget Proposals 2012
State of Indian Economy & Budget Proposals 2012 Akash Jauhari
 
Tata Motors Acquisition of Jaguar&amp;Land Rover
Tata Motors Acquisition of Jaguar&amp;Land RoverTata Motors Acquisition of Jaguar&amp;Land Rover
Tata Motors Acquisition of Jaguar&amp;Land RoverAkash Jauhari
 
Wal mart Entering India
Wal mart Entering IndiaWal mart Entering India
Wal mart Entering IndiaAkash Jauhari
 
How culture can make or break a company
How culture can make or break a companyHow culture can make or break a company
How culture can make or break a companyAkash Jauhari
 
Resources & rivalry in Central asia
Resources & rivalry in Central asiaResources & rivalry in Central asia
Resources & rivalry in Central asiaAkash Jauhari
 
Behavior of Indian Investor: A Market Research
Behavior of Indian Investor: A Market ResearchBehavior of Indian Investor: A Market Research
Behavior of Indian Investor: A Market ResearchAkash Jauhari
 
Econometric Forecasting of Short term Interest Rates in India
Econometric Forecasting of Short term Interest Rates in IndiaEconometric Forecasting of Short term Interest Rates in India
Econometric Forecasting of Short term Interest Rates in IndiaAkash Jauhari
 
Corporate & Business Strategy: GE
Corporate & Business Strategy: GECorporate & Business Strategy: GE
Corporate & Business Strategy: GEAkash Jauhari
 
C-Si Module Manufacturers in India
C-Si Module Manufacturers in IndiaC-Si Module Manufacturers in India
C-Si Module Manufacturers in IndiaAkash Jauhari
 
Management Information System & Technology
Management Information System & TechnologyManagement Information System & Technology
Management Information System & TechnologyAkash Jauhari
 
The Dubai Logistics Industry
The Dubai Logistics IndustryThe Dubai Logistics Industry
The Dubai Logistics IndustryAkash Jauhari
 
Case Study on Air Deccan - The Marketing Mantra
Case Study on Air Deccan - The Marketing MantraCase Study on Air Deccan - The Marketing Mantra
Case Study on Air Deccan - The Marketing MantraAkash Jauhari
 
India's First Low Cost Airline
India's First Low Cost AirlineIndia's First Low Cost Airline
India's First Low Cost AirlineAkash Jauhari
 
Product Differentiation as Marketing Strategy
Product Differentiation as Marketing StrategyProduct Differentiation as Marketing Strategy
Product Differentiation as Marketing StrategyAkash Jauhari
 
Branding as Marketing Tool
Branding as Marketing ToolBranding as Marketing Tool
Branding as Marketing ToolAkash Jauhari
 
The PC Industry Wars
The PC Industry WarsThe PC Industry Wars
The PC Industry WarsAkash Jauhari
 
Are indian stock market driven more by sentiments than fundamentals- A Resear...
Are indian stock market driven more by sentiments than fundamentals- A Resear...Are indian stock market driven more by sentiments than fundamentals- A Resear...
Are indian stock market driven more by sentiments than fundamentals- A Resear...Akash Jauhari
 
The Company Act of India : Articles and Memorandums
The Company Act of India : Articles and MemorandumsThe Company Act of India : Articles and Memorandums
The Company Act of India : Articles and MemorandumsAkash Jauhari
 
Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.Akash Jauhari
 

More from Akash Jauhari (20)

Engineering services outsourcing_unraveling myths
Engineering services outsourcing_unraveling mythsEngineering services outsourcing_unraveling myths
Engineering services outsourcing_unraveling myths
 
State of Indian Economy & Budget Proposals 2012
State of Indian Economy & Budget Proposals 2012 State of Indian Economy & Budget Proposals 2012
State of Indian Economy & Budget Proposals 2012
 
Tata Motors Acquisition of Jaguar&amp;Land Rover
Tata Motors Acquisition of Jaguar&amp;Land RoverTata Motors Acquisition of Jaguar&amp;Land Rover
Tata Motors Acquisition of Jaguar&amp;Land Rover
 
Wal mart Entering India
Wal mart Entering IndiaWal mart Entering India
Wal mart Entering India
 
How culture can make or break a company
How culture can make or break a companyHow culture can make or break a company
How culture can make or break a company
 
Resources & rivalry in Central asia
Resources & rivalry in Central asiaResources & rivalry in Central asia
Resources & rivalry in Central asia
 
Behavior of Indian Investor: A Market Research
Behavior of Indian Investor: A Market ResearchBehavior of Indian Investor: A Market Research
Behavior of Indian Investor: A Market Research
 
Econometric Forecasting of Short term Interest Rates in India
Econometric Forecasting of Short term Interest Rates in IndiaEconometric Forecasting of Short term Interest Rates in India
Econometric Forecasting of Short term Interest Rates in India
 
Corporate & Business Strategy: GE
Corporate & Business Strategy: GECorporate & Business Strategy: GE
Corporate & Business Strategy: GE
 
C-Si Module Manufacturers in India
C-Si Module Manufacturers in IndiaC-Si Module Manufacturers in India
C-Si Module Manufacturers in India
 
Management Information System & Technology
Management Information System & TechnologyManagement Information System & Technology
Management Information System & Technology
 
The Dubai Logistics Industry
The Dubai Logistics IndustryThe Dubai Logistics Industry
The Dubai Logistics Industry
 
Case Study on Air Deccan - The Marketing Mantra
Case Study on Air Deccan - The Marketing MantraCase Study on Air Deccan - The Marketing Mantra
Case Study on Air Deccan - The Marketing Mantra
 
India's First Low Cost Airline
India's First Low Cost AirlineIndia's First Low Cost Airline
India's First Low Cost Airline
 
Product Differentiation as Marketing Strategy
Product Differentiation as Marketing StrategyProduct Differentiation as Marketing Strategy
Product Differentiation as Marketing Strategy
 
Branding as Marketing Tool
Branding as Marketing ToolBranding as Marketing Tool
Branding as Marketing Tool
 
The PC Industry Wars
The PC Industry WarsThe PC Industry Wars
The PC Industry Wars
 
Are indian stock market driven more by sentiments than fundamentals- A Resear...
Are indian stock market driven more by sentiments than fundamentals- A Resear...Are indian stock market driven more by sentiments than fundamentals- A Resear...
Are indian stock market driven more by sentiments than fundamentals- A Resear...
 
The Company Act of India : Articles and Memorandums
The Company Act of India : Articles and MemorandumsThe Company Act of India : Articles and Memorandums
The Company Act of India : Articles and Memorandums
 
Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.
 

Recently uploaded

PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Aggregage
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAScathy664059
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfASGITConsulting
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 

Recently uploaded (20)

PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAS
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdf
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 

Financial Feasibility of Solar Power Plant in India

  • 1.
  • 2. Tax holidays for first 10 years of operation for power producing firms.
  • 3. Exemptions on custom and excise for goods imported required in power plants.
  • 4. Levy of VAT at a discounted rate of 5%
  • 5.
  • 6. Life of the project is expected to be 12 years, since the technology will become obsolete after that time period
  • 7. The cost of equity is assumed to be 15% with 50% weight age. The cost of debt is taken to be 11.5% (as per IREDA norms) with 50% weight age. Hence, the cost of capital is calculated to be 13.25%.
  • 8. For discounting purpose, hurdle rate is taken to be 14%.
  • 9. Power Purchase Agreement of Rs. 15.3/KWh is taken to be constant for the period of 12 years.
  • 10.
  • 11. The NPV value is $64.36
  • 12. NPV as a percentage of initial outlay is 0.05%.
  • 13. Return on Equity is 0.11.
  • 14.
  • 17.
  • 18. The Sector is highly driven by Government support, hence any Scenario where Government reduces or minimizes the incentives proves to be destructive to return & risk profile of the project. However, possibility of such a development is expected to be low.
  • 19. Reducing Poly-silicon prices, increasing efficiency and economies of scale are expected to drive down the Initial outlay of project and hence increase the return. Thus considering the supply-demand gap in India energy market and reducing cost of PV, Solar power plants are expected to be lucrative in long term. We thus recommend Global players to invest with some delay of about 3-4 years with improved technology and reduced cost.
  • 20. Further to reduce cost in India, players should focus on manufacturing poly-silicon wafers indigenously, developing technology tailored for Indian conditions, and joint venture with technology providers to improve efficiency. Backward and forward integration will also help to increase the margins for the firms.
  • 21. Going by example of Germany, world leader in PV technology, we expect PPA offered in India to decrease to about Rs 10.7 by 2015 and Rs. 7.8 by 2019, with reducing cost structure of PV power. As per data available we expect PV power to reach grid parity by 2020. Hence after 2020 we expect PV power to compete with other sources of energy without any Government support, and contribute about 7% of energy demand of the nation. Appendix 1<br />Appendix 2<br />