SlideShare a Scribd company logo
1 of 54
Standard costing

1
Standard
 The

word standard means a criterion (principle,
measure).
 A standard figure is one against which one can
measure an actual figure to see the deviation.

2
Standard Rate




The word Standard Rate is the numerical proportion
prevailing between two sets of things.
A firm has three ‘standard of things’ available on which to
base standard rates: Money, Physical inputs and Physical
outputs.
Money
Money/output, e.g.
Re./unit of
materials

Physical
Inputs

3

Money/output, e.g.
Re./unit of product

Input/output, e.g. labour/machine
hrs./unit of product

Physical
Outputs
Standard Cost
 Standard

cost is ‘a predetermined cost which is
compared in advance of production on the basis of
specifications of all the factors affecting costs and
used in standard costing.’
 In other words, standard cost is a predetermined
cost that should be attained under a given set of
operating conditions.

4
Standard Costing








5

Standard costing is a technique which is used in many
industries, where production is of repetitive nature.
Standard costing is developed due to the shortcomings of
historical costing.
CIMA, London, defines standard costing ‘as the
predetermined cost based on technical estimates of materials,
labour and overheads for selected period of time and for the
prescribed set of working conditions’.
Standard costing is that technique in which the standard cost
is determined before starting the production.
Standard costing system
 The

management evaluates the performance
of a company by comparing it with some
predetermined measures
 Therefore, it can be used as a process of
measuring and correcting actual performance
to ensure that the plans are properly set and
implemented

6
Objectives Of Standard Costing
 To

establish control
 To set standards for various elements of cost
 To fix responsibility
 To make budgetary control more effective

7
Procedures of standard costing
system







8

Set the predetermined standards for sales margin and
production costs
Collect the information about the actual performance
Compare the actual performance with the standards to
arrive at the variance
Analyze the variances and ascertaining the causes of
variance
Take corrective action to avoid adverse variance
Adjust the budget in order to make the standards more
realistic
Functions of standard costing
system
 Valuation
–

Assigning the standard cost to the actual output

 Planning
–

Use the current standards to estimate future sales
volume and future costs

 Controlling
–

9

Evaluating performance by determining how
efficiently the current operations are being carried
out
 Motivation
–

Notify the staff of the management’s expectations

 Setting

10

of selling price
Variance

11
Variance analysis
A

variance is the difference between the
standards and the actual performance
 When the actual results are better than the
expected results, there will be a favourable
variance (F)
 If the actual results are worse than the
expected results, there will be an adverse
variance (A)
12
Classification Of Variances
 Functional

Basis
 Measurement Basis
 Result Basis
 Controllability Basis

13
Functional Basis

14
Measurement Basis

15
 Absolute

variance: Difference between the
standard cost and the actual cost in terms of money
is known as absolute variance.

 Relative

variance: difference is expressed as a
percentage of the standard cost, it is known as
relative variance.

16
Result basis

17
Cost variance

18
Cost variance
•Cost variance = Price variance + Quantity variance
Cost variance is the difference between the standard cost and the
Actual cost
•Price variance = (standard price – actual price)*Actual quantity
A price variance reflects the extent of the profit change
resulting from the change in activity level

19

•Quantity variance = (standard quantity – actual quantity)*
standard cost
A quantity variance reflects the extent of the profit change
resulting from the change in activity level
Three types of cost variance
 Material

cost variance
 Labour cost variance
 Variable overheads variance

20
Material and labour variance

21
22
23
Material cost variance






24

It is the difference between the standard direct material
cost of the actual production volume and the actual cost
of direct materials.
Material cost variance = (Standard quantity of input for
actual production × SP) – (Actual quantity of input ×
AP)
Material cost variance = Material price variance +
Material usage variance
Material cost variance
Material price variance
= (standard price – actual price)*actual quantity
= ($3 - $3.2)*2400
= $480 (A)
 Material usage variance
= (Standard quantity – actual quantity)* standard price
= (Standard quantity for actual production – actual
quantity production) * standard price
4000 units
= (4*800 – 2400)*$3
1000 units
= $2400 (F)
25

Material cost variance
 Material

price variance
 Material usage variance
 Total Material cost variance

26

$480 (A)
$2400 (F)
$1920 (F)
Material price variance
 This

27

is that portion of the material cost variance
which is due to the difference between the standard
price specified and the actual price paid.
 If the actual price is higher than the standard price,
it would result in adverse price variance and if the
actual price is lower than standard price, the result
is favorable price variance.
 Material price variance = (standard price – actual
price) x actual quantity of materials
Material Usage Variance
 This

28

is that portion of material cost variance which
is due to the difference between the standard
quantity of actual production and the actual quantity
used.
 Material usage variance
= (Standard quantity – actual quantity) x standard
price
= (Standard quantity for actual production – actual
quantity production) x standard price
Material Mix Variance
 This

is that portion of usage variance which is due
to the difference between the standard and actual
composition of mixture.
 Material Mixture Variance = Standard price
[Actual quantity in standard mix (i.e. RSQ) – Actual
quantity]
 Revised Standard quantity = Total actual quantity
consumed ×
29
Material Yield Variance
 This

variance arises due to the difference between
the standard yield specified and actual yield
obtained.
 Material yield variance = [(Standard loss in terms
of actual input) – (Actual loss on actual input)] ×
(Average standard price)
 Material yield variance = Material usage variance
– Material mix variance
30
Material Sub-usage Variance
 When

a product is produced from a mixture of two
or more kinds of material, there may arise material
sub-usage variance.
 Material sub-usage variance = (Standard Quantity
– Revised Standard Quantity) × Standard Price
 It can be seen from this formula that material subusage variance is the analysis of variance in basic
standard quantity of each material.
31
Labour Variances

32
Formulas Of Labour Variances










33

Labour rate variance = (standard price – actual price) x actual
hours
Labour Idle Time Variance = [(actual hrs.- idle time) x standard
price] – (actual hrs. x standard price)
Labour Gang variance = [revised(actual hrs.- idle time) x standard
price] – [(actual hrs.- idle time) x standard price]
Labour Yield variance = [revised(actual hrs.- idle time) x standard
price x (actual output/standard output)] - [revised(actual hrs.- idle
time) x standard price]
Labour sub-efficiency variance = (standard hrs. x standard price)
- [revised(actual hrs.- idle time) x standard price x (actual
output/standard output)]






34

Labour Cost Variance = (standard hrs. x standard price) –
(actual hrs. x actual price)
Labour Usage variance = standard price x (standard hrs. –
actual hrs.)
Labour efficiency variance = (standard hrs. x standard price) [revised(actual hrs.- idle time) x standard price]
Labour Rate Variance
 This

is that portion of the labour cost variance
which is caused by the use of actual wage rate other
than predetermined.

 Labour

rate variance = Actual labour time
(Standard wage rate – Actual wage rate)

35
Labour Efficiency Variance
 It

is the difference between the standard time and
the actual time spent multiplied by standard wage
rate.

 Labour

efficiency variance = Standard wage rate
(Standard labour time – Actual labour time)

36
Labour Idle Time Variance
 It

is that portion of labour cost variance which is
due to the abnormal idle time of workers.
 While calculating labour efficiency variance,
abnormal idle time is deducted from the actual time
spent to determine the real efficiency of the
workers.
 Idle

37

time variance = Abnormal idle time ×
Standard wage rate
Labour Gang Variance
 This

variance arises due to the change in the
composition or mix of a group of workers as
compared to the standard composition or mix.

 Labour

gang variance = (Revised standard time –
Idle time) × Standard rate per hour
 Here, RST= Total actual time x
38
Labour Yield Variance
 It

is computed on the basis of the increase or
decrease in the actual yield or output when
compared to the standard.

 Labour

Yield Variance = [Actual yield – Standard
yield in units expected from the actual hours
worked] × Standard labour cost per unit

39
Labour Usage Variance
 Labour

Usage Variance is the measure of difference
between standard hours and actual hours,multiplied
by the standard rate.

 Labour

Usage variance = (standard hrs. –
actual hrs.) x standard price

40
Labour Cost Variance
 Labor

cost variance can be defined as the
deviation of the actual direct wages paid from
the direct wages specified for the standard
output.
 Labour Cost Variance= (Standard time x
Standard price)-(Actual time x Actual price)

41
Overheads variance

42
I.

Variable Production Overhead
Variance

 Standard

Variable Overheads= Actual
Production * Standard Rate
 Standard Rate = Budgeted Variable
Overheads/Budgeted Production

43
II. Fixed Production Overhead
Variances

44
 Fixed

Production Overhead Cost or Total
Variance

Total Variance =( Actual Production * Standard
Recovery Rate)- Actual Overheads
 Fixed

Production Overhead Expenditure
Variance

Expenditure Variance=( Standard Recovery rate
* Budgeted Production)- Actual Overhead
45
 Fixed

Production Overhead Volume
Variance

Volume Variance = Standard Fixed OverheadBudgeted fixed Overhead

46
SALES
 Sales

variances an b calculated in two ways:
A. The turnover or the volume method
B. The profit or the margin method

47
A. The Turnover or The Value Method

48
 Value

Variance= Actual Sales- Budgeted Sales
 Price Variance= Actual Sales – Standard Sales
 Volume Variance= Standard Sales- Budgeted
Sales
 Quantity Variance= Revised Standard Sales –
Budgeted Sales
 Mixed Variance= Standard Sales – Revised
Standard Sales
49
B. Profit Method

50
Application Of Standard Costing
 Process

industries
 Service industries
 Engineering industries
 Textile industries
 Extraction industries

51
Advantages Of Standard Costing
•
•
•
•
•
•
•
•
•

52

Formulation of price and production policies
Comparison and analysis of data
Management by exception
Delegation of authority and responsibility
Cost consciousness
Better capacity to anticipate
Better economy, efficiency, and productivity
Preparation of periodical financial statements
Facilities budgeting
Limitations Of Standard Costing
 High

degree of technical skill
 Segregation of variances into controllable and noncontrollable factors
 Duplication in recording,
 Either too strict or too liberal.

53
“THANK YOU”

54

More Related Content

What's hot

Standard costing and Variance Analysis
Standard costing and Variance AnalysisStandard costing and Variance Analysis
Standard costing and Variance AnalysisArunkumar Duna
 
Budget and Budgetary Control
Budget and Budgetary ControlBudget and Budgetary Control
Budget and Budgetary ControlAshish Nangla
 
Price level Accounting
Price level AccountingPrice level Accounting
Price level AccountingAijaz Aryan
 
UNDERSTANDING MARGINAL COSTING
UNDERSTANDING MARGINAL COSTINGUNDERSTANDING MARGINAL COSTING
UNDERSTANDING MARGINAL COSTINGambarish_9
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysisSumit Malhotra
 
Cost volume profit analysis.
Cost volume profit analysis.Cost volume profit analysis.
Cost volume profit analysis.Varadraj Bapat
 
Absorption Costing Concept
Absorption Costing ConceptAbsorption Costing Concept
Absorption Costing ConceptBimarsh Giri
 
Method of costing
Method of costingMethod of costing
Method of costingskillssoft
 
Cost of capital
Cost of capitalCost of capital
Cost of capitalNirmal PR
 
The Break-even Analysis
The Break-even AnalysisThe Break-even Analysis
The Break-even AnalysisYashika Parekh
 
Materials cost accounting
Materials cost accountingMaterials cost accounting
Materials cost accountingAchal Singhal
 
Objectives of cost accounting
Objectives of cost accountingObjectives of cost accounting
Objectives of cost accountingUday Teke
 

What's hot (20)

Standard costing and Variance Analysis
Standard costing and Variance AnalysisStandard costing and Variance Analysis
Standard costing and Variance Analysis
 
Job costing
Job costingJob costing
Job costing
 
Budget and Budgetary Control
Budget and Budgetary ControlBudget and Budgetary Control
Budget and Budgetary Control
 
Price level Accounting
Price level AccountingPrice level Accounting
Price level Accounting
 
Chapter 05 Overhead Costs
Chapter 05   Overhead CostsChapter 05   Overhead Costs
Chapter 05 Overhead Costs
 
UNDERSTANDING MARGINAL COSTING
UNDERSTANDING MARGINAL COSTINGUNDERSTANDING MARGINAL COSTING
UNDERSTANDING MARGINAL COSTING
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysis
 
Elements of cost
Elements of costElements of cost
Elements of cost
 
Cost volume profit analysis.
Cost volume profit analysis.Cost volume profit analysis.
Cost volume profit analysis.
 
Absorption Costing Concept
Absorption Costing ConceptAbsorption Costing Concept
Absorption Costing Concept
 
Method of costing
Method of costingMethod of costing
Method of costing
 
Cost of capital
Cost of capitalCost of capital
Cost of capital
 
Cost sheet
Cost sheetCost sheet
Cost sheet
 
Labour cost
Labour costLabour cost
Labour cost
 
Inventory valuation
Inventory valuationInventory valuation
Inventory valuation
 
The Break-even Analysis
The Break-even AnalysisThe Break-even Analysis
The Break-even Analysis
 
Process costing
Process costingProcess costing
Process costing
 
Materials cost accounting
Materials cost accountingMaterials cost accounting
Materials cost accounting
 
Objectives of cost accounting
Objectives of cost accountingObjectives of cost accounting
Objectives of cost accounting
 
Elements of cost and cost sheet
Elements of cost and cost sheetElements of cost and cost sheet
Elements of cost and cost sheet
 

Similar to Standard costing presentation

Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)DSDEVDA
 
Amresh management accounting
Amresh management accountingAmresh management accounting
Amresh management accountingAMRESH VELGEKAR
 
Mca i fma u 4.4 varience analysis
Mca i fma u 4.4 varience analysisMca i fma u 4.4 varience analysis
Mca i fma u 4.4 varience analysisRai University
 
Bca i fma u 4.4 varience analysis
Bca i fma u 4.4 varience analysisBca i fma u 4.4 varience analysis
Bca i fma u 4.4 varience analysisRai University
 
Standard costing and variances
Standard costing and variancesStandard costing and variances
Standard costing and variancespankajmaini
 
Standard costing
Standard costingStandard costing
Standard costingnishat2
 
Standard Costing Operational Performance Measures And
Standard Costing Operational Performance Measures AndStandard Costing Operational Performance Measures And
Standard Costing Operational Performance Measures Andafiali
 
Understanding SAP production order variance
Understanding SAP production order varianceUnderstanding SAP production order variance
Understanding SAP production order varianceDhaval Gala
 
Managerial Accounting Project.pptx
Managerial Accounting Project.pptxManagerial Accounting Project.pptx
Managerial Accounting Project.pptxTeeshaGehaniJagdesh
 
Standard costing.ppt
Standard costing.pptStandard costing.ppt
Standard costing.pptVijesh35
 
Budgetory Control System and Cost Control
Budgetory Control System and Cost ControlBudgetory Control System and Cost Control
Budgetory Control System and Cost ControlKishore Raveendran
 
Variance Analysis
Variance Analysis Variance Analysis
Variance Analysis MACFAST
 

Similar to Standard costing presentation (20)

Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)
 
Amresh management accounting
Amresh management accountingAmresh management accounting
Amresh management accounting
 
management accounting
 management accounting management accounting
management accounting
 
181572.pdf
181572.pdf181572.pdf
181572.pdf
 
Mca i fma u 4.4 varience analysis
Mca i fma u 4.4 varience analysisMca i fma u 4.4 varience analysis
Mca i fma u 4.4 varience analysis
 
Bca i fma u 4.4 varience analysis
Bca i fma u 4.4 varience analysisBca i fma u 4.4 varience analysis
Bca i fma u 4.4 varience analysis
 
Standard costing and variances
Standard costing and variancesStandard costing and variances
Standard costing and variances
 
Standard costing
Standard costingStandard costing
Standard costing
 
Standard Costing Operational Performance Measures And
Standard Costing Operational Performance Measures AndStandard Costing Operational Performance Measures And
Standard Costing Operational Performance Measures And
 
3901853 standard-costing
3901853 standard-costing3901853 standard-costing
3901853 standard-costing
 
Standard costing summary
Standard costing summaryStandard costing summary
Standard costing summary
 
Understanding SAP production order variance
Understanding SAP production order varianceUnderstanding SAP production order variance
Understanding SAP production order variance
 
Projecto variance
Projecto varianceProjecto variance
Projecto variance
 
Managerial Accounting Project.pptx
Managerial Accounting Project.pptxManagerial Accounting Project.pptx
Managerial Accounting Project.pptx
 
Standard costing
Standard costingStandard costing
Standard costing
 
Standard costing.ppt
Standard costing.pptStandard costing.ppt
Standard costing.ppt
 
Standard Costing
Standard Costing Standard Costing
Standard Costing
 
Budgetory Control System and Cost Control
Budgetory Control System and Cost ControlBudgetory Control System and Cost Control
Budgetory Control System and Cost Control
 
Variance analysis
Variance analysisVariance analysis
Variance analysis
 
Variance Analysis
Variance Analysis Variance Analysis
Variance Analysis
 

Recently uploaded

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesShubhangi Sonawane
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxNikitaBankoti2
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 

Recently uploaded (20)

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 

Standard costing presentation

  • 2. Standard  The word standard means a criterion (principle, measure).  A standard figure is one against which one can measure an actual figure to see the deviation. 2
  • 3. Standard Rate   The word Standard Rate is the numerical proportion prevailing between two sets of things. A firm has three ‘standard of things’ available on which to base standard rates: Money, Physical inputs and Physical outputs. Money Money/output, e.g. Re./unit of materials Physical Inputs 3 Money/output, e.g. Re./unit of product Input/output, e.g. labour/machine hrs./unit of product Physical Outputs
  • 4. Standard Cost  Standard cost is ‘a predetermined cost which is compared in advance of production on the basis of specifications of all the factors affecting costs and used in standard costing.’  In other words, standard cost is a predetermined cost that should be attained under a given set of operating conditions. 4
  • 5. Standard Costing     5 Standard costing is a technique which is used in many industries, where production is of repetitive nature. Standard costing is developed due to the shortcomings of historical costing. CIMA, London, defines standard costing ‘as the predetermined cost based on technical estimates of materials, labour and overheads for selected period of time and for the prescribed set of working conditions’. Standard costing is that technique in which the standard cost is determined before starting the production.
  • 6. Standard costing system  The management evaluates the performance of a company by comparing it with some predetermined measures  Therefore, it can be used as a process of measuring and correcting actual performance to ensure that the plans are properly set and implemented 6
  • 7. Objectives Of Standard Costing  To establish control  To set standards for various elements of cost  To fix responsibility  To make budgetary control more effective 7
  • 8. Procedures of standard costing system       8 Set the predetermined standards for sales margin and production costs Collect the information about the actual performance Compare the actual performance with the standards to arrive at the variance Analyze the variances and ascertaining the causes of variance Take corrective action to avoid adverse variance Adjust the budget in order to make the standards more realistic
  • 9. Functions of standard costing system  Valuation – Assigning the standard cost to the actual output  Planning – Use the current standards to estimate future sales volume and future costs  Controlling – 9 Evaluating performance by determining how efficiently the current operations are being carried out
  • 10.  Motivation – Notify the staff of the management’s expectations  Setting 10 of selling price
  • 12. Variance analysis A variance is the difference between the standards and the actual performance  When the actual results are better than the expected results, there will be a favourable variance (F)  If the actual results are worse than the expected results, there will be an adverse variance (A) 12
  • 13. Classification Of Variances  Functional Basis  Measurement Basis  Result Basis  Controllability Basis 13
  • 16.  Absolute variance: Difference between the standard cost and the actual cost in terms of money is known as absolute variance.  Relative variance: difference is expressed as a percentage of the standard cost, it is known as relative variance. 16
  • 19. Cost variance •Cost variance = Price variance + Quantity variance Cost variance is the difference between the standard cost and the Actual cost •Price variance = (standard price – actual price)*Actual quantity A price variance reflects the extent of the profit change resulting from the change in activity level 19 •Quantity variance = (standard quantity – actual quantity)* standard cost A quantity variance reflects the extent of the profit change resulting from the change in activity level
  • 20. Three types of cost variance  Material cost variance  Labour cost variance  Variable overheads variance 20
  • 21. Material and labour variance 21
  • 22. 22
  • 23. 23
  • 24. Material cost variance    24 It is the difference between the standard direct material cost of the actual production volume and the actual cost of direct materials. Material cost variance = (Standard quantity of input for actual production × SP) – (Actual quantity of input × AP) Material cost variance = Material price variance + Material usage variance
  • 25. Material cost variance Material price variance = (standard price – actual price)*actual quantity = ($3 - $3.2)*2400 = $480 (A)  Material usage variance = (Standard quantity – actual quantity)* standard price = (Standard quantity for actual production – actual quantity production) * standard price 4000 units = (4*800 – 2400)*$3 1000 units = $2400 (F) 25 
  • 26. Material cost variance  Material price variance  Material usage variance  Total Material cost variance 26 $480 (A) $2400 (F) $1920 (F)
  • 27. Material price variance  This 27 is that portion of the material cost variance which is due to the difference between the standard price specified and the actual price paid.  If the actual price is higher than the standard price, it would result in adverse price variance and if the actual price is lower than standard price, the result is favorable price variance.  Material price variance = (standard price – actual price) x actual quantity of materials
  • 28. Material Usage Variance  This 28 is that portion of material cost variance which is due to the difference between the standard quantity of actual production and the actual quantity used.  Material usage variance = (Standard quantity – actual quantity) x standard price = (Standard quantity for actual production – actual quantity production) x standard price
  • 29. Material Mix Variance  This is that portion of usage variance which is due to the difference between the standard and actual composition of mixture.  Material Mixture Variance = Standard price [Actual quantity in standard mix (i.e. RSQ) – Actual quantity]  Revised Standard quantity = Total actual quantity consumed × 29
  • 30. Material Yield Variance  This variance arises due to the difference between the standard yield specified and actual yield obtained.  Material yield variance = [(Standard loss in terms of actual input) – (Actual loss on actual input)] × (Average standard price)  Material yield variance = Material usage variance – Material mix variance 30
  • 31. Material Sub-usage Variance  When a product is produced from a mixture of two or more kinds of material, there may arise material sub-usage variance.  Material sub-usage variance = (Standard Quantity – Revised Standard Quantity) × Standard Price  It can be seen from this formula that material subusage variance is the analysis of variance in basic standard quantity of each material. 31
  • 33. Formulas Of Labour Variances      33 Labour rate variance = (standard price – actual price) x actual hours Labour Idle Time Variance = [(actual hrs.- idle time) x standard price] – (actual hrs. x standard price) Labour Gang variance = [revised(actual hrs.- idle time) x standard price] – [(actual hrs.- idle time) x standard price] Labour Yield variance = [revised(actual hrs.- idle time) x standard price x (actual output/standard output)] - [revised(actual hrs.- idle time) x standard price] Labour sub-efficiency variance = (standard hrs. x standard price) - [revised(actual hrs.- idle time) x standard price x (actual output/standard output)]
  • 34.    34 Labour Cost Variance = (standard hrs. x standard price) – (actual hrs. x actual price) Labour Usage variance = standard price x (standard hrs. – actual hrs.) Labour efficiency variance = (standard hrs. x standard price) [revised(actual hrs.- idle time) x standard price]
  • 35. Labour Rate Variance  This is that portion of the labour cost variance which is caused by the use of actual wage rate other than predetermined.  Labour rate variance = Actual labour time (Standard wage rate – Actual wage rate) 35
  • 36. Labour Efficiency Variance  It is the difference between the standard time and the actual time spent multiplied by standard wage rate.  Labour efficiency variance = Standard wage rate (Standard labour time – Actual labour time) 36
  • 37. Labour Idle Time Variance  It is that portion of labour cost variance which is due to the abnormal idle time of workers.  While calculating labour efficiency variance, abnormal idle time is deducted from the actual time spent to determine the real efficiency of the workers.  Idle 37 time variance = Abnormal idle time × Standard wage rate
  • 38. Labour Gang Variance  This variance arises due to the change in the composition or mix of a group of workers as compared to the standard composition or mix.  Labour gang variance = (Revised standard time – Idle time) × Standard rate per hour  Here, RST= Total actual time x 38
  • 39. Labour Yield Variance  It is computed on the basis of the increase or decrease in the actual yield or output when compared to the standard.  Labour Yield Variance = [Actual yield – Standard yield in units expected from the actual hours worked] × Standard labour cost per unit 39
  • 40. Labour Usage Variance  Labour Usage Variance is the measure of difference between standard hours and actual hours,multiplied by the standard rate.  Labour Usage variance = (standard hrs. – actual hrs.) x standard price 40
  • 41. Labour Cost Variance  Labor cost variance can be defined as the deviation of the actual direct wages paid from the direct wages specified for the standard output.  Labour Cost Variance= (Standard time x Standard price)-(Actual time x Actual price) 41
  • 43. I. Variable Production Overhead Variance  Standard Variable Overheads= Actual Production * Standard Rate  Standard Rate = Budgeted Variable Overheads/Budgeted Production 43
  • 44. II. Fixed Production Overhead Variances 44
  • 45.  Fixed Production Overhead Cost or Total Variance Total Variance =( Actual Production * Standard Recovery Rate)- Actual Overheads  Fixed Production Overhead Expenditure Variance Expenditure Variance=( Standard Recovery rate * Budgeted Production)- Actual Overhead 45
  • 46.  Fixed Production Overhead Volume Variance Volume Variance = Standard Fixed OverheadBudgeted fixed Overhead 46
  • 47. SALES  Sales variances an b calculated in two ways: A. The turnover or the volume method B. The profit or the margin method 47
  • 48. A. The Turnover or The Value Method 48
  • 49.  Value Variance= Actual Sales- Budgeted Sales  Price Variance= Actual Sales – Standard Sales  Volume Variance= Standard Sales- Budgeted Sales  Quantity Variance= Revised Standard Sales – Budgeted Sales  Mixed Variance= Standard Sales – Revised Standard Sales 49
  • 51. Application Of Standard Costing  Process industries  Service industries  Engineering industries  Textile industries  Extraction industries 51
  • 52. Advantages Of Standard Costing • • • • • • • • • 52 Formulation of price and production policies Comparison and analysis of data Management by exception Delegation of authority and responsibility Cost consciousness Better capacity to anticipate Better economy, efficiency, and productivity Preparation of periodical financial statements Facilities budgeting
  • 53. Limitations Of Standard Costing  High degree of technical skill  Segregation of variances into controllable and noncontrollable factors  Duplication in recording,  Either too strict or too liberal. 53