SlideShare a Scribd company logo
1 of 44
URBAN SPRAWL | JIGAR PANDYA | 2013
URBAN SPRAWL
ULCRA | L.A. ACT | Town Planning Schemes
& smart growth
URBAN SPRAWL | JIGAR PANDYA | 2013
Urban sprawl
is the
biggest barrier to smart growth
URBAN SPRAWL | JIGAR PANDYA | 2013
Urban Sprawl creates
~ linkages ~
beyond urban fringe.
It displays inefficient land use
Which results into poor urban infrastructure
URBAN SPRAWL | JIGAR PANDYA | 2013
How does a City Grow?
In theory, any city requires spaces to grow.
IF there are geographic constraints, the growth can either be
restricted or immensely sporadic in nature.
An urban center growth has one of the 4 classic patterns.
URBAN SPRAWL | JIGAR PANDYA | 2013
THEORY 1 | Concentric Urban Sprawl
In1920s. Ernest Burgess, a geographer at the university of Chicago’s School of Uraban
Geography, proposed a ‘Concentric Circle Theory’ for Urban Land use structure.
As per the theory, most of the cities have a clearly visible business core, known as ‘Central
Business district (CBD), where office buildings, major retail stores, services, government
buildings, library, etc are located. The development takes place around the CBD in a circular ring
pattern.
The inner most ring, closest to the CBD is usually known as ‘Transition Zone’ which has some
manufacturing zones and low income housing for workers and labors associated with
manufacturing industries.
The outer two rings are mainly hosing developments having low to medium income
residential multifamily or single houses scattered in the ring and the outermost ring having the
upper income groups housing having luxurious ranches with lavish multifamily houses for the
medium income groups.
URBAN SPRAWL | JIGAR PANDYA | 2013
Transportation and infrastructure
play a major role in the direction
in which the communities grow.
Railroads were major drivers for
the manufacturing industry
carrying freight, making growth
pattern concentrated around the
railroad network. Other land uses
developed in a circular pattern
around the business core of a
town or city.
URBAN SPRAWL | JIGAR PANDYA | 2013
THEORY 2 | Sectoral Growth
This theory was proposed by Homer Hoyt, a
geographer from Chicago.
The sector sprawl is similar to the Concentric
sprawl, however, unlike rings, the development
develops concentric to the CBD in a radial or
sectoral pattern.
The upper and middle income groups, likely to
have their own personal transportation tend to be
located away on the opposite side of the CBD to
gain advantage of the environmental factors, class
prestige and peace.
URBAN SPRAWL | JIGAR PANDYA | 2013
THEORY 3 | Axial Sprawl
The axial Growth theory of land use
develops on the concentric growth
pattern by adding transportation routes
which are characterized by their axes. It
recognizes the CBD as the most
intensely used area, travel time to the
CBD is the key for growth and not the
distance between the two locations.
Several towns and city having
geographic entities such as sea faces,
riverfronts or mountains have shown
axial sprawl.
URBAN SPRAWL | JIGAR PANDYA | 2013
THEROY 4 | Multiple Nuclei Sprawl
In recent times, the urbanization trend price of REAL
ESTATE has developed several pockets of settlement
in and around a major city. A metropolitan city in
every country is known to have several suburbs
around it. These suburbs have been there for some
time now, but due to scarcity of land in the CBD, and
industries not willing to relocate to new towns or
states, they tend to re establish themselves, or have
branch operations from the suburbs.. Slowly, these
suburbs are transformed into mini satellite urban
centers around the CBD, having their own mini
Business district. Multiple nuclei sprawl is seen very
commonly in many major cities across the world.
URBAN SPRAWL | JIGAR PANDYA | 2013
Identifying growth patterns and vectors | An Investor/ Planner can identify
growth patterns by plotting historical data on maps of the sub-markets and
comparing the results. Classifying the historical pattern (concentric, sector,
axial or multiple nuclei) may provide deep insight into how the area will
change and predict future developments. In addition an investor can track:-
– Where is the capital moving?
– Where are the population pockets evolving?
– Where are the land use changing?
– What are the trends in the land prices, area wise?
– What are major upcoming directions of roads and transportation construction?
– What is the Location and direction of existing and upcoming municipal services?
– What are zoning changes?
– What are the various Annexation activities?
– What kind of building permits are granted in certain areas?
– How are the neighborhoods changing?
URBAN SPRAWL | JIGAR PANDYA | 2013
ULCRA- 1976
Urban Land Ceiling & Regulation Act
CLASS BOUNDARY MAX LAND
HOLDING
CITIES
A 10 Kms 500 Sq. Mts MUMBAI, KOLKATA,
CHENNAI, NEW DELHI
B 8 Kms 1000 Sq. Mts AHMEDABAD,
BANGALORE,
HYDERABAD
C 6 Kms 1500 Sq. Mts LUCKNOW, PUNE, and
more.
D 4 Kms 2000 Sq. Mts BARODA, SURAT, and
more.
URBAN SPRAWL | JIGAR PANDYA | 2013
IMPACT OF ULCRA |
URBAN LAND DEVELOPMENTS
CL LIMIT MAX LAND
HOLDING
CITIES
A 10 Kms 500 M2 METROS
B 8 Kms 1000 M2 AHMEDABAD,
C 6 Kms 1500 M2 PUNE
D 4 Kms 2000 M2 BARODA,
SURAT
City Center
With Municipal
Corporation Limit
URBAN SPRAWL | JIGAR PANDYA | 2013
IMPACT OF ULCRA |
URBAN LAND DEVELOPMENTS
CL LIMIT MAX LAND
HOLDING
CITIES
A 10 Kms 500 M2 METROS
B 8 Kms 1000 M2 AHMEDABAD,
C 6 Kms 1500 M2 PUNE
D 4 Kms 2000 M2 BARODA,
SURAT
Corporation
Area
Distance for ULCRA
limit (8 Kms)
URBAN SPRAWL | JIGAR PANDYA | 2013
IMPACT OF ULCRA |
URBAN LAND DEVELOPMENTS
CL LIMIT MAX LAND
HOLDING
CITIES
A 10 Kms 500 M2 METROS
B 8 Kms 1000 M2 AHMEDABAD,
C 6 Kms 1500 M2 PUNE
D 4 Kms 2000 M2 BARODA,
SURAT
Area for
Development as per
Master Plan or
Development Plan
URBAN SPRAWL | JIGAR PANDYA | 2013
IMPACT OF ULCRA |
URBAN LAND DEVELOPMENTS
CL LIMIT MAX LAND
HOLDING
CITIES
A 10 Kms 500 M2 METROS
B 8 Kms 1000 M2 AHMEDABAD,
C 6 Kms 1500 M2 PUNE
D 4 Kms 2000 M2 BARODA,
SURAT
URBAN SPRAWL | JIGAR PANDYA | 2013
IMPACT OF ULCRA |
URBAN LAND DEVELOPMENTS
CL LIMIT MAX LAND
HOLDING
CITIES
A 10 Kms 500 M2 METROS
B 8 Kms 1000 M2 AHMEDABAD,
C 6 Kms 1500 M2 PUNE
D 4 Kms 2000 M2 BARODA,
SURAT
URBAN SPRAWL | JIGAR PANDYA | 2013
IMPACT OF ULCRA |
URBAN LAND DEVELOPMENTS
CL LIMIT MAX LAND
HOLDING
CITIES
A 10 Kms 500 M2 METROS
B 8 Kms 1000 M2 AHMEDABAD,
C 6 Kms 1500 M2 PUNE
D 4 Kms 2000 M2 BARODA,
SURAT
URBAN SPRAWL | JIGAR PANDYA | 2013
IMPACT OF ULCRA |
URBAN LAND DEVELOPMENTS
CL LIMIT MAX LAND
HOLDING
CITIES
A 10 Kms 500 M2 METROS
B 8 Kms 1000 M2 AHMEDABAD,
C 6 Kms 1500 M2 PUNE
D 4 Kms 2000 M2 BARODA,
SURAT
URBAN SPRAWL | JIGAR PANDYA | 2013
Approaches to Managing New Growth:
The Gujarat Model
There have been, by and large, two approaches to managing new urban
growth in India. In the first approach the public planning authorities and
development agencies acquire large portions of land and then re plan them
in a desirable or appropriate manner.
This is referred to as the “land acquisition” method. In
the second approach, the public planning agencies and development
authorities, instead of acquiring land, bring together or “pool together” a
group of owners and then re plan the area by readjusting or reshaping
every land parcel in a manner such that it is given a regular shape and
access and in the process a portion of land parcel is appropriated to provide
for roads, infrastructure, and public amenities.
This is referred to as the “land readjustment and pooling” method. Both
the approaches, with their merits and demerits, are briefly explained and
illustrated through sketches.
URBAN SPRAWL | JIGAR PANDYA | 2013
Land Acquisition Method
In this method, the public planning authorities/development agencies acquire
large areas of land from agricultural landholders (farmers) under the Land
Acquisition Act of 1894.
Compensation paid to farmers is based on prevailing agricultural land prices. To
minimize opposition to acquisition farmers are paid prices marginally higher than
agricultural land prices. Then a master plan of the area is prepared, laying out the
roads, plots for social amenities, and plots for sale.
Roads and infrastructure are then built, using government funds or loans. Serviced
plots are then sold for urban uses at market rates, which are most often much
higher than the rate at which land is acquired.
URBAN SPRAWL | JIGAR PANDYA | 2013
Advantages of LA method
Adequate amounts of land for urban uses can be rapidly generated,
provided that there is little opposition to bulk acquisition from farmers.
To expedite acquisition, some states allow private developers to assemble
land. In many cases, developers use extralegal means ( additional
incentives/ non formal offers) to secure farmers' consent.
There are very few constraints in preparing the master plan. The benefit of
appreciation of land value on its being converted to urban use accrues to
the development authority. ( Builders and authority profit more)
URBAN SPRAWL | JIGAR PANDYA | 2013
Disadvantages of LA method
Original owners or farmers don’t share this benefit in any manner. This goes against the
grain of fairness. In this method, farmers are essentially thrown off their land.
Unable to wisely invest the money received as compensation for their land and
deprived of a means of livelihood, they have to join the pool of urban labor. This
process adds to familiar urban problems—growth of slums, increase in crime rates, and
increased informal-sector economic activity.
The development process is slow. Any person who needs land for urban use has to
approach the urban development authority. The development authority ends up
becoming a bottleneck for development.
Development agencies using the method of bulk land acquisition end up being
powerful large-scale land developers, controlling vast urban resources. This is likely to
breed corruption and is antithetical to the emerging paradigm, where government plays
a facilitator’s role.
URBAN SPRAWL | JIGAR PANDYA | 2013
TDR stands for transferable development rights. Maharastra and some others States have
allowed builders to exceed their FSI for a particular plot, by transferring development rights
from elsewhere.
Reason
Sometimes state Governments have to acquire land for public purposes and
reimburse them according as per the provisions of Land Acquisition Act.
In order to speed up the acquisition of reserved plots of land, some of the
states Governments have evolved this new scheme.
Under the scheme, the owner develops the plot required by the Govt. for
public purposes at his own cost up to plinth level and hands over the same
without receiving any monetary compensation.
TDR
URBAN SPRAWL | JIGAR PANDYA | 2013
TDR
The state Government however, in lieu, grants to the owner, FSI equivalent
to the FSI of the land surrendered in the form of a certificate of
Development Rights (DRC). These DRCs are transferable as negotiable
instruments, and are commonly called TDRs.
To sum up, TDR means that FSI of a property under acquisition or
reservation is transferred as movable property to some other property
where the same can be utilized for construction of additional floors /
premises exceeding the permissible FSI of the latter property.
URBAN SPRAWL | JIGAR PANDYA | 2013
TDR a tool for Smart Growth
• Allows Urban Densifications.
• Can be controlled – depending on up gradation of Urban
Infrastructure.
• Incentives can be linked beyond FSI & Built-up
• Can be used to solve the housing backlog.
• Very effective for Slum Rehabilitation and Government Utility
Buildings.
URBAN SPRAWL | JIGAR PANDYA | 2013
Land Pooling and Readjustment Method
(Town Planning Schemes)
• In this method, the public planning agency or development authority temporarily brings
together a group of landowners for the purpose of planning, under the aegis of the state-
level town or urban planning act. As there is no acquisition or transfer of ownership involved,
there is no case for paying compensation.
• A master plan of the area is prepared, laying out the roads and plots for social amenities. The
remaining land is reconstituted into final plots for the original owners. The size of the final
plot is in proportion to the size of the original plot, and its location is as close as possible to
the original plot.
• A betterment charge based on the cost of the infrastructure proposed to be laid is levied on
the landowners. Infrastructure is then provided utilizing these funds.
URBAN SPRAWL | JIGAR PANDYA | 2013
Town Planning Schemes | Land Pooling & readjustment Mechanism
URBAN SPRAWL | JIGAR PANDYA | 2013
• Town Planning Schemes | Land Pooling & readjustment Mechanism
URBAN SPRAWL | JIGAR PANDYA | 2013
• Town Planning Schemes | Land Pooling & readjustment Mechanism
URBAN SPRAWL | JIGAR PANDYA | 2013
Valuation & area
Town Planning Schemes | Land Pooling & readjustment Mechanism
URBAN SPRAWL | JIGAR PANDYA | 2013
Valuation & area
Town Planning Schemes | Land Pooling & readjustment Mechanism
URBAN SPRAWL | JIGAR PANDYA | 2013
Valuation & area
Town Planning Schemes | Land Pooling & readjustment Mechanism
URBAN SPRAWL | JIGAR PANDYA | 2013
Advantages
All the land, except whatever is needed for infrastructure development and social
amenities, remains with the original owner. The development agency plays a
limited role in ensuring planned urban growth.
The increment in land value resulting from the development accrues to the
original owner whenever the land is sold and developed for urban use. Thus the
benefit of development goes to the original owner instead of the development
agency.
The original owner is not displaced in the process of land development and
continues to enjoy access to the land resource. Thus the negative impact of the
process of urbanization on farmers (original owners) is minimized.
Town Planning Schemes | Land Pooling & readjustment Mechanism
URBAN SPRAWL | JIGAR PANDYA | 2013
Disadvantages
• Time consuming,
– land pooling or readjustment schemes is unduly complicated and
cumbersome.
• Betterment charges are levied at the time of Plan passing.
– . Due to the inordinate delays in finalizing schemes, the betterment charges
levied on finalization of the scheme do not meet the cost of the infrastructure
provided.
• This method has only been successfully used in Gujarat as of today.
Town Planning Schemes | Land Pooling & readjustment Mechanism
URBAN SPRAWL | JIGAR PANDYA | 2013
Road network
40.0
0
M
12
.0
0M
12.00
M
12.00M
24.00 M
24.00
M
12.00
M
12.00M
18
.0
0M
18
.0
0M
9.00
M
24
.00M
12
.0
0
M
12.00
M
9.00
M
12.0
0
M
18
.0
0M
12.00 M
24.00M
12.00 M
7.50M
12.00 M
12.00M
12.00 M
12.0
0
M
12.00
M
40.0
0
M
18
.00M
24
.00M
18.00 M
12.00 M
12.00M
12.00 M
12.0
0
M
12
.0
0M
18
.0
0M
18
.0
0M
12.00M
12.00 M
18.00 M
7.50M
12.00M
18.00
M
24.00M
18.00 M
18.00 M
9.00M
18.00 M
24.00M
12.00M
12.00M
9.00M
12.00M
7.50M
12.00M
7.50M
9.00 M
18.00
M
18.00 M
18.00M
12.00M
30.00 M
30.00 M
9.00M
24.00M
9.00 M
9.00
M
12.00 M
12.00 M
9.00M
9.00 M12.00M
24.00M
18.00 M
DRAFT T.P.S. NO-24 (VEJALPUR)
24.00M
12.00M
12.00M
18.00 M
18
.00M
18
.00M
18
.00M
18.00 M
18.00 M
DRAFT T.P.S. NO-23 (VEJALPUR)
9.00 M
9.00 M
9.00M
7.50M
9.00 M
9.00 M
DRAFT T.P.S. NO-25 (VEJALPUR)
18.00 M
7.
50
M
12.00M
12.00M
DRAFT T.P.S. NO-26
(M
AKARBA)
A
D
J.
M
A
K
A
R
B
A
-
D.P.
A
R
E
A
A
D
J.
V
E
J
A
L
P
U
R
-
D.P.
A
R
E
A
60.00MT.
NATIONAL
HIGHWAY
ROAD
9.00 M
7.50M
AHMEDABAD URBAN DEVELOPMENT AUTHORITY
ASSISTANT TOWN PLANNER CHIEF EXECUTIVE AUTHORITYSENIOR TOWN PLANNER
020 20 40 80 Meters
AHMEDABAD
URBAN DEVELOPMENT
AUTHORITY
TOSARKHEJ
TOGANDHINAGAR
TO SHYAMAL CROSS ROADS
R
A
I
L
W
A
Y
L
I
N
E
LEGEND
T.P.S. BOUNDRY
SURVEY BOUNDRY
O.P. BOUNDARY
F.P. BOUNDARY
BUILD UP STRUCTURES
SALE FOR COMMERCIAL
NEIGHBOURHOOD CENTRE
S.E.W.S.H.(Socially Eco.
Weaker Sec. Housing )
GARDEN, PLAY GROUND, O.S.
ROADS
VILLAGE BOUNDRY
SALE FOR RESIDENTIAL
WATER BODY
O.N.G.C. PIPELINE
• Level 1 : 36m wide roads of 2.5
km length
• Level 2 : 24 m wide roads of 3.2
km length Level 3 : 18 m wide
roads of 6.5 km length
• Level 4 : 12 m & below wide
roads of 4.3 km length
Bus routes and bus stops
• Bus routes on level 1 and level 2
roads
• 4 bus stops at major road
junctions
Town Planning Schemes | PRAHLADNAGAR
URBAN SPRAWL | JIGAR PANDYA | 2013
Final plots
333
335
334
323
282
314
339
329338
317
318
322
321
312
319
313
311
310
304
324
320
305
271
308
309
315
307
303
302
276
306
299
298
295
301
337
274
325
291
293/2
293/1
296
294
278
300
275
280
277
297 332
290
292
279
263
261
264
289
283
270
272 273
268/2
269
330
331
260 232
234
229
227
228
226
254
218
213220
222
231
230
225
219
208
223
224
259
209
206
205
207
210
215
211
268/1 233 216214
221
107
212
267
203
204
258
202
256
201
200
265
266
257
248
82
199
87
84
76
139/1
8081
130
169
85
86
83
73
192
69
77
79
67
78
68
75
70
71
72
62 63 64
66/1
74
66/2
96
65
117 95
97
100
101
102
103
189
246 99
128
129
45
54/2
46
53/2
49/1
236
58
44
43
49/2 47
48/1
60
20
19
1718151413/2
16
42
13/1 13/3
12
36
10
11
9
6
28
3
35
34
7 8
41
59
50
30
1
32
33
22
21/2
4
21/1
23
26
27
31
40
29
39/1
39/2
61
54/1
51
55
90/3
98
123
113
148
116
138137136115
114
110
111
112108
109
142
125
106
193
124
120
245
104
131 133 132
134
127
122
244
126
135
119
121 150
243
154
155
156186
157184183
151
180153195
196
177
158159
160
162
161
146145
147
149
144
143
165
164
163
141
237
179
140
167 191 194
250
181
185
190
178 166
174
173
165
187/2
139/2
170
171
172
197
240
239
188
249
242
241
238
251
175
176
187/1
252
326
284
286 287
285
288
327
235/1
235/2
316
40.0
0
M
12
.00 M
12.00
M
12.00M
24.00 M
24.00 M
12.00
M
12.00M
18
.00 M
18
.00 M
9.00
M
24
.00M
12.0
0
M
12.00
M
9.00
M
12.0
0
M
18
.00 M
12.00 M
24.00M
12.00 M
7.50M
12.00 M
12.00M
12.00 M
12.0
0
M
12.00 M
40.0
0
M
18.00M
24
.00M
18.00 M
12.00 M
12.00M
12.00 M
12.0
0
M
12
.00 M
18
.00 M
18
.00 M
12.00M
12.00 M
18.00 M
7.50M
12.00M
18.00
M
24.00M
18.00 M
18.00 M
9.00M
18.00 M
24.00M
12.00M
12.00M
9.00M
12.00M
7.50M
12.00M
7.50M
9.00 M
18.00
M
18.00 M
18.00M
12.00M
30.00 M
90/1
94
152
53/1
5289
57 105
88
90/2
91
9293
118
56
30.00 M
9.00M
24.00M
9.00 M
9.00
M
12.00 M
12.00 M
9.00M
9.00 M
12.00M
24.00M
18.00 M
DRAFT T.P.S. NO-24 (VEJALPUR)
24.00M
12.00M
12.00M
18.00 M
18
.00M
18
.00M
18
.00M
18.00 M
18.00 M
5
2
DRAFT T.P.S. NO-23 (VEJALPUR)
9.00 M
9.00 M
9.00M
7.50M
9.00 M
9.00 M
DRAFT T.P.S. NO-25 (VEJALPUR)
18.00 M
7.
50
M
12.00M
24
25
38
37
856
868/1/2
867
133
135/P
137
136/P
140
866/P
138
142/P
141 845/1/1
140
846
851
840
841
847
843
844
864
838
838
837
848
792
793
794/2
791
794/1
790
5/1
5/2
6
849
5/3
850
833
835/1 + 835/3
795
796 789
797/4
797/3
797/1 797/2
787
785/3
785/2
786
784
788/1
788/2
834 798/P
800/2
804/1
831
806
783
781/1
781/3
782
8/2
9
10
781/2
779
778
801
828/P
780
802/1+2
803/1/1+1
803/3
816
815
811
812
810
809
805
813
888
896
894
936
895
891 892
938
939
940/4
940/1 940/2
940/3
937
935
934/3
944 945
946/2
942/2
942/1
943
941/1
941/2
941/3
941/4
934/1
890
886
887
817
814
885/1
823
820
885/2
885/3
900 901/1
901/2
902
901/3
901/4
926/1
926/2
928/1
928/2
955
954/2
952
953
954/1
956/2
956/1
924/4
924/3925/3
925/2903/2903/1
904
905
908
907/2
907/1
912
909/1
909/3 910/2
925/1
922/1
921
911/2
911/1
1335/1+2
922/2
924/1
924/2
929/2
929/1 929/3
932/3
932/1 930/5
931
948
947
949
951
930/4
933/1 933/2
933/3
932/2
898
897
899
824
821
829
825
826
906
830
828
827
884
913
914/2
915
920
919/3
957
919/2
916
918
883
835
831
833
919/1
834
836 881
879880837
836
833
839/3
838/1
838/2
882
917
958
33959
875
876
877
878
862861
860
839/1
839/2
841/1
859/1 TO 7
864
863
857
865
866 868
869
870
872
873
871
874
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
S.E.W.S.H.
S.E.W.S.H.
S.E.W.S.H.
S.E.W.S.H.
336
12.00M
GARDEN
GARDEN
GARDEN
262
GARDEN
GARDEN
GARDEN
GARDEN
SALE FOR
SALE FORCOMM.
COMM.
SALE FOR
COMM.
SALE FOR
COMM.
217
255
SALE FOR
COMM.
SALE FOR
COMM.
SALE FOR
COMM.
SALE FOR
COMM.
SALE FOR COMM.
SALE FOR
COMM.
SALE FOR
COMM.
NEIGHBOUR HOOD
CENTRE
NEIGHBOUR HOOD
CENTRE
198
NEIGHBOUR HOOD
CENTRE
247
NEIGHBOUR HOOD
CENTRE
253
NEIGHBOUR HOOD
CENTRE
NEIGHBOUR HOOD
CENTRE
SCHOOL
SCHOOL
SCHOOL
SALE FOR
COMM.
GARDEN
O.S.
O.S.
PLAY
GROUND
OPEN SPACE
O.S.
O.S.
O.S.
O.S.
DRAFT T.P.S. NO-26
(M
AKARBA)
A
D
J.
M
A
K
A
R
B
A
-
D.P.
A
R
E
A
A
D
J.
V
E
J
A
L
P
U
R
-
D.P.
A
R
E
A
60.00MT.
NATIONAL
HIGHWAY
ROAD
S.E.W.S.H.
S.E.W.S.H.
S.E.W.S.H.
S.E.W.S.H.
S.E.W.S.H.
9.00 M
7.50M
O.S.
TANK
N.C.
O.
S. O.
S.
N.C.
AHMEDABAD URBAN DEVELOPMENT AUTHORITY
020 20 40 80 Meters
799/1
862
188
TOSARKHEJ
TOGANDHINAGAR
TO SHYAMAL CROSS ROADS
O.
S.
328
SALE
COMM.
FOR
914/1
822
182
910/1
923
909/2 909/4
956/3
927
950
930/1
930/6
930/2
930/3
934/2
946/2
818/2
826/P
+
803/2
827/P
800/1
804/2
805
785
799/2
798
835/2
836
7
8/1+3+4
807
808
893
863
845/2
+
845/1+2
866/P
136/P
139/1 TO 139/6
859
144
135/P
145/P
146/1
146/2
180
869/2
869/1
184
185/P
870
214
871/P
842/1+2
881
889
852
R
A
I
L
W
A
Y
L
I
N
E
LEGEND
T.P.S. BOUNDRY
SURVEY BOUNDRY
O.P. BOUNDARY
F.P. BOUNDARY
BUILD UP STRUCTURES
SALE FOR COMMERCIAL
NEIGHBOURHOOD CENTRE
S.E.W.S.H.(Socially Eco.
Weaker Sec. Housing )
GARDEN, PLAY GROUND, O.S.
ROADS
VILLAGE BOUNDRY
SALE FOR RESIDENTIAL
WATER BODY
O.N.G.C. PIPELINE
• Total area of the scheme
162 Ha.
• Total area of original plots
155 Ha.
• Final plots allotted to land
owners in lieu of original plots
78 Ha.
• Net deduction 49.6 %
• Area of road 32.13 Ha
• Area of plots allotted to
authority for public purpose
51.87 Ha.
Town Planning Schemes | PRAHLADNAGAR
URBAN SPRAWL | JIGAR PANDYA | 2013
Plan no. 4
59
58
60
56
55/1
55/2
54
53
333
335
334
49/2
49/1
48
47/1
47/2
50
46/2
31/2
43
31/1
32
33
41
34
29
40
38
37
35
42
45
12
28
26
25
27
15
14
16
17
24
36
11/1+2
10
5
7
9
22
23
18
170
171
176
172
173
174
175
168
165
164
162
163
149
166
161
167
169
160
147
157
156 158
146
19
20
21
4 156
155
150
151
152
148
145 153
154
144
44
2
141
142
23
25
24
26
110
140
13 14
21
20
1
177
182
181
179
184
183
180
131
130
129
178
132
135
133
134
116
115
114113
109
107
117
119
118
120
128
121
122
123
124
125
126127
136
137
138
139
80
70 81
108
82
106
83
22
11
12
15
16
17
18
8
9
1
5
6
7
2
3
4
7
3
2
16
17
18 19
6/2
6/1
5
13/3
13/1
13/2
14
15
12/2
12/1
11
10
9
7 8
6
24
25
26
22
4
5
27
29
28
31
30
9
12
11
10
8
20
27 28
33
34
32
3031
51
35
39
40 41
36
37
38
46
47
44
45
42
43
68
67
66
69
71
72
73 75
84
74
76 77
78
55
54
79
86
88
85 87
89
91
100
101
99
103
104
105
102 9798
96
92
90
95
93
94
58
53
56
60
5962 57
63
64
65
50
49
52
19
29
52
30
61
13
3
143
61
48
21
32
1
23
323
282
314
339
329338
317
318
322
39
321
312
319
313
311
310
304
324
320
305
271
308
309
315
307
303
302
276
306
299
298
295
301
337
274
325
291
293/2
293/1
296
294
278
300
275
280
277
297 332
290
292
279
263
261
264
289
283
270
272 273
268/2
269
330
331
260 232
234
229
227
228
226
254
218
213220
222
231
230
225
219
208
223
224
259
209
206
205
207
210
215
211
268/1 233 216214
221
107
212
267
203
204
258
202
256
201
200
265
266
257
248
82
199
87
84
76
139/1
8081
130
169
85
86
83
73
192
69
77
79
67
78
68
75
70
71
72
62 63 64
66/1
74
66/2
96
65
117 95
97
100
101
102
103
189
246 99
128
129
45
54/2
46
53/2
49/1
236
4
58
44
43
49/2 47
48/1
60
20
19
1718151413/2
16
42
13/1 13/3
12
36
10
11
9
6
28
3
35
34
7 8
41
59
50
30
1
32
33
22
21/2
4
21/1
23
26
27
31
40
29
39/1
39/2
61
54/1
51
55
90/3
98
123
113
148
116
138137136115
114
110
111
112108
109
142
125
106
193
124
120
245
104
131 133 132
134
127
122
244
126
135
119
121 150
243
154
155
156186
157184183
151
180153195
196
177
158159
160
162
161
146145
147
149
144
143
165
164
163
141
237
179
140
167 191 194
250
181
185
190
178 166
174
173
165
187/2
139/2
170
171
172
197
240
239
188
249
242
241
238
251
175
176
187/1
252
326
284
286 287
285
288
327
235/1
235/2
316
40.0
0
M
12
.0
0
M
12.00
M
12.00
M
24.00
M
24
.00
M
12.00
M
12.00M
18
.0
0
M
18
.0
0
M
9.0
0 M
24
.00M
12
.0
0
M
12.00
M
9.00
M
12
.0
0
M
18
.0
0
M
12.00 M
24.00
M
12.00 M
7.50M
12.00 M
12.00
M
12.00 M
12
.0
0
M
12.00
M
40.0
0
M
18.00
M
24
.00M
18.00 M
12.00 M
12.00M
12.00 M
12.0
0
M
12
.0
0
M
18
.0
0
M
18
.0
0
M
12.00M
12.00 M
18.00 M
7.50M
12.00M
18.00
M
24.00M
18.00 M
18.00 M
9.00M
18.00 M
24.00M
12.00M
12.00M
9.00M
12.00M
7.50M
12.00M
7.50M
9.00 M
18.00
M
18.00 M
18.00M
12.00M
30.00 M
90/1
94
152
53/1
5289
57 105
88
90/2
91
9293
118
56
30.00 M
9.00M
24.00M
9.00 M
9.00
M
12.00 M
12.00 M
9.00M
9.00 M
12.00M
24.00M
18.00 M
DRAFT T.P.S. NO-24 (VEJALPUR)
24.00M
12.00M
12.00M
18.00 M
18
.00M
18
.00M
18
.00M
18.00 M
18.00 M
5
2
DRAFT T.P.S. NO-23 (VEJALPUR)
9.00 M
9.00 M
9.00M
7.50M
9.00 M
9.00 M
DRAFT T.P.S. NO-25 (VEJALPUR)
18.00 M
7.
50
M
12.00M
24
25
38
37
856
868/1/2
867
133
135/P
137
136/P
140
866/P
138
142/P
141 845/1/1
140
846
851
840
841
847
843
844
864
838
838
837
848
792
793
794/2
791
794/1
790
5/1
5/2
6
849
5/3
850
833
835/1 + 835/3
795
796 789
797/4
797/3
797/1 797/2
787
785/3
785/2
786
784
788/1
788/2
834 798/P
800/2
804/1
831
806
783
781/1
781/3
782
8/2
9
10
781/2
779
778
801
828/P
780
802/1+2
803/1/1+1
803/3
816
815
811
812
810
809
805
813
888
896
894
936
895
891 892
938
939
940/4
940/1 940/2
940/3
937
935
934/3
944 945
946/2
942/2
942/1
943
941/1
941/2
941/3
941/4
934/1
890
886
887
817
814
885/1
823
820
885/2
885/3
900 901/1
901/2
902
901/3
901/4
926/1
926/2
928/1
928/2
955
954/2
952
953
954/1
956/2
956/1
924/4
924/3925/3
925/2903/2903/1
904
905
908
907/2
907/1
912
909/1
909/3 910/2
925/1
922/1
921
911/2
911/1
1335/1+2
922/2
924/1
924/2
929/2
929/1 929/3
932/3
932/1 930/5
931
948
947
949
951
930/4
933/1 933/2
933/3
932/2
898
897
899
824
821
829
825
826
906
830
828
827
884
913
914/2
915
920
919/3
957
919/2
916
918
883
835
831
833
919/1
834
836 881
879880837
836
833
839/3
838/1
838/2
882
917
958
33959
875
876
877
878
862861
860
839/1
839/2
841/1
859/1 TO 7
864
863
857
865
866 868
869
870
872
873
871
874
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
SALE FOR
RESIDENCE
S.E.W.S.H.
S.E.W.S.H.
S.E.W.S.H.
S.E.W.S.H.
336
12.00M
GARDEN
GARDEN
GARDEN
262
GARDEN
GARDEN
GARDEN
GARDEN
SALE FOR
SALE FORCOMM.
COMM.
SALE FOR
COMM.
SALE FOR
COMM.
217
255
SALE FOR
COMM.
SALE FOR
COMM.
SALE FOR
COMM.
SALE FOR
COMM.
SALE FOR COMM.
SALE FOR
COMM.
SALE FOR
COMM.
NEIGHBOUR HOOD
CENTRE
NEIGHBOUR HOOD
CENTRE
198
NEIGHBOUR HOOD
CENTRE
247
NEIGHBOUR HOOD
CENTRE
253
NEIGHBOUR HOOD
CENTRE
NEIGHBOUR HOOD
CENTRE
SCHOOL
SCHOOL
SCHOOL
SALE FOR
COMM.
GARDEN
O.S.
O.S.
PLAY
GROUND
OPEN SPACE
O.S.
O.S.
O.S.
O.S.
DRAFT T.P.S. NO-26
(M
AKARBA)
A
D
J.
M
A
K
A
R
B
A
-
D.P.
A
R
E
A
A
D
J.
V
E
J
A
L
P
U
R
-
D.P.
A
R
E
A
60.00MT.
NATIONAL
HIGHWAY
ROAD
S.E.W.S.H.
S.E.W.S.H.
S.E.W.S.H.
S.E.W.S.H.
S.E.W.S.H.
9.00 M
7.50M
O.S.
TANK
N.C.
O.
S. O.
S.
N.C.
AHMEDABAD URBAN DEVELOPMENT AUTHORITY
020 20 40 80 Meters
799/1
862
188
TOSARKHEJ
TOGANDHINAGAR
TO SHYAMAL CROSS ROADS
O.
S.
328
SALE
COMM.
FOR
914/1
822
10
182
1
910/1
923
909/2 909/4
956/3
927
950
930/1
930/6
930/2
930/3
934/2
946/2
818/2
826/P
+
803/2
827/P
800/1
804/2
805
785
799/2
798
6
835/2
8
836
7
8/1+3+4
807
808
112
893
863
845/2
+
845/1+2
866/P46/1
136/P
139/1 TO 139/6
859
144
135/P
145/P
146/1
146/2
51
180
869/2
869/1
184
57
185/P
870
214
871/P
842/1+2
881
111
889
852
R
A
I
L
W
A
Y
L
I
N
E
LEGEND
T.P.S. BOUNDRY
SURVEY BOUNDRY
O.P. BOUNDARY
F.P. BOUNDARY
BUILD UP STRUCTURES
SALE FOR COMMERCIAL
NEIGHBOURHOOD CENTRE
S.E.W.S.H.(Socially Eco.
Weaker Sec. Housing )
GARDEN, PLAY GROUND, O.S.
ROADS
VILLAGE BOUNDRY
SALE FOR RESIDENTIAL
WATER BODY
O.N.G.C. PIPELINE
• Plots allotted to AUDA for
public purpose were
distributed spatially to
cater the demand sector
wise.
• Water bodies were not
only preserved but are
proposed for
development.
• Roads were proposed in
continuance with adjacent
schemes and lands on
other side of highway
Town Planning Schemes | PRAHLADNAGAR
URBAN SPRAWL | JIGAR PANDYA | 2013
plots to AUDA
40.0
0
M
12
.0
0
M
12.00 M
12.00M
24.00 M
24
.00 M
12.00
M
12.00M
18
.0
0
M
18
.0
0
M
9.00
M
24
.00M
12.0
0
M
12.00
M
9.00
M
12.0
0
M
18
.0
0
M
12.00 M
24.00M
12.00 M
7.50M
12.00 M
12.00M
12.00 M
12.0
0
M
12.00 M
40.0
0
M
18.00M
24
.00M
18.00 M
12.00 M
12.00M
12.00 M
12.0
0
M
12
.0
0
M
18
.0
0
M
18
.0
0
M
12.00M
12.00 M
18.00 M
7.50M
12.00M
18.00
M
24.00M
18.00 M
18.00 M
9.00M
18.00 M
24.00M
12.00M
12.00M
9.00M
12.00M
7.50M
12.00M
7.50M
9.00 M
18.00
M
18.00 M
18.00M
12.00M
30.00 M
30.00 M
9.00M
24.00M
9.00 M
9.00
M
12.00 M
12.00 M
9.00M
9.00 M
12.00M
24.00M
18.00 M
DRAFT T.P.S. NO-24 (VEJALPUR)
24.00M
12.00M
12.00M
18.00 M
18
.00M
18
.00M
18
.00M
18.00 M
18.00 M
DRAFT T.P.S. NO-23 (VEJALPUR)
9.00 M
9.00 M
9.00M
7.50M
9.00 M
9.00 M
DRAFT T.P.S. NO-25 (VEJALPUR)
18.00 M
7.
50
M
12.00M
12.00M
DRAFT T.P.S. NO-26
(M
AKARBA)
A
D
J.
M
A
K
A
R
B
A
-
D.P.
A
R
E
A
A
D
J.
V
E
J
A
L
P
U
R
-
D.P.
A
R
E
A
60.00MT.
NATIONAL
HIGHWAY
ROAD
9.00 M
7.50M
AHMEDABAD URBAN DEVELOPMENT AUTHORITY
020 20 40 80 Meters
TOSARKHEJ
TOGANDHINAGAR
TO SHYAMAL CROSS ROADS
R
A
I
L
W
A
Y
L
I
N
E
LEGEND
T.P.S. BOUNDRY
SURVEY BOUNDRY
O.P. BOUNDARY
F.P. BOUNDARY
BUILD UP STRUCTURES
SALE FOR COMMERCIAL
NEIGHBOURHOOD CENTRE
S.E.W.S.H.(Socially Eco.
Weaker Sec. Housing )
GARDEN, PLAY GROUND, O.S.
ROADS
VILLAGE BOUNDRY
SALE FOR RESIDENTIAL
WATER BODY
O.N.G.C. PIPELINE
• Plots allotted to
appropriate authority for
sale for residential &
commercial of an area of
20 Ha. Is estimated to
fetch an amount of 40
crores that may be used
for infrastructure to be
developed.
• Loans from financial
institutions can also be
availed in lieu of it
Town Planning Schemes | PRAHLADNAGAR
URBAN SPRAWL | JIGAR PANDYA | 2013
gardens/o.s. & road
Area %
in Ha.
Garden/O.S. 7.55 4.66
Water bodies 2.00 1.24
Roads 32.13 19.83
TOTAL 41.86 25.73
Area of scheme – 162 Ha.
25.73 % area covered under
roads & open space at scheme
level is highest compared to any
scheme in AUDA.
40.00 M
12
.00M
12.00 M
12.00M
24.00 M
24.00 M
12.00 M
12.00M
18
.00M
18
.00M
9.00
M
24
.00M
12.0
0
M
12.00
M
9.00
M
12.0
0
M
18
.00M
12.00 M
24.00M
12.00 M
7.50M
12.00 M
12.00M
12.00 M
12.0
0
M
12.00 M
40.0
0
M
18
.00M
24
.00M
18.00 M
12.00 M
12.00M
12.00 M
12.0
0
M
12
.00M
18
.00M
18
.00M
12.00M
12.00 M
18.00 M
7.50M
12.00M
18.00M
24.00M
18.00 M
18.00 M
9.00M
18.00 M 24.00M
12.00M
12.00M
9.00M
12.00M
7.50M
12.00M
7.50M
9.00 M
18.00M
18.00 M
18.00M
12.00M
30.00 M
30.00 M
9.00M
24.00M
9.00 M
9.00
M
12.00 M
12.00 M
9.00M
9.00 M
12.00M
24.00M
18.00 M
DRAFT T.P.S. NO-24 (VEJALPUR)
24.00M
12.00M
12.00M
18.00 M
18
.00M
18
.00M
18
.00M
18.00 M
18.00 M
DRAFT T.P.S. NO-23 (VEJALPUR)
9.00 M
9.00 M
9.00M
7.50M
9.00 M
9.00 M
DRAFT T.P.S. NO-25 (VEJALPUR)
18.00 M
7.
50
M
12.00M
12.00M
DRAFT T.P.S. NO-26
(M
AKARBA)
9.00 M
7.50M
AHMEDABAD URBAN DEVELOPMENT AUTHORITY
ASSISTANT TOWN PLANNER CHIEF EXECUTIVE AUTHORITYSENIOR TOWN PLANNER
020 20 40 80 Meters
AHMEDABAD
URBAN DEVELOPMENT
A
UTHORITY
TO SHYAMAL CROSS ROADS
LEGEND
T.P.S. BOUNDRY
SURVEY BOUNDRY
O.P. BOUNDARY
F.P. BOUNDARY
BUILD UP STRUCTURES
SALE FOR COMMERCIAL
NEIGHBOURHOOD CENTRE
S.E.W.S.H.(Socially Eco.
Weaker Sec. Housing )
GARDEN, PLAY GROUND, O.S.
ROADS
VILLAGE BOUNDRY
SALE FOR RESIDENTIAL
WATER BODY
O.N.G.C. PIPELINE
Town Planning Schemes | PRAHLADNAGAR
URBAN SPRAWL | JIGAR PANDYA | 2013
Finance | Form ‘G’
• Expenses u/s 40(3)(c,f,g,h) 25,40,60,275/-
• Compensation as per col. 11 20,50,23,034/-
• Cost of publication 5,50,000/-
• Legal expenses 12,50,000/-
• Compensation u/s 82 1,00,000/-
• Cost of preparing scheme 1,70,00,000/-
• Total cost of scheme 47,79,83,309/-
• Total of increment, col. 12 82,16,24,229/-
• 50% of increment paid to auda 41,08,12,115/-
• Net cost of scheme to AUDA 6,71,71,193/-
Town Planning Schemes | PRAHLADNAGAR
URBAN SPRAWL | JIGAR PANDYA | 2013
TPS Redistribution & valuation | F form ~ Betterment charge
T Revenue
Serial e Survey Without
Num- Name of Owner n Number reference
ber u ---------- Num- Area in to Inclusive
r C. S . ber Sq.Mtrs value of of
e NO. structures structures
1 2 3 3(a) 4 5 6 (a) 6(b)
1 CHANDKHEDA NAGAR PALIKA 705/P 1 5078 1015600 1015600
2 SHAMBHUPRASAD VIZ. GOVINDLAL
SHANKARLAL
706/1 2/1 8052 1449360 1449360
JAIMINABEN G/O 706/2 2/2 1213 315380 315380
MINOR :- 706/3 2/3 2087 584360 584360
AMIBEN BHARATKUMAR PATEL 11352 2349100 2349100
NATVARLAL AMBALAL
CHANCHALBEN WD/O AMBALAL
MANIBEN PRABHUDAS
PRAVINCHANDRA PRABHUDAS
BHARATKUMAR PRABHUDAS
SHARMISHTABEN PRABHUDAS
NIRUBEN PRABHUDAS
ORIGINAL PLOT
VALUE IN RUPEES
URBAN SPRAWL | JIGAR PANDYA | 2013
Form ‘ F’ contd.
Contribution Addition to (+) Net demand
(+) or deduction from (+) or by
Compensation Increment from (-) (-) owner being
Without Without Under Section(Section 78) Contribution Contribution the addition of
reference Inclusive reference Inclusive 80 Colmn 9(b) Column (Section 79) to be made columns
Num- Area in to value of of struc- to value of of struc- MINUS 10(a) MINUS 50% of under other 11,13,14,
ber Sq.Mtrs structures tures structures tures Column 6(b) Column 9(a) Column 12 Section columns
7 8 9(a) 9(b) 10 (a) 10(b) 11 12 13 14 15
1 3047 609360 609360 1828080 1828080 -406240 1218720 609360 --- 203120
2 6811 1430352 1430352 4291056 4291056 -918748 2860704 1430352 --- 511604
1) SHARES OF OWNERS IN F.P. AS PER THEIR SHARES IN O.P.
2) OWNERS TO RECEIVE COMPENCATION AND PAY CONTRIBUTION
IN PROPORATION TO THEIR SHARES
FINAL PLOT
VALUE IN RUPEES
Undeveloped Developed
TPS Redistribution & valuation | F form ~ Betterment charge
URBAN SPRAWL | JIGAR PANDYA | 2013
Summary
• Town planning scheme is widely used tool for development of urban area
in Gujarat
• It is self financing mechanism for development of infrastructure
• It is most democratic way of development where owner is not deprived of
his land
• If the tool is used in its utmost right way, development can be much faster
than any other way of development
• However, it has not played a vital role in Smart Growth..but it can.
• No plot are reserved or planned for hawking, Parking, or community
development.
• The deductions too are not dynamic, and only vary depending on the zone
in which the T.P.S is being executed.
URBAN SPRAWL | JIGAR PANDYA | 2013
Model testing | SWOT & PEST analysis
time: 2 hrs
Group A & B
Dynamic Land Deductions based on Pre-Specified Land
Use.(30%, 40% & 50%) (pre Construction)
Group C & D
Contiguous Common Open Plot planning at the rear to create
Land equity for community purpose ( post Occupancy )
Group E & F
5% Land Deductions on FP to create Land equity for community
purpose ( post Occupancy)

More Related Content

What's hot

Theories and Concepts of town planning
Theories and Concepts of town planningTheories and Concepts of town planning
Theories and Concepts of town planning
Srishti Mehta
 
Thresold analysis planning techniques bhavesh patel_20sa03up014
Thresold analysis planning techniques bhavesh patel_20sa03up014Thresold analysis planning techniques bhavesh patel_20sa03up014
Thresold analysis planning techniques bhavesh patel_20sa03up014
Kruti Galia
 
Data survey design for Urban Planning
Data survey design for Urban PlanningData survey design for Urban Planning
Data survey design for Urban Planning
Iram Aziz
 

What's hot (20)

Theories and Concepts of town planning
Theories and Concepts of town planningTheories and Concepts of town planning
Theories and Concepts of town planning
 
Master Plan & Delhi Master Plan
Master Plan & Delhi Master PlanMaster Plan & Delhi Master Plan
Master Plan & Delhi Master Plan
 
Determinants or Urban Form urban morphology
Determinants or Urban Form urban morphologyDeterminants or Urban Form urban morphology
Determinants or Urban Form urban morphology
 
Radiant city concept of le corbusier
Radiant city concept of le corbusierRadiant city concept of le corbusier
Radiant city concept of le corbusier
 
GARDEN CITY MOVEMENT
GARDEN CITY MOVEMENT GARDEN CITY MOVEMENT
GARDEN CITY MOVEMENT
 
Architecture Town And Planing Lecture
Architecture Town And Planing LectureArchitecture Town And Planing Lecture
Architecture Town And Planing Lecture
 
TRANSIT ORIENTED DEVELOPMENT
TRANSIT ORIENTED DEVELOPMENTTRANSIT ORIENTED DEVELOPMENT
TRANSIT ORIENTED DEVELOPMENT
 
Structural plan for bangalore
Structural plan for bangaloreStructural plan for bangalore
Structural plan for bangalore
 
Planning Surveys
Planning SurveysPlanning Surveys
Planning Surveys
 
Urban planning theories
Urban planning theoriesUrban planning theories
Urban planning theories
 
City forms
City formsCity forms
City forms
 
Thresold analysis planning techniques bhavesh patel_20sa03up014
Thresold analysis planning techniques bhavesh patel_20sa03up014Thresold analysis planning techniques bhavesh patel_20sa03up014
Thresold analysis planning techniques bhavesh patel_20sa03up014
 
Multi Nuclei Model
Multi Nuclei ModelMulti Nuclei Model
Multi Nuclei Model
 
Neighbourhood Planning
Neighbourhood PlanningNeighbourhood Planning
Neighbourhood Planning
 
Central business district
Central business districtCentral business district
Central business district
 
Data survey design for Urban Planning
Data survey design for Urban PlanningData survey design for Urban Planning
Data survey design for Urban Planning
 
Mumford
MumfordMumford
Mumford
 
Chandigarh: grid iron pattern
Chandigarh: grid iron patternChandigarh: grid iron pattern
Chandigarh: grid iron pattern
 
Garden city and the Idea of Modern Planning (Lewis Mumford)
Garden city and the Idea of Modern Planning (Lewis Mumford)Garden city and the Idea of Modern Planning (Lewis Mumford)
Garden city and the Idea of Modern Planning (Lewis Mumford)
 
Land pooling Policy of DDA TPS and Magarpatta
Land pooling   Policy of DDA TPS and MagarpattaLand pooling   Policy of DDA TPS and Magarpatta
Land pooling Policy of DDA TPS and Magarpatta
 

Similar to Urban sprawl in india and smart growth model

Challenges opportunities and way forward in making indian cities and citizens...
Challenges opportunities and way forward in making indian cities and citizens...Challenges opportunities and way forward in making indian cities and citizens...
Challenges opportunities and way forward in making indian cities and citizens...
ANIRBAN CHOUDHURY
 
Sustaibale cities -Suggestive approach to make cities energy efficient
Sustaibale cities -Suggestive approach to make cities energy efficientSustaibale cities -Suggestive approach to make cities energy efficient
Sustaibale cities -Suggestive approach to make cities energy efficient
JitKumarGupta1
 
How to make Cities great places to live.docx
How to make Cities great places to live.docxHow to make Cities great places to live.docx
How to make Cities great places to live.docx
JIT KUMAR GUPTA
 

Similar to Urban sprawl in india and smart growth model (20)

Challenges opportunities and way forward in making indian cities and citizens...
Challenges opportunities and way forward in making indian cities and citizens...Challenges opportunities and way forward in making indian cities and citizens...
Challenges opportunities and way forward in making indian cities and citizens...
 
IRJET-About Urban Sprawl: A Case Study of Ahmedabad City
IRJET-About Urban Sprawl: A Case Study of Ahmedabad CityIRJET-About Urban Sprawl: A Case Study of Ahmedabad City
IRJET-About Urban Sprawl: A Case Study of Ahmedabad City
 
Urban Real Estate & Development in India
Urban Real Estate & Development in IndiaUrban Real Estate & Development in India
Urban Real Estate & Development in India
 
100 smart cities India-CONCEPT & SCHEME
100 smart cities India-CONCEPT & SCHEME100 smart cities India-CONCEPT & SCHEME
100 smart cities India-CONCEPT & SCHEME
 
Redefining Master Plans to Promote Smart and Sustainable Cities
Redefining Master Plans to Promote Smart and Sustainable CitiesRedefining Master Plans to Promote Smart and Sustainable Cities
Redefining Master Plans to Promote Smart and Sustainable Cities
 
PLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTS
PLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTSPLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTS
PLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTS
 
Presentation2.pptx
Presentation2.pptxPresentation2.pptx
Presentation2.pptx
 
Trends of Urbanisation in Smart City of Faridabad: A Geographical Perspective
Trends of Urbanisation in Smart City of Faridabad: A Geographical PerspectiveTrends of Urbanisation in Smart City of Faridabad: A Geographical Perspective
Trends of Urbanisation in Smart City of Faridabad: A Geographical Perspective
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
 
IRJET- Study on Transit Oriented Development
IRJET- Study on Transit Oriented DevelopmentIRJET- Study on Transit Oriented Development
IRJET- Study on Transit Oriented Development
 
IRJET- A Review Study on Urban Sprawl
IRJET-  	  A Review Study on Urban SprawlIRJET-  	  A Review Study on Urban Sprawl
IRJET- A Review Study on Urban Sprawl
 
Smart growth in INDIAN context
Smart growth in INDIAN contextSmart growth in INDIAN context
Smart growth in INDIAN context
 
IRJET- A Review Study on Compact City
IRJET-  	  A Review Study on Compact CityIRJET-  	  A Review Study on Compact City
IRJET- A Review Study on Compact City
 
SMART CITY MISSION.pdf
SMART CITY MISSION.pdfSMART CITY MISSION.pdf
SMART CITY MISSION.pdf
 
Proposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of Nashik
Proposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of NashikProposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of Nashik
Proposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of Nashik
 
Sustaibale cities -Suggestive approach to make cities energy efficient
Sustaibale cities -Suggestive approach to make cities energy efficientSustaibale cities -Suggestive approach to make cities energy efficient
Sustaibale cities -Suggestive approach to make cities energy efficient
 
Strategies for preventing melting cities
Strategies for preventing melting cities   Strategies for preventing melting cities
Strategies for preventing melting cities
 
Strategies for preventing melting cities
Strategies for preventing melting cities   Strategies for preventing melting cities
Strategies for preventing melting cities
 
How to make Cities great places to live.docx
How to make Cities great places to live.docxHow to make Cities great places to live.docx
How to make Cities great places to live.docx
 
Smart city mostafizur rahman lpu
Smart city mostafizur rahman lpuSmart city mostafizur rahman lpu
Smart city mostafizur rahman lpu
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 

Urban sprawl in india and smart growth model

  • 1. URBAN SPRAWL | JIGAR PANDYA | 2013 URBAN SPRAWL ULCRA | L.A. ACT | Town Planning Schemes & smart growth
  • 2. URBAN SPRAWL | JIGAR PANDYA | 2013 Urban sprawl is the biggest barrier to smart growth
  • 3. URBAN SPRAWL | JIGAR PANDYA | 2013 Urban Sprawl creates ~ linkages ~ beyond urban fringe. It displays inefficient land use Which results into poor urban infrastructure
  • 4. URBAN SPRAWL | JIGAR PANDYA | 2013 How does a City Grow? In theory, any city requires spaces to grow. IF there are geographic constraints, the growth can either be restricted or immensely sporadic in nature. An urban center growth has one of the 4 classic patterns.
  • 5. URBAN SPRAWL | JIGAR PANDYA | 2013 THEORY 1 | Concentric Urban Sprawl In1920s. Ernest Burgess, a geographer at the university of Chicago’s School of Uraban Geography, proposed a ‘Concentric Circle Theory’ for Urban Land use structure. As per the theory, most of the cities have a clearly visible business core, known as ‘Central Business district (CBD), where office buildings, major retail stores, services, government buildings, library, etc are located. The development takes place around the CBD in a circular ring pattern. The inner most ring, closest to the CBD is usually known as ‘Transition Zone’ which has some manufacturing zones and low income housing for workers and labors associated with manufacturing industries. The outer two rings are mainly hosing developments having low to medium income residential multifamily or single houses scattered in the ring and the outermost ring having the upper income groups housing having luxurious ranches with lavish multifamily houses for the medium income groups.
  • 6. URBAN SPRAWL | JIGAR PANDYA | 2013 Transportation and infrastructure play a major role in the direction in which the communities grow. Railroads were major drivers for the manufacturing industry carrying freight, making growth pattern concentrated around the railroad network. Other land uses developed in a circular pattern around the business core of a town or city.
  • 7. URBAN SPRAWL | JIGAR PANDYA | 2013 THEORY 2 | Sectoral Growth This theory was proposed by Homer Hoyt, a geographer from Chicago. The sector sprawl is similar to the Concentric sprawl, however, unlike rings, the development develops concentric to the CBD in a radial or sectoral pattern. The upper and middle income groups, likely to have their own personal transportation tend to be located away on the opposite side of the CBD to gain advantage of the environmental factors, class prestige and peace.
  • 8. URBAN SPRAWL | JIGAR PANDYA | 2013 THEORY 3 | Axial Sprawl The axial Growth theory of land use develops on the concentric growth pattern by adding transportation routes which are characterized by their axes. It recognizes the CBD as the most intensely used area, travel time to the CBD is the key for growth and not the distance between the two locations. Several towns and city having geographic entities such as sea faces, riverfronts or mountains have shown axial sprawl.
  • 9. URBAN SPRAWL | JIGAR PANDYA | 2013 THEROY 4 | Multiple Nuclei Sprawl In recent times, the urbanization trend price of REAL ESTATE has developed several pockets of settlement in and around a major city. A metropolitan city in every country is known to have several suburbs around it. These suburbs have been there for some time now, but due to scarcity of land in the CBD, and industries not willing to relocate to new towns or states, they tend to re establish themselves, or have branch operations from the suburbs.. Slowly, these suburbs are transformed into mini satellite urban centers around the CBD, having their own mini Business district. Multiple nuclei sprawl is seen very commonly in many major cities across the world.
  • 10. URBAN SPRAWL | JIGAR PANDYA | 2013 Identifying growth patterns and vectors | An Investor/ Planner can identify growth patterns by plotting historical data on maps of the sub-markets and comparing the results. Classifying the historical pattern (concentric, sector, axial or multiple nuclei) may provide deep insight into how the area will change and predict future developments. In addition an investor can track:- – Where is the capital moving? – Where are the population pockets evolving? – Where are the land use changing? – What are the trends in the land prices, area wise? – What are major upcoming directions of roads and transportation construction? – What is the Location and direction of existing and upcoming municipal services? – What are zoning changes? – What are the various Annexation activities? – What kind of building permits are granted in certain areas? – How are the neighborhoods changing?
  • 11. URBAN SPRAWL | JIGAR PANDYA | 2013 ULCRA- 1976 Urban Land Ceiling & Regulation Act CLASS BOUNDARY MAX LAND HOLDING CITIES A 10 Kms 500 Sq. Mts MUMBAI, KOLKATA, CHENNAI, NEW DELHI B 8 Kms 1000 Sq. Mts AHMEDABAD, BANGALORE, HYDERABAD C 6 Kms 1500 Sq. Mts LUCKNOW, PUNE, and more. D 4 Kms 2000 Sq. Mts BARODA, SURAT, and more.
  • 12. URBAN SPRAWL | JIGAR PANDYA | 2013 IMPACT OF ULCRA | URBAN LAND DEVELOPMENTS CL LIMIT MAX LAND HOLDING CITIES A 10 Kms 500 M2 METROS B 8 Kms 1000 M2 AHMEDABAD, C 6 Kms 1500 M2 PUNE D 4 Kms 2000 M2 BARODA, SURAT City Center With Municipal Corporation Limit
  • 13. URBAN SPRAWL | JIGAR PANDYA | 2013 IMPACT OF ULCRA | URBAN LAND DEVELOPMENTS CL LIMIT MAX LAND HOLDING CITIES A 10 Kms 500 M2 METROS B 8 Kms 1000 M2 AHMEDABAD, C 6 Kms 1500 M2 PUNE D 4 Kms 2000 M2 BARODA, SURAT Corporation Area Distance for ULCRA limit (8 Kms)
  • 14. URBAN SPRAWL | JIGAR PANDYA | 2013 IMPACT OF ULCRA | URBAN LAND DEVELOPMENTS CL LIMIT MAX LAND HOLDING CITIES A 10 Kms 500 M2 METROS B 8 Kms 1000 M2 AHMEDABAD, C 6 Kms 1500 M2 PUNE D 4 Kms 2000 M2 BARODA, SURAT Area for Development as per Master Plan or Development Plan
  • 15. URBAN SPRAWL | JIGAR PANDYA | 2013 IMPACT OF ULCRA | URBAN LAND DEVELOPMENTS CL LIMIT MAX LAND HOLDING CITIES A 10 Kms 500 M2 METROS B 8 Kms 1000 M2 AHMEDABAD, C 6 Kms 1500 M2 PUNE D 4 Kms 2000 M2 BARODA, SURAT
  • 16. URBAN SPRAWL | JIGAR PANDYA | 2013 IMPACT OF ULCRA | URBAN LAND DEVELOPMENTS CL LIMIT MAX LAND HOLDING CITIES A 10 Kms 500 M2 METROS B 8 Kms 1000 M2 AHMEDABAD, C 6 Kms 1500 M2 PUNE D 4 Kms 2000 M2 BARODA, SURAT
  • 17. URBAN SPRAWL | JIGAR PANDYA | 2013 IMPACT OF ULCRA | URBAN LAND DEVELOPMENTS CL LIMIT MAX LAND HOLDING CITIES A 10 Kms 500 M2 METROS B 8 Kms 1000 M2 AHMEDABAD, C 6 Kms 1500 M2 PUNE D 4 Kms 2000 M2 BARODA, SURAT
  • 18. URBAN SPRAWL | JIGAR PANDYA | 2013 IMPACT OF ULCRA | URBAN LAND DEVELOPMENTS CL LIMIT MAX LAND HOLDING CITIES A 10 Kms 500 M2 METROS B 8 Kms 1000 M2 AHMEDABAD, C 6 Kms 1500 M2 PUNE D 4 Kms 2000 M2 BARODA, SURAT
  • 19. URBAN SPRAWL | JIGAR PANDYA | 2013 Approaches to Managing New Growth: The Gujarat Model There have been, by and large, two approaches to managing new urban growth in India. In the first approach the public planning authorities and development agencies acquire large portions of land and then re plan them in a desirable or appropriate manner. This is referred to as the “land acquisition” method. In the second approach, the public planning agencies and development authorities, instead of acquiring land, bring together or “pool together” a group of owners and then re plan the area by readjusting or reshaping every land parcel in a manner such that it is given a regular shape and access and in the process a portion of land parcel is appropriated to provide for roads, infrastructure, and public amenities. This is referred to as the “land readjustment and pooling” method. Both the approaches, with their merits and demerits, are briefly explained and illustrated through sketches.
  • 20. URBAN SPRAWL | JIGAR PANDYA | 2013 Land Acquisition Method In this method, the public planning authorities/development agencies acquire large areas of land from agricultural landholders (farmers) under the Land Acquisition Act of 1894. Compensation paid to farmers is based on prevailing agricultural land prices. To minimize opposition to acquisition farmers are paid prices marginally higher than agricultural land prices. Then a master plan of the area is prepared, laying out the roads, plots for social amenities, and plots for sale. Roads and infrastructure are then built, using government funds or loans. Serviced plots are then sold for urban uses at market rates, which are most often much higher than the rate at which land is acquired.
  • 21. URBAN SPRAWL | JIGAR PANDYA | 2013 Advantages of LA method Adequate amounts of land for urban uses can be rapidly generated, provided that there is little opposition to bulk acquisition from farmers. To expedite acquisition, some states allow private developers to assemble land. In many cases, developers use extralegal means ( additional incentives/ non formal offers) to secure farmers' consent. There are very few constraints in preparing the master plan. The benefit of appreciation of land value on its being converted to urban use accrues to the development authority. ( Builders and authority profit more)
  • 22. URBAN SPRAWL | JIGAR PANDYA | 2013 Disadvantages of LA method Original owners or farmers don’t share this benefit in any manner. This goes against the grain of fairness. In this method, farmers are essentially thrown off their land. Unable to wisely invest the money received as compensation for their land and deprived of a means of livelihood, they have to join the pool of urban labor. This process adds to familiar urban problems—growth of slums, increase in crime rates, and increased informal-sector economic activity. The development process is slow. Any person who needs land for urban use has to approach the urban development authority. The development authority ends up becoming a bottleneck for development. Development agencies using the method of bulk land acquisition end up being powerful large-scale land developers, controlling vast urban resources. This is likely to breed corruption and is antithetical to the emerging paradigm, where government plays a facilitator’s role.
  • 23. URBAN SPRAWL | JIGAR PANDYA | 2013 TDR stands for transferable development rights. Maharastra and some others States have allowed builders to exceed their FSI for a particular plot, by transferring development rights from elsewhere. Reason Sometimes state Governments have to acquire land for public purposes and reimburse them according as per the provisions of Land Acquisition Act. In order to speed up the acquisition of reserved plots of land, some of the states Governments have evolved this new scheme. Under the scheme, the owner develops the plot required by the Govt. for public purposes at his own cost up to plinth level and hands over the same without receiving any monetary compensation. TDR
  • 24. URBAN SPRAWL | JIGAR PANDYA | 2013 TDR The state Government however, in lieu, grants to the owner, FSI equivalent to the FSI of the land surrendered in the form of a certificate of Development Rights (DRC). These DRCs are transferable as negotiable instruments, and are commonly called TDRs. To sum up, TDR means that FSI of a property under acquisition or reservation is transferred as movable property to some other property where the same can be utilized for construction of additional floors / premises exceeding the permissible FSI of the latter property.
  • 25. URBAN SPRAWL | JIGAR PANDYA | 2013 TDR a tool for Smart Growth • Allows Urban Densifications. • Can be controlled – depending on up gradation of Urban Infrastructure. • Incentives can be linked beyond FSI & Built-up • Can be used to solve the housing backlog. • Very effective for Slum Rehabilitation and Government Utility Buildings.
  • 26. URBAN SPRAWL | JIGAR PANDYA | 2013 Land Pooling and Readjustment Method (Town Planning Schemes) • In this method, the public planning agency or development authority temporarily brings together a group of landowners for the purpose of planning, under the aegis of the state- level town or urban planning act. As there is no acquisition or transfer of ownership involved, there is no case for paying compensation. • A master plan of the area is prepared, laying out the roads and plots for social amenities. The remaining land is reconstituted into final plots for the original owners. The size of the final plot is in proportion to the size of the original plot, and its location is as close as possible to the original plot. • A betterment charge based on the cost of the infrastructure proposed to be laid is levied on the landowners. Infrastructure is then provided utilizing these funds.
  • 27. URBAN SPRAWL | JIGAR PANDYA | 2013 Town Planning Schemes | Land Pooling & readjustment Mechanism
  • 28. URBAN SPRAWL | JIGAR PANDYA | 2013 • Town Planning Schemes | Land Pooling & readjustment Mechanism
  • 29. URBAN SPRAWL | JIGAR PANDYA | 2013 • Town Planning Schemes | Land Pooling & readjustment Mechanism
  • 30. URBAN SPRAWL | JIGAR PANDYA | 2013 Valuation & area Town Planning Schemes | Land Pooling & readjustment Mechanism
  • 31. URBAN SPRAWL | JIGAR PANDYA | 2013 Valuation & area Town Planning Schemes | Land Pooling & readjustment Mechanism
  • 32. URBAN SPRAWL | JIGAR PANDYA | 2013 Valuation & area Town Planning Schemes | Land Pooling & readjustment Mechanism
  • 33. URBAN SPRAWL | JIGAR PANDYA | 2013 Advantages All the land, except whatever is needed for infrastructure development and social amenities, remains with the original owner. The development agency plays a limited role in ensuring planned urban growth. The increment in land value resulting from the development accrues to the original owner whenever the land is sold and developed for urban use. Thus the benefit of development goes to the original owner instead of the development agency. The original owner is not displaced in the process of land development and continues to enjoy access to the land resource. Thus the negative impact of the process of urbanization on farmers (original owners) is minimized. Town Planning Schemes | Land Pooling & readjustment Mechanism
  • 34. URBAN SPRAWL | JIGAR PANDYA | 2013 Disadvantages • Time consuming, – land pooling or readjustment schemes is unduly complicated and cumbersome. • Betterment charges are levied at the time of Plan passing. – . Due to the inordinate delays in finalizing schemes, the betterment charges levied on finalization of the scheme do not meet the cost of the infrastructure provided. • This method has only been successfully used in Gujarat as of today. Town Planning Schemes | Land Pooling & readjustment Mechanism
  • 35. URBAN SPRAWL | JIGAR PANDYA | 2013 Road network 40.0 0 M 12 .0 0M 12.00 M 12.00M 24.00 M 24.00 M 12.00 M 12.00M 18 .0 0M 18 .0 0M 9.00 M 24 .00M 12 .0 0 M 12.00 M 9.00 M 12.0 0 M 18 .0 0M 12.00 M 24.00M 12.00 M 7.50M 12.00 M 12.00M 12.00 M 12.0 0 M 12.00 M 40.0 0 M 18 .00M 24 .00M 18.00 M 12.00 M 12.00M 12.00 M 12.0 0 M 12 .0 0M 18 .0 0M 18 .0 0M 12.00M 12.00 M 18.00 M 7.50M 12.00M 18.00 M 24.00M 18.00 M 18.00 M 9.00M 18.00 M 24.00M 12.00M 12.00M 9.00M 12.00M 7.50M 12.00M 7.50M 9.00 M 18.00 M 18.00 M 18.00M 12.00M 30.00 M 30.00 M 9.00M 24.00M 9.00 M 9.00 M 12.00 M 12.00 M 9.00M 9.00 M12.00M 24.00M 18.00 M DRAFT T.P.S. NO-24 (VEJALPUR) 24.00M 12.00M 12.00M 18.00 M 18 .00M 18 .00M 18 .00M 18.00 M 18.00 M DRAFT T.P.S. NO-23 (VEJALPUR) 9.00 M 9.00 M 9.00M 7.50M 9.00 M 9.00 M DRAFT T.P.S. NO-25 (VEJALPUR) 18.00 M 7. 50 M 12.00M 12.00M DRAFT T.P.S. NO-26 (M AKARBA) A D J. M A K A R B A - D.P. A R E A A D J. V E J A L P U R - D.P. A R E A 60.00MT. NATIONAL HIGHWAY ROAD 9.00 M 7.50M AHMEDABAD URBAN DEVELOPMENT AUTHORITY ASSISTANT TOWN PLANNER CHIEF EXECUTIVE AUTHORITYSENIOR TOWN PLANNER 020 20 40 80 Meters AHMEDABAD URBAN DEVELOPMENT AUTHORITY TOSARKHEJ TOGANDHINAGAR TO SHYAMAL CROSS ROADS R A I L W A Y L I N E LEGEND T.P.S. BOUNDRY SURVEY BOUNDRY O.P. BOUNDARY F.P. BOUNDARY BUILD UP STRUCTURES SALE FOR COMMERCIAL NEIGHBOURHOOD CENTRE S.E.W.S.H.(Socially Eco. Weaker Sec. Housing ) GARDEN, PLAY GROUND, O.S. ROADS VILLAGE BOUNDRY SALE FOR RESIDENTIAL WATER BODY O.N.G.C. PIPELINE • Level 1 : 36m wide roads of 2.5 km length • Level 2 : 24 m wide roads of 3.2 km length Level 3 : 18 m wide roads of 6.5 km length • Level 4 : 12 m & below wide roads of 4.3 km length Bus routes and bus stops • Bus routes on level 1 and level 2 roads • 4 bus stops at major road junctions Town Planning Schemes | PRAHLADNAGAR
  • 36. URBAN SPRAWL | JIGAR PANDYA | 2013 Final plots 333 335 334 323 282 314 339 329338 317 318 322 321 312 319 313 311 310 304 324 320 305 271 308 309 315 307 303 302 276 306 299 298 295 301 337 274 325 291 293/2 293/1 296 294 278 300 275 280 277 297 332 290 292 279 263 261 264 289 283 270 272 273 268/2 269 330 331 260 232 234 229 227 228 226 254 218 213220 222 231 230 225 219 208 223 224 259 209 206 205 207 210 215 211 268/1 233 216214 221 107 212 267 203 204 258 202 256 201 200 265 266 257 248 82 199 87 84 76 139/1 8081 130 169 85 86 83 73 192 69 77 79 67 78 68 75 70 71 72 62 63 64 66/1 74 66/2 96 65 117 95 97 100 101 102 103 189 246 99 128 129 45 54/2 46 53/2 49/1 236 58 44 43 49/2 47 48/1 60 20 19 1718151413/2 16 42 13/1 13/3 12 36 10 11 9 6 28 3 35 34 7 8 41 59 50 30 1 32 33 22 21/2 4 21/1 23 26 27 31 40 29 39/1 39/2 61 54/1 51 55 90/3 98 123 113 148 116 138137136115 114 110 111 112108 109 142 125 106 193 124 120 245 104 131 133 132 134 127 122 244 126 135 119 121 150 243 154 155 156186 157184183 151 180153195 196 177 158159 160 162 161 146145 147 149 144 143 165 164 163 141 237 179 140 167 191 194 250 181 185 190 178 166 174 173 165 187/2 139/2 170 171 172 197 240 239 188 249 242 241 238 251 175 176 187/1 252 326 284 286 287 285 288 327 235/1 235/2 316 40.0 0 M 12 .00 M 12.00 M 12.00M 24.00 M 24.00 M 12.00 M 12.00M 18 .00 M 18 .00 M 9.00 M 24 .00M 12.0 0 M 12.00 M 9.00 M 12.0 0 M 18 .00 M 12.00 M 24.00M 12.00 M 7.50M 12.00 M 12.00M 12.00 M 12.0 0 M 12.00 M 40.0 0 M 18.00M 24 .00M 18.00 M 12.00 M 12.00M 12.00 M 12.0 0 M 12 .00 M 18 .00 M 18 .00 M 12.00M 12.00 M 18.00 M 7.50M 12.00M 18.00 M 24.00M 18.00 M 18.00 M 9.00M 18.00 M 24.00M 12.00M 12.00M 9.00M 12.00M 7.50M 12.00M 7.50M 9.00 M 18.00 M 18.00 M 18.00M 12.00M 30.00 M 90/1 94 152 53/1 5289 57 105 88 90/2 91 9293 118 56 30.00 M 9.00M 24.00M 9.00 M 9.00 M 12.00 M 12.00 M 9.00M 9.00 M 12.00M 24.00M 18.00 M DRAFT T.P.S. NO-24 (VEJALPUR) 24.00M 12.00M 12.00M 18.00 M 18 .00M 18 .00M 18 .00M 18.00 M 18.00 M 5 2 DRAFT T.P.S. NO-23 (VEJALPUR) 9.00 M 9.00 M 9.00M 7.50M 9.00 M 9.00 M DRAFT T.P.S. NO-25 (VEJALPUR) 18.00 M 7. 50 M 12.00M 24 25 38 37 856 868/1/2 867 133 135/P 137 136/P 140 866/P 138 142/P 141 845/1/1 140 846 851 840 841 847 843 844 864 838 838 837 848 792 793 794/2 791 794/1 790 5/1 5/2 6 849 5/3 850 833 835/1 + 835/3 795 796 789 797/4 797/3 797/1 797/2 787 785/3 785/2 786 784 788/1 788/2 834 798/P 800/2 804/1 831 806 783 781/1 781/3 782 8/2 9 10 781/2 779 778 801 828/P 780 802/1+2 803/1/1+1 803/3 816 815 811 812 810 809 805 813 888 896 894 936 895 891 892 938 939 940/4 940/1 940/2 940/3 937 935 934/3 944 945 946/2 942/2 942/1 943 941/1 941/2 941/3 941/4 934/1 890 886 887 817 814 885/1 823 820 885/2 885/3 900 901/1 901/2 902 901/3 901/4 926/1 926/2 928/1 928/2 955 954/2 952 953 954/1 956/2 956/1 924/4 924/3925/3 925/2903/2903/1 904 905 908 907/2 907/1 912 909/1 909/3 910/2 925/1 922/1 921 911/2 911/1 1335/1+2 922/2 924/1 924/2 929/2 929/1 929/3 932/3 932/1 930/5 931 948 947 949 951 930/4 933/1 933/2 933/3 932/2 898 897 899 824 821 829 825 826 906 830 828 827 884 913 914/2 915 920 919/3 957 919/2 916 918 883 835 831 833 919/1 834 836 881 879880837 836 833 839/3 838/1 838/2 882 917 958 33959 875 876 877 878 862861 860 839/1 839/2 841/1 859/1 TO 7 864 863 857 865 866 868 869 870 872 873 871 874 SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE S.E.W.S.H. S.E.W.S.H. S.E.W.S.H. S.E.W.S.H. 336 12.00M GARDEN GARDEN GARDEN 262 GARDEN GARDEN GARDEN GARDEN SALE FOR SALE FORCOMM. COMM. SALE FOR COMM. SALE FOR COMM. 217 255 SALE FOR COMM. SALE FOR COMM. SALE FOR COMM. SALE FOR COMM. SALE FOR COMM. SALE FOR COMM. SALE FOR COMM. NEIGHBOUR HOOD CENTRE NEIGHBOUR HOOD CENTRE 198 NEIGHBOUR HOOD CENTRE 247 NEIGHBOUR HOOD CENTRE 253 NEIGHBOUR HOOD CENTRE NEIGHBOUR HOOD CENTRE SCHOOL SCHOOL SCHOOL SALE FOR COMM. GARDEN O.S. O.S. PLAY GROUND OPEN SPACE O.S. O.S. O.S. O.S. DRAFT T.P.S. NO-26 (M AKARBA) A D J. M A K A R B A - D.P. A R E A A D J. V E J A L P U R - D.P. A R E A 60.00MT. NATIONAL HIGHWAY ROAD S.E.W.S.H. S.E.W.S.H. S.E.W.S.H. S.E.W.S.H. S.E.W.S.H. 9.00 M 7.50M O.S. TANK N.C. O. S. O. S. N.C. AHMEDABAD URBAN DEVELOPMENT AUTHORITY 020 20 40 80 Meters 799/1 862 188 TOSARKHEJ TOGANDHINAGAR TO SHYAMAL CROSS ROADS O. S. 328 SALE COMM. FOR 914/1 822 182 910/1 923 909/2 909/4 956/3 927 950 930/1 930/6 930/2 930/3 934/2 946/2 818/2 826/P + 803/2 827/P 800/1 804/2 805 785 799/2 798 835/2 836 7 8/1+3+4 807 808 893 863 845/2 + 845/1+2 866/P 136/P 139/1 TO 139/6 859 144 135/P 145/P 146/1 146/2 180 869/2 869/1 184 185/P 870 214 871/P 842/1+2 881 889 852 R A I L W A Y L I N E LEGEND T.P.S. BOUNDRY SURVEY BOUNDRY O.P. BOUNDARY F.P. BOUNDARY BUILD UP STRUCTURES SALE FOR COMMERCIAL NEIGHBOURHOOD CENTRE S.E.W.S.H.(Socially Eco. Weaker Sec. Housing ) GARDEN, PLAY GROUND, O.S. ROADS VILLAGE BOUNDRY SALE FOR RESIDENTIAL WATER BODY O.N.G.C. PIPELINE • Total area of the scheme 162 Ha. • Total area of original plots 155 Ha. • Final plots allotted to land owners in lieu of original plots 78 Ha. • Net deduction 49.6 % • Area of road 32.13 Ha • Area of plots allotted to authority for public purpose 51.87 Ha. Town Planning Schemes | PRAHLADNAGAR
  • 37. URBAN SPRAWL | JIGAR PANDYA | 2013 Plan no. 4 59 58 60 56 55/1 55/2 54 53 333 335 334 49/2 49/1 48 47/1 47/2 50 46/2 31/2 43 31/1 32 33 41 34 29 40 38 37 35 42 45 12 28 26 25 27 15 14 16 17 24 36 11/1+2 10 5 7 9 22 23 18 170 171 176 172 173 174 175 168 165 164 162 163 149 166 161 167 169 160 147 157 156 158 146 19 20 21 4 156 155 150 151 152 148 145 153 154 144 44 2 141 142 23 25 24 26 110 140 13 14 21 20 1 177 182 181 179 184 183 180 131 130 129 178 132 135 133 134 116 115 114113 109 107 117 119 118 120 128 121 122 123 124 125 126127 136 137 138 139 80 70 81 108 82 106 83 22 11 12 15 16 17 18 8 9 1 5 6 7 2 3 4 7 3 2 16 17 18 19 6/2 6/1 5 13/3 13/1 13/2 14 15 12/2 12/1 11 10 9 7 8 6 24 25 26 22 4 5 27 29 28 31 30 9 12 11 10 8 20 27 28 33 34 32 3031 51 35 39 40 41 36 37 38 46 47 44 45 42 43 68 67 66 69 71 72 73 75 84 74 76 77 78 55 54 79 86 88 85 87 89 91 100 101 99 103 104 105 102 9798 96 92 90 95 93 94 58 53 56 60 5962 57 63 64 65 50 49 52 19 29 52 30 61 13 3 143 61 48 21 32 1 23 323 282 314 339 329338 317 318 322 39 321 312 319 313 311 310 304 324 320 305 271 308 309 315 307 303 302 276 306 299 298 295 301 337 274 325 291 293/2 293/1 296 294 278 300 275 280 277 297 332 290 292 279 263 261 264 289 283 270 272 273 268/2 269 330 331 260 232 234 229 227 228 226 254 218 213220 222 231 230 225 219 208 223 224 259 209 206 205 207 210 215 211 268/1 233 216214 221 107 212 267 203 204 258 202 256 201 200 265 266 257 248 82 199 87 84 76 139/1 8081 130 169 85 86 83 73 192 69 77 79 67 78 68 75 70 71 72 62 63 64 66/1 74 66/2 96 65 117 95 97 100 101 102 103 189 246 99 128 129 45 54/2 46 53/2 49/1 236 4 58 44 43 49/2 47 48/1 60 20 19 1718151413/2 16 42 13/1 13/3 12 36 10 11 9 6 28 3 35 34 7 8 41 59 50 30 1 32 33 22 21/2 4 21/1 23 26 27 31 40 29 39/1 39/2 61 54/1 51 55 90/3 98 123 113 148 116 138137136115 114 110 111 112108 109 142 125 106 193 124 120 245 104 131 133 132 134 127 122 244 126 135 119 121 150 243 154 155 156186 157184183 151 180153195 196 177 158159 160 162 161 146145 147 149 144 143 165 164 163 141 237 179 140 167 191 194 250 181 185 190 178 166 174 173 165 187/2 139/2 170 171 172 197 240 239 188 249 242 241 238 251 175 176 187/1 252 326 284 286 287 285 288 327 235/1 235/2 316 40.0 0 M 12 .0 0 M 12.00 M 12.00 M 24.00 M 24 .00 M 12.00 M 12.00M 18 .0 0 M 18 .0 0 M 9.0 0 M 24 .00M 12 .0 0 M 12.00 M 9.00 M 12 .0 0 M 18 .0 0 M 12.00 M 24.00 M 12.00 M 7.50M 12.00 M 12.00 M 12.00 M 12 .0 0 M 12.00 M 40.0 0 M 18.00 M 24 .00M 18.00 M 12.00 M 12.00M 12.00 M 12.0 0 M 12 .0 0 M 18 .0 0 M 18 .0 0 M 12.00M 12.00 M 18.00 M 7.50M 12.00M 18.00 M 24.00M 18.00 M 18.00 M 9.00M 18.00 M 24.00M 12.00M 12.00M 9.00M 12.00M 7.50M 12.00M 7.50M 9.00 M 18.00 M 18.00 M 18.00M 12.00M 30.00 M 90/1 94 152 53/1 5289 57 105 88 90/2 91 9293 118 56 30.00 M 9.00M 24.00M 9.00 M 9.00 M 12.00 M 12.00 M 9.00M 9.00 M 12.00M 24.00M 18.00 M DRAFT T.P.S. NO-24 (VEJALPUR) 24.00M 12.00M 12.00M 18.00 M 18 .00M 18 .00M 18 .00M 18.00 M 18.00 M 5 2 DRAFT T.P.S. NO-23 (VEJALPUR) 9.00 M 9.00 M 9.00M 7.50M 9.00 M 9.00 M DRAFT T.P.S. NO-25 (VEJALPUR) 18.00 M 7. 50 M 12.00M 24 25 38 37 856 868/1/2 867 133 135/P 137 136/P 140 866/P 138 142/P 141 845/1/1 140 846 851 840 841 847 843 844 864 838 838 837 848 792 793 794/2 791 794/1 790 5/1 5/2 6 849 5/3 850 833 835/1 + 835/3 795 796 789 797/4 797/3 797/1 797/2 787 785/3 785/2 786 784 788/1 788/2 834 798/P 800/2 804/1 831 806 783 781/1 781/3 782 8/2 9 10 781/2 779 778 801 828/P 780 802/1+2 803/1/1+1 803/3 816 815 811 812 810 809 805 813 888 896 894 936 895 891 892 938 939 940/4 940/1 940/2 940/3 937 935 934/3 944 945 946/2 942/2 942/1 943 941/1 941/2 941/3 941/4 934/1 890 886 887 817 814 885/1 823 820 885/2 885/3 900 901/1 901/2 902 901/3 901/4 926/1 926/2 928/1 928/2 955 954/2 952 953 954/1 956/2 956/1 924/4 924/3925/3 925/2903/2903/1 904 905 908 907/2 907/1 912 909/1 909/3 910/2 925/1 922/1 921 911/2 911/1 1335/1+2 922/2 924/1 924/2 929/2 929/1 929/3 932/3 932/1 930/5 931 948 947 949 951 930/4 933/1 933/2 933/3 932/2 898 897 899 824 821 829 825 826 906 830 828 827 884 913 914/2 915 920 919/3 957 919/2 916 918 883 835 831 833 919/1 834 836 881 879880837 836 833 839/3 838/1 838/2 882 917 958 33959 875 876 877 878 862861 860 839/1 839/2 841/1 859/1 TO 7 864 863 857 865 866 868 869 870 872 873 871 874 SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE SALE FOR RESIDENCE S.E.W.S.H. S.E.W.S.H. S.E.W.S.H. S.E.W.S.H. 336 12.00M GARDEN GARDEN GARDEN 262 GARDEN GARDEN GARDEN GARDEN SALE FOR SALE FORCOMM. COMM. SALE FOR COMM. SALE FOR COMM. 217 255 SALE FOR COMM. SALE FOR COMM. SALE FOR COMM. SALE FOR COMM. SALE FOR COMM. SALE FOR COMM. SALE FOR COMM. NEIGHBOUR HOOD CENTRE NEIGHBOUR HOOD CENTRE 198 NEIGHBOUR HOOD CENTRE 247 NEIGHBOUR HOOD CENTRE 253 NEIGHBOUR HOOD CENTRE NEIGHBOUR HOOD CENTRE SCHOOL SCHOOL SCHOOL SALE FOR COMM. GARDEN O.S. O.S. PLAY GROUND OPEN SPACE O.S. O.S. O.S. O.S. DRAFT T.P.S. NO-26 (M AKARBA) A D J. M A K A R B A - D.P. A R E A A D J. V E J A L P U R - D.P. A R E A 60.00MT. NATIONAL HIGHWAY ROAD S.E.W.S.H. S.E.W.S.H. S.E.W.S.H. S.E.W.S.H. S.E.W.S.H. 9.00 M 7.50M O.S. TANK N.C. O. S. O. S. N.C. AHMEDABAD URBAN DEVELOPMENT AUTHORITY 020 20 40 80 Meters 799/1 862 188 TOSARKHEJ TOGANDHINAGAR TO SHYAMAL CROSS ROADS O. S. 328 SALE COMM. FOR 914/1 822 10 182 1 910/1 923 909/2 909/4 956/3 927 950 930/1 930/6 930/2 930/3 934/2 946/2 818/2 826/P + 803/2 827/P 800/1 804/2 805 785 799/2 798 6 835/2 8 836 7 8/1+3+4 807 808 112 893 863 845/2 + 845/1+2 866/P46/1 136/P 139/1 TO 139/6 859 144 135/P 145/P 146/1 146/2 51 180 869/2 869/1 184 57 185/P 870 214 871/P 842/1+2 881 111 889 852 R A I L W A Y L I N E LEGEND T.P.S. BOUNDRY SURVEY BOUNDRY O.P. BOUNDARY F.P. BOUNDARY BUILD UP STRUCTURES SALE FOR COMMERCIAL NEIGHBOURHOOD CENTRE S.E.W.S.H.(Socially Eco. Weaker Sec. Housing ) GARDEN, PLAY GROUND, O.S. ROADS VILLAGE BOUNDRY SALE FOR RESIDENTIAL WATER BODY O.N.G.C. PIPELINE • Plots allotted to AUDA for public purpose were distributed spatially to cater the demand sector wise. • Water bodies were not only preserved but are proposed for development. • Roads were proposed in continuance with adjacent schemes and lands on other side of highway Town Planning Schemes | PRAHLADNAGAR
  • 38. URBAN SPRAWL | JIGAR PANDYA | 2013 plots to AUDA 40.0 0 M 12 .0 0 M 12.00 M 12.00M 24.00 M 24 .00 M 12.00 M 12.00M 18 .0 0 M 18 .0 0 M 9.00 M 24 .00M 12.0 0 M 12.00 M 9.00 M 12.0 0 M 18 .0 0 M 12.00 M 24.00M 12.00 M 7.50M 12.00 M 12.00M 12.00 M 12.0 0 M 12.00 M 40.0 0 M 18.00M 24 .00M 18.00 M 12.00 M 12.00M 12.00 M 12.0 0 M 12 .0 0 M 18 .0 0 M 18 .0 0 M 12.00M 12.00 M 18.00 M 7.50M 12.00M 18.00 M 24.00M 18.00 M 18.00 M 9.00M 18.00 M 24.00M 12.00M 12.00M 9.00M 12.00M 7.50M 12.00M 7.50M 9.00 M 18.00 M 18.00 M 18.00M 12.00M 30.00 M 30.00 M 9.00M 24.00M 9.00 M 9.00 M 12.00 M 12.00 M 9.00M 9.00 M 12.00M 24.00M 18.00 M DRAFT T.P.S. NO-24 (VEJALPUR) 24.00M 12.00M 12.00M 18.00 M 18 .00M 18 .00M 18 .00M 18.00 M 18.00 M DRAFT T.P.S. NO-23 (VEJALPUR) 9.00 M 9.00 M 9.00M 7.50M 9.00 M 9.00 M DRAFT T.P.S. NO-25 (VEJALPUR) 18.00 M 7. 50 M 12.00M 12.00M DRAFT T.P.S. NO-26 (M AKARBA) A D J. M A K A R B A - D.P. A R E A A D J. V E J A L P U R - D.P. A R E A 60.00MT. NATIONAL HIGHWAY ROAD 9.00 M 7.50M AHMEDABAD URBAN DEVELOPMENT AUTHORITY 020 20 40 80 Meters TOSARKHEJ TOGANDHINAGAR TO SHYAMAL CROSS ROADS R A I L W A Y L I N E LEGEND T.P.S. BOUNDRY SURVEY BOUNDRY O.P. BOUNDARY F.P. BOUNDARY BUILD UP STRUCTURES SALE FOR COMMERCIAL NEIGHBOURHOOD CENTRE S.E.W.S.H.(Socially Eco. Weaker Sec. Housing ) GARDEN, PLAY GROUND, O.S. ROADS VILLAGE BOUNDRY SALE FOR RESIDENTIAL WATER BODY O.N.G.C. PIPELINE • Plots allotted to appropriate authority for sale for residential & commercial of an area of 20 Ha. Is estimated to fetch an amount of 40 crores that may be used for infrastructure to be developed. • Loans from financial institutions can also be availed in lieu of it Town Planning Schemes | PRAHLADNAGAR
  • 39. URBAN SPRAWL | JIGAR PANDYA | 2013 gardens/o.s. & road Area % in Ha. Garden/O.S. 7.55 4.66 Water bodies 2.00 1.24 Roads 32.13 19.83 TOTAL 41.86 25.73 Area of scheme – 162 Ha. 25.73 % area covered under roads & open space at scheme level is highest compared to any scheme in AUDA. 40.00 M 12 .00M 12.00 M 12.00M 24.00 M 24.00 M 12.00 M 12.00M 18 .00M 18 .00M 9.00 M 24 .00M 12.0 0 M 12.00 M 9.00 M 12.0 0 M 18 .00M 12.00 M 24.00M 12.00 M 7.50M 12.00 M 12.00M 12.00 M 12.0 0 M 12.00 M 40.0 0 M 18 .00M 24 .00M 18.00 M 12.00 M 12.00M 12.00 M 12.0 0 M 12 .00M 18 .00M 18 .00M 12.00M 12.00 M 18.00 M 7.50M 12.00M 18.00M 24.00M 18.00 M 18.00 M 9.00M 18.00 M 24.00M 12.00M 12.00M 9.00M 12.00M 7.50M 12.00M 7.50M 9.00 M 18.00M 18.00 M 18.00M 12.00M 30.00 M 30.00 M 9.00M 24.00M 9.00 M 9.00 M 12.00 M 12.00 M 9.00M 9.00 M 12.00M 24.00M 18.00 M DRAFT T.P.S. NO-24 (VEJALPUR) 24.00M 12.00M 12.00M 18.00 M 18 .00M 18 .00M 18 .00M 18.00 M 18.00 M DRAFT T.P.S. NO-23 (VEJALPUR) 9.00 M 9.00 M 9.00M 7.50M 9.00 M 9.00 M DRAFT T.P.S. NO-25 (VEJALPUR) 18.00 M 7. 50 M 12.00M 12.00M DRAFT T.P.S. NO-26 (M AKARBA) 9.00 M 7.50M AHMEDABAD URBAN DEVELOPMENT AUTHORITY ASSISTANT TOWN PLANNER CHIEF EXECUTIVE AUTHORITYSENIOR TOWN PLANNER 020 20 40 80 Meters AHMEDABAD URBAN DEVELOPMENT A UTHORITY TO SHYAMAL CROSS ROADS LEGEND T.P.S. BOUNDRY SURVEY BOUNDRY O.P. BOUNDARY F.P. BOUNDARY BUILD UP STRUCTURES SALE FOR COMMERCIAL NEIGHBOURHOOD CENTRE S.E.W.S.H.(Socially Eco. Weaker Sec. Housing ) GARDEN, PLAY GROUND, O.S. ROADS VILLAGE BOUNDRY SALE FOR RESIDENTIAL WATER BODY O.N.G.C. PIPELINE Town Planning Schemes | PRAHLADNAGAR
  • 40. URBAN SPRAWL | JIGAR PANDYA | 2013 Finance | Form ‘G’ • Expenses u/s 40(3)(c,f,g,h) 25,40,60,275/- • Compensation as per col. 11 20,50,23,034/- • Cost of publication 5,50,000/- • Legal expenses 12,50,000/- • Compensation u/s 82 1,00,000/- • Cost of preparing scheme 1,70,00,000/- • Total cost of scheme 47,79,83,309/- • Total of increment, col. 12 82,16,24,229/- • 50% of increment paid to auda 41,08,12,115/- • Net cost of scheme to AUDA 6,71,71,193/- Town Planning Schemes | PRAHLADNAGAR
  • 41. URBAN SPRAWL | JIGAR PANDYA | 2013 TPS Redistribution & valuation | F form ~ Betterment charge T Revenue Serial e Survey Without Num- Name of Owner n Number reference ber u ---------- Num- Area in to Inclusive r C. S . ber Sq.Mtrs value of of e NO. structures structures 1 2 3 3(a) 4 5 6 (a) 6(b) 1 CHANDKHEDA NAGAR PALIKA 705/P 1 5078 1015600 1015600 2 SHAMBHUPRASAD VIZ. GOVINDLAL SHANKARLAL 706/1 2/1 8052 1449360 1449360 JAIMINABEN G/O 706/2 2/2 1213 315380 315380 MINOR :- 706/3 2/3 2087 584360 584360 AMIBEN BHARATKUMAR PATEL 11352 2349100 2349100 NATVARLAL AMBALAL CHANCHALBEN WD/O AMBALAL MANIBEN PRABHUDAS PRAVINCHANDRA PRABHUDAS BHARATKUMAR PRABHUDAS SHARMISHTABEN PRABHUDAS NIRUBEN PRABHUDAS ORIGINAL PLOT VALUE IN RUPEES
  • 42. URBAN SPRAWL | JIGAR PANDYA | 2013 Form ‘ F’ contd. Contribution Addition to (+) Net demand (+) or deduction from (+) or by Compensation Increment from (-) (-) owner being Without Without Under Section(Section 78) Contribution Contribution the addition of reference Inclusive reference Inclusive 80 Colmn 9(b) Column (Section 79) to be made columns Num- Area in to value of of struc- to value of of struc- MINUS 10(a) MINUS 50% of under other 11,13,14, ber Sq.Mtrs structures tures structures tures Column 6(b) Column 9(a) Column 12 Section columns 7 8 9(a) 9(b) 10 (a) 10(b) 11 12 13 14 15 1 3047 609360 609360 1828080 1828080 -406240 1218720 609360 --- 203120 2 6811 1430352 1430352 4291056 4291056 -918748 2860704 1430352 --- 511604 1) SHARES OF OWNERS IN F.P. AS PER THEIR SHARES IN O.P. 2) OWNERS TO RECEIVE COMPENCATION AND PAY CONTRIBUTION IN PROPORATION TO THEIR SHARES FINAL PLOT VALUE IN RUPEES Undeveloped Developed TPS Redistribution & valuation | F form ~ Betterment charge
  • 43. URBAN SPRAWL | JIGAR PANDYA | 2013 Summary • Town planning scheme is widely used tool for development of urban area in Gujarat • It is self financing mechanism for development of infrastructure • It is most democratic way of development where owner is not deprived of his land • If the tool is used in its utmost right way, development can be much faster than any other way of development • However, it has not played a vital role in Smart Growth..but it can. • No plot are reserved or planned for hawking, Parking, or community development. • The deductions too are not dynamic, and only vary depending on the zone in which the T.P.S is being executed.
  • 44. URBAN SPRAWL | JIGAR PANDYA | 2013 Model testing | SWOT & PEST analysis time: 2 hrs Group A & B Dynamic Land Deductions based on Pre-Specified Land Use.(30%, 40% & 50%) (pre Construction) Group C & D Contiguous Common Open Plot planning at the rear to create Land equity for community purpose ( post Occupancy ) Group E & F 5% Land Deductions on FP to create Land equity for community purpose ( post Occupancy)