SlideShare a Scribd company logo
1 of 20
Information Technology
                    Team KRA Presentation




February 25, 2013
IT VISION




           The vision of ITG is to sustain a quality focused, highly
           productive, service-oriented and responsive organization
           based upon City Savings Bank’s brand promise of being a
                           helpful and reliable bank.




02/25/13
IT Mission Statement




   The mission of IT Group is to exceed CSB customers and other
           operating units’ expectations by providing secure
        information technology infrastructure and innovative,
     timely and reliable systems that supports efficient delivery
     of Bank services and to cost-effectively leverage technology
          to enable the Bank to meet its business objectives.




02/25/13
IT STRATEGIC GOALS


 1. Business and IT Strategic Alignment
 2. A Skilled and Knowledgeable IT Workforce
 3. Secure & Reliable IT Infrastructure
 4. Effective and Efficient Management of Desktop Hardware
    and Applications
 5. Management of Software Development Efforts for an
    Effective and Efficient Support of Business Processes and
    Service Delivery
 6. Efficient User Support and Quality Assurance
 7. Effective IT Controls and Standards



02/25/13
IT Strategic Goals, Objectives and Initiatives


 GOAL No.1         Business and IT Strategic Alignment

                   Ensuring that the IT organization and technology are aligned with CSB’s Business mission, goals and
 Goal Details:
                   objectives throughout planning and execution

                   Ensure that CSB’s future technology needs and IT Services are planned, strategically aligned and
 Objective:        prioritized according to Bank needs and objectives in an optimal manner ensuring that clear guidance is
                   known as to how IT decisions are made.
                   Periodically review, revise and update the IT strategic plan, at least once a year. This includes the
 Initiative:
                   development of annual IT Tactical Plan to implement the IT strategic plan.

 Deliverables:     IT Strategic and Tactical Plan

                                                           Periodic review
                                                           of deliverables    Expected
 Budgetary Cost:   N/A                 Start Date:                                                    Done – for approval
                                                           (monthly           Completion Date:
                                                           updates)
                                                           Staff
 Responsible TL:   Bong Tiamzon                                              IT Department Heads
                                                           Resource:

 Dependencies:     Corporate Strategic Plan




02/25/13
IT Strategic Goals, Objectives and Initiatives
  GOAL No.2                         A Skilled and Knowledgeable IT Workforce

                                    Aligning the IT organization’s structure and skills with the needs of the Bank, while promoting
  Goal Details:
                                    employee learning and satisfaction

                                    Improve the IT Organization through realignment of functions based on industry best practices to have
  Objective A:
                                    an effective and efficient delivery of information technology services for the Bank.
                                    1.    Identify core competencies necessary to assure business/IT alignment
                                    2.    Ensure continued alignment of information technology manpower in support of organizational
                                          goals and objectives.
                                    3.    Define clear lines of responsibilities to improve internal IT collaboration and teamwork.
  Initiatives:                            Overlapping responsibilities will be eliminated.
                                    4.    Provide an inventory of IT services and assign tightly-coupled or similar services to the same
                                          team.
                                    5.    Devise an organizational structure that is more adaptive and responsive to changes in
                                          technology and business needs
  Deliverables:                     Manpower Plan, Training Plan


                    Manpower Plan N/A                                       N/A                                      Done - Approved
  Budgetary Cost:                                                                             Expected
                                                       Start Date:
                                                                                              Completion Date:
                    Training Plan    PHP 1,808,208                          January 4, 2013                          March 15, 2013


  Responsible TL:                   Bong Tiamzon                           Staff Resource:    IT Department Heads

  Dependencies:                     Approved Training Budget



02/25/13
IT Strategic Goals, Objectives and Initiatives


  GOAL No.2         A Skilled and Knowledgeable IT Workforce

                    Aligning the IT organization’s structure and skills with the needs of the Bank, while promoting
  Goal Details:
                    employee learning and satisfaction

  Objective B:      Increase Technical Proficiency and Expertise

                    1.    Implement a comprehensive approach to IT employee technical development by developing a
                          Technical Training Plan to ensure excellence in IT delivery across the Bank.
                            •    Provide training opportunities to IT staff to keep current and learn new technologies they
                                 are required to support and encourage staff to obtain certifications where appropriate.
                            •    Increase cross training on critical systems for IT staff.
  Initiatives:
                    2.    Coordinate with Human Resources to set minimum technology proficiency standards and
                          identify critical applications for new hires and apply the standards in job descriptions,
                          requirements and evaluations.
                    3.    Require that training for users and IT support staff is a component of the purchase of any new
                          information technology system.
  Deliverables:     Training Plan
                                                                              Expected
  Budgetary Cost:    PHP 1,808,208     Start Date:          January 4, 2013                          March 15, 2013
                                                                              Completion Date:

  Responsible TL:   Bong Tiamzon                           Staff Resource:    IT Department Heads

  Dependencies:     Approved Training Budget



02/25/13
IT Strategic Goals, Objectives and Initiatives


GOAL No.3        Secure & Reliable IT Infrastructure
                 Defining and operating the Infrastructure and underlying architecture for long-term IT support of CSB
Goal Details:
                 business capabilities.
                 Implement adequate system, tools and infrastructure to be truly outcome-driven, customer-focused,
Objective A:
                 employee-enabled, accountable, efficient, and transparent.
                 1.    Implement tools and best practices that make routine tasks such as server administration, network
                       troubleshooting less time consuming and burdensome.
                 2.    Continue improvement of branches links through load balancing and redundancy (secondary service
                       provider or digital radio link whenever possible).
                 3.    Monitor technology evolution to cost effectively improve network throughput to branches.
                 4.    Enhance network management pro-active support capability by implementing an enterprise Network
Initiatives:
                       Management System.
                 5.    Reduce network infrastructure costs and improved network throughput by participating in the
                       Group’s Network Rationalization initiative (AEV).
                 6.    Reduce regional voice communication costs by routing regional phone calls over existing data
                       networks via Voice over IP technology.
                 7.    Institute a capacity management program to better address server and storage requirements.
                 Implementation of Network and Server Monitoring Tools, Branches Links Redundancy, Network Redesign
Deliverables:    and Upgrade, Network Rationalization, VOIP Implementation (HO Telephone System), Demand and
                 Capacity Management Plan




02/25/13
IT Strategic Goals, Objectives and Initiatives
                  Implementation of
                  Network and Server    N/A (Freeware)                        January 22,2013                        January 29,2013
                     Monitoring
                                       PHP 120,000 (one-
                     Branches Links                                                                                 Contract signing to
                                       time cost)
                  Redundancy (existing                                        Started                               be completed within
                                       PHP 60,000
                       branches)                                                                                    January 2013
                                       (recurring cost)
                                                                                                                    H.O. – April 30, 2013
                   Network Redesign
                                        PHP 4,754,000                         February 1, 2013                      Branches – June
                     and Upgrade
                                                                                                                    29,2013
                        Network
                                        N/A                                  Started (with AEV)     Expected        continuing
Budgetary            Rationalization
                                                             Start Date:                            Completion
Cost:             VOIP Implementation                                                                               H.O. – May 31, 2013
                                                                                                    Date:
                     (HO Telephone      PHP 2,480,200                         March 1, 2013                         Branches – July
                        System)                                                                                     31,2013
                  Demand and Capacity
                                         N/A                                  January 8, 2013                       February 15,2013
                   Management Plan
                   Finacle Production
                                         PHP 6,000,000                        Jan 3, 2013                            Jan 6, 2013 (Done)
                     Server Upgrade
                    Finacle DR Server
                                         PHP 2,500,000                        June 1, 2013                           July 31, 2013
                        Upgrade

                  Storage and Backup
                                         PHP 1,485,000                        August 1, 2013                         August 31, 2013
                       Solution

                                                                                                   Infrastructure Management Team,
                                        Technology Operations Head (for
Responsible TL:                                                               Staff Resource:      Network Administrator (additional
                                        hiring)/Nilo Singcol
                                                                                                   manpower)
Dependencies:                            Approved CAPEX, Hiring of Technology Operations Manager and Network Administrator

02/25/13
IT Strategic Goals, Objectives and Initiatives


 GOAL No.3         Secure & Reliable IT Infrastructure

                   Defining and operating the Infrastructure and underlying architecture for long-term IT support of CSB
 Goal Details:
                   business capabilities.
                   Recognize technology and security trends, and position CSB to benefit from the evaluation of emerging
 Objective B:
                   technology and the implementation of proven technology solutions.
                   1.    Identify opportunities to improve service levels through hardware and data redundancy.
 Initiatives:      2.    Preserve and enhance the network infrastructure through an ongoing commitment to upgrade,
                         extend and diversify its capabilities and support.
 Deliverables:     Network Redesign and Upgrade
                                                                                                H.O. – April 30, 2013
                                                         February 1,       Expected
 Budgetary Cost:   PHP 4,754,000      Start Date:                                               Branches – June
                                                         2013              Completion Date:
                                                                                                29,2013
                   Technology Operations Head (for       Staff           Infrastructure Management Team, Network
 Responsible TL:
                   hiring)/Nilo Singcol                  Resource:       Administrator (additional manpower)

 Dependencies:      Approved CAPEX, Hiring of Technology Operations Manager and Network Administrator




02/25/13
IT Strategic Goals, Objectives and Initiatives

GOAL No.3                        Secure & Reliable IT Infrastructure
                                 Defining and operating the Infrastructure and underlying architecture for long-term IT support of CSB
Goal Details:
                                 business capabilities.
                                 Leverage on the Group’s entire IT investments through group-wide coordination on IT
Objective C:
                                 investments/initiatives and the possibility of consolidation of IT systems and services
                                 1.    Work with the group IT (AEV-CSD) to identify opportunity areas for IT shared services / strategic
                                       sourcing initiatives.
                                 2.    Achieve Data Center Consolidation – Corporate Initiative (AEV). Upon completion of the data centers’
                                       co-location, the CSB will be moving in the direction of virtualization and then establishing common
Initiatives:                           computing services as a unified enterprise strategy (AEV).
                                 3.    Continue to look at opportunities for reducing the number of technology environments.
                                 4.    Establish Disaster Recovery Capabilities - Creation of a more efficient IT environment that includes
                                       additional disaster recovery capability. Identify other major core applications/components that need
                                       to be replicated to the off-site/DR facility.
Deliverables:                     Out-sourcing Plan, Storage and Backup Solution, DRP
                Out-sourcing Plan N/A                                 Feb 1, 2013                                    Feb 28, 2013
Budgetary         Storage and                                                               Expected Completion
                                PHP 1,485,000      Start Date:        August 1, 2013                                 August 31, 2013
Cost:           Backup Solution                                                             Date:
                      DRP         N/A                                 part of BCP                                    part of BCP
                Out-sourcing Plan Bong Tiamzon                                              IT Department Heads
                  Storage and
Responsible TL:                   Technology Operations Head (for     Staff Resource:      Infrastructure Management Team, Network
                Backup Solution,
                                  hiring)/Nilo Singcol                                     Administrator (additional manpower)
                      DRP
Dependencies:                      BCP, Approved CAPEX, Hiring of Technology Operations Manager and Network Administrator



02/25/13
IT Strategic Goals, Objectives and Initiatives
GOAL No.4                            Effective and Efficient Management of Desktop Hardware and Applications
Goal Details:                        Managing desktop hardware and applications to ensure effective and efficient support of business goals.
                                     Efficient management of desktop hardware and applications from acquisition, setup and installation, end user
Objective A:
                                     operation, to administration and support.
                                     1.    Continue to develop and fund a model for the availability of consistent, up-to-date technology and an
                                           “acquire, retire, and upgrade” cycle for computers, software, and other information technology.
                                     2.    Implement a PC and peripherals replacement program where Bank PCs and related hardware are
                                           replaced on a recurring basis. Assume a PC/Desktop life cycle of four years. Replace printers during the
Initiatives:                               five to seven year period. Acquire work group or departmental printers wherever possible.
                                     3.    Continue to acquire Windows Operating system and Microsoft Office Professional for each PC/Desktop.
                                     4.    Institute a formal software licensing tracking program.
                                     5.    Recommend and implement use of PC/Desktop remote management tools.
                                     6.    Implement a physical IT and software asset inventory methodology.
                                     Desktop Replacement Plan, Software Licensing Tracking System, Desktop Remote Management System, IT
Deliverables:
                                     Inventory System
                     Desktop
                                     N/A                                   January 15, 2013                                February 15, 2013
                Replacement Plan
                     Software
                Licensing Tracking   N/A                                   January 22, 2013                                March 15, 2013
Budgetary Cost:       System                                                                         Expected
                                                       Start Date:
                 Desktop Remote                                                                      Completion Date:
                   Management        N/A (Freeware)                        February 19, 2013                               March 19,2013
                      System
                   IT Inventory
                                     N/A                                   January 22, 2013                                March 15, 2013
                      System
                                                                                                    Rose Ygona (Records Management), Tech
Responsible TL:                       Butch Solon                          Staff Resource:
                                                                                                    Support Team
Dependencies:                         None

 02/25/13
IT Strategic Goals, Objectives and Initiatives



GOAL No.4         Effective and Efficient Management of Desktop Hardware and Applications


Goal Details:     Managing desktop hardware and applications to ensure effective and efficient support of business goals.

Objective B:      Timely updates of essential desktop tools

                  Continually monitor the vendor marketplace in areas of desktop applications and tools that are core to
Initiatives:
                  the Bank's IT environment.

Deliverables:     Desktop Software Inventory (Tracking List)
                                                                              Expected
Budgetary Cost:   N/A                Start Date:          January 15, 2013                          February 15, 2013
                                                                              Completion Date:
Responsible TL:    Butch Solon                           Staff Resource: Technical Support Team

Dependencies:      None




02/25/13
IT Strategic Goals, Objectives and Initiatives

                                  Management of Software Development Efforts for an Effective and Efficient Support of Business
GOAL No.5
                                  Processes and Service Delivery

Goal Details:                     Effective and efficient delivery of application solutions following best practices and standards

                                  Recognize the potential of the new core banking system and leverage its power for an increased
Objective A:
                                  operational efficiencies and productivity.
                                  1.   Implement Finacle Phase 2 – Loans Module
Initiatives:                      2.   Continuous improvement of core banking system. (Enhance the capability of support staff to handle
                                       customization support).
Deliverables:                      Finacle Loans Module Implementation, Customization Training
                   Finacle Loans
                      Module     USD 335,000                            Started Dec. 2012                                July 31, 2013
Budgetary                                                                                         Expected
                  Implementation                     Start Date:
Cost:                                                                                             Completion Date:
                   Customization Part of Phase 2
                                                                        May 6, 2013                                      May 18, 2013
                      Training   Budget
                                                                                                 Core Banking System Project Management
Responsible TL:                    Bong Tiamzon/Ramil Tigley            Staff Resource:
                                                                                                 Team (Core Team)

Dependencies:                      Quality of Infosys Deliverables, Hiring of Additional User Support




02/25/13
IT Strategic Goals, Objectives and Initiatives


                  Management of Software Development Efforts for an Effective and Efficient Support of
GOAL No.5
                  Business Processes and Service Delivery

Goal Details:     Effective and efficient delivery of application solutions following best practices and standards

Objective B:      Appropriately manage project risks in IT initiatives involving large and complex projects.

                  1.    Ensure that effective project management methods/framework, including risk management
Initiatives:            activities, are followed on all IT projects.
                  2.    Comply with the policy and procedure on project Risk rating.

Deliverables:      Adopting Best Practices Framework for Project Management

                                                                            Expected
Budgetary Cost:   N/A                 Start Date:          Continuing                            Continuing
                                                                            Completion Date:
                                                                           Application Development and Maintenance
Responsible TL:    Ramil Tigley                            Staff Resource:
                                                                           Team

Dependencies:      ISMS Policies and Procedures




02/25/13
IT Strategic Goals, Objectives and Initiatives

                                   Management of Software Development Efforts for an Effective and Efficient Support of Business
GOAL No.5
                                   Processes and Service Delivery
Goal Details:                      Effective and efficient delivery of application solutions following best practices and standards
Objective C:                       Improve business process automation
                                   1.     Create CSB e-Community (a one stop shop for information portal) - Internal/External/Regulatory
Initiatives:                              reports, Branch/Employee directory, Policies/Procedures, etc.
                                   2.     Support to other business requirements (Central Clearing, Bills Payment, Asset Management)
Deliverables:                        e-Community portal, Bills Payment Facility, Central Clearing System, Asset Management System
                   e-Community In-house
Budgetary Cost:                                                             Started (2012)                           December 29, 2013
                        portal     development
                                                                                                                    Dependent on Business
                   Bills Payment In-house
Budgetary Cost:                                                             Started (2012)                          requirement/target
                       Facility    development
                                                                                                Expected            date
                                                        Start Date:
                  Central Clearing                                                              Completion Date:
Budgetary Cost:                    PHP 9,149,750                            Started (2012)                           August 15, 2013
                       System
                        Asset
                                    In-house
Budgetary Cost:    Management                                               January 21, 2013                         April 15, 2013
                                   development
                       System
                                                                                             Application Development and Maintenance
Responsible TL:                     Ramil Tigley                            Staff Resource:
                                                                                             Team, User Support and QA Team
Dependencies:                        Hiring of additional developer, Loans successful implementation




02/25/13
IT Strategic Goals, Objectives and Initiatives
GOAL No.6                         Efficient User Support and Quality Assurance
                                  Establish an IT support model that satisfies the diverse needs of the Bank and provide an accurate, valid,
Goal Details:
                                  real time IT systems that support the business functions
Objective A:                      Improve User Support Best Practices
                                  1.    Develop service level agreements with end-users and departments.
                                  2.    Provide enhanced Incident and Problem management by implementing an IT helpdesk system.
                                  3.    Establish a feedback mechanism through a periodic Customer Service satisfaction survey.
                                  4.    Implement a formal approach to IT performance management. It includes collaboration between IT
                                        and business units to define specific IT performance targets and develop a process for measuring and
Initiatives:
                                        regularly reporting on IT service.
                                  5.    Formalize IT service desk processes and procedures (on top of what is included in ISMS).
                                  6.    Implement methodologies to improve first call resolution.
                                  7.    Peer to Peer coaching within and among user support staff to ensure that support is provided in a
                                        consistent manner to all IT customers.
Deliverables:                      Service Level Management Procedure, IT Helpdesk System, Customer Service satisfaction survey
                    Service Level
                    Management     N/A                                  Jan 8, 2013                                     February 23, 2013
                      Procedure
Budgetary            IT Helpdesk                                                                 Expected
                                   2012 budget      Start Date:         August 1, 2012                                  January 31, 2013
Cost:                   System                                                                   Completion Date:
                  Customer Service
                     satisfaction  N/A                                  January 10, 2013                                February 9, 2013
                        survey
                                                                                                User Support and QA Team, IT Controls
Responsible TL:                    Edwin Lim                            Staff Resource:
                                                                                                Officer
Dependencies:                      SDP PO Approval

02/25/13
IT Strategic Goals, Objectives and Initiatives


GOAL No.6         Efficient User Support and Quality Assurance

                  Establish an IT support model that satisfies the diverse needs of the Bank and provide an accurate, valid,
Goal Details:
                  real time IT systems that support the business functions

Objective B:      Ensure that all applications releases are checked for quality

                  1.    Improve the quality of Application testing by establishing a structured approach to the testing
                        process through implementation of Test Management Tool.
                  2.    Develop detailed application test plans, conditions, scenarios, cases and related data to attain
Initiatives:
                        quality test results and system application.
                  3.    Establish strong collaboration with SMEs and support departments to validate that the software
                        under testing meets the agreed requirement upon acceptance criteria.
Deliverables:      Application Testing Standards and Procedures
                                                                              Expected
Budgetary Cost:   N/A                 Start Date:          Dec 15, 2012                              January 26, 2013
                                                                              Completion Date:
Responsible TL:    Edwin Lim                               Staff Resource: User Support and QA Team, IT Controls Officer

Dependencies:      None




02/25/13
IT Strategic Goals, Objectives and Initiatives


GOAL No.7         Effective IT Controls and Standards

Goal Details:     Establish a best practice controls and standards for IT

                  Ensure that appropriate levels of control are in place to protect the IT resources. Develop and maintain
Objective A:
                  appropriate standards, methods, controls and procedures for the use of IT and associated resources.
                  1.   Formulate and Implement IT Policies and Procedures adopting IT Service Management Standard
                       (lacking policies and procedures not included in ISMS)
                  2.   Identify and establish Best Practice standards and methodologies for technical support, application
Initiatives:
                       development and support, database management, disaster recovery, and change management in
                       an effort to standardize support efforts.
                  3.   Ensure best practice change control processes are followed (ISMS).
Deliverables:      IT Policies and Procedures

                                                                            Expected
Budgetary Cost:   N/A                 Start Date:          March 1, 2013                           August 31, 2013
                                                                            Completion Date:
                  Edwin Lim/IT Controls Head (for
Responsible TL:                                            Staff Resource: IT Controls Team
                  hiring)

Dependencies:      Hiring of IT Controls Officer




02/25/13
IT Strategic Goals, Objectives and Initiatives


GOAL No.7                          Effective IT Controls and Standards

Goal Details:                      Establish a best practice controls and standards for IT

Objective B:                       As technology evolves, update the security model to continue to protect the bank’s information resources.

                                   1.     Ensure that IT complies with the Information Security System Manual and where deviations from the
                                          policies are documented and approved where required.
Initiatives:                       2.     Ensure all IT staff is updated at least annually on the current state of IT security and any updates to
                                          the ISMS manual.
                                   3.     Ensure any serious IT security incident is reported to the appropriate authority.
Deliverables:                        IT Security Compliance Checklist, IT Security Design (part of Network Upgrade)
                   IT Security
                   Compliance       N/A                                   February 1, 2013                                Feb 28, 2013
Budgetary           Checklist                                                                   Expected Completion
                                                    Start Date::
Cost:                              N/A (part of                                                 Date:
                IT Security Design Network                                February 1, 2013                                February 23, 2013
                                   upgrade budget)
                                   Edwin Lim/IT Controls Officer (for
Responsible TL:                                                          Staff Resource:        IT Controls Team
                                   hiring)
Dependencies:                        Network Upgrade, Hiring of IT Controls Officer




02/25/13

More Related Content

Similar to Information technology kra presentation - jan 2013 ver. 2

CV - Sheela Velappa - 2017 Latest
CV - Sheela Velappa - 2017 LatestCV - Sheela Velappa - 2017 Latest
CV - Sheela Velappa - 2017 LatestSheela V
 
Gtc West 2011 It Strategic Plan Presentation
Gtc West 2011 It Strategic Plan PresentationGtc West 2011 It Strategic Plan Presentation
Gtc West 2011 It Strategic Plan Presentationjoepanora
 
GTC West 2011 - CDCR\'s IT Strategic Plan Presentation
GTC West 2011 - CDCR\'s IT Strategic Plan PresentationGTC West 2011 - CDCR\'s IT Strategic Plan Presentation
GTC West 2011 - CDCR\'s IT Strategic Plan Presentationjoepanora
 
IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)jimmcdonaldpmp
 
iTaNGO Workshop Presentation
iTaNGO Workshop Presentation iTaNGO Workshop Presentation
iTaNGO Workshop Presentation iTaNGOproject
 
Master IT balanced scorecard (final).pptx
Master IT balanced scorecard (final).pptxMaster IT balanced scorecard (final).pptx
Master IT balanced scorecard (final).pptxGlen Alleman
 
Technology Planning and Implementation
Technology Planning and ImplementationTechnology Planning and Implementation
Technology Planning and ImplementationSteve Heye
 
SNW Spring 10 Presentation General
SNW Spring 10 Presentation GeneralSNW Spring 10 Presentation General
SNW Spring 10 Presentation GeneralJeff Kubacki
 
Presentation week 5
Presentation week 5Presentation week 5
Presentation week 5ryjackson
 
A CAREER IN I.T..
A CAREER IN I.T..A CAREER IN I.T..
A CAREER IN I.T..Rob Wilson
 
ICT Governance & Infrastructure Implementaion
ICT Governance & Infrastructure ImplementaionICT Governance & Infrastructure Implementaion
ICT Governance & Infrastructure ImplementaionOtieno Olago
 
Resume of md. ataul islam
Resume of md. ataul islamResume of md. ataul islam
Resume of md. ataul islamMd. Ataul Islam
 

Similar to Information technology kra presentation - jan 2013 ver. 2 (20)

CV - Sheela Velappa - 2017 Latest
CV - Sheela Velappa - 2017 LatestCV - Sheela Velappa - 2017 Latest
CV - Sheela Velappa - 2017 Latest
 
Gtc West 2011 It Strategic Plan Presentation
Gtc West 2011 It Strategic Plan PresentationGtc West 2011 It Strategic Plan Presentation
Gtc West 2011 It Strategic Plan Presentation
 
GTC West 2011 - CDCR\'s IT Strategic Plan Presentation
GTC West 2011 - CDCR\'s IT Strategic Plan PresentationGTC West 2011 - CDCR\'s IT Strategic Plan Presentation
GTC West 2011 - CDCR\'s IT Strategic Plan Presentation
 
IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)
 
iTaNGO Workshop Presentation
iTaNGO Workshop Presentation iTaNGO Workshop Presentation
iTaNGO Workshop Presentation
 
Master IT balanced scorecard (final).pptx
Master IT balanced scorecard (final).pptxMaster IT balanced scorecard (final).pptx
Master IT balanced scorecard (final).pptx
 
Technology Planning and Implementation
Technology Planning and ImplementationTechnology Planning and Implementation
Technology Planning and Implementation
 
SNW Spring 10 Presentation General
SNW Spring 10 Presentation GeneralSNW Spring 10 Presentation General
SNW Spring 10 Presentation General
 
Presentation week 5
Presentation week 5Presentation week 5
Presentation week 5
 
IT Transformation Plan
IT Transformation PlanIT Transformation Plan
IT Transformation Plan
 
Sanjay Pawar
Sanjay PawarSanjay Pawar
Sanjay Pawar
 
CURRICULUM VITAE-LAST23
CURRICULUM VITAE-LAST23CURRICULUM VITAE-LAST23
CURRICULUM VITAE-LAST23
 
CV9
CV9CV9
CV9
 
A CAREER IN I.T..
A CAREER IN I.T..A CAREER IN I.T..
A CAREER IN I.T..
 
Suchasmita Padhi Resume
Suchasmita Padhi ResumeSuchasmita Padhi Resume
Suchasmita Padhi Resume
 
ICAB - ITA Chapter 1 class 3 - IT Strategy
ICAB - ITA Chapter 1 class 3 - IT StrategyICAB - ITA Chapter 1 class 3 - IT Strategy
ICAB - ITA Chapter 1 class 3 - IT Strategy
 
CV_of_Ashish Agarwal
CV_of_Ashish AgarwalCV_of_Ashish Agarwal
CV_of_Ashish Agarwal
 
ICT Governance & Infrastructure Implementaion
ICT Governance & Infrastructure ImplementaionICT Governance & Infrastructure Implementaion
ICT Governance & Infrastructure Implementaion
 
Resume of md. ataul islam
Resume of md. ataul islamResume of md. ataul islam
Resume of md. ataul islam
 
Harshal Asset Mangt
Harshal Asset MangtHarshal Asset Mangt
Harshal Asset Mangt
 

Information technology kra presentation - jan 2013 ver. 2

  • 1. Information Technology Team KRA Presentation February 25, 2013
  • 2. IT VISION The vision of ITG is to sustain a quality focused, highly productive, service-oriented and responsive organization based upon City Savings Bank’s brand promise of being a helpful and reliable bank. 02/25/13
  • 3. IT Mission Statement The mission of IT Group is to exceed CSB customers and other operating units’ expectations by providing secure information technology infrastructure and innovative, timely and reliable systems that supports efficient delivery of Bank services and to cost-effectively leverage technology to enable the Bank to meet its business objectives. 02/25/13
  • 4. IT STRATEGIC GOALS 1. Business and IT Strategic Alignment 2. A Skilled and Knowledgeable IT Workforce 3. Secure & Reliable IT Infrastructure 4. Effective and Efficient Management of Desktop Hardware and Applications 5. Management of Software Development Efforts for an Effective and Efficient Support of Business Processes and Service Delivery 6. Efficient User Support and Quality Assurance 7. Effective IT Controls and Standards 02/25/13
  • 5. IT Strategic Goals, Objectives and Initiatives GOAL No.1 Business and IT Strategic Alignment Ensuring that the IT organization and technology are aligned with CSB’s Business mission, goals and Goal Details: objectives throughout planning and execution Ensure that CSB’s future technology needs and IT Services are planned, strategically aligned and Objective: prioritized according to Bank needs and objectives in an optimal manner ensuring that clear guidance is known as to how IT decisions are made. Periodically review, revise and update the IT strategic plan, at least once a year. This includes the Initiative: development of annual IT Tactical Plan to implement the IT strategic plan. Deliverables: IT Strategic and Tactical Plan Periodic review of deliverables Expected Budgetary Cost: N/A Start Date: Done – for approval (monthly Completion Date: updates) Staff Responsible TL: Bong Tiamzon IT Department Heads Resource: Dependencies: Corporate Strategic Plan 02/25/13
  • 6. IT Strategic Goals, Objectives and Initiatives GOAL No.2 A Skilled and Knowledgeable IT Workforce Aligning the IT organization’s structure and skills with the needs of the Bank, while promoting Goal Details: employee learning and satisfaction Improve the IT Organization through realignment of functions based on industry best practices to have Objective A: an effective and efficient delivery of information technology services for the Bank. 1. Identify core competencies necessary to assure business/IT alignment 2. Ensure continued alignment of information technology manpower in support of organizational goals and objectives. 3. Define clear lines of responsibilities to improve internal IT collaboration and teamwork. Initiatives: Overlapping responsibilities will be eliminated. 4. Provide an inventory of IT services and assign tightly-coupled or similar services to the same team. 5. Devise an organizational structure that is more adaptive and responsive to changes in technology and business needs Deliverables: Manpower Plan, Training Plan Manpower Plan N/A N/A Done - Approved Budgetary Cost: Expected Start Date: Completion Date: Training Plan PHP 1,808,208 January 4, 2013 March 15, 2013 Responsible TL: Bong Tiamzon Staff Resource: IT Department Heads Dependencies: Approved Training Budget 02/25/13
  • 7. IT Strategic Goals, Objectives and Initiatives GOAL No.2 A Skilled and Knowledgeable IT Workforce Aligning the IT organization’s structure and skills with the needs of the Bank, while promoting Goal Details: employee learning and satisfaction Objective B: Increase Technical Proficiency and Expertise 1. Implement a comprehensive approach to IT employee technical development by developing a Technical Training Plan to ensure excellence in IT delivery across the Bank. • Provide training opportunities to IT staff to keep current and learn new technologies they are required to support and encourage staff to obtain certifications where appropriate. • Increase cross training on critical systems for IT staff. Initiatives: 2. Coordinate with Human Resources to set minimum technology proficiency standards and identify critical applications for new hires and apply the standards in job descriptions, requirements and evaluations. 3. Require that training for users and IT support staff is a component of the purchase of any new information technology system. Deliverables: Training Plan Expected Budgetary Cost: PHP 1,808,208 Start Date: January 4, 2013 March 15, 2013 Completion Date: Responsible TL: Bong Tiamzon Staff Resource: IT Department Heads Dependencies: Approved Training Budget 02/25/13
  • 8. IT Strategic Goals, Objectives and Initiatives GOAL No.3 Secure & Reliable IT Infrastructure Defining and operating the Infrastructure and underlying architecture for long-term IT support of CSB Goal Details: business capabilities. Implement adequate system, tools and infrastructure to be truly outcome-driven, customer-focused, Objective A: employee-enabled, accountable, efficient, and transparent. 1. Implement tools and best practices that make routine tasks such as server administration, network troubleshooting less time consuming and burdensome. 2. Continue improvement of branches links through load balancing and redundancy (secondary service provider or digital radio link whenever possible). 3. Monitor technology evolution to cost effectively improve network throughput to branches. 4. Enhance network management pro-active support capability by implementing an enterprise Network Initiatives: Management System. 5. Reduce network infrastructure costs and improved network throughput by participating in the Group’s Network Rationalization initiative (AEV). 6. Reduce regional voice communication costs by routing regional phone calls over existing data networks via Voice over IP technology. 7. Institute a capacity management program to better address server and storage requirements. Implementation of Network and Server Monitoring Tools, Branches Links Redundancy, Network Redesign Deliverables: and Upgrade, Network Rationalization, VOIP Implementation (HO Telephone System), Demand and Capacity Management Plan 02/25/13
  • 9. IT Strategic Goals, Objectives and Initiatives Implementation of Network and Server N/A (Freeware) January 22,2013 January 29,2013 Monitoring PHP 120,000 (one- Branches Links Contract signing to time cost) Redundancy (existing Started be completed within PHP 60,000 branches) January 2013 (recurring cost) H.O. – April 30, 2013 Network Redesign PHP 4,754,000 February 1, 2013 Branches – June and Upgrade 29,2013 Network N/A Started (with AEV) Expected continuing Budgetary Rationalization Start Date: Completion Cost: VOIP Implementation H.O. – May 31, 2013 Date: (HO Telephone PHP 2,480,200 March 1, 2013 Branches – July System) 31,2013 Demand and Capacity N/A January 8, 2013 February 15,2013 Management Plan Finacle Production PHP 6,000,000 Jan 3, 2013 Jan 6, 2013 (Done) Server Upgrade Finacle DR Server PHP 2,500,000 June 1, 2013 July 31, 2013 Upgrade Storage and Backup PHP 1,485,000 August 1, 2013 August 31, 2013 Solution Infrastructure Management Team, Technology Operations Head (for Responsible TL: Staff Resource: Network Administrator (additional hiring)/Nilo Singcol manpower) Dependencies: Approved CAPEX, Hiring of Technology Operations Manager and Network Administrator 02/25/13
  • 10. IT Strategic Goals, Objectives and Initiatives GOAL No.3 Secure & Reliable IT Infrastructure Defining and operating the Infrastructure and underlying architecture for long-term IT support of CSB Goal Details: business capabilities. Recognize technology and security trends, and position CSB to benefit from the evaluation of emerging Objective B: technology and the implementation of proven technology solutions. 1. Identify opportunities to improve service levels through hardware and data redundancy. Initiatives: 2. Preserve and enhance the network infrastructure through an ongoing commitment to upgrade, extend and diversify its capabilities and support. Deliverables: Network Redesign and Upgrade H.O. – April 30, 2013 February 1, Expected Budgetary Cost: PHP 4,754,000 Start Date: Branches – June 2013 Completion Date: 29,2013 Technology Operations Head (for Staff Infrastructure Management Team, Network Responsible TL: hiring)/Nilo Singcol Resource: Administrator (additional manpower) Dependencies: Approved CAPEX, Hiring of Technology Operations Manager and Network Administrator 02/25/13
  • 11. IT Strategic Goals, Objectives and Initiatives GOAL No.3 Secure & Reliable IT Infrastructure Defining and operating the Infrastructure and underlying architecture for long-term IT support of CSB Goal Details: business capabilities. Leverage on the Group’s entire IT investments through group-wide coordination on IT Objective C: investments/initiatives and the possibility of consolidation of IT systems and services 1. Work with the group IT (AEV-CSD) to identify opportunity areas for IT shared services / strategic sourcing initiatives. 2. Achieve Data Center Consolidation – Corporate Initiative (AEV). Upon completion of the data centers’ co-location, the CSB will be moving in the direction of virtualization and then establishing common Initiatives: computing services as a unified enterprise strategy (AEV). 3. Continue to look at opportunities for reducing the number of technology environments. 4. Establish Disaster Recovery Capabilities - Creation of a more efficient IT environment that includes additional disaster recovery capability. Identify other major core applications/components that need to be replicated to the off-site/DR facility. Deliverables: Out-sourcing Plan, Storage and Backup Solution, DRP Out-sourcing Plan N/A Feb 1, 2013 Feb 28, 2013 Budgetary Storage and Expected Completion PHP 1,485,000 Start Date: August 1, 2013 August 31, 2013 Cost: Backup Solution Date: DRP N/A part of BCP part of BCP Out-sourcing Plan Bong Tiamzon IT Department Heads Storage and Responsible TL: Technology Operations Head (for Staff Resource: Infrastructure Management Team, Network Backup Solution, hiring)/Nilo Singcol Administrator (additional manpower) DRP Dependencies: BCP, Approved CAPEX, Hiring of Technology Operations Manager and Network Administrator 02/25/13
  • 12. IT Strategic Goals, Objectives and Initiatives GOAL No.4 Effective and Efficient Management of Desktop Hardware and Applications Goal Details: Managing desktop hardware and applications to ensure effective and efficient support of business goals. Efficient management of desktop hardware and applications from acquisition, setup and installation, end user Objective A: operation, to administration and support. 1. Continue to develop and fund a model for the availability of consistent, up-to-date technology and an “acquire, retire, and upgrade” cycle for computers, software, and other information technology. 2. Implement a PC and peripherals replacement program where Bank PCs and related hardware are replaced on a recurring basis. Assume a PC/Desktop life cycle of four years. Replace printers during the Initiatives: five to seven year period. Acquire work group or departmental printers wherever possible. 3. Continue to acquire Windows Operating system and Microsoft Office Professional for each PC/Desktop. 4. Institute a formal software licensing tracking program. 5. Recommend and implement use of PC/Desktop remote management tools. 6. Implement a physical IT and software asset inventory methodology. Desktop Replacement Plan, Software Licensing Tracking System, Desktop Remote Management System, IT Deliverables: Inventory System Desktop N/A January 15, 2013 February 15, 2013 Replacement Plan Software Licensing Tracking N/A January 22, 2013 March 15, 2013 Budgetary Cost: System Expected Start Date: Desktop Remote Completion Date: Management N/A (Freeware) February 19, 2013 March 19,2013 System IT Inventory N/A January 22, 2013 March 15, 2013 System Rose Ygona (Records Management), Tech Responsible TL: Butch Solon Staff Resource: Support Team Dependencies: None 02/25/13
  • 13. IT Strategic Goals, Objectives and Initiatives GOAL No.4 Effective and Efficient Management of Desktop Hardware and Applications Goal Details: Managing desktop hardware and applications to ensure effective and efficient support of business goals. Objective B: Timely updates of essential desktop tools Continually monitor the vendor marketplace in areas of desktop applications and tools that are core to Initiatives: the Bank's IT environment. Deliverables: Desktop Software Inventory (Tracking List) Expected Budgetary Cost: N/A Start Date: January 15, 2013 February 15, 2013 Completion Date: Responsible TL: Butch Solon Staff Resource: Technical Support Team Dependencies: None 02/25/13
  • 14. IT Strategic Goals, Objectives and Initiatives Management of Software Development Efforts for an Effective and Efficient Support of Business GOAL No.5 Processes and Service Delivery Goal Details: Effective and efficient delivery of application solutions following best practices and standards Recognize the potential of the new core banking system and leverage its power for an increased Objective A: operational efficiencies and productivity. 1. Implement Finacle Phase 2 – Loans Module Initiatives: 2. Continuous improvement of core banking system. (Enhance the capability of support staff to handle customization support). Deliverables: Finacle Loans Module Implementation, Customization Training Finacle Loans Module USD 335,000 Started Dec. 2012 July 31, 2013 Budgetary Expected Implementation Start Date: Cost: Completion Date: Customization Part of Phase 2 May 6, 2013 May 18, 2013 Training Budget Core Banking System Project Management Responsible TL: Bong Tiamzon/Ramil Tigley Staff Resource: Team (Core Team) Dependencies: Quality of Infosys Deliverables, Hiring of Additional User Support 02/25/13
  • 15. IT Strategic Goals, Objectives and Initiatives Management of Software Development Efforts for an Effective and Efficient Support of GOAL No.5 Business Processes and Service Delivery Goal Details: Effective and efficient delivery of application solutions following best practices and standards Objective B: Appropriately manage project risks in IT initiatives involving large and complex projects. 1. Ensure that effective project management methods/framework, including risk management Initiatives: activities, are followed on all IT projects. 2. Comply with the policy and procedure on project Risk rating. Deliverables: Adopting Best Practices Framework for Project Management Expected Budgetary Cost: N/A Start Date: Continuing Continuing Completion Date: Application Development and Maintenance Responsible TL: Ramil Tigley Staff Resource: Team Dependencies: ISMS Policies and Procedures 02/25/13
  • 16. IT Strategic Goals, Objectives and Initiatives Management of Software Development Efforts for an Effective and Efficient Support of Business GOAL No.5 Processes and Service Delivery Goal Details: Effective and efficient delivery of application solutions following best practices and standards Objective C: Improve business process automation 1. Create CSB e-Community (a one stop shop for information portal) - Internal/External/Regulatory Initiatives: reports, Branch/Employee directory, Policies/Procedures, etc. 2. Support to other business requirements (Central Clearing, Bills Payment, Asset Management) Deliverables: e-Community portal, Bills Payment Facility, Central Clearing System, Asset Management System e-Community In-house Budgetary Cost: Started (2012) December 29, 2013 portal development Dependent on Business Bills Payment In-house Budgetary Cost: Started (2012) requirement/target Facility development Expected date Start Date: Central Clearing Completion Date: Budgetary Cost: PHP 9,149,750 Started (2012) August 15, 2013 System Asset In-house Budgetary Cost: Management January 21, 2013 April 15, 2013 development System Application Development and Maintenance Responsible TL: Ramil Tigley Staff Resource: Team, User Support and QA Team Dependencies: Hiring of additional developer, Loans successful implementation 02/25/13
  • 17. IT Strategic Goals, Objectives and Initiatives GOAL No.6 Efficient User Support and Quality Assurance Establish an IT support model that satisfies the diverse needs of the Bank and provide an accurate, valid, Goal Details: real time IT systems that support the business functions Objective A: Improve User Support Best Practices 1. Develop service level agreements with end-users and departments. 2. Provide enhanced Incident and Problem management by implementing an IT helpdesk system. 3. Establish a feedback mechanism through a periodic Customer Service satisfaction survey. 4. Implement a formal approach to IT performance management. It includes collaboration between IT and business units to define specific IT performance targets and develop a process for measuring and Initiatives: regularly reporting on IT service. 5. Formalize IT service desk processes and procedures (on top of what is included in ISMS). 6. Implement methodologies to improve first call resolution. 7. Peer to Peer coaching within and among user support staff to ensure that support is provided in a consistent manner to all IT customers. Deliverables: Service Level Management Procedure, IT Helpdesk System, Customer Service satisfaction survey Service Level Management N/A Jan 8, 2013 February 23, 2013 Procedure Budgetary IT Helpdesk Expected 2012 budget Start Date: August 1, 2012 January 31, 2013 Cost: System Completion Date: Customer Service satisfaction N/A January 10, 2013 February 9, 2013 survey User Support and QA Team, IT Controls Responsible TL: Edwin Lim Staff Resource: Officer Dependencies: SDP PO Approval 02/25/13
  • 18. IT Strategic Goals, Objectives and Initiatives GOAL No.6 Efficient User Support and Quality Assurance Establish an IT support model that satisfies the diverse needs of the Bank and provide an accurate, valid, Goal Details: real time IT systems that support the business functions Objective B: Ensure that all applications releases are checked for quality 1. Improve the quality of Application testing by establishing a structured approach to the testing process through implementation of Test Management Tool. 2. Develop detailed application test plans, conditions, scenarios, cases and related data to attain Initiatives: quality test results and system application. 3. Establish strong collaboration with SMEs and support departments to validate that the software under testing meets the agreed requirement upon acceptance criteria. Deliverables: Application Testing Standards and Procedures Expected Budgetary Cost: N/A Start Date: Dec 15, 2012 January 26, 2013 Completion Date: Responsible TL: Edwin Lim Staff Resource: User Support and QA Team, IT Controls Officer Dependencies: None 02/25/13
  • 19. IT Strategic Goals, Objectives and Initiatives GOAL No.7 Effective IT Controls and Standards Goal Details: Establish a best practice controls and standards for IT Ensure that appropriate levels of control are in place to protect the IT resources. Develop and maintain Objective A: appropriate standards, methods, controls and procedures for the use of IT and associated resources. 1. Formulate and Implement IT Policies and Procedures adopting IT Service Management Standard (lacking policies and procedures not included in ISMS) 2. Identify and establish Best Practice standards and methodologies for technical support, application Initiatives: development and support, database management, disaster recovery, and change management in an effort to standardize support efforts. 3. Ensure best practice change control processes are followed (ISMS). Deliverables: IT Policies and Procedures Expected Budgetary Cost: N/A Start Date: March 1, 2013 August 31, 2013 Completion Date: Edwin Lim/IT Controls Head (for Responsible TL: Staff Resource: IT Controls Team hiring) Dependencies: Hiring of IT Controls Officer 02/25/13
  • 20. IT Strategic Goals, Objectives and Initiatives GOAL No.7 Effective IT Controls and Standards Goal Details: Establish a best practice controls and standards for IT Objective B: As technology evolves, update the security model to continue to protect the bank’s information resources. 1. Ensure that IT complies with the Information Security System Manual and where deviations from the policies are documented and approved where required. Initiatives: 2. Ensure all IT staff is updated at least annually on the current state of IT security and any updates to the ISMS manual. 3. Ensure any serious IT security incident is reported to the appropriate authority. Deliverables: IT Security Compliance Checklist, IT Security Design (part of Network Upgrade) IT Security Compliance N/A February 1, 2013 Feb 28, 2013 Budgetary Checklist Expected Completion Start Date:: Cost: N/A (part of Date: IT Security Design Network February 1, 2013 February 23, 2013 upgrade budget) Edwin Lim/IT Controls Officer (for Responsible TL: Staff Resource: IT Controls Team hiring) Dependencies: Network Upgrade, Hiring of IT Controls Officer 02/25/13