Time Management
Compressing the Project
Compressing the Project
Fast Tracking
Crashing
Or a little bit of both
A
Design
20
B
Purchase
4
Finish to Start
Task B cannot start until A is finished
“Purchase Parts” (Task B) can’t start until “Design
System” is complete (Task A)
Fast Tracking
0 A 20
Design
20
20 B 24
Purchase
4
Finish to Start
Task B cannot start until A is finished
“Purchase Parts” (Task B) can’t start until “Design
System” is complete (Task A)
TOTAL DURATION
24 Days
Fast Tracking
A
Design
20 B
Purchase
4Start to Start
Task B can start 4 days after Task A is started
“Purchase Parts” (Task B) can start 4 days after
“Design System” STARTS!! (Task A)
Lag: 4
Fast Tracking
0 A 20
Design
20 4 B 8
Purchase
4Start to Start
Task B can start 4 days after Task A is started
“Purchase Parts” (Task B) can start 4 days after
“Design System” STARTS!! (Task A)
Lag: 4
TOTAL DURATION
20 Days
Fast Tracking
0 A 20
Design
20
20 B 24
Purchase
4
Fast Tracking
24 C 36
Test
Com.
12
36 D 56
Assemble
20
TOTAL DURATION: 56 Days
0 A 20
Design
20
4 B 8
Purchase
4
Fast Tracking
10 C 24
Test
Com.
12
17 D 37
Assemble
20
TOTAL DURATION: Days
Lag: 4
Lag: 6
Lag: 7
37
Complete the Project in 33% less time
Pros
• No extra costs
• Reduces project time
Fast Tracking
Cons
• Increases risk
• Network is more
sensitive
• Requires more
communication

More Related Content

Viewers also liked

PMP Informational Presentation
PMP Informational PresentationPMP Informational Presentation
PMP Informational Presentationvaninam333
 
Taking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepTaking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepComputer Aid, Inc
 
PMP Certification Training
PMP Certification TrainingPMP Certification Training
PMP Certification TrainingSimplilearn
 
PMP Certification Application
PMP Certification ApplicationPMP Certification Application
PMP Certification ApplicationSimplilearn
 
Webinar On Collect Requirement - iZenBridge
Webinar On Collect Requirement - iZenBridgeWebinar On Collect Requirement - iZenBridge
Webinar On Collect Requirement - iZenBridgeSaket Bansal
 
Content Partner Presentation
Content Partner PresentationContent Partner Presentation
Content Partner PresentationSimplilearn
 
Pmp(project management professional ) presentation
Pmp(project management professional ) presentationPmp(project management professional ) presentation
Pmp(project management professional ) presentationgokula kannan
 
PMP Certificate Requirements
PMP Certificate RequirementsPMP Certificate Requirements
PMP Certificate RequirementsSimplilearn
 
Workshop on Test Driven Development (TDD) Noida
Workshop on Test Driven Development (TDD) NoidaWorkshop on Test Driven Development (TDD) Noida
Workshop on Test Driven Development (TDD) NoidaSaket Bansal
 
How To Pass PMP Exam- PMP Certification Presentation
How To Pass PMP Exam- PMP Certification PresentationHow To Pass PMP Exam- PMP Certification Presentation
How To Pass PMP Exam- PMP Certification PresentationSimplilearn
 
Cost Variance (CV) in Project Management
Cost Variance (CV) in Project ManagementCost Variance (CV) in Project Management
Cost Variance (CV) in Project ManagementJ. Scott Christianson
 
Project Change Request Form
Project Change Request FormProject Change Request Form
Project Change Request FormDemand Metric
 
PMP Certification Presentation
PMP Certification PresentationPMP Certification Presentation
PMP Certification PresentationSimplilearn
 

Viewers also liked (16)

PMP Informational Presentation
PMP Informational PresentationPMP Informational Presentation
PMP Informational Presentation
 
Taking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepTaking the Creep Out of Scope Creep
Taking the Creep Out of Scope Creep
 
PMP Certification Training
PMP Certification TrainingPMP Certification Training
PMP Certification Training
 
PMP Certification Application
PMP Certification ApplicationPMP Certification Application
PMP Certification Application
 
Webinar On Collect Requirement - iZenBridge
Webinar On Collect Requirement - iZenBridgeWebinar On Collect Requirement - iZenBridge
Webinar On Collect Requirement - iZenBridge
 
Content Partner Presentation
Content Partner PresentationContent Partner Presentation
Content Partner Presentation
 
Pmp(project management professional ) presentation
Pmp(project management professional ) presentationPmp(project management professional ) presentation
Pmp(project management professional ) presentation
 
PMP Certificate Requirements
PMP Certificate RequirementsPMP Certificate Requirements
PMP Certificate Requirements
 
Workshop on Test Driven Development (TDD) Noida
Workshop on Test Driven Development (TDD) NoidaWorkshop on Test Driven Development (TDD) Noida
Workshop on Test Driven Development (TDD) Noida
 
How To Pass PMP Exam- PMP Certification Presentation
How To Pass PMP Exam- PMP Certification PresentationHow To Pass PMP Exam- PMP Certification Presentation
How To Pass PMP Exam- PMP Certification Presentation
 
What is a project?
What is a project?What is a project?
What is a project?
 
Cost Performance Index (CPI)
Cost Performance Index (CPI)Cost Performance Index (CPI)
Cost Performance Index (CPI)
 
Cost Variance (CV) in Project Management
Cost Variance (CV) in Project ManagementCost Variance (CV) in Project Management
Cost Variance (CV) in Project Management
 
Project Change Request Form
Project Change Request FormProject Change Request Form
Project Change Request Form
 
Project networks
Project networksProject networks
Project networks
 
PMP Certification Presentation
PMP Certification PresentationPMP Certification Presentation
PMP Certification Presentation
 

More from J. Scott Christianson

The Future of Money: Central Bank Digital Currencies
The Future of Money: Central Bank Digital CurrenciesThe Future of Money: Central Bank Digital Currencies
The Future of Money: Central Bank Digital CurrenciesJ. Scott Christianson
 
The Future of Money: Decentralized Finance
The Future of Money: Decentralized FinanceThe Future of Money: Decentralized Finance
The Future of Money: Decentralized FinanceJ. Scott Christianson
 
Turning to Teaching: Going from Industry Leader to Classroom Teacher.
Turning to Teaching: Going from Industry Leader to Classroom Teacher.Turning to Teaching: Going from Industry Leader to Classroom Teacher.
Turning to Teaching: Going from Industry Leader to Classroom Teacher.J. Scott Christianson
 
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...J. Scott Christianson
 
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.J. Scott Christianson
 
Small Biz vs. Start-Up, Fast Follower vs. First Mover
Small Biz vs. Start-Up, Fast Follower vs. First MoverSmall Biz vs. Start-Up, Fast Follower vs. First Mover
Small Biz vs. Start-Up, Fast Follower vs. First MoverJ. Scott Christianson
 
Agile and Traditional Project Management
Agile and Traditional Project ManagementAgile and Traditional Project Management
Agile and Traditional Project ManagementJ. Scott Christianson
 
Using Print Anything 3D Printing in Your Class
Using Print Anything 3D Printing in Your ClassUsing Print Anything 3D Printing in Your Class
Using Print Anything 3D Printing in Your ClassJ. Scott Christianson
 
Bottom-up time estimations techiques
Bottom-up time estimations techiquesBottom-up time estimations techiques
Bottom-up time estimations techiquesJ. Scott Christianson
 
Schedule Performance Index (SPI) in Project Management
Schedule Performance Index (SPI) in Project ManagementSchedule Performance Index (SPI) in Project Management
Schedule Performance Index (SPI) in Project ManagementJ. Scott Christianson
 

More from J. Scott Christianson (20)

The Future of Money: Central Bank Digital Currencies
The Future of Money: Central Bank Digital CurrenciesThe Future of Money: Central Bank Digital Currencies
The Future of Money: Central Bank Digital Currencies
 
The Future of Money: Decentralized Finance
The Future of Money: Decentralized FinanceThe Future of Money: Decentralized Finance
The Future of Money: Decentralized Finance
 
Purpose of a grade
Purpose of a gradePurpose of a grade
Purpose of a grade
 
Churn and Customer LIfetime Value
Churn and Customer LIfetime ValueChurn and Customer LIfetime Value
Churn and Customer LIfetime Value
 
Porters 5 forces
Porters 5 forcesPorters 5 forces
Porters 5 forces
 
Turning to Teaching: Going from Industry Leader to Classroom Teacher.
Turning to Teaching: Going from Industry Leader to Classroom Teacher.Turning to Teaching: Going from Industry Leader to Classroom Teacher.
Turning to Teaching: Going from Industry Leader to Classroom Teacher.
 
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
 
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
 
The blockchain game
The blockchain gameThe blockchain game
The blockchain game
 
Crossing the Chasm
Crossing the ChasmCrossing the Chasm
Crossing the Chasm
 
Technology Adoption LifeCycle
Technology Adoption LifeCycle Technology Adoption LifeCycle
Technology Adoption LifeCycle
 
Gartner Hype-Cycle
Gartner Hype-CycleGartner Hype-Cycle
Gartner Hype-Cycle
 
Drivers of Exponential Growth
Drivers of Exponential GrowthDrivers of Exponential Growth
Drivers of Exponential Growth
 
The Six Ds of Exponential Growth
The Six Ds of Exponential GrowthThe Six Ds of Exponential Growth
The Six Ds of Exponential Growth
 
Small Biz vs. Start-Up, Fast Follower vs. First Mover
Small Biz vs. Start-Up, Fast Follower vs. First MoverSmall Biz vs. Start-Up, Fast Follower vs. First Mover
Small Biz vs. Start-Up, Fast Follower vs. First Mover
 
Agile and Traditional Project Management
Agile and Traditional Project ManagementAgile and Traditional Project Management
Agile and Traditional Project Management
 
Copy and Paste Hardware
Copy and Paste Hardware Copy and Paste Hardware
Copy and Paste Hardware
 
Using Print Anything 3D Printing in Your Class
Using Print Anything 3D Printing in Your ClassUsing Print Anything 3D Printing in Your Class
Using Print Anything 3D Printing in Your Class
 
Bottom-up time estimations techiques
Bottom-up time estimations techiquesBottom-up time estimations techiques
Bottom-up time estimations techiques
 
Schedule Performance Index (SPI) in Project Management
Schedule Performance Index (SPI) in Project ManagementSchedule Performance Index (SPI) in Project Management
Schedule Performance Index (SPI) in Project Management
 

Recently uploaded

computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 

Recently uploaded (20)

young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 

Time Management Techniques for Compressing Project Schedules

  • 2. Compressing the Project Fast Tracking Crashing Or a little bit of both
  • 3. A Design 20 B Purchase 4 Finish to Start Task B cannot start until A is finished “Purchase Parts” (Task B) can’t start until “Design System” is complete (Task A) Fast Tracking
  • 4. 0 A 20 Design 20 20 B 24 Purchase 4 Finish to Start Task B cannot start until A is finished “Purchase Parts” (Task B) can’t start until “Design System” is complete (Task A) TOTAL DURATION 24 Days Fast Tracking
  • 5. A Design 20 B Purchase 4Start to Start Task B can start 4 days after Task A is started “Purchase Parts” (Task B) can start 4 days after “Design System” STARTS!! (Task A) Lag: 4 Fast Tracking
  • 6. 0 A 20 Design 20 4 B 8 Purchase 4Start to Start Task B can start 4 days after Task A is started “Purchase Parts” (Task B) can start 4 days after “Design System” STARTS!! (Task A) Lag: 4 TOTAL DURATION 20 Days Fast Tracking
  • 7. 0 A 20 Design 20 20 B 24 Purchase 4 Fast Tracking 24 C 36 Test Com. 12 36 D 56 Assemble 20 TOTAL DURATION: 56 Days
  • 8. 0 A 20 Design 20 4 B 8 Purchase 4 Fast Tracking 10 C 24 Test Com. 12 17 D 37 Assemble 20 TOTAL DURATION: Days Lag: 4 Lag: 6 Lag: 7 37 Complete the Project in 33% less time
  • 9. Pros • No extra costs • Reduces project time Fast Tracking Cons • Increases risk • Network is more sensitive • Requires more communication

Editor's Notes

  1. Reducing Project Scope Compromise Quality Adding Resources Outsourcing Project Work Scheduling Overtime Have owner take on more responsibility Negative Float: If you have negative project float (meaning the estimated completion date is after the desired date), would your first choice be to tell the customer the date cannot be met and to ask for more time? No; the first choice would be to analyze what could be done about the negative float by compressing the schedule. In crashing or fast tracking, it is best to see all potential choices and then select the option or options that have the least negative impact on the project. For the exam, remember that you need to identify all the possible options and, if given a choice between crashing or fast tracking options, select the choice or combination of choices with the least negative impact
  2. This technique involves taking critical path activities that were originally planned in a series in a finish to start and doing them instead in parallel (start to start)
  3. Pros Fast tracking often results in rework, usually increases risk, and requires more attention to communication.