What is a “Project”
Is Temporary
Definite Start
1
Is Temporary
Definite End
Has a Specific
Objective
2
3 Has a “Customer” and
Stakeholders
3
Stakeholders
Internal Stakeholders
Employees
Manager
Owners
External Stakeholders
Suppliers
Society
Government
Creditors
Customers
NE with an Interest in the
Has Constraints
Time
Cost
Scope
4
Has Constraints
Time
Cost
Scope
4
Has metrics for Success5
$0.00
$1,250.00
$2,500.00
$3,750.00
$5,000.00
0 Week 1 Week 2 Week 3
PV AC EV
SV= -$507CV= -$933
$3000
SPI = 0.80
$2574 $2,067
CPI = 0.69
BAC (Project Total PV) = $4,134
0.69
5
6

More Related Content

More from J. Scott Christianson

More from J. Scott Christianson (20)

The Future of Money: Central Bank Digital Currencies
The Future of Money: Central Bank Digital CurrenciesThe Future of Money: Central Bank Digital Currencies
The Future of Money: Central Bank Digital Currencies
 
The Future of Money: Decentralized Finance
The Future of Money: Decentralized FinanceThe Future of Money: Decentralized Finance
The Future of Money: Decentralized Finance
 
Purpose of a grade
Purpose of a gradePurpose of a grade
Purpose of a grade
 
Churn and Customer LIfetime Value
Churn and Customer LIfetime ValueChurn and Customer LIfetime Value
Churn and Customer LIfetime Value
 
Porters 5 forces
Porters 5 forcesPorters 5 forces
Porters 5 forces
 
Turning to Teaching: Going from Industry Leader to Classroom Teacher.
Turning to Teaching: Going from Industry Leader to Classroom Teacher.Turning to Teaching: Going from Industry Leader to Classroom Teacher.
Turning to Teaching: Going from Industry Leader to Classroom Teacher.
 
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
 
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
 
The blockchain game
The blockchain gameThe blockchain game
The blockchain game
 
Crossing the Chasm
Crossing the ChasmCrossing the Chasm
Crossing the Chasm
 
Technology Adoption LifeCycle
Technology Adoption LifeCycle Technology Adoption LifeCycle
Technology Adoption LifeCycle
 
Gartner Hype-Cycle
Gartner Hype-CycleGartner Hype-Cycle
Gartner Hype-Cycle
 
Drivers of Exponential Growth
Drivers of Exponential GrowthDrivers of Exponential Growth
Drivers of Exponential Growth
 
The Six Ds of Exponential Growth
The Six Ds of Exponential GrowthThe Six Ds of Exponential Growth
The Six Ds of Exponential Growth
 
Small Biz vs. Start-Up, Fast Follower vs. First Mover
Small Biz vs. Start-Up, Fast Follower vs. First MoverSmall Biz vs. Start-Up, Fast Follower vs. First Mover
Small Biz vs. Start-Up, Fast Follower vs. First Mover
 
Agile and Traditional Project Management
Agile and Traditional Project ManagementAgile and Traditional Project Management
Agile and Traditional Project Management
 
Copy and Paste Hardware
Copy and Paste Hardware Copy and Paste Hardware
Copy and Paste Hardware
 
Using Print Anything 3D Printing in Your Class
Using Print Anything 3D Printing in Your ClassUsing Print Anything 3D Printing in Your Class
Using Print Anything 3D Printing in Your Class
 
Bottom-up time estimations techiques
Bottom-up time estimations techiquesBottom-up time estimations techiques
Bottom-up time estimations techiques
 
Schedule Performance Index (SPI) in Project Management
Schedule Performance Index (SPI) in Project ManagementSchedule Performance Index (SPI) in Project Management
Schedule Performance Index (SPI) in Project Management
 

Recently uploaded

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 

What is a project?

Editor's Notes

  1. Most work that we do can either be operational or project work. They are related https://pixabay.com/en/question-mark-concept-white-sign-213671/
  2. A Beginning https://pixabay.com/en/safety-information-warning-machine-44486/
  3. An End https://pixabay.com/en/end-guy-cinema-strip-movie-film-139848/
  4. A Specific Objective: unique product, service, or result https://pixabay.com/en/bull-s-eye-target-butt-object-aim-147729/
  5. http://www.freegreatpicture.com/business-class-people/business-people-28663
  6. Has specific time, cost, and (Scope) performance requirements.
  7. Has specific time, cost, and (Scope) performance requirements.
  8. We have to make a trade off between expending time and resources to measure progress vs. accuracy. Luckily there are some guidelines that we can use. https://pixabay.com/en/centimeter-equipment-inch-inches-15656/
  9. Estimated cost to complete remaining work
  10. Has to be monitored and controlled. Adjustments need to be made. Changes need to be implemented and problems with occur, some of which are hard to predict.