Julen C Mohanty
Program Management
DISCLAIMERS
Any Views or Opinions or Procedures or Techniques
showcased in this presentation are solely those of the author
and may not necessarily represent those of the Citigroup.
INDEX
 Role Plays
 Assignmen
 Brainstorm
 Case Study
What we will learn today
What is Program management
What is NOT Program Management
Project V/S Program
Why Program Management is required
Relationship Between Program & Project Management
Program Life Cycle
Program Management v/s Project
Management
Program Management Framework
Program Management Value Chain
Program Management Components
Skills Of Program Manager
Program Management Office
Why PMO is required
What activities PMO do
Levels of PMO
Program Life Cycle and Benefits Management
Program Benefits Management – Balanced Score
Card
Program Governance
Program Life Cycle and Stakeholder Management
Program management is the process of managing several related projects, often
with the intention of improving an organization's performance
- Program Manager has oversight of the purpose & status of all projects in a Program
- Can use this oversight to support project-level activity to ensure the overall
program goals are likely to be met
- providing a decision-making capacity that cannot be achieved at project level
- Providing the Project Manager with a program perspective when required
- Sounding board for ideas and approaches to solving project issues that have
program impacts
A Program is a group of related projects managed in a coordinated manner to obtain
benefits and control NOT available from managing them individually. Programs may
include elements of related work outside of the scope of the discreet projects in the
program... Some projects within a program can deliver useful incremental benefits to
the organization before the program itself has completed. - PMBoK
What is Program Management
In a program there is a need to identify and manage cross-project dependencies
Often the PMO may not have sufficient insight of the risk, issues, requirements,
design or solution to be able to usefully manage these
The Program manager may be well placed to provide this insight by actively
seeking out such information from the Project Managers although in large
and/or complex projects
Program Manager need to communicate with project managers, in order to be
comfortable that the overall program goals are achievable.
An organization should select the group of programs that must take it towards
its strategic aims while remaining within its capacity to deliver the changes
What is Program Management
Without programme management, the projects would be uncoordinated and
not integrated into a final goal.
Program management is the management of all the coordinated projects within
a program
What is NOT Program Management
Programs are not simply ‘large projects’
Good project managers may not make good program managers
Programs succeed if component projects succeed
Strong technical team make programs succeed
I am managing 5-6 projects, I am a program manager
I am giving cost saving to the company by different projects, that makes me
successful program manager
Program management is the actual management of the projects and their
day-to-day work
Projects deliver outputs, discrete parcels or "chunks" of change; programs
create outcomes.
Project V/S Program
Program is nothing more than either a large project or a set (or portfolio) of
projects.
On this view, a project might deliver a new factory, hospital or IT system. By
combining these projects with other deliverables and changes, their programs
might deliver increased income from a new product, shorter waiting lists at the
hospital or reduced operating costs due to improved technology.
The project manager's job is to ensure that
their project succeeds
program manager, may not care about
individual projects, but is concerned with
the aggregate result or end-state
On this second view, the point of having a program is to exploit economies of
scale and to reduce coordination costs and risks
Why Program Management is required
Strategic
Formulation
Value
Management
Project
Management
Operational
Improvement
Pressure
to change
Corporate
Objective
Business
Needs
Strategic
Objective
Expected
Benefits
Expected
Outcome
Proposed
Actions
Proposed
Deliverables
Delivered
Outputs
Enhanced
Capabilities
Realized
Outcomes
Realized
Benefits
Program Management
Driving Force
Why Program Management is required
Mission &
Vision
Program Program Program
Project Project
Project
Project
Project
Project
Project
Project
Why Program Management is required
• Resources, talent, and expert judgment are shared across the program.
• The isolation of project independence is broken down.
• All projects follow the same rules and policies of the program.
• Collective bargaining, shared procurement, and vendor management are unified.
• Risk and issue management is centralized at the program level.
• Information can be more freely shared.
• Communication stems from the program manager for all project managers.
• Stakeholder management follows a common approach.
• Costs and schedule control is managed from a centralized locale.
Assignment 1
Identify Program & Project
1. Bug fixing for a particular module in a software
2. Installing 1000 PC in a company
3. Making 2 KM road
4. Building a house in 2000 Sq ft Land
5. Making a restaurant with 20 seats
6. Building a Sky Scraper
7. Making 5 KM highway road with one water stream & 1 rail line to cross
8. Building menu & billing software for restaurant
9. Making PC & restaurant billing software, to sell as bundle
10. Develop an ERP software from scratch
Assignment 1
Initiating Planning Executing
Monitoring
& Control
Closing
- Program Desired Goals
- Benefits
- Management Approach
- Project Risks
- Change Requests
- Change in Baseline (Time, Cost, Quality)
- Issues
Project Management Processes
Projects
Projects
Program Management Processes
Relationship Between Program & Project Management
Relationship Between Program & Project Management
Project Management
• Delivery of Product/
Service
• Scope, Cost, Schedule
• Responsible for Quality
of deliverables
Program Management
Portfolio Management
• Sponsored by business
• Ownership of benefits
• Multiple Projects
• Alignment of projects to the overall
program benefits
• Compliance with project management
Standards
• Led by the business
• Business goal alignment
• Business value alignment (risks/ benefits)
• Program Selection
• Portfolio Optimization
Relationship Between Program & Project Management
Program management centres on three key themes
Benefits management
Stakeholder management
Program governance
A benefit is the result of a program;
EX: Increased Revenue, Decreased Costs OR the reduction of waste
Benefits management is the sum of the planning, tools, and techniques
The overall management of the activities that define, create, maximize, and sustain the
benefits created by the program.
Stakeholder management is the balance of stakeholder identification, Communication,
leadership, trade-offs, competing objectives, and prioritization of needs and demands
Program governance is the enforcement of the rules and procedures an organization follows
Program governance is the assurance that all program procedures are followed as planned
and expected by the organization, the project managers, and you, the program manager.
Programs offer a means to an end. The end, of course, is the realization of an
organization’s goal, vision, strategy, or mission.
Program Life Cycle
Formulation stage
Organization stage
Deployment stage
Appraisal stage
Dissolution stage
Defines the program’s expected benefits through Stakeholder Analysis and the
agreement on the program purpose and objectives, which can include a functional
blueprint. This process is iterative.
Develop the program’s detailed Business Case and Technical Blueprint as well as
operational procedures and structures. This process is iterative with the
formulation.
Delivery of capabilities through the program’s constituent projects and other
actions, including the transition into the business. This is a cyclical process.
Program-level assessment of the benefits realization and evaluation of the success
of the transition to operational benefits. This is also a cyclical process.
Agreement on the timing and grounds for dissolution and implementation of the
closing process, which includes long-term benefits measurement processes.
Program Life Cycle
Strategy
Programme
Projects
Operations
Benefits
1st Cycle
Benefits
2nd Cycle
Benefits
nth Cycle
Formulation
Organization
Deployment
Appraisal
Dissolution
LearningLearningPerformance
Program Life Cycle
Pre-Program
preparation
Program
Initiation
Program
Setup
Delivery of
Program
Benefits
Program
Closure
Phase Gate Review
Pre-program set up
The program concept is shared, and there’s an organizational effort for program support and
stakeholder buy-in. The program is chartered and the program manager has been identified.
The range of activities in this phase includes:
• Understanding the strategic benefits of the program
• Developing a plan to initiate the program
• Defining the program objectives and their alignment with the organization’s goals
• Developing a high-level business case demonstrating an understanding of the needs,
business benefits, feasibility and justification of the program.
• Agreeing to ”check points” throughout the program, to ensure it is on track.
Program Initiation
The program’s scope, schedule, activities, costs, and other planning results are generated.
Program Plan
The “Skeleton” of the program are created. The infrastructure defines how the program and its
projects will operate.
Program Life Cycle
Pre-Program
preparation
Program
Initiation
Program
Setup
Delivery of
Program
Benefits
Program
Closure
Phase Gate ReviewProgram Plan
The “Skeleton” of the program are created. The infrastructure defines how the program and its
projects will operate.
Aligning the mission, vision, and values for the program with the organization’s objectives
Developing an initial detailed cost and schedule plan for setting up the program and outline
plans for the remainder of the program
Conducting feasibility studies, where applicable, to assess the proposed program for technical
and economic feasibility, as well as ethical feasibility or acceptability
The program’s projects are initiated, and the project managers and their project teams go
about creating the incremental benefits for the goal of the program.
• Establishing a project governance structure to monitor and control the projects
• Initiating projects in order to meet program objectives
• Ensuring component deliverables meet the requirements
• Analysing progress to plan
• Identifying environmental changes which may impact the program management or its
anticipated benefits
Delivery of Program Benefits
Program Life Cycle
Pre-Program
preparation
Program
Initiation
Program
Setup
Delivery of
Program
Benefits
Program
Closure
Phase Gate Review
Closing the program
The program moves through its closure and documentation of its successes and failures.
• Review status of benefits with the stakeholders
• Disband the program organization
• Disband the program team and ensure arrangements are in place for appropriate
Redeployment of all human resources
• Document lessons learned in the organizational database so they can be referenced in
the future by similar programs. Lessons learned are generally expressed as
weaknesses or areas to improve and as strengths and best practices of the performing
organization to be utilized in the future
On-going operations The realized benefits of the program are incorporated
into on-going operations for the performing organization.
Strategic
Objectives
Delivered
Output
ProjectManagementValueManagement
ProgramManagement
Sensemaking
Ideation
Elaboration
Planning
Execution
Control
Learning Cycle
Performance Cycle
(Deliver Result)
(Capture Expectations)
Expected
Benefits
Expected
Outcomes
Proposed
Actions
Proposed
Deliverables
Program Management v/s Project Management
Program Management v/s Project Management
ANALYZE DESIGN INTEGRATE INSTALL MANAGE
 Technical
analysis
 Service profile
deployment
 Technology
assessment
 Proof of
concept
solutions
 Business
Planning
 Network
architecture
design
 Software
development
lifecycle (SDLC)
 Capacity
Management
 Pre-design &
deployment
analysis
 Equipment
roadmap
 Inventory
 Procurement
 Legacy to new
– HW/ SW
integration
 HW SW roll out
 Network
engineering
 Installation
management
 Testing &
integration
 System
Administration
 Performance
Tuning
 QA & Change
Control
 Maintenance
 Upgrades (SW
HW)
Managed Service
• Preventive &
Corrosive
maintenance
• Service EquipmentProject Management
Program Management
Consulting Planning Deployment/ Post-Deployment
Program Management V/S Project Management
Program Management Project Management
Architecture v/s Engineering
Engineering, which deals with detailed planningArchitecture, which deals with design elements
More like engineersMore like Architects
Focuses on the vision through function and design Provides the structure & mechanism to enable vision
Program managers should focus on the vision of the program and how they can design
the program architecture – select, prioritize, link and align the projects within the
program along with their structural dependencies to help in achieve the optimum
benefits of the program.
Program Management V/S Project Management
Strategic v/s Tactical
The project manager role is more tactical.
It is centred on completing tasks, completing
specific deliverables and meeting specifications
on time and within budget.
The program manager role is more strategic.
It focuses on the big picture and is measured
by the implementation and fulfilment of a
strategy & realization of benefits (growth,
productivity or bottom line results).
Program Management Project Management
Program Management V/S Project Management
Operations & Business v/s Project
Focused on the end date of the project
May have operational elements as a part of the
overall program environment
Thinks beyond the end date of the individual projects
Focus on Transitional and Operational elements.
Responsible for tasks, deliverables and outputs of
the project
Often must “wear the hat of a businessperson”
because responsible to see how the projects within
the program result in business benefits.
Program Management Project Management
Program Management V/S Project Management
Leadership & Facilitation v/s Management & Coordination
Manage and Coordinate tasks and activities
Team players who may contribute to deliverables
The program manager role is more strategic.
Provide leadership and vision
Motivate through use of knowledge and skillsPlay the role of facilitators & coaches who can
inspire and guide project managers & their teams
to achieve the strategic goals of the programs
stakeholder management, benefits
management and governance
Program Management Project Management
Program Management V/S Project Management
Sequencing
Sequencing of project activities to achieve project
execution requirements within any programmatic
constraints imposed by contract
Sequencing of programmatic activities
including defined projects & re-sequencing of
projects to achieve the desired strategic
business outcome
Through achievement of strategic business
objectives (more permanent in nature)
Duration associated with completion of project
activities
Timeframe
Program wide execution planning including top level
schedule, budget, performance standards, supply
chain configuration and contracting strategy
Project execution planning consistent with agreed to
scope schedule, budget. and performance standards
Execution Planning
Program Management Project Management
Case Study 1
Identify If program management is required OR NO
Case Study 1
There is a BPO company called Customer Service Inc. (CSI). the company has staff strength of more than 4000
people & have a revenue of $800m. The company is into existence for more than 10 years.
The company has a good track record of supporting its clients in various areas of voice & non-voice related
processes. They have more than 150 people as IT support staff who work on a regular basis to make sure the
infrastructure is UP & running 24/7. This is headed by John Mathew, a 15 year experience guy & in CSI for more
than 8 years.
The company supports its clients in various areas of following business areas:
1. Financial accounting
2. Internal Audit
3. Human Resource
4. Marketing
5. Data aggregation
6. Sales of products
One of the client of CSI has a networking software that needs major up gradation. The vendor who was managing
the same, have some management issue in the company & has refused to work till the issues has been solved.
The client is in good relationship with the CEO & the CEO wants to check if CSI can do that for them.
The CEO approaches John Mathew to check. John studied the same project in detail & the priliminary estimation
shows it's a 40-45 MD work & he can dedicate 3-4 resources for the same.
What should John Do now..??
Analyze
Assess
Prepare
/ Plan
StrategizeOptimize
Improvement
Support
Maintain
Customer
Requirements
Program Management Framework
Planning & Strategy
Project Management
Architecture
Investment
Value management
Strategy Formulation
Trends
Project Resourcing
Risk Management
Project Monitoring
Implementation
Management
Architecture
Planning
Infrastructure
Planning
Gap AnalysisMigration
Planning
Program Management Framework
Customer
Leadership/
Sponsor
Requirements
Business Goals
& Targets
Existing
Processes
Existing
Solution Suits
Technology
Vision
Requireme
nt Analysis
Feasibility
Constraint
s & Risks
Scope
Resource
Availability
Preparedn
ess
Knowledge
& Training
Estimates
Identify
Fine tune/
Refine
Check
Fitment
Publish
Fine
tune/
Refine
Check
Fitment
Publish
Identify
Planning
Subjective &
Objective Metric s
Collation
Constraint
Evaluation
Innovate &
Suggest
Feedback
Execute Test Control Transfer
SLA Definition Monitoring Control
Report
Target
Definition
Evaluation
Maintenance
& Control
Report
The Company Leadership
Implement
Support
Maintain
PMO
Implement Prepare/ Plan Strategize Optimize
Program Management Framework
Program Management Value Chain
SCOPE MANAGEMENT
TIME MANAGEMENT
COST MANAGEMENT
QUALITY MANAGEMENT
COMMUNICATION MANAGEMENT
RISK & ISSUE MANAGEMENT
PERFORMANCE METRICS
Program Initiation
Scope Plan
Resource Plan
Time Mgmt Plan
Cost Plan
Quality Plan
Communication Plan
Risk Plan
Program Plan
PLAN EXECUTE CONTROL CLOSE
Program Plan Execution
Team Development
Quality Assurance
Information Distribution
Integrated Program
Control
Scope Change
Control
Schedule Control
Cost Control
Quality Control
Performance Reporting
Risk Control
Administrative Closure
Knowledge
Management
Feedback Mechanism
ACTIVITIES
ProgramManagement
CoreProcesses
PHASES
Program Management Process
Plan
Execute
Control
Close
Defines Plans, Processes and Procedures, Tools and Techniques, and metrics to
properly manage the Core-Processes
Executes the program in accordance with pre-defined plans set forth for the said
Core-Processes
Monitors the Core-Processes by analysing and managing the metrics defined
during Planning for the initiative by:
1. Tracking the performance of the projects at milestones and
recommending corrective actions as required
2. Monitoring the implementation of corrective actions
3. Tracking the program against the performance limits and taking
corrective actions
Manages the completion of the initiative by:
1. Performing analysis to compare the performance of the various projects
2. Capturing learning and updating the process documentation
3. Submitting the lessons learned document to all stakeholders
4. Capturing the project teams feedback
5. Generating, gathering and disseminating information to formalize project
completion
Case Study 2
Identify If program management is required OR NO
Case Study 2
CSI Delivered the small network related project very successfully. Client was very happy & CSI earned
a good reputation and dollars too. John got promoted & became the Head of operations &
technology, also the CEO’s favourite champ.
Few months later the same client approached John for a software work. Client wanted to have a
accounting software for it’s internal employees. This software should contain the employee details,
their perk & benefit, rest all financial information. They wanted to classify these based on
employee’s grade, employee’s department, appraisals & rest all. Currently the financial company
don’t have anything & they are maintaining in Access DB. Also they wants the intranet sites to show
the employee details, Processes, Procedures, Communications & information.
John was very confused, went to the CEO and asked Software development & CSI..??? No match.
Client is very good friend of CEO & the CEO looked an opportunity in this. He was also been
approached for the similar things by one of his other big pharmaceutical client. He thought they
have technical people, they have executed project, They have knowledge of HR & finance system
why not, software development & CSI..!!
He advised John that they almost have the required resources, so why don’t John do a feasibility
study & come back with the approach for the same.
How John is going to look into feasibility & What would be his approach?
Program Management Components
Value/ Benefit
Management
Financial/ Cost
Management
Performance
Management
Program
Governance
Resource
Management
Schedule/
Milestone
Management
Scope/ Change
Management
Project
Methods &
Tools
Knowledge
Management
Quality
Assurance
Issue/ Risk
Management
Deployment/
Release
Management
Supplier/
Vendor
Management
Project
Integration
Architecture/
Compliance
Communication/
Reporting
Organizational
Change
Management
Training
Application
Management
Production
Support
Benefit Focussed
Risk management mindset
Leadership Skills
Good knowledge of project management principles
Conflict Resolution skills
Good communication skills
Ability to command respect
Comfortable in an uncertain environment
Program manager Responsibilities & Underlying Competency
• Review the value and organizational impact of the organization’s program.
• Work to quantify the specific, measurable, and actual benefits of the program.
• Assign responsibilities within the program to recognize the planned and expected
benefits reaped from each program project.
• Identify interdependencies of projects & benefits each contributes to the program.
• Complete change analysis for program change requests and understand how the
potential changes may help or hinder the ability to reach program objectives.
Program Management Office
PMO is required for improving the organization’s program management capability
PMO decides on the standard to be adhered to by all Program participants. Its main
role is to provide centralized monitoring and support for the projects and to bring
them to successful completion.
Main function is overseeing and liaising with the Project Offices
Program Management Office (PMO)
Project
Office 1
Project
Office 1
Project
Office 1
Project
Office 1
Program Management Office
Benefits of PMO
1 Multiple projects result in competing demands for limited resources (people, space,
infrastructure, and so on). Without the existence of a central organizer such as a Program
Management Office, it is not easy to determine the best project for allocating resources.
2. Flexible information flow to facilitate rapid and accurate communications among project
participants.
3. Interdependency among projects prompts centralized, high level monitoring by a
Program Management Office.
4. Each project has its own management and administrative process, resulting in difficulties
for an organization to measure the performance of one project against another.
5. It provides consistent means of measurement for all projects’ performance.
6. As the conduit between the projects and business executives, a PMO provides an efficient
channel for the escalation (thus the resolution) of project issues, and it helps make
project risks visible.
7. PMO assists business executives by providing a high-level view of projects (strategic
alignment, benefits & performance), thus assisting them in making decisions on resource
allocation.
8. As projects come and go, the Program Management Office facilitates the formal retention
of knowledge.
Program Management Office
PMO Activities
Project Resource Management
Responsible for coordinating resources (human resources, equipment, space, and so on)
according to what each project demands and the amount of resources available (either from
within the organization, from temporary resources, or through outsourcing).
Financial Management
The PMO is required to produce a consolidated financial statement, compiled from each
project, with a certain frequency (which could be weekly, monthly, quarterly, and/or yearly).
The statement should contain information such as the actual budget and expenditure, as well
as the projected budget and expenditure. In addition to monitoring the projects’ progress,
the information can also be used to determine funding allocation.
Vendor Management
The PMO assists each Project Office with the management of third-party contracts with vendors.
Process Management
The PMO standardizes and continuously improves the operational processes and procedures
in the project environment.
Program Management Office
PMO Activities
Program Monitoring (Quality Management).
The PMO is responsible for monitoring the progress of each project in terms of schedule,
scope, changes, cost, and quality.
Project Selection.
PMO assists the business executives with selecting projects that are aligned with the business
by, among other things, identifying potential risks, reviewing the company’s capabilities to
undertake the projects,
Knowledge Management
Makes sure that all the knowledge gained and the lessons learned are not lost (i.e., by
creating a project knowledge repository) when experienced personnel leave the company
Knowledge management is about making sure that the organization cultivates its existing
project knowledge, continuously improving it and sharing it as a part of the staff development
process
Program Management Office
PMO Activities
Customer Management
PMO’s customers are people working in the project environment & in the business environment.
Training Management
PMO work closely with various Project Offices as well as with the organization’s human
resource coordinator to create a training program that is consistent with the organization’s
strategic positioning.
Communications Management
Develops and implements a communication plan that involves all the stakeholders (e.g., the
Project Offices and the business executives and steering committees).
The activities may include the dissemination of information, escalation of issues, and others.
PMO Functions
PEOPLE
PROCESS TECHNOLOGY
PMO
Performance
Communication
Cost
Resource
Quality
Scope
Issues
Risk
Schedule
Vendors
Program Management Office (PMO)
PMO crucial portion of the program’s infrastructure.
supports the program manager with the management of multiple, unrelated projects
• Defining the program management processes that will be followed
• Managing schedule and budget at the program level
• Defining the quality standards for the program and for the program’s components
• Providing document configuration management
• Providing centralized support for managing changes and tracking risks and issues
PMO Supports the Program Manager by
Program Management Office - Levels
Level 1
In other words, Level 1 PMO adopts a reactive approach instead of the proactive approach
This PMO acts as a liaison between the Project Offices and the executive board for
administrative purposes only (e.g., providing a summary report of the progress of all projects in
the organization to the executive board, assisting with project issues escalation, and so on).
CEO
Finance Dept IT Dept
Marketing
Dept
HR Dept
PMO
Program Management Office - Levels
Level 2
This PMO goes beyond providing support and has the authority to implement actions that improve
the organization’s project management capacity and capability (e.g., standardizing the
organization’s project management process, providing project management training, and so on).
CEO
Finance Dept IT Dept
Marketing
Dept
HR DeptPMO
Program Management Office - Levels
Level 3
This PMO does not act only as an independent body with authority to lead the project environment,
but also as a centre of excellence.
PMO
as center
of
excellence
Board of mgmt
& CEO
Other dept
heads
Other CoEs &
external bodies
Project
Environment
It directly contributes to the organization’s discussions on strategy, and it takes actions to implement
those strategies through projects to create competitive advantages for the organization.
Case Study 3
Identify If Program Management Office is required OR NO
Case Study 3
The Program manager is appointed in CSI. He is Robert de Niro. The project has been initiated. Now
the process need to be geared up.
But Robert don’t know much about CSI, it’s work culture & also have to concentrate on program
initiation with the project details to be finalized with the client.
As this the first proper technological work been done in CSI there is no process, Procedure or
standardization of any of the work.
Is John need to implement the PMO?
If YES then What would be his level of PMO?
If NO then why isn’t it required.
Program Life Cycle and Benefits Management
Pre-Program
preparation
Program
Initiation
Program
Setup
Delivery of
Program
Benefits
Program
Closure
Program Benefits Management
Benefit
Identification
Benefits
Analysis
Benefits
Realization
Benefits
Transition
- Identify Business
benefits
- Qualify Business
Benefits
- Derive & Prioritize
Components
- Define benefits
Matrix
- Monitor
Components
- Maintain benefits
Registered
- Report Benefits
- Consolidate Co-
ordinated benefits
- Transfer the
ongoing benefits
Programs that deliver incremental benefits, the management of these benefits has a
life cycle of its own which runs parallel to that of the program, a relationship
Benefits
Planning
- Establish benefits
Realization plan &
monitoring
- Map Benefits into
program Plan
Program Life Cycle and Benefits Management
- Identify Business
benefits
- Qualify Business
Benefits
Benefit
Identification- Identify & Qualify Business benefits
Identifying the business benefits the program will create
The program manager, senior management, and the key stakeholders
must work together to establish the objectives of the program
Identify how the program will meet organizational objectives
Pre-Program
preparation
Benefits
Analysis
- Derive & Prioritize
Components
- Define benefits
Matrix
Program
Initiation
Collect the specific, expected benefits the program is to create for the
performing organization from the program charter, senior management, and
key stakeholders
- Benefit Analysis
Once the benefits have been clearly defined, the program manager works to
prioritize the benefit components for project initiation, goal setting, and
scope creations.
Identify the metrics for success for each of the identified program benefits
This is required as what’s good for the program manager may not be the
same level of good the customer envisions
Program Life Cycle and Benefits Management
Benefits
Planning
- Establish benefits
Realization plan &
monitoring
- Map Benefits into
program Plan
Program
Setup- Benefits Planning
The task here is to establish the rules and procedures the program’s projects
will follow in order to create the benefits the program expects.
Create a Benefits Realization Plan to show how the program and its projects
will create the integrated benefits for the program
Establishment of the benefits monitoring processes
Map the benefits into the program management plan. This defines the Critical Success Factor &
also allows programs to move the benefits to the next phase to deliver Incremental Benefits
Delivery of
Program Benefits
Benefits
Realization
- Monitor
Components
- Maintain benefits
Registered
- Report Benefits
Execution of all the projects within the program
- Benefits Realization
Monitor the program components i.e. the projects within the program to
ensure that each project manager is keeping on task, on scope, on budget &
generally on track in order to create the benefits the program expects
Allow corrective and preventive actions to ensure the project managers
create what’s expected of them
Program Life Cycle and Benefits Management
Delivery of
Program Benefits
Benefits
Realization
- Monitor
Components
- Maintain benefits
Registered
- Report Benefits
- Benefits Realization
Creates and maintains a benefits register that should contain :
• What the benefit is and its constituent components
• What project components are dependent on or contribute to the
realized benefit
• Time to create the benefits
• Cost to create the benefits
• Risks and issues surrounding the benefit
• Secondary benefits tied to the benefit
• All other relevant benefit information
Program
Closure
Benefits
Transition
- Consolidate Co-
ordinated benefits
- Transfer the
ongoing benefits
Stage when the scope of the program has been met/ the program was cancelled
- Benefits Transition
Moves the realized, documented benefits the projects have created into the
on-going operations of the performing organization
The consolidation of the coordinated benefits
Program Benefits Management – Balanced Score Card
I. Strategic Focus
II. Assessment
III. Change Planning & Implementation
IV. Continuous Improvement
STEP 1 – Define & Commit to Strategy
STEP 2 – Audit Measures
STEP 3 – Develop New Measures
STEP 4 – Apply New Measures
STEP 5 – Analyze & Report
STEP 6 – Implement Improvement Plans
STEP 7 – Track Metrics
STEP 8 – Continuous Improvement &
Revisit Scorecard
Vision &
Strategy
CUSTOMER: To achieve our
vision How should we appear to
our customer
Objective ---------------------
Measures ---------------------
Targets ---------------------
Initiatives ---------------------
INTERNAL BUSINESS PROCESS:
To Satisfy Our Stakeholders What
business process we should have
Objective ---------------------
Measures ---------------------
Targets ---------------------
Initiatives ---------------------
FINANCIAL: To succeed
financially what should we do &
how should we do
Objective ---------------------
Measures ---------------------
Targets ---------------------
Initiatives ---------------------
LEARNING & DEVELOPMENT:
To achieve our vision How should
we sustain our ability to change
& improve
Objective ---------------------
Measures ---------------------
Targets ---------------------
Initiatives ---------------------
Program Benefits Management – Balanced Score Card
Pre-Program
preparation
Program
Initiation
Program
Setup
Delivery of
Program
Benefits
Program
Closure
Program Benefits Management
Program Governance
Programs are often too complex to be managed by a single individual
That’s why appropriate implementation of program governance is critical for a
program to succeed.
Across program life cycle Program governance assists in
- managing risks,
- stakeholders,
- benefits,
- resources, and
- quality.
This is facilitated by the regular and
phase-gate-based oversight of deliverables,
performance, risks, and issues by the program board.
Program governance provides an appropriate organizational structure and the policies
and procedures necessary to support program delivery through formal program
reviews.
G1 G2 G3 G4
Program Governance
Program Governance
• Budget for the program The aggregate costs of the projects and the costs of managing the
program define the cost baseline.
Consider the program governance for each of the following areas:
• Scope of the program The scope of the program defines the benefits of the program.
• Schedule for program benefit realization The timeline of the program defines when the
project’s deliverables may be incorporated into on-going operations.
• Procurement processes Enterprise environmental factors and the rules of the program
governance may affect the procurement processes within the program. Consider step funding and
cash flow forecasting and their impact on procurement in a program and its phases.
• Quality expectations of the program and its projects The satisfied quality measured at
the end of a program phase allows the program to move on to subsequent phases.
• Staffing demands Consider the availability of skilled labour, consultants & subject matter
experts. A resource shortage may affect the schedule, costs, risks & other knowledge areas within
the program.
• Communication challenges Language barriers, time zone differences, regulatory issues, and
stakeholder constraints may affect the phases of a program.
• Risk management Program managers may adjust the phases of a program to account for the
amount of risk exposure the program is leveraging in the project.
Program Life Cycle and Stakeholder Management
Stakeholders can be the individuals that are affected by your program benefits and the deliverables
of your project. Stakeholders can also be organizations such as government agencies and vendors
that may influence your project.
Goal of stakeholder management is to market, sell, and create buy-in from all the stakeholders as
early as possible in the program.
Program director
Program manager
Project managers
Program sponsor
Customer
Program team members
Project team members
Program management office
Program office
Program governance board
Suppliers
Government agencies

More Related Content

What's hot

Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Saad Merie
 
What is Program Management - An Overview
What is Program Management - An OverviewWhat is Program Management - An Overview
What is Program Management - An OverviewYolanda Williams
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Managementmovinghats
 
Project management
Project managementProject management
Project managementJay Raval
 
Project Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaProject Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaEdureka!
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Managementpankajsh10
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinarAli Zeeshan
 
Effective GOVERNANCE in Project Portfolio Management
Effective GOVERNANCE in Project Portfolio ManagementEffective GOVERNANCE in Project Portfolio Management
Effective GOVERNANCE in Project Portfolio ManagementMichal Augustini
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementMohamed Loey
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAshish Mittal
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsMaria Erland, PMP
 

What's hot (20)

Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
The PMO journey
The PMO journeyThe PMO journey
The PMO journey
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
What is Program Management - An Overview
What is Program Management - An OverviewWhat is Program Management - An Overview
What is Program Management - An Overview
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Project management
Project managementProject management
Project management
 
PMO-Framework
PMO-FrameworkPMO-Framework
PMO-Framework
 
Project management
Project managementProject management
Project management
 
Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
 
Project Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaProject Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | Edureka
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio management
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinar
 
Effective GOVERNANCE in Project Portfolio Management
Effective GOVERNANCE in Project Portfolio ManagementEffective GOVERNANCE in Project Portfolio Management
Effective GOVERNANCE in Project Portfolio Management
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project Management
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 

Viewers also liked

Risk analysis on textile industry
Risk analysis on textile industryRisk analysis on textile industry
Risk analysis on textile industryProjects Kart
 
Modern Management: Creating Space for Everyone to Be Awesome
Modern Management: Creating Space for Everyone to Be AwesomeModern Management: Creating Space for Everyone to Be Awesome
Modern Management: Creating Space for Everyone to Be AwesomeMeri Williams
 
Stealing Project Management Lessons from Artificial Intelligence
Stealing Project Management Lessons from Artificial IntelligenceStealing Project Management Lessons from Artificial Intelligence
Stealing Project Management Lessons from Artificial IntelligenceMeri Williams
 
Brilliant People Management in an Agile Setting
Brilliant People Management in an Agile SettingBrilliant People Management in an Agile Setting
Brilliant People Management in an Agile SettingMeri Williams
 
DPM UK: Stealing Project Management Lessons from Artificial Intelligence
DPM UK: Stealing Project Management Lessons from Artificial IntelligenceDPM UK: Stealing Project Management Lessons from Artificial Intelligence
DPM UK: Stealing Project Management Lessons from Artificial IntelligenceMeri Williams
 
Stealing Management Lessons from Artificial Intelligence - TDC14
Stealing Management Lessons from Artificial Intelligence - TDC14Stealing Management Lessons from Artificial Intelligence - TDC14
Stealing Management Lessons from Artificial Intelligence - TDC14Meri Williams
 

Viewers also liked (6)

Risk analysis on textile industry
Risk analysis on textile industryRisk analysis on textile industry
Risk analysis on textile industry
 
Modern Management: Creating Space for Everyone to Be Awesome
Modern Management: Creating Space for Everyone to Be AwesomeModern Management: Creating Space for Everyone to Be Awesome
Modern Management: Creating Space for Everyone to Be Awesome
 
Stealing Project Management Lessons from Artificial Intelligence
Stealing Project Management Lessons from Artificial IntelligenceStealing Project Management Lessons from Artificial Intelligence
Stealing Project Management Lessons from Artificial Intelligence
 
Brilliant People Management in an Agile Setting
Brilliant People Management in an Agile SettingBrilliant People Management in an Agile Setting
Brilliant People Management in an Agile Setting
 
DPM UK: Stealing Project Management Lessons from Artificial Intelligence
DPM UK: Stealing Project Management Lessons from Artificial IntelligenceDPM UK: Stealing Project Management Lessons from Artificial Intelligence
DPM UK: Stealing Project Management Lessons from Artificial Intelligence
 
Stealing Management Lessons from Artificial Intelligence - TDC14
Stealing Management Lessons from Artificial Intelligence - TDC14Stealing Management Lessons from Artificial Intelligence - TDC14
Stealing Management Lessons from Artificial Intelligence - TDC14
 

Similar to Program management - Fundamentals

Program management scope management
Program management   scope managementProgram management   scope management
Program management scope managementJulen Mohanty
 
New Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceNew Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceSusan Schanta
 
LSI - PMP - Training material
LSI - PMP - Training materialLSI - PMP - Training material
LSI - PMP - Training materialKrishna Sujeer
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance StructureSaurabh Sardesai
 
PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...Thomas Walenta, PMI Fellow
 
Beyond PMP: Integration Management
Beyond PMP: Integration ManagementBeyond PMP: Integration Management
Beyond PMP: Integration Managementabhinayverma
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementYamanta Raj Niroula, PMP
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]OyetadeTobi
 
How to get started - managing a programme
How to get started - managing a programmeHow to get started - managing a programme
How to get started - managing a programmeMaven
 
Performing Proficient Portfolio Management Against All Odds
Performing Proficient Portfolio Management Against All OddsPerforming Proficient Portfolio Management Against All Odds
Performing Proficient Portfolio Management Against All OddsAggregage
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 

Similar to Program management - Fundamentals (20)

Program management scope management
Program management   scope managementProgram management   scope management
Program management scope management
 
Program Management
Program ManagementProgram Management
Program Management
 
PgMP - Introduction to Program Management
PgMP -  Introduction to Program ManagementPgMP -  Introduction to Program Management
PgMP - Introduction to Program Management
 
Program management for goup1
Program management for goup1Program management for goup1
Program management for goup1
 
New Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceNew Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program Assurance
 
LSI - PMP - Training material
LSI - PMP - Training materialLSI - PMP - Training material
LSI - PMP - Training material
 
Cs pmp-day-01
Cs pmp-day-01Cs pmp-day-01
Cs pmp-day-01
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance Structure
 
PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...
 
Beyond PMP: Integration Management
Beyond PMP: Integration ManagementBeyond PMP: Integration Management
Beyond PMP: Integration Management
 
A white paper on Program Management
A white paper on Program ManagementA white paper on Program Management
A white paper on Program Management
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project Management
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]
 
How to get started - managing a programme
How to get started - managing a programmeHow to get started - managing a programme
How to get started - managing a programme
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
Performing Proficient Portfolio Management Against All Odds
Performing Proficient Portfolio Management Against All OddsPerforming Proficient Portfolio Management Against All Odds
Performing Proficient Portfolio Management Against All Odds
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 

More from Julen Mohanty

Robotics Process Automation (RPA) - Hands on knowledge
Robotics Process Automation (RPA) - Hands on knowledgeRobotics Process Automation (RPA) - Hands on knowledge
Robotics Process Automation (RPA) - Hands on knowledgeJulen Mohanty
 
Requirementless testing
Requirementless testingRequirementless testing
Requirementless testingJulen Mohanty
 
Strategic Business IT alignment
Strategic Business IT alignmentStrategic Business IT alignment
Strategic Business IT alignmentJulen Mohanty
 
BA conf presentation 2010
BA conf presentation 2010BA conf presentation 2010
BA conf presentation 2010Julen Mohanty
 
Solution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical ApproachSolution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical ApproachJulen Mohanty
 
Info sec 2011 julen c mohanty
Info sec 2011   julen c mohantyInfo sec 2011   julen c mohanty
Info sec 2011 julen c mohantyJulen Mohanty
 
Info sec 2011 julen c mohanty
Info sec 2011   julen c mohantyInfo sec 2011   julen c mohanty
Info sec 2011 julen c mohantyJulen Mohanty
 
Agile adoption julen c. mohanty
Agile adoption   julen c. mohantyAgile adoption   julen c. mohanty
Agile adoption julen c. mohantyJulen Mohanty
 

More from Julen Mohanty (9)

Robotics Process Automation (RPA) - Hands on knowledge
Robotics Process Automation (RPA) - Hands on knowledgeRobotics Process Automation (RPA) - Hands on knowledge
Robotics Process Automation (RPA) - Hands on knowledge
 
Requirementless testing
Requirementless testingRequirementless testing
Requirementless testing
 
Strategic Business IT alignment
Strategic Business IT alignmentStrategic Business IT alignment
Strategic Business IT alignment
 
Business case
Business case  Business case
Business case
 
BA conf presentation 2010
BA conf presentation 2010BA conf presentation 2010
BA conf presentation 2010
 
Solution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical ApproachSolution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical Approach
 
Info sec 2011 julen c mohanty
Info sec 2011   julen c mohantyInfo sec 2011   julen c mohanty
Info sec 2011 julen c mohanty
 
Info sec 2011 julen c mohanty
Info sec 2011   julen c mohantyInfo sec 2011   julen c mohanty
Info sec 2011 julen c mohanty
 
Agile adoption julen c. mohanty
Agile adoption   julen c. mohantyAgile adoption   julen c. mohanty
Agile adoption julen c. mohanty
 

Recently uploaded

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 

Recently uploaded (20)

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 

Program management - Fundamentals

  • 2. DISCLAIMERS Any Views or Opinions or Procedures or Techniques showcased in this presentation are solely those of the author and may not necessarily represent those of the Citigroup.
  • 3. INDEX  Role Plays  Assignmen  Brainstorm  Case Study What we will learn today What is Program management What is NOT Program Management Project V/S Program Why Program Management is required Relationship Between Program & Project Management Program Life Cycle Program Management v/s Project Management Program Management Framework Program Management Value Chain Program Management Components Skills Of Program Manager Program Management Office Why PMO is required What activities PMO do Levels of PMO Program Life Cycle and Benefits Management Program Benefits Management – Balanced Score Card Program Governance Program Life Cycle and Stakeholder Management
  • 4. Program management is the process of managing several related projects, often with the intention of improving an organization's performance - Program Manager has oversight of the purpose & status of all projects in a Program - Can use this oversight to support project-level activity to ensure the overall program goals are likely to be met - providing a decision-making capacity that cannot be achieved at project level - Providing the Project Manager with a program perspective when required - Sounding board for ideas and approaches to solving project issues that have program impacts A Program is a group of related projects managed in a coordinated manner to obtain benefits and control NOT available from managing them individually. Programs may include elements of related work outside of the scope of the discreet projects in the program... Some projects within a program can deliver useful incremental benefits to the organization before the program itself has completed. - PMBoK What is Program Management
  • 5. In a program there is a need to identify and manage cross-project dependencies Often the PMO may not have sufficient insight of the risk, issues, requirements, design or solution to be able to usefully manage these The Program manager may be well placed to provide this insight by actively seeking out such information from the Project Managers although in large and/or complex projects Program Manager need to communicate with project managers, in order to be comfortable that the overall program goals are achievable. An organization should select the group of programs that must take it towards its strategic aims while remaining within its capacity to deliver the changes What is Program Management Without programme management, the projects would be uncoordinated and not integrated into a final goal. Program management is the management of all the coordinated projects within a program
  • 6. What is NOT Program Management Programs are not simply ‘large projects’ Good project managers may not make good program managers Programs succeed if component projects succeed Strong technical team make programs succeed I am managing 5-6 projects, I am a program manager I am giving cost saving to the company by different projects, that makes me successful program manager Program management is the actual management of the projects and their day-to-day work
  • 7. Projects deliver outputs, discrete parcels or "chunks" of change; programs create outcomes. Project V/S Program Program is nothing more than either a large project or a set (or portfolio) of projects. On this view, a project might deliver a new factory, hospital or IT system. By combining these projects with other deliverables and changes, their programs might deliver increased income from a new product, shorter waiting lists at the hospital or reduced operating costs due to improved technology. The project manager's job is to ensure that their project succeeds program manager, may not care about individual projects, but is concerned with the aggregate result or end-state On this second view, the point of having a program is to exploit economies of scale and to reduce coordination costs and risks
  • 8. Why Program Management is required Strategic Formulation Value Management Project Management Operational Improvement Pressure to change Corporate Objective Business Needs Strategic Objective Expected Benefits Expected Outcome Proposed Actions Proposed Deliverables Delivered Outputs Enhanced Capabilities Realized Outcomes Realized Benefits Program Management Driving Force
  • 9. Why Program Management is required Mission & Vision Program Program Program Project Project Project Project Project Project Project Project
  • 10. Why Program Management is required • Resources, talent, and expert judgment are shared across the program. • The isolation of project independence is broken down. • All projects follow the same rules and policies of the program. • Collective bargaining, shared procurement, and vendor management are unified. • Risk and issue management is centralized at the program level. • Information can be more freely shared. • Communication stems from the program manager for all project managers. • Stakeholder management follows a common approach. • Costs and schedule control is managed from a centralized locale.
  • 12. 1. Bug fixing for a particular module in a software 2. Installing 1000 PC in a company 3. Making 2 KM road 4. Building a house in 2000 Sq ft Land 5. Making a restaurant with 20 seats 6. Building a Sky Scraper 7. Making 5 KM highway road with one water stream & 1 rail line to cross 8. Building menu & billing software for restaurant 9. Making PC & restaurant billing software, to sell as bundle 10. Develop an ERP software from scratch Assignment 1
  • 13. Initiating Planning Executing Monitoring & Control Closing - Program Desired Goals - Benefits - Management Approach - Project Risks - Change Requests - Change in Baseline (Time, Cost, Quality) - Issues Project Management Processes Projects Projects Program Management Processes Relationship Between Program & Project Management
  • 14. Relationship Between Program & Project Management Project Management • Delivery of Product/ Service • Scope, Cost, Schedule • Responsible for Quality of deliverables Program Management Portfolio Management • Sponsored by business • Ownership of benefits • Multiple Projects • Alignment of projects to the overall program benefits • Compliance with project management Standards • Led by the business • Business goal alignment • Business value alignment (risks/ benefits) • Program Selection • Portfolio Optimization
  • 15. Relationship Between Program & Project Management Program management centres on three key themes Benefits management Stakeholder management Program governance A benefit is the result of a program; EX: Increased Revenue, Decreased Costs OR the reduction of waste Benefits management is the sum of the planning, tools, and techniques The overall management of the activities that define, create, maximize, and sustain the benefits created by the program. Stakeholder management is the balance of stakeholder identification, Communication, leadership, trade-offs, competing objectives, and prioritization of needs and demands Program governance is the enforcement of the rules and procedures an organization follows Program governance is the assurance that all program procedures are followed as planned and expected by the organization, the project managers, and you, the program manager. Programs offer a means to an end. The end, of course, is the realization of an organization’s goal, vision, strategy, or mission.
  • 16. Program Life Cycle Formulation stage Organization stage Deployment stage Appraisal stage Dissolution stage Defines the program’s expected benefits through Stakeholder Analysis and the agreement on the program purpose and objectives, which can include a functional blueprint. This process is iterative. Develop the program’s detailed Business Case and Technical Blueprint as well as operational procedures and structures. This process is iterative with the formulation. Delivery of capabilities through the program’s constituent projects and other actions, including the transition into the business. This is a cyclical process. Program-level assessment of the benefits realization and evaluation of the success of the transition to operational benefits. This is also a cyclical process. Agreement on the timing and grounds for dissolution and implementation of the closing process, which includes long-term benefits measurement processes.
  • 17. Program Life Cycle Strategy Programme Projects Operations Benefits 1st Cycle Benefits 2nd Cycle Benefits nth Cycle Formulation Organization Deployment Appraisal Dissolution LearningLearningPerformance
  • 18. Program Life Cycle Pre-Program preparation Program Initiation Program Setup Delivery of Program Benefits Program Closure Phase Gate Review Pre-program set up The program concept is shared, and there’s an organizational effort for program support and stakeholder buy-in. The program is chartered and the program manager has been identified. The range of activities in this phase includes: • Understanding the strategic benefits of the program • Developing a plan to initiate the program • Defining the program objectives and their alignment with the organization’s goals • Developing a high-level business case demonstrating an understanding of the needs, business benefits, feasibility and justification of the program. • Agreeing to ”check points” throughout the program, to ensure it is on track. Program Initiation The program’s scope, schedule, activities, costs, and other planning results are generated. Program Plan The “Skeleton” of the program are created. The infrastructure defines how the program and its projects will operate.
  • 19. Program Life Cycle Pre-Program preparation Program Initiation Program Setup Delivery of Program Benefits Program Closure Phase Gate ReviewProgram Plan The “Skeleton” of the program are created. The infrastructure defines how the program and its projects will operate. Aligning the mission, vision, and values for the program with the organization’s objectives Developing an initial detailed cost and schedule plan for setting up the program and outline plans for the remainder of the program Conducting feasibility studies, where applicable, to assess the proposed program for technical and economic feasibility, as well as ethical feasibility or acceptability The program’s projects are initiated, and the project managers and their project teams go about creating the incremental benefits for the goal of the program. • Establishing a project governance structure to monitor and control the projects • Initiating projects in order to meet program objectives • Ensuring component deliverables meet the requirements • Analysing progress to plan • Identifying environmental changes which may impact the program management or its anticipated benefits Delivery of Program Benefits
  • 20. Program Life Cycle Pre-Program preparation Program Initiation Program Setup Delivery of Program Benefits Program Closure Phase Gate Review Closing the program The program moves through its closure and documentation of its successes and failures. • Review status of benefits with the stakeholders • Disband the program organization • Disband the program team and ensure arrangements are in place for appropriate Redeployment of all human resources • Document lessons learned in the organizational database so they can be referenced in the future by similar programs. Lessons learned are generally expressed as weaknesses or areas to improve and as strengths and best practices of the performing organization to be utilized in the future On-going operations The realized benefits of the program are incorporated into on-going operations for the performing organization.
  • 21. Strategic Objectives Delivered Output ProjectManagementValueManagement ProgramManagement Sensemaking Ideation Elaboration Planning Execution Control Learning Cycle Performance Cycle (Deliver Result) (Capture Expectations) Expected Benefits Expected Outcomes Proposed Actions Proposed Deliverables Program Management v/s Project Management
  • 22. Program Management v/s Project Management ANALYZE DESIGN INTEGRATE INSTALL MANAGE  Technical analysis  Service profile deployment  Technology assessment  Proof of concept solutions  Business Planning  Network architecture design  Software development lifecycle (SDLC)  Capacity Management  Pre-design & deployment analysis  Equipment roadmap  Inventory  Procurement  Legacy to new – HW/ SW integration  HW SW roll out  Network engineering  Installation management  Testing & integration  System Administration  Performance Tuning  QA & Change Control  Maintenance  Upgrades (SW HW) Managed Service • Preventive & Corrosive maintenance • Service EquipmentProject Management Program Management Consulting Planning Deployment/ Post-Deployment
  • 23. Program Management V/S Project Management Program Management Project Management Architecture v/s Engineering Engineering, which deals with detailed planningArchitecture, which deals with design elements More like engineersMore like Architects Focuses on the vision through function and design Provides the structure & mechanism to enable vision Program managers should focus on the vision of the program and how they can design the program architecture – select, prioritize, link and align the projects within the program along with their structural dependencies to help in achieve the optimum benefits of the program.
  • 24. Program Management V/S Project Management Strategic v/s Tactical The project manager role is more tactical. It is centred on completing tasks, completing specific deliverables and meeting specifications on time and within budget. The program manager role is more strategic. It focuses on the big picture and is measured by the implementation and fulfilment of a strategy & realization of benefits (growth, productivity or bottom line results). Program Management Project Management
  • 25. Program Management V/S Project Management Operations & Business v/s Project Focused on the end date of the project May have operational elements as a part of the overall program environment Thinks beyond the end date of the individual projects Focus on Transitional and Operational elements. Responsible for tasks, deliverables and outputs of the project Often must “wear the hat of a businessperson” because responsible to see how the projects within the program result in business benefits. Program Management Project Management
  • 26. Program Management V/S Project Management Leadership & Facilitation v/s Management & Coordination Manage and Coordinate tasks and activities Team players who may contribute to deliverables The program manager role is more strategic. Provide leadership and vision Motivate through use of knowledge and skillsPlay the role of facilitators & coaches who can inspire and guide project managers & their teams to achieve the strategic goals of the programs stakeholder management, benefits management and governance Program Management Project Management
  • 27. Program Management V/S Project Management Sequencing Sequencing of project activities to achieve project execution requirements within any programmatic constraints imposed by contract Sequencing of programmatic activities including defined projects & re-sequencing of projects to achieve the desired strategic business outcome Through achievement of strategic business objectives (more permanent in nature) Duration associated with completion of project activities Timeframe Program wide execution planning including top level schedule, budget, performance standards, supply chain configuration and contracting strategy Project execution planning consistent with agreed to scope schedule, budget. and performance standards Execution Planning Program Management Project Management
  • 28. Case Study 1 Identify If program management is required OR NO
  • 29. Case Study 1 There is a BPO company called Customer Service Inc. (CSI). the company has staff strength of more than 4000 people & have a revenue of $800m. The company is into existence for more than 10 years. The company has a good track record of supporting its clients in various areas of voice & non-voice related processes. They have more than 150 people as IT support staff who work on a regular basis to make sure the infrastructure is UP & running 24/7. This is headed by John Mathew, a 15 year experience guy & in CSI for more than 8 years. The company supports its clients in various areas of following business areas: 1. Financial accounting 2. Internal Audit 3. Human Resource 4. Marketing 5. Data aggregation 6. Sales of products One of the client of CSI has a networking software that needs major up gradation. The vendor who was managing the same, have some management issue in the company & has refused to work till the issues has been solved. The client is in good relationship with the CEO & the CEO wants to check if CSI can do that for them. The CEO approaches John Mathew to check. John studied the same project in detail & the priliminary estimation shows it's a 40-45 MD work & he can dedicate 3-4 resources for the same. What should John Do now..??
  • 31. Planning & Strategy Project Management Architecture Investment Value management Strategy Formulation Trends Project Resourcing Risk Management Project Monitoring Implementation Management Architecture Planning Infrastructure Planning Gap AnalysisMigration Planning Program Management Framework
  • 32. Customer Leadership/ Sponsor Requirements Business Goals & Targets Existing Processes Existing Solution Suits Technology Vision Requireme nt Analysis Feasibility Constraint s & Risks Scope Resource Availability Preparedn ess Knowledge & Training Estimates Identify Fine tune/ Refine Check Fitment Publish Fine tune/ Refine Check Fitment Publish Identify Planning Subjective & Objective Metric s Collation Constraint Evaluation Innovate & Suggest Feedback Execute Test Control Transfer SLA Definition Monitoring Control Report Target Definition Evaluation Maintenance & Control Report The Company Leadership Implement Support Maintain PMO Implement Prepare/ Plan Strategize Optimize Program Management Framework
  • 33. Program Management Value Chain SCOPE MANAGEMENT TIME MANAGEMENT COST MANAGEMENT QUALITY MANAGEMENT COMMUNICATION MANAGEMENT RISK & ISSUE MANAGEMENT PERFORMANCE METRICS Program Initiation Scope Plan Resource Plan Time Mgmt Plan Cost Plan Quality Plan Communication Plan Risk Plan Program Plan PLAN EXECUTE CONTROL CLOSE Program Plan Execution Team Development Quality Assurance Information Distribution Integrated Program Control Scope Change Control Schedule Control Cost Control Quality Control Performance Reporting Risk Control Administrative Closure Knowledge Management Feedback Mechanism ACTIVITIES ProgramManagement CoreProcesses PHASES
  • 34. Program Management Process Plan Execute Control Close Defines Plans, Processes and Procedures, Tools and Techniques, and metrics to properly manage the Core-Processes Executes the program in accordance with pre-defined plans set forth for the said Core-Processes Monitors the Core-Processes by analysing and managing the metrics defined during Planning for the initiative by: 1. Tracking the performance of the projects at milestones and recommending corrective actions as required 2. Monitoring the implementation of corrective actions 3. Tracking the program against the performance limits and taking corrective actions Manages the completion of the initiative by: 1. Performing analysis to compare the performance of the various projects 2. Capturing learning and updating the process documentation 3. Submitting the lessons learned document to all stakeholders 4. Capturing the project teams feedback 5. Generating, gathering and disseminating information to formalize project completion
  • 35. Case Study 2 Identify If program management is required OR NO
  • 36. Case Study 2 CSI Delivered the small network related project very successfully. Client was very happy & CSI earned a good reputation and dollars too. John got promoted & became the Head of operations & technology, also the CEO’s favourite champ. Few months later the same client approached John for a software work. Client wanted to have a accounting software for it’s internal employees. This software should contain the employee details, their perk & benefit, rest all financial information. They wanted to classify these based on employee’s grade, employee’s department, appraisals & rest all. Currently the financial company don’t have anything & they are maintaining in Access DB. Also they wants the intranet sites to show the employee details, Processes, Procedures, Communications & information. John was very confused, went to the CEO and asked Software development & CSI..??? No match. Client is very good friend of CEO & the CEO looked an opportunity in this. He was also been approached for the similar things by one of his other big pharmaceutical client. He thought they have technical people, they have executed project, They have knowledge of HR & finance system why not, software development & CSI..!! He advised John that they almost have the required resources, so why don’t John do a feasibility study & come back with the approach for the same. How John is going to look into feasibility & What would be his approach?
  • 37. Program Management Components Value/ Benefit Management Financial/ Cost Management Performance Management Program Governance Resource Management Schedule/ Milestone Management Scope/ Change Management Project Methods & Tools Knowledge Management Quality Assurance Issue/ Risk Management Deployment/ Release Management Supplier/ Vendor Management Project Integration Architecture/ Compliance Communication/ Reporting Organizational Change Management Training Application Management Production Support
  • 38. Benefit Focussed Risk management mindset Leadership Skills Good knowledge of project management principles Conflict Resolution skills Good communication skills Ability to command respect Comfortable in an uncertain environment Program manager Responsibilities & Underlying Competency • Review the value and organizational impact of the organization’s program. • Work to quantify the specific, measurable, and actual benefits of the program. • Assign responsibilities within the program to recognize the planned and expected benefits reaped from each program project. • Identify interdependencies of projects & benefits each contributes to the program. • Complete change analysis for program change requests and understand how the potential changes may help or hinder the ability to reach program objectives.
  • 39. Program Management Office PMO is required for improving the organization’s program management capability PMO decides on the standard to be adhered to by all Program participants. Its main role is to provide centralized monitoring and support for the projects and to bring them to successful completion. Main function is overseeing and liaising with the Project Offices Program Management Office (PMO) Project Office 1 Project Office 1 Project Office 1 Project Office 1
  • 40. Program Management Office Benefits of PMO 1 Multiple projects result in competing demands for limited resources (people, space, infrastructure, and so on). Without the existence of a central organizer such as a Program Management Office, it is not easy to determine the best project for allocating resources. 2. Flexible information flow to facilitate rapid and accurate communications among project participants. 3. Interdependency among projects prompts centralized, high level monitoring by a Program Management Office. 4. Each project has its own management and administrative process, resulting in difficulties for an organization to measure the performance of one project against another. 5. It provides consistent means of measurement for all projects’ performance. 6. As the conduit between the projects and business executives, a PMO provides an efficient channel for the escalation (thus the resolution) of project issues, and it helps make project risks visible. 7. PMO assists business executives by providing a high-level view of projects (strategic alignment, benefits & performance), thus assisting them in making decisions on resource allocation. 8. As projects come and go, the Program Management Office facilitates the formal retention of knowledge.
  • 41. Program Management Office PMO Activities Project Resource Management Responsible for coordinating resources (human resources, equipment, space, and so on) according to what each project demands and the amount of resources available (either from within the organization, from temporary resources, or through outsourcing). Financial Management The PMO is required to produce a consolidated financial statement, compiled from each project, with a certain frequency (which could be weekly, monthly, quarterly, and/or yearly). The statement should contain information such as the actual budget and expenditure, as well as the projected budget and expenditure. In addition to monitoring the projects’ progress, the information can also be used to determine funding allocation. Vendor Management The PMO assists each Project Office with the management of third-party contracts with vendors. Process Management The PMO standardizes and continuously improves the operational processes and procedures in the project environment.
  • 42. Program Management Office PMO Activities Program Monitoring (Quality Management). The PMO is responsible for monitoring the progress of each project in terms of schedule, scope, changes, cost, and quality. Project Selection. PMO assists the business executives with selecting projects that are aligned with the business by, among other things, identifying potential risks, reviewing the company’s capabilities to undertake the projects, Knowledge Management Makes sure that all the knowledge gained and the lessons learned are not lost (i.e., by creating a project knowledge repository) when experienced personnel leave the company Knowledge management is about making sure that the organization cultivates its existing project knowledge, continuously improving it and sharing it as a part of the staff development process
  • 43. Program Management Office PMO Activities Customer Management PMO’s customers are people working in the project environment & in the business environment. Training Management PMO work closely with various Project Offices as well as with the organization’s human resource coordinator to create a training program that is consistent with the organization’s strategic positioning. Communications Management Develops and implements a communication plan that involves all the stakeholders (e.g., the Project Offices and the business executives and steering committees). The activities may include the dissemination of information, escalation of issues, and others.
  • 45. Program Management Office (PMO) PMO crucial portion of the program’s infrastructure. supports the program manager with the management of multiple, unrelated projects • Defining the program management processes that will be followed • Managing schedule and budget at the program level • Defining the quality standards for the program and for the program’s components • Providing document configuration management • Providing centralized support for managing changes and tracking risks and issues PMO Supports the Program Manager by
  • 46. Program Management Office - Levels Level 1 In other words, Level 1 PMO adopts a reactive approach instead of the proactive approach This PMO acts as a liaison between the Project Offices and the executive board for administrative purposes only (e.g., providing a summary report of the progress of all projects in the organization to the executive board, assisting with project issues escalation, and so on). CEO Finance Dept IT Dept Marketing Dept HR Dept PMO
  • 47. Program Management Office - Levels Level 2 This PMO goes beyond providing support and has the authority to implement actions that improve the organization’s project management capacity and capability (e.g., standardizing the organization’s project management process, providing project management training, and so on). CEO Finance Dept IT Dept Marketing Dept HR DeptPMO
  • 48. Program Management Office - Levels Level 3 This PMO does not act only as an independent body with authority to lead the project environment, but also as a centre of excellence. PMO as center of excellence Board of mgmt & CEO Other dept heads Other CoEs & external bodies Project Environment It directly contributes to the organization’s discussions on strategy, and it takes actions to implement those strategies through projects to create competitive advantages for the organization.
  • 49. Case Study 3 Identify If Program Management Office is required OR NO
  • 50. Case Study 3 The Program manager is appointed in CSI. He is Robert de Niro. The project has been initiated. Now the process need to be geared up. But Robert don’t know much about CSI, it’s work culture & also have to concentrate on program initiation with the project details to be finalized with the client. As this the first proper technological work been done in CSI there is no process, Procedure or standardization of any of the work. Is John need to implement the PMO? If YES then What would be his level of PMO? If NO then why isn’t it required.
  • 51. Program Life Cycle and Benefits Management Pre-Program preparation Program Initiation Program Setup Delivery of Program Benefits Program Closure Program Benefits Management Benefit Identification Benefits Analysis Benefits Realization Benefits Transition - Identify Business benefits - Qualify Business Benefits - Derive & Prioritize Components - Define benefits Matrix - Monitor Components - Maintain benefits Registered - Report Benefits - Consolidate Co- ordinated benefits - Transfer the ongoing benefits Programs that deliver incremental benefits, the management of these benefits has a life cycle of its own which runs parallel to that of the program, a relationship Benefits Planning - Establish benefits Realization plan & monitoring - Map Benefits into program Plan
  • 52. Program Life Cycle and Benefits Management - Identify Business benefits - Qualify Business Benefits Benefit Identification- Identify & Qualify Business benefits Identifying the business benefits the program will create The program manager, senior management, and the key stakeholders must work together to establish the objectives of the program Identify how the program will meet organizational objectives Pre-Program preparation Benefits Analysis - Derive & Prioritize Components - Define benefits Matrix Program Initiation Collect the specific, expected benefits the program is to create for the performing organization from the program charter, senior management, and key stakeholders - Benefit Analysis Once the benefits have been clearly defined, the program manager works to prioritize the benefit components for project initiation, goal setting, and scope creations. Identify the metrics for success for each of the identified program benefits This is required as what’s good for the program manager may not be the same level of good the customer envisions
  • 53. Program Life Cycle and Benefits Management Benefits Planning - Establish benefits Realization plan & monitoring - Map Benefits into program Plan Program Setup- Benefits Planning The task here is to establish the rules and procedures the program’s projects will follow in order to create the benefits the program expects. Create a Benefits Realization Plan to show how the program and its projects will create the integrated benefits for the program Establishment of the benefits monitoring processes Map the benefits into the program management plan. This defines the Critical Success Factor & also allows programs to move the benefits to the next phase to deliver Incremental Benefits Delivery of Program Benefits Benefits Realization - Monitor Components - Maintain benefits Registered - Report Benefits Execution of all the projects within the program - Benefits Realization Monitor the program components i.e. the projects within the program to ensure that each project manager is keeping on task, on scope, on budget & generally on track in order to create the benefits the program expects Allow corrective and preventive actions to ensure the project managers create what’s expected of them
  • 54. Program Life Cycle and Benefits Management Delivery of Program Benefits Benefits Realization - Monitor Components - Maintain benefits Registered - Report Benefits - Benefits Realization Creates and maintains a benefits register that should contain : • What the benefit is and its constituent components • What project components are dependent on or contribute to the realized benefit • Time to create the benefits • Cost to create the benefits • Risks and issues surrounding the benefit • Secondary benefits tied to the benefit • All other relevant benefit information Program Closure Benefits Transition - Consolidate Co- ordinated benefits - Transfer the ongoing benefits Stage when the scope of the program has been met/ the program was cancelled - Benefits Transition Moves the realized, documented benefits the projects have created into the on-going operations of the performing organization The consolidation of the coordinated benefits
  • 55. Program Benefits Management – Balanced Score Card I. Strategic Focus II. Assessment III. Change Planning & Implementation IV. Continuous Improvement STEP 1 – Define & Commit to Strategy STEP 2 – Audit Measures STEP 3 – Develop New Measures STEP 4 – Apply New Measures STEP 5 – Analyze & Report STEP 6 – Implement Improvement Plans STEP 7 – Track Metrics STEP 8 – Continuous Improvement & Revisit Scorecard
  • 56. Vision & Strategy CUSTOMER: To achieve our vision How should we appear to our customer Objective --------------------- Measures --------------------- Targets --------------------- Initiatives --------------------- INTERNAL BUSINESS PROCESS: To Satisfy Our Stakeholders What business process we should have Objective --------------------- Measures --------------------- Targets --------------------- Initiatives --------------------- FINANCIAL: To succeed financially what should we do & how should we do Objective --------------------- Measures --------------------- Targets --------------------- Initiatives --------------------- LEARNING & DEVELOPMENT: To achieve our vision How should we sustain our ability to change & improve Objective --------------------- Measures --------------------- Targets --------------------- Initiatives --------------------- Program Benefits Management – Balanced Score Card
  • 57. Pre-Program preparation Program Initiation Program Setup Delivery of Program Benefits Program Closure Program Benefits Management Program Governance Programs are often too complex to be managed by a single individual That’s why appropriate implementation of program governance is critical for a program to succeed. Across program life cycle Program governance assists in - managing risks, - stakeholders, - benefits, - resources, and - quality. This is facilitated by the regular and phase-gate-based oversight of deliverables, performance, risks, and issues by the program board. Program governance provides an appropriate organizational structure and the policies and procedures necessary to support program delivery through formal program reviews. G1 G2 G3 G4 Program Governance
  • 58. Program Governance • Budget for the program The aggregate costs of the projects and the costs of managing the program define the cost baseline. Consider the program governance for each of the following areas: • Scope of the program The scope of the program defines the benefits of the program. • Schedule for program benefit realization The timeline of the program defines when the project’s deliverables may be incorporated into on-going operations. • Procurement processes Enterprise environmental factors and the rules of the program governance may affect the procurement processes within the program. Consider step funding and cash flow forecasting and their impact on procurement in a program and its phases. • Quality expectations of the program and its projects The satisfied quality measured at the end of a program phase allows the program to move on to subsequent phases. • Staffing demands Consider the availability of skilled labour, consultants & subject matter experts. A resource shortage may affect the schedule, costs, risks & other knowledge areas within the program. • Communication challenges Language barriers, time zone differences, regulatory issues, and stakeholder constraints may affect the phases of a program. • Risk management Program managers may adjust the phases of a program to account for the amount of risk exposure the program is leveraging in the project.
  • 59. Program Life Cycle and Stakeholder Management Stakeholders can be the individuals that are affected by your program benefits and the deliverables of your project. Stakeholders can also be organizations such as government agencies and vendors that may influence your project. Goal of stakeholder management is to market, sell, and create buy-in from all the stakeholders as early as possible in the program. Program director Program manager Project managers Program sponsor Customer Program team members Project team members Program management office Program office Program governance board Suppliers Government agencies