SlideShare a Scribd company logo
1 of 10
Download to read offline
1
WW aa tt ee rr SS uu pp pp ll yy ff rr oo mm PP ee rr ss ii aa nn GG uu ll ff CC oo ..
Summary
Feature of Project
WWaatteerr TTrraannssffeerr ffrroomm tthhee PPeerrssiiaann GGuullff ttoo tthhee
SSoouutthh EEaasstt ooff IIrraann’’ss MMiinneerraall IInndduussttrriieess PPrroojjeecctt
No. of Report: 410900-5567
Date of transmittal: Jul. 2013
2
Table of Contents
DESCRIPTION PAGE
------------------------------------------------------------------------------------------------------------------------------------------------------------
1-Introduction……………………………………………… 3
2-Location and Scope of project………………………….. 3
3-Objectives ……………………………………………….. 5
4-Project components……………………………………… 5
4-1- The Specification of Transmission Pipe Line (Part-1) 5
4-2- The Specification of Transmission Pipe Line (Part-2) 7
4-3- The Specification of Transmission Pipe Line (Part-3) 8
5-Project Cost………………………………………………. 9
3
1- Introduction:
Iran as one of the biggest country in Middle East Region and Persian Gulf experience water
shortage, particularly in areas adjacent to South and East of the country.
In other hand possessing about 68 different type of Non-petroleum mineral and about 37 billion
tons of discovered deposits and about 58 billion tons of potentially reserves is counted as one
the 15-strong and mineral –rich countries in the world.
Major parts of Iran’s mines, such as Iron Ore and Copper Mines, are located in south east of
country, especially in Hormozgan, Kerman and Yazd Provinces. For example Golgohar iron ore
mines in Sirjan city with about 1020 million tons of potentially deposits, is considered to be the
biggest iron ore deposits in Middle East or Sarchechmeh Copper Mine is considered as one of
the largest copper mines in the region .
Due to the high potential of the Region, large development projects in mineral industries such
as manufacturing and processing mineral ore, concentrate, pellets, proceeding steel industry,
copper extraction and copper processing is under proceeding.
Development and utilization of above mentioned project require large amount of water
resources. Providing this amount of water is out of local resource potential. Therefore, the use
of sea water is as a serious source of supplying of potable and industry water.
According to this approach, Golgohar Mineral Industrial Complex, National Iranian Copper
Industries Company and Chadormalu Mining and Industrial Complex for water supply to
existing facilities and the developing projects have placed on the agenda the desalinating and
transmitting of about 110 million cubic meters per year.
Required water will be transmitted to the place of consumption at the path length of about 760
km, from desalination plant in the West Zone of Bandar Abbas.
4
2-Location and Scope of project:
The project is located in Hormozgan, Kerman and Yazd provinces. Project starts from the West
of Bandar Abbas , the location of the under construction plant (near the shipbuilding factory) and
continues northward through the mountains of Finn and Haji Abad cities and then via the plain
goes to Golgohar Mineral Complex located in southwest of Sirjan and since leeds to
Sarcheshmah Copper Complex located in Southwest of Rafsanjan in Kerman Province.
afterwards the pipeline originates from sarcheshmah to the the North West of Yazd province
where steel industries lacated. A branch of the transmission line is divided into Chadormalu
mines. Figure (2-1) present position of the transmission pipe line.
5
Fig (2-1) Plan layout of transmission route
6
3- Objectives
The main objective of the project is to supply existing and developmental schemes
water demands for the companies participating in the project as tabulated below:
Table 3-1- water demands for the companies participating in the project
Name
Water Demand
(MCM/Y)
Percentage
Golgohar mining and Industrial Company
(GMICO)
45 41
National Iranian copper industries
Company(NICICO)
30 27
Chadormalu Mining and Industrial
Company and other Industries
(CMICO)
20 18
Other users 15 14
Total 110 100
4 - Project Components:
As shown in Figure (2-1) the present project includes three main parts. The first part from
Bandar Abbas Desalination Plant to Gol Gohar Mineral Complex in Sirjan . The second part
from Golgohar Complex to Sarcheshmah Copper Complex and third part from Sarcheshmah
Copper Complex to steel industrial zone in Ardakan and then to Chadormalu Mineral Industry
in Yazd Province.
4-1- The Specification of Transmission Pipe Line (Part-1)
Desalinated water will be transmitted from Bandar Abbas Pesalination Plant and via pumps by
1600 mm nominal diameter steel pipeline with nominal pressure from 16 to 40 bars to the Gol
Gohar Mine in Sirjan. This pipe line includes seven pump stations with a total power of 125 MW
and a total height of approximately 2400 m of the water column.
7
First part of transmission pipe line with approximate length of 285 km will transmit the water
with the rate of rate 110 MCM per year (4 CMS) from zero elevation from sea level (Bandar
Abbas Desalination Plant) to elevation of 1,800 meters above sea level in the Golgohar region.
For the crossing through the mountains, construction of a tunnel to approximate lengh of 3,000
meters is expected.
The total estimated investment cost of the first part of transmitting pipe line including the cost of
providing pipes, equipment and enforcement costs are about 14000 billion Iranian Rails.
The route of first part of the water transmission pipe line is illustrated in Figure (4-1)
Fig (4-1) –Plan layout of transmission route (Part -1)
8
4-2- The Specification of Transmission Pipe Line (Part-2)
The water in the second part is pumped by 1300 mm nominal diameter steel pipeline from
reservoir that will be constructed within Golgohar to Sarcheshmah copper complex. This pipe line
consists of four pump stations with a total power of 50 MW and a total height of 1,400 meters.
The nominal pipe pressure varies from 16 to 40 bars, depending on the topography and location
of pumping stations.
Second part of transmission pipe line with approximate length of 135 km will transmit the water
with the rate of rate 75 MCM per year (2.7 CMS) from elevation of 1800 meter to elevation of
2750 meters above sea level in the Sarcheshmah copper complex.
The total estimated investment cost of the second part of transmitting pipe line including the cost
of providing pipes, equipment and Executive costs are about 4,500 billion Iranian Rials.
The route of second part of the water transmission pipe line is illustrated in Figure (4-2)
Fig (4-2) - Plan layout of transmission route (Part -2)
9
4-3- The Specification of Transmission Pipe Line (Part-3)
The water in the third part is transmitted by 1300 and 900 mm nominal diameter steel pipeline
from reservoir that will be constructed within Sarcheshmah Copper Mines to Steel Industrial
Zone and Chadormalu Mining Industry in Yazd Province .The nominal pipe pressure varies from
16 to 40 bars depending on the topography .
Third part of transmission pipe line with approximate length of 340 km will transmit the water
with the rate of 40 MCM per year (1.5 CMS) to the consumption places.
The total estimated investment cost of the Third part of transmitting pipe line including the cost
of providing pipes, equipment and enforcement costs are about 4400 billion Iranian Rials.
The route of third part of the water transmission pipe line is illustrated in Figure (4-3)
Fig (4-3) - Plan layout of transmission route (Part -3)
10
5-Project Estimated Cost:
Cost of the project includes four major parts as follows:
 The cost of providing Pipe, Valves and Fitting, Coating of pipe, Execution of
Transmission pipe line and valves basin.
 Construction costs include the cost of access roads, tunnels, on the way reservoirs,
vacuum reservoirs and pumping station building.
 Cost of supply and installation and commissioning of mechanical and electrical
equipment of pumping stations and transmission lines.
 Cost of power supply and the required power transmission lines and required
substations.
Total cost of the project is estimated breakdown of the various components as described in
table 5-1 below:
Table 5-1- Total Project Cost
Description Value (Billion RLs)
Costs of First Part 14000
Costs of Second Part 4500
Costs of Third Part 4400
Total Costs of the project 22900

More Related Content

Similar to feature of project 10

project report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railwaysproject report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railwaysDevesh Chaurasia
 
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET Journal
 
59323623 1943-g-g-001-r c
59323623 1943-g-g-001-r c59323623 1943-g-g-001-r c
59323623 1943-g-g-001-r chomeworkping4
 
Steel Plant Layout: Civil Engineering perspective
Steel Plant Layout: Civil Engineering perspectiveSteel Plant Layout: Civil Engineering perspective
Steel Plant Layout: Civil Engineering perspectiveIRJET Journal
 
BHILAI STEEL PLANT VOCATIONAL TRAINING
BHILAI STEEL PLANT VOCATIONAL TRAININGBHILAI STEEL PLANT VOCATIONAL TRAINING
BHILAI STEEL PLANT VOCATIONAL TRAININGVikash Kumar
 
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...IRJET Journal
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPPSaad Raja
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitaeSunil Singh
 
EIA POWER PLANT.pptx
EIA POWER PLANT.pptxEIA POWER PLANT.pptx
EIA POWER PLANT.pptxsunilghosh11
 
500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction reportSumit Singh
 
design specification and problems of kuraz irrigation scheme
 design specification and problems  of kuraz irrigation scheme design specification and problems  of kuraz irrigation scheme
design specification and problems of kuraz irrigation schemetamasgenqmokonnin
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report muhammad khurram
 
Steel melting shop (sms) - 2
Steel melting shop (sms) - 2Steel melting shop (sms) - 2
Steel melting shop (sms) - 2NIT - ROURKELA
 

Similar to feature of project 10 (20)

project report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railwaysproject report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railways
 
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
 
59323623 1943-g-g-001-r c
59323623 1943-g-g-001-r c59323623 1943-g-g-001-r c
59323623 1943-g-g-001-r c
 
Steel Plant Layout: Civil Engineering perspective
Steel Plant Layout: Civil Engineering perspectiveSteel Plant Layout: Civil Engineering perspective
Steel Plant Layout: Civil Engineering perspective
 
BHILAI STEEL PLANT VOCATIONAL TRAINING
BHILAI STEEL PLANT VOCATIONAL TRAININGBHILAI STEEL PLANT VOCATIONAL TRAINING
BHILAI STEEL PLANT VOCATIONAL TRAINING
 
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
 
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
RMHS Manual 2.1
RMHS Manual 2.1RMHS Manual 2.1
RMHS Manual 2.1
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Nitin
NitinNitin
Nitin
 
EIA POWER PLANT.pptx
EIA POWER PLANT.pptxEIA POWER PLANT.pptx
EIA POWER PLANT.pptx
 
500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report
 
design specification and problems of kuraz irrigation scheme
 design specification and problems  of kuraz irrigation scheme design specification and problems  of kuraz irrigation scheme
design specification and problems of kuraz irrigation scheme
 
Ntpc training report
Ntpc training reportNtpc training report
Ntpc training report
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Steel melting shop (sms) - 2
Steel melting shop (sms) - 2Steel melting shop (sms) - 2
Steel melting shop (sms) - 2
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
 

feature of project 10

  • 1. 1 WW aa tt ee rr SS uu pp pp ll yy ff rr oo mm PP ee rr ss ii aa nn GG uu ll ff CC oo .. Summary Feature of Project WWaatteerr TTrraannssffeerr ffrroomm tthhee PPeerrssiiaann GGuullff ttoo tthhee SSoouutthh EEaasstt ooff IIrraann’’ss MMiinneerraall IInndduussttrriieess PPrroojjeecctt No. of Report: 410900-5567 Date of transmittal: Jul. 2013
  • 2. 2 Table of Contents DESCRIPTION PAGE ------------------------------------------------------------------------------------------------------------------------------------------------------------ 1-Introduction……………………………………………… 3 2-Location and Scope of project………………………….. 3 3-Objectives ……………………………………………….. 5 4-Project components……………………………………… 5 4-1- The Specification of Transmission Pipe Line (Part-1) 5 4-2- The Specification of Transmission Pipe Line (Part-2) 7 4-3- The Specification of Transmission Pipe Line (Part-3) 8 5-Project Cost………………………………………………. 9
  • 3. 3 1- Introduction: Iran as one of the biggest country in Middle East Region and Persian Gulf experience water shortage, particularly in areas adjacent to South and East of the country. In other hand possessing about 68 different type of Non-petroleum mineral and about 37 billion tons of discovered deposits and about 58 billion tons of potentially reserves is counted as one the 15-strong and mineral –rich countries in the world. Major parts of Iran’s mines, such as Iron Ore and Copper Mines, are located in south east of country, especially in Hormozgan, Kerman and Yazd Provinces. For example Golgohar iron ore mines in Sirjan city with about 1020 million tons of potentially deposits, is considered to be the biggest iron ore deposits in Middle East or Sarchechmeh Copper Mine is considered as one of the largest copper mines in the region . Due to the high potential of the Region, large development projects in mineral industries such as manufacturing and processing mineral ore, concentrate, pellets, proceeding steel industry, copper extraction and copper processing is under proceeding. Development and utilization of above mentioned project require large amount of water resources. Providing this amount of water is out of local resource potential. Therefore, the use of sea water is as a serious source of supplying of potable and industry water. According to this approach, Golgohar Mineral Industrial Complex, National Iranian Copper Industries Company and Chadormalu Mining and Industrial Complex for water supply to existing facilities and the developing projects have placed on the agenda the desalinating and transmitting of about 110 million cubic meters per year. Required water will be transmitted to the place of consumption at the path length of about 760 km, from desalination plant in the West Zone of Bandar Abbas.
  • 4. 4 2-Location and Scope of project: The project is located in Hormozgan, Kerman and Yazd provinces. Project starts from the West of Bandar Abbas , the location of the under construction plant (near the shipbuilding factory) and continues northward through the mountains of Finn and Haji Abad cities and then via the plain goes to Golgohar Mineral Complex located in southwest of Sirjan and since leeds to Sarcheshmah Copper Complex located in Southwest of Rafsanjan in Kerman Province. afterwards the pipeline originates from sarcheshmah to the the North West of Yazd province where steel industries lacated. A branch of the transmission line is divided into Chadormalu mines. Figure (2-1) present position of the transmission pipe line.
  • 5. 5 Fig (2-1) Plan layout of transmission route
  • 6. 6 3- Objectives The main objective of the project is to supply existing and developmental schemes water demands for the companies participating in the project as tabulated below: Table 3-1- water demands for the companies participating in the project Name Water Demand (MCM/Y) Percentage Golgohar mining and Industrial Company (GMICO) 45 41 National Iranian copper industries Company(NICICO) 30 27 Chadormalu Mining and Industrial Company and other Industries (CMICO) 20 18 Other users 15 14 Total 110 100 4 - Project Components: As shown in Figure (2-1) the present project includes three main parts. The first part from Bandar Abbas Desalination Plant to Gol Gohar Mineral Complex in Sirjan . The second part from Golgohar Complex to Sarcheshmah Copper Complex and third part from Sarcheshmah Copper Complex to steel industrial zone in Ardakan and then to Chadormalu Mineral Industry in Yazd Province. 4-1- The Specification of Transmission Pipe Line (Part-1) Desalinated water will be transmitted from Bandar Abbas Pesalination Plant and via pumps by 1600 mm nominal diameter steel pipeline with nominal pressure from 16 to 40 bars to the Gol Gohar Mine in Sirjan. This pipe line includes seven pump stations with a total power of 125 MW and a total height of approximately 2400 m of the water column.
  • 7. 7 First part of transmission pipe line with approximate length of 285 km will transmit the water with the rate of rate 110 MCM per year (4 CMS) from zero elevation from sea level (Bandar Abbas Desalination Plant) to elevation of 1,800 meters above sea level in the Golgohar region. For the crossing through the mountains, construction of a tunnel to approximate lengh of 3,000 meters is expected. The total estimated investment cost of the first part of transmitting pipe line including the cost of providing pipes, equipment and enforcement costs are about 14000 billion Iranian Rails. The route of first part of the water transmission pipe line is illustrated in Figure (4-1) Fig (4-1) –Plan layout of transmission route (Part -1)
  • 8. 8 4-2- The Specification of Transmission Pipe Line (Part-2) The water in the second part is pumped by 1300 mm nominal diameter steel pipeline from reservoir that will be constructed within Golgohar to Sarcheshmah copper complex. This pipe line consists of four pump stations with a total power of 50 MW and a total height of 1,400 meters. The nominal pipe pressure varies from 16 to 40 bars, depending on the topography and location of pumping stations. Second part of transmission pipe line with approximate length of 135 km will transmit the water with the rate of rate 75 MCM per year (2.7 CMS) from elevation of 1800 meter to elevation of 2750 meters above sea level in the Sarcheshmah copper complex. The total estimated investment cost of the second part of transmitting pipe line including the cost of providing pipes, equipment and Executive costs are about 4,500 billion Iranian Rials. The route of second part of the water transmission pipe line is illustrated in Figure (4-2) Fig (4-2) - Plan layout of transmission route (Part -2)
  • 9. 9 4-3- The Specification of Transmission Pipe Line (Part-3) The water in the third part is transmitted by 1300 and 900 mm nominal diameter steel pipeline from reservoir that will be constructed within Sarcheshmah Copper Mines to Steel Industrial Zone and Chadormalu Mining Industry in Yazd Province .The nominal pipe pressure varies from 16 to 40 bars depending on the topography . Third part of transmission pipe line with approximate length of 340 km will transmit the water with the rate of 40 MCM per year (1.5 CMS) to the consumption places. The total estimated investment cost of the Third part of transmitting pipe line including the cost of providing pipes, equipment and enforcement costs are about 4400 billion Iranian Rials. The route of third part of the water transmission pipe line is illustrated in Figure (4-3) Fig (4-3) - Plan layout of transmission route (Part -3)
  • 10. 10 5-Project Estimated Cost: Cost of the project includes four major parts as follows:  The cost of providing Pipe, Valves and Fitting, Coating of pipe, Execution of Transmission pipe line and valves basin.  Construction costs include the cost of access roads, tunnels, on the way reservoirs, vacuum reservoirs and pumping station building.  Cost of supply and installation and commissioning of mechanical and electrical equipment of pumping stations and transmission lines.  Cost of power supply and the required power transmission lines and required substations. Total cost of the project is estimated breakdown of the various components as described in table 5-1 below: Table 5-1- Total Project Cost Description Value (Billion RLs) Costs of First Part 14000 Costs of Second Part 4500 Costs of Third Part 4400 Total Costs of the project 22900