2
 Usually work/task will be divided among the
groups.
 Formal Groups will be divided into subgroups
 There are two types
 Command Group: Formal Mgmt Struct
 Task Group
Step wise frame work
Prof. Kanchana Devi
3
 Identify project scope and objectives
 Identify project infrastructure
 Analyze project characteristics
 Estimate effort for each activity
 Identify activity risks
 Allocate resources
 Review/Publicize Plan
Becoming a Team
Prof. Kanchana Devi
4
 There are 5 basic stages of development
 Forming
 Storming
 Norming
 Performing
 Adjourning
Forming
Prof. Kanchana Devi
5
 Members of the group get to know each other
 Set up some ground rules about behavior
Storming
Prof. Kanchana Devi
6
 Conflicts arises, everyone will try to
dominate(Leadership)
 Group’s methods of operation are established
Norming
Prof. Kanchana Devi
7
 Conflicts are settled
 A feel of group identity emerges
Performing
Prof. Kanchana Devi
8
 The emphasis will be on the task at hand
Adjourning
Prof. Kanchana Devi
9
 The group disbands
Balance – Different People
Prof. Kanchana Devi
10
 The Chair
 The Plant
 The Monitor – Evaluator
 The Sharper
 The Team Worker
 The Resource Investigator
 The Completer – Finisher
 The Company Worker
 Similar to our institution
Group Performance
Prof. Kanchana Devi
11
 One way of categorizing group tasks into:
 Additive Tasks
 Effort to get final result
 Compensatory Tasks
 Judgments of individual group members are pooled
 Disjunctive Tasks
 Only one correct answer
 Conjunctive Tasks
 Progress is governed by the rate of slowest performer
Decision Making
Prof. Kanchana Devi
12
 Decisions are categorized as
 Structured: Simple, Routine Decisions (Rules can
be applied in straight forward way)
 Unstructured: More Complex and often requiring
a degree of creativity
Obstacles to make good decision
Prof. Kanchana Devi
13
 Faulty Heuristics
 “Rule of Thumb”
 Escalation of Commitment
 Difficult to alter
 Information Overload
 Too much of information
Obstacles to good GROUP decision
Prof. Kanchana Devi
14
 Groups deal less effectively with
 Poor Structures
 Problems need Creative Solutions
 Risky Shifts – Making decision on their own
Methods to reduce the
disadvantages of group DM
Prof. Kanchana Devi
15
 Delphi Technique: Given a problem following
procedure have to be carried out
 The cooperation of a number of experts is enlisted
 The problem is presented to the experts
 The experts record their recommendations
 These recommendations are collated and reproduced
 The collected responses are re-circulated
 The experts comment
 If there is any deviation the process will be stopped
Team Heedfulness
Prof. Kanchana Devi
16
 Eg: Foot Ball team
 Group members are aware of activities of
others that contribute to overall success
 “Collective Mind”
 Shared Understanding, Familiarity and good
communications
 In software development environment
 Egoless Programming
 Chief Programmer Teams
 Extreme Programming
 Scrum – Similar to Agile Model
Organization & Team Structure
Prof. Kanchana Devi
17
 There are two important issues that are critical
to the effective functioning of every
organization are
 Department Structure
 How is a department is organized into teams?
 Team Structure
 How are project teams structured?
Department Structure
Prof. Kanchana Devi
18
 There are three broad ways in which a
software development department can be
structured:
 Functional Format
 Project Format
 Matrix Format
Functional Format VS Project
Format
Prof. Kanchana Devi
19
Top
Management
Project
Team n
Project
Team 1
Top Management
a. Project Organization
Requirements
Design
Coding
Networking
Testing
Database Project
Team n
Project
Team 1
b. Functional Organization
Functional Groups
Matrix Format
Prof. Kanchana Devi
20
Project
Functional
Group
#1 #2 #3
#1 2 0 3 Functional
Manager 1
#2 0 5 3 Functional
Manager 2
#3 0 4 2 Functional
Manager 3
#4 1 4 0 Functional
Manager 4
#5 0 4 6 Functional
Manager 5
Team Structure
Prof. Kanchana Devi
21
 Denotes the reporting, responsibility and
communication structures in individual project
teams
 There are only three team structures:
 Democratic
 Chief Programmer
 Mixed team organization
Chief Programmer team
Prof. Kanchana Devi
22
Project Manager
Reporting
Team Members
Democratic Team
Prof. Kanchana Devi
23
Team Member
Communication
Mixed Control Team Structure
Prof. Kanchana Devi
24
Team
Members
Senior Members
Project Manager

More Related Content

What's hot

Software project management
Software project managementSoftware project management
Software project management
R A Akerkar
 

What's hot (20)

Issues in Data Link Layer
Issues in Data Link LayerIssues in Data Link Layer
Issues in Data Link Layer
 
Managing contracts
Managing contractsManaging contracts
Managing contracts
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
Spm ap-network model-
Spm ap-network model-Spm ap-network model-
Spm ap-network model-
 
Comet Cloud
Comet CloudComet Cloud
Comet Cloud
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software Engineering
 
Issues in design_of_code_generator
Issues in design_of_code_generatorIssues in design_of_code_generator
Issues in design_of_code_generator
 
Multichannel User Interfaces
Multichannel User InterfacesMultichannel User Interfaces
Multichannel User Interfaces
 
ELEMENTS OF TRANSPORT PROTOCOL
ELEMENTS OF TRANSPORT PROTOCOLELEMENTS OF TRANSPORT PROTOCOL
ELEMENTS OF TRANSPORT PROTOCOL
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
Software project management
Software project managementSoftware project management
Software project management
 
Design Pattern in Software Engineering
Design Pattern in Software EngineeringDesign Pattern in Software Engineering
Design Pattern in Software Engineering
 
Spm unit 4
Spm unit 4Spm unit 4
Spm unit 4
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
 
Decomposition technique In Software Engineering
Decomposition technique In Software Engineering Decomposition technique In Software Engineering
Decomposition technique In Software Engineering
 
Spm unit 1
Spm unit 1Spm unit 1
Spm unit 1
 
Data Designs (Software Engg.)
Data Designs (Software Engg.)Data Designs (Software Engg.)
Data Designs (Software Engg.)
 
Importance & Principles of Modeling from UML Designing
Importance & Principles of Modeling from UML DesigningImportance & Principles of Modeling from UML Designing
Importance & Principles of Modeling from UML Designing
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation Techniques
 
Unit 2(advanced class modeling & state diagram)
Unit  2(advanced class modeling & state diagram)Unit  2(advanced class modeling & state diagram)
Unit 2(advanced class modeling & state diagram)
 

Viewers also liked (9)

Spm unit iii-risk-pert
Spm unit iii-risk-pertSpm unit iii-risk-pert
Spm unit iii-risk-pert
 
List of 10 Sales Performance Management (SPM) Vendors
List of 10 Sales Performance Management (SPM) VendorsList of 10 Sales Performance Management (SPM) Vendors
List of 10 Sales Performance Management (SPM) Vendors
 
Spm unit iii-risk-resource allocation
Spm unit iii-risk-resource allocationSpm unit iii-risk-resource allocation
Spm unit iii-risk-resource allocation
 
Spm unit iii-risk-monitoring & control1
Spm unit iii-risk-monitoring & control1Spm unit iii-risk-monitoring & control1
Spm unit iii-risk-monitoring & control1
 
Leadership In Project Management
Leadership In Project ManagementLeadership In Project Management
Leadership In Project Management
 
Risk identification
Risk identificationRisk identification
Risk identification
 
Teamwork
TeamworkTeamwork
Teamwork
 
Resource allocation
Resource allocationResource allocation
Resource allocation
 
Risk Management Framework
Risk Management FrameworkRisk Management Framework
Risk Management Framework
 

Similar to Spm unit iii-risk-working in teams

Yonce.clayton
Yonce.claytonYonce.clayton
Yonce.clayton
NASAPMC
 
Organisational Behaviour Group Dynamics Unit 4.ppt
Organisational Behaviour Group Dynamics Unit 4.pptOrganisational Behaviour Group Dynamics Unit 4.ppt
Organisational Behaviour Group Dynamics Unit 4.ppt
RbiGradeB
 
Chapter 6Our Coherence Framework is simplexity.” Simplexity is .docx
Chapter 6Our Coherence Framework is simplexity.” Simplexity is .docxChapter 6Our Coherence Framework is simplexity.” Simplexity is .docx
Chapter 6Our Coherence Framework is simplexity.” Simplexity is .docx
mccormicknadine86
 
--Student NumberStudent NumberFormative AssessmentModu.docx
--Student NumberStudent NumberFormative AssessmentModu.docx--Student NumberStudent NumberFormative AssessmentModu.docx
--Student NumberStudent NumberFormative AssessmentModu.docx
mercysuttle
 
1MGMT 428Team ProcessesFall 2015Team Processes –.docx
1MGMT 428Team ProcessesFall 2015Team Processes –.docx1MGMT 428Team ProcessesFall 2015Team Processes –.docx
1MGMT 428Team ProcessesFall 2015Team Processes –.docx
hyacinthshackley2629
 
leadership_academy_7_-leadership_w_kip-participants.ppt
leadership_academy_7_-leadership_w_kip-participants.pptleadership_academy_7_-leadership_w_kip-participants.ppt
leadership_academy_7_-leadership_w_kip-participants.ppt
sreeeswar
 

Similar to Spm unit iii-risk-working in teams (20)

Organisational Management: Objectives & Case Studies
Organisational Management: Objectives & Case StudiesOrganisational Management: Objectives & Case Studies
Organisational Management: Objectives & Case Studies
 
teamwork n group..
teamwork n group..teamwork n group..
teamwork n group..
 
Team basics
Team basicsTeam basics
Team basics
 
Updated Team And Team Work
Updated Team And Team WorkUpdated Team And Team Work
Updated Team And Team Work
 
NCV 3 Project Management Hands-On Support Slide Show - Module 8
NCV 3 Project Management Hands-On Support Slide Show - Module 8NCV 3 Project Management Hands-On Support Slide Show - Module 8
NCV 3 Project Management Hands-On Support Slide Show - Module 8
 
Yonce.clayton
Yonce.claytonYonce.clayton
Yonce.clayton
 
Team Building F Lussier V1.3 Eng
Team Building F Lussier V1.3 EngTeam Building F Lussier V1.3 Eng
Team Building F Lussier V1.3 Eng
 
How to increase your productivity including team management - Tarja Keski-Mat...
How to increase your productivity including team management -	Tarja Keski-Mat...How to increase your productivity including team management -	Tarja Keski-Mat...
How to increase your productivity including team management - Tarja Keski-Mat...
 
Organisational Behaviour Group Dynamics Unit 4.ppt
Organisational Behaviour Group Dynamics Unit 4.pptOrganisational Behaviour Group Dynamics Unit 4.ppt
Organisational Behaviour Group Dynamics Unit 4.ppt
 
Team & their Types
Team & their TypesTeam & their Types
Team & their Types
 
Assessment of team projects in mba courses
Assessment of team projects in mba coursesAssessment of team projects in mba courses
Assessment of team projects in mba courses
 
Chapter 6Our Coherence Framework is simplexity.” Simplexity is .docx
Chapter 6Our Coherence Framework is simplexity.” Simplexity is .docxChapter 6Our Coherence Framework is simplexity.” Simplexity is .docx
Chapter 6Our Coherence Framework is simplexity.” Simplexity is .docx
 
Leadership series-foundations
Leadership series-foundationsLeadership series-foundations
Leadership series-foundations
 
--Student NumberStudent NumberFormative AssessmentModu.docx
--Student NumberStudent NumberFormative AssessmentModu.docx--Student NumberStudent NumberFormative AssessmentModu.docx
--Student NumberStudent NumberFormative AssessmentModu.docx
 
1MGMT 428Team ProcessesFall 2015Team Processes –.docx
1MGMT 428Team ProcessesFall 2015Team Processes –.docx1MGMT 428Team ProcessesFall 2015Team Processes –.docx
1MGMT 428Team ProcessesFall 2015Team Processes –.docx
 
leadership_academy_7_-leadership_w_kip-participants.ppt
leadership_academy_7_-leadership_w_kip-participants.pptleadership_academy_7_-leadership_w_kip-participants.ppt
leadership_academy_7_-leadership_w_kip-participants.ppt
 
BA 15 Chapter 12
BA 15 Chapter 12BA 15 Chapter 12
BA 15 Chapter 12
 
EFFECTIVE LEADERSHIP. 14-05-2024 aprilpptx.pptx
EFFECTIVE LEADERSHIP. 14-05-2024 aprilpptx.pptxEFFECTIVE LEADERSHIP. 14-05-2024 aprilpptx.pptx
EFFECTIVE LEADERSHIP. 14-05-2024 aprilpptx.pptx
 
Project Teams and leadership-effective .
Project Teams and leadership-effective .Project Teams and leadership-effective .
Project Teams and leadership-effective .
 
EFFECTIVE LEADERSHIP and projects teams.
EFFECTIVE LEADERSHIP and projects teams.EFFECTIVE LEADERSHIP and projects teams.
EFFECTIVE LEADERSHIP and projects teams.
 

More from Kanchana Devi (10)

Spm unit v-software reliability-
Spm unit v-software reliability-Spm unit v-software reliability-
Spm unit v-software reliability-
 
Spm unit v-software maintenance-intro
Spm unit v-software maintenance-introSpm unit v-software maintenance-intro
Spm unit v-software maintenance-intro
 
Spm unit iii-configuration mgmt-responsibilities
Spm unit iii-configuration mgmt-responsibilitiesSpm unit iii-configuration mgmt-responsibilities
Spm unit iii-configuration mgmt-responsibilities
 
Spm unit iii-configuration mgmt-intro
Spm unit iii-configuration mgmt-introSpm unit iii-configuration mgmt-intro
Spm unit iii-configuration mgmt-intro
 
Spm unit iii-risk-intro
Spm unit iii-risk-introSpm unit iii-risk-intro
Spm unit iii-risk-intro
 
SPM Activity Planning Introduction
SPM Activity Planning IntroductionSPM Activity Planning Introduction
SPM Activity Planning Introduction
 
Spm project planning
Spm project planning Spm project planning
Spm project planning
 
SPM Evaluation
SPM EvaluationSPM Evaluation
SPM Evaluation
 
Open source spm tools
Open source spm toolsOpen source spm tools
Open source spm tools
 
Software project management introduction
Software project management introductionSoftware project management introduction
Software project management introduction
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Recently uploaded (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Spm unit iii-risk-working in teams

  • 1. SPM-UNIT III RISK MANAGEMENT WORKING IN TEAMS Prof. Kanchana Devi
  • 2. Working in Teams Prof. Kanchana Devi 2  Usually work/task will be divided among the groups.  Formal Groups will be divided into subgroups  There are two types  Command Group: Formal Mgmt Struct  Task Group
  • 3. Step wise frame work Prof. Kanchana Devi 3  Identify project scope and objectives  Identify project infrastructure  Analyze project characteristics  Estimate effort for each activity  Identify activity risks  Allocate resources  Review/Publicize Plan
  • 4. Becoming a Team Prof. Kanchana Devi 4  There are 5 basic stages of development  Forming  Storming  Norming  Performing  Adjourning
  • 5. Forming Prof. Kanchana Devi 5  Members of the group get to know each other  Set up some ground rules about behavior
  • 6. Storming Prof. Kanchana Devi 6  Conflicts arises, everyone will try to dominate(Leadership)  Group’s methods of operation are established
  • 7. Norming Prof. Kanchana Devi 7  Conflicts are settled  A feel of group identity emerges
  • 8. Performing Prof. Kanchana Devi 8  The emphasis will be on the task at hand
  • 10. Balance – Different People Prof. Kanchana Devi 10  The Chair  The Plant  The Monitor – Evaluator  The Sharper  The Team Worker  The Resource Investigator  The Completer – Finisher  The Company Worker  Similar to our institution
  • 11. Group Performance Prof. Kanchana Devi 11  One way of categorizing group tasks into:  Additive Tasks  Effort to get final result  Compensatory Tasks  Judgments of individual group members are pooled  Disjunctive Tasks  Only one correct answer  Conjunctive Tasks  Progress is governed by the rate of slowest performer
  • 12. Decision Making Prof. Kanchana Devi 12  Decisions are categorized as  Structured: Simple, Routine Decisions (Rules can be applied in straight forward way)  Unstructured: More Complex and often requiring a degree of creativity
  • 13. Obstacles to make good decision Prof. Kanchana Devi 13  Faulty Heuristics  “Rule of Thumb”  Escalation of Commitment  Difficult to alter  Information Overload  Too much of information
  • 14. Obstacles to good GROUP decision Prof. Kanchana Devi 14  Groups deal less effectively with  Poor Structures  Problems need Creative Solutions  Risky Shifts – Making decision on their own
  • 15. Methods to reduce the disadvantages of group DM Prof. Kanchana Devi 15  Delphi Technique: Given a problem following procedure have to be carried out  The cooperation of a number of experts is enlisted  The problem is presented to the experts  The experts record their recommendations  These recommendations are collated and reproduced  The collected responses are re-circulated  The experts comment  If there is any deviation the process will be stopped
  • 16. Team Heedfulness Prof. Kanchana Devi 16  Eg: Foot Ball team  Group members are aware of activities of others that contribute to overall success  “Collective Mind”  Shared Understanding, Familiarity and good communications  In software development environment  Egoless Programming  Chief Programmer Teams  Extreme Programming  Scrum – Similar to Agile Model
  • 17. Organization & Team Structure Prof. Kanchana Devi 17  There are two important issues that are critical to the effective functioning of every organization are  Department Structure  How is a department is organized into teams?  Team Structure  How are project teams structured?
  • 18. Department Structure Prof. Kanchana Devi 18  There are three broad ways in which a software development department can be structured:  Functional Format  Project Format  Matrix Format
  • 19. Functional Format VS Project Format Prof. Kanchana Devi 19 Top Management Project Team n Project Team 1 Top Management a. Project Organization Requirements Design Coding Networking Testing Database Project Team n Project Team 1 b. Functional Organization Functional Groups
  • 20. Matrix Format Prof. Kanchana Devi 20 Project Functional Group #1 #2 #3 #1 2 0 3 Functional Manager 1 #2 0 5 3 Functional Manager 2 #3 0 4 2 Functional Manager 3 #4 1 4 0 Functional Manager 4 #5 0 4 6 Functional Manager 5
  • 21. Team Structure Prof. Kanchana Devi 21  Denotes the reporting, responsibility and communication structures in individual project teams  There are only three team structures:  Democratic  Chief Programmer  Mixed team organization
  • 22. Chief Programmer team Prof. Kanchana Devi 22 Project Manager Reporting Team Members
  • 23. Democratic Team Prof. Kanchana Devi 23 Team Member Communication
  • 24. Mixed Control Team Structure Prof. Kanchana Devi 24 Team Members Senior Members Project Manager