Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
CV - Keith
1. Curriculum Vitae
Keith T Musonza
Page 1 of 8
Name Keith T Musonza
Profession Irrigation & Water Engineering Technician
Date of Birth 15 March 1987
Nationality Zimbabwean
Contact Details Email: keithfiberpipe@gmail.com
Phone: + 263 772441251/ +263 772 625 275
Education National Certificate in Irrigation Engineering (2009) -Harare Polytechnic
National Diploma in Irrigation Engineering (2012) -Harare Polytechnic
Higher National Diploma in Irrigation Engineering (2013)-Harare Polytechnic
Post Graduate Diploma in Water Supply & Sanitation (2014)
Other Training Glass Reinforced Polyester Pipe (GRP) Sales & Technical Training at
Fiberpipe in South Africa (May 2012). (Mr. Dominic Sikuka+27 760 121275)
Hydraulic Modelling Software (WaterCAD, SewerCAD) Training at Hazen
Engineering in association with Bentley Systems of the United States of
America.
CAD software (Microstation & AutoCAD)
GIS Systems at Hazen Engineering
Microsoft Projects at Hazen Engineering
Class 4 Drivers Licence
Countries of Work
Experience
Zimbabwe, Mozambique, Zambia & Namibia
Detailed Tasks
Assigned at Place
of Employment
GRP Pipe Marketing and Sales(Ref: Mr. Dominic Sikuka+27 760 121275)
After sales technical support (Ref: Mr. Jaco Fourie +27 82 938 5346)
Strategic Planning
The design, supervision, planning and assessment of irrigation, water &
sanitation infrastructure
Technical Presentations
Monitoring & Evaluation of water and sanitation projects
Field engineering supervision for the only manufacturer of Glass
Reinforced Polyester Pipes in Sub-Saharan Africa (FIBERPIPE Pty Ltd
South Africa)
Irrigation appraisals and needs assessment
Stakeholder Technical training
Engineering Drawing (AutoCAD & Microstation)
Hydraulic Modelling (WaterCAD, Model Maker & IrriCAD)
Project Management
Proposal & Report Writing
Stakeholder liaisons
Conducting site meetings
Pipeline Engineering
Business Development
2. Curriculum Vitae
Keith T Musonza
Page 2 of 8
EXPIRIENCE THAT BEST ILLUSTRATES RELEVANT CAPABILITIES:
Name Of Assignment Or Project : Bulawayo Annual Supply of Pipes and Fittings
Year: November 2015
Location: Bulawayo, Zimbabwe
Client: Bulawayo City Council (Eng S. Ncube +263 774 785 869)
Main project features: Supply of pipe materials for rehabilitation of water and sewer
pipelines. Over 7km of piping supplied.
Position held: Sales and Field Engineering Technician
Activities performed:
Site Visits
Tendering
Technical support during pipe offloading and storage
Installation training to client
Name Of Project :DELTA FAIRBRIDGE EFFLUENT LINE
Year: June 2015 to August 2015
Location: Bulawayo, Zimbabwe
Client: Delta Beverages Pvt Ltd (Eng Tawanda Tawengwa +263 773755343)
Main project features: Construction of a 7km 450mm diameter Effluent pipeline from the
Chibuku manufacturing plant in Fairbridge to Mahatshula. Involved the casting of plinths for
some above ground sections and laying of buried pipes as well as installation of manholes.
Three contractors JRG Contracting, Tzircalle Brothers and Stelix Civils each did a section
jus over 2km of the pipeline.
Position held: Sales & Field Engineering Technician
Activities performed:
Inspection and assessment installations.
Marketing of pipe product used
Supervision of Pipelaying by contractors.
Ensuring correct pipe laying procedure is adhered to.
Pipe installation training to contractor.
Recommending amendments to support design.
Liaison with stakeholders including client, contractor and supplier.
3. Curriculum Vitae
Keith T Musonza
Page 3 of 8
EXPIRIENCE THAT BEST ILLUSTRATES RELEVANT CAPABILITIES:
Name Of Assignment Or Project : Musese Irrigation Scheme
Year: Feb 2015 to April 2015
Location: Rundu, Kavango West, Rundu, Namibia
Client: Ministry of Agriculture & Forestry Namibia (Contractor: M & D Construction- Doki
+264 81 280 0644)
Main project features: Setting up of Irrigation facilities on 100Hectares. Involved installation
of a 2,3km main line and installation of centre pivots and drag line irrigation
Position held: Field Engineering Supervisor
Activities performed:
Inspection and assessment of installations on mainline.
Advising contractor on most suitable installation parameters.
Bedding and backfill material assessment.
Ensuring correct pipe laying procedure is adhered to.
Pipe installation training to contractor.
Setting out works for pipeline and control of levels.
Liaison with stakeholders including client, contractor, transporter and supplier.
Compilation of reports
Name Of Project :SOUTHVIEW HOUSING DEVELOPMENT
Year: July 2014 to Jan 2015
Location: Harare, Zimbabwe
Client: Fidelity Life Assurance ( Eng Ngoni Musowe-Tensor Construction +263 773 229 242)
Main project features: Development of 5000 high density housing units, project cost
approximately US$27million.
Position held: Sales & Field Engineering Technician
Activities performed:
Water & Sewer pipeline installation supervision
Marketing and sale of pipe product used
Quality Control.
Ensuring correct pipe laying procedure is adhered to.
Pipe installation training to contractor.
Recommending amendments to support design.
Liaison with stakeholders including client, contractor and supplier.
4. Curriculum Vitae
Keith T Musonza
Page 4 of 8
EXPIRIENCE THAT BEST ILLUSTRATES RELEVANT CAPABILITIES:
Name Of Assignment Or Project : KEDE IRRIGATION PROJECT
Year: Nov 2013 to April 2014
Location: Mazabuka, Zambia
Client: Mazabuka Pipe Consortium (Eng Brad Stubbs +260 966 377 741)
Main project features: Project involved the construction of a 3km long 1200mm diameter
steel pipeline, a 1,8km 1100mm GRP pipeline as well as a 2km canal. The pipeline was to
supply water to the Kede Sugar Plantation. Ten Centre Pivots were also installed in the field
for irrigation. Project cost US$8.5million.
Position held: Field Engineering Supervisor
Activities performed:
Inspection and assessment of installations.
Ensuring correct pipe laying procedure is adhered to.
Pipe installation training to contractor.
Maintenance training.
Liaison with stakeholders including client, contractor, transporter and supplier.
Compilation of reports
Name Of Project :BULAWAYO EMERGENCY WATER & SANITATION PROJECT
(BEWAP 03/13)
Year: July 2013 to August 2013
Location: Bulawayo
Client: Bulawayo Town Council (Eng Ncube +263 9 75011)(Raymond Kwenda RJK Consult)
Main project features: A World Vision funded project which involved the replacement of
300m of above ground sewer steel pipeline with GRP pipes.
Position held: Field Engineering Supervisor
Activities performed:
Inspection and assessment installations.
Ensuring correct pipe laying procedure is adhered to.
Pipe installation training to contractor.
Recommending amendments to support design.
Liaison with stakeholders including client, contractor and supplier.
5. Curriculum Vitae
Keith T Musonza
Page 5 of 8
Name Of Assignment Or Project :
MONTE CASSINO MISSION MACHEKE RIVER PIPELINE
Year: September 2013
Location: Macheke
Client: Monte Cassino Mission (Sister Martina +263 772 441 470)
Main project features: Involved the design and construction of a 2.5km long pipeline
abstracting raw water from Macheke river to concrete tanks on a mountain at a head of 109m
Position held: Team Leader
Activities performed:
Pipeline Design.
Thrust block design.
Pipe installation.
Supervision of personnel.
Preparation of bills of quantities.
Liaison with stakeholders including client, contractor and supplier.
Compilation of reports
Name Of Assignment Or Project :
BEITBRIDGE EMERGENCY SEWER AND WATER REHABILITATION PROJECT
Year: September 2012 to December 2012
Location: Beitbridge
Client: Beitbridge Town Council (Eng. Karenyi +263 778 863 040)
Main project features: A World Bank funded project to the tune of US$1,65mil involved the
replacement of 1.07km of an existing AC pipeline with 600mm & 700mm GRP pipes
Position held: Field Engineering Supervisor
Activities performed:
Inspection and assessment of site.
Ensuring correct pipe laying procedure is adhered to.
Pipe installation training to contractor.
Maintenance training.
Liaison with stakeholders including client, contractor and supplier.
compilation of reports
6. Curriculum Vitae
Keith T Musonza
Page 6 of 8
Name Of Assignment Or Project:
IMPROVEMENT OF WATER SUPPLY, SEWAGE AND SOLID WASTE MANAGEMENT
Year: November 2012 – February 2013
Location: Chitungwiza, Zimbabwe
Client: Municipality Of Chitungwiza, JICA (Eng. Jaison Hazen Eng +263 773 154 697)
Main project features: Manhole and Sewer Survey Study for NJS (NIPPON JOGESUIDO
SEKKEI) Co LTD.CONSULTING ENGINEERS, JAPAN (JICA) to provide relevant information
for informed decision making in the analysis and development of the sewerage system.
Position held: GPS Topographical Capturer, Electronic Data Reviewer and Sewer Profiler.
Activities performed:
Consolidation and review of survey and surveillance data.
AutoCAD Sewer profiling.
To provide relevant information for informed decision making in the analysis
Providing information that will be used to facilitate solutions that can be implemented for
the people to have sustainable sewerage reticulation system.
Produce an asset register for all the manholes on the sewer network of Chitungwiza
Google Earth Imagery of sites and demarcating zones.
Quantitative & Qualitative Analysis of data collected on site.
Prepare and submit monthly reports
Name Of Assignment Or Project: WATER RESOURCES ASSESSMENT
Year: Jan 2013 to Feb 2013
Location: Gokwe North, Zimbabwe
Client: CAFOD-CARITAS (Mr George Matonhodze +263 772 481 361/ 04 737191)
Main project features: CAFOD was supporting the Integrated WASH Project being
implemented by Caritas Gokwe. . The project’s goal was to ensure access to water and
sanitation facilities and improved hygiene practices of targeted vulnerable populations in
Gokwe North.
Position held: Water Engineering Technician
Activities performed:
Site inspection and detailed assessment of existing facilities in Gokwe North.
Monitoring and Evaluation of intervention in line with the terms of reference.
Engineering designs of rehabilitation needs, possible interventions and costing.
Community consultations and liaison with stakeholders such as ZINWA, DDF and RDC
Assessment of the water provision options (looking at services people want, technical
alternatives which work and affordability) in the targeted wards of Gokwe North, wards 13,
23and 36
Identify opportunities for appropriate water supply interventions for all rural communities
who do not have sustainable access to improved domestic/drinking water sources in the
targeted wards of Gokwe North, including factors such as cost, accessibility, reliability,
yield, sustainability and lifespan, etc
Recommend to CAFOD and its partners on the appropriate and sustainable strategies and
technologies that access to safe water for the vulnerable communities in Gokwe North
Document the study findings and recommendations for shared learning and advocacy
Detailed Report preparation.
7. Curriculum Vitae
Keith T Musonza
Page 7 of 8
Name Of Assignment Or Project: PUNGWE-DURU HYDROPOWER PROJECT
Year: November 2012 to March 2013
Location: Honde Valley, Zimbabwe
Client: Nyangani Renewable Energy (NREZIM) (Eng. Ian Mckersie +263 772 434 876)
Main project features: Involved the installation of a 3.4km pipeline with a 2.5km steel section
and a 900m GRP section. There was construction of a weir on Pungwe river and a hydro-
powerhouse with a capacity of 3MW.
Position held: Field Engineering Supervisor
Activities performed:
Inspection and assessment of site.
Ensuring correct pipe laying procedure is adhered to.
Pipe installation training to contractor.
Maintenance training.
Liaison with stakeholders including client, contractor and supplier.
Compilation of reports
Name Of Assignment Or Project:
NYAMWANGA MINI HYDROPOWER PROJECT
Year: June 2012 to August 2012
Location: Honde Valley
Client: Practical Action (Eng Loveridge Ngwenya +263 773 226 603)
Main project features: A community capacity building initiative funded by the EU through Practical A
and they transported water from a river to a powerhouse with a 3.5Kw capacity.
Position held: Field Engineering Supervisor
Activities performed:
Inspection and assessment of site.
Ensuring correct pipe laying procedure is adhered to.
Encouraging community participation.
Pipe installation training to contractor.
Maintenance training.
Liaison with stakeholders including client, contractor and supplier.
Compilation of reports.
Name Of Assignment Or Project:
CHITUNGA MINI HYDROPOWER PROJECT
Year: September 2012
Location: Chitunga, Mozambique
Client: Practical Action
Main project features: Installation of 1.2km of GRP pipeline as pen stocks for Hydropower.
Position held: Field Engineering Supervisor
8. Curriculum Vitae
Keith T Musonza
Page 8 of 8
Activities performed:
Inspection and assessment of site.
Ensuring correct pipe laying procedure is adhered to.
Pipe installation training to contractor.
Liaison with stakeholders including client, contractor and supplier.
OTHER RELEVANT EXPERIENCE
2010 (Jan-Dec) Student internship at the Zimbabwe Irrigation Technology Centre for The Ministry of
Agriculture, Mechanisation and Irrigation Development.
Employment Record
Feb 2012
To Date
Employer :
Positions Held :
Hazen Pipeline Management Systems
Water & Irrigation Engineering Technician
Languages Speaking Reading Writing
English Excellent Excellent Excellent
Shona Mother Tongue
Certification
I, the undersigned, certify that to the best of my knowledge and belief, this data correctly describes
me, my qualifications and experience.
Signature:
Date: January, 2016