Crash Course in PSD Permitting:
Key Concepts, Pitfalls, and Strategies
Midwest Environmental Compliance Conference
May 13, 2015
Presented by
Piyush Srivastav, President
NAQS-Environmental Experts
COMPANY HISTORY
• NAQS was established in 2003 in Lincoln, NE
• First clients were local municipal power plants
• 2005 - First Fortune 500 Client
• Emerged as a leader in air quality
management consultancy services
• By mid-2008, the majority of applications
processed by the Nebraska Department of
Environmental Quality (NDEQ) were
submitted by NAQS
• NAQS is growing to serve our expanding client
base
ORGANIZATIONAL POSITION
• Our Vision: The preeminent leader in air quality, water
quality, risk management plans, and climate change.
• Our Purpose: Partner with clients to provide value added
environmental solutions that ensure:
– Regulatory Compliance
– Increased Operational Flexibility
– Successful Project Planning
– Liability Identification, Reduction
ORGANIZATIONAL POSITION
• Our Mission: Bridge the gap between industry and
regulators by engaging employees with undisputable
expertise, excellent critical thinking abilities, and strong
communication skills.
SERVICES
• Permitting –
– Applications
– Strategies
– Draft Permits
– Permit Reviews
• Compliance Assistance
• Regulatory Analysis
• Emissions Inventories
• Compliance Certifications
• Deviation Reports
• Stack Testing Assistance
• Litigation Support
• Training
• Audits
• Compliance Management
• Executive Training
• Risk Management Planning
• GHG Inventories and
Management
• Strategic Project Planning
• Dispersion Modeling
SELECT CLIENTS
Partnering with a spectrum of clients
ranging from small municipalities to
Fortune 500 Companies
Cargill/Polyols
ABENGOA BIOENERGY
New Source Review (NSR)
Key Concepts
New Source Review (NSR)
• New Source Review (NSR) is a preconstruction
permit program
– requires stationary sources of air pollution to get
permits before construction can start
• There are three types of NSR permitting
1. Prevention of Significant Deterioration (PSD)
Permits
2. Nonattainment NSR (NANSR) Permits
3. Minor Source Permits
New Source Review (NSR)
• What triggers NSR permitting?
– Construct a New “Major” stationary source
– Undertake a “Major Modification” at an existing
major stationary source
New Source Review (NSR)
• Definitions
–Major stationary source:
• One of 28 “listed” major source categories which emits,
or has the potential to emit, 100 tons per year or more
of any regulated NSR pollutant (including fugitive
emissions)
• Any stationary source (other than the listed 28) which
emits, or has the potential to emit, 250 tons per year or
more of a regulated NSR pollutant (excluding fugitive
emissions)
New Source Review (NSR)
• Definitions
–Major modification:
• any physical change in or change in the method
of operation of a major stationary source that
would result in:
– a significant emissions increase of a regulated NSR
pollutant; and
– a significant net emissions increase of that pollutant
from the major stationary source
PSD Permits
• Prevention of Significant Deterioration (PSD)
applies to new major sources or major
modifications at existing sources for pollutants
where the area the source is located is in
attainment or unclassifiable with the National
Ambient Air Quality Standards (NAAQS).
PSD Permits
• Requirements
– Installation of the Best Available Control
Technology (BACT)
– Air Quality NAAQS Modeling Analysis
– Air Quality Increment Analysis
– Additional Impacts Analysis
– Public Involvement
Nonattainment NSR Permits
• For new major sources or major sources making a
major modification in a nonattainment area
• Requirements
– Installation of Lowest Achievable Emission Rate (LAER)
– Emission Offsets (reduce emissions or buy credits)
– Air Quality NAAQS Modeling Analysis
– Air Quality Increment Analysis
– Additional Impacts Analysis
– Opportunity for Public Involvement
Minor NSR Permits
• For projects at stationary sources that do not
require PSD or nonattainment NSR permits
• Minor NSR permits often contain permit
conditions to limit the sources emissions to
avoid PSD or nonattainment NSR
– Make sure the facility can live with the permit
conditions
NSR Applicability
Physical or Operational
Change?
Proposed Project Emissions
Increase Significant?
Can Project Net Out of
Major NSR?
YES
YES
NO
NO
YES
STEP 1
STEP 2
STEP 3
NO
No Modification
Project Not Major
Project Not Major
SUBJECT TO MAJOR NSR
STEP 1
Physical or Operational Change
• No definition in the rule
• Only a few exceptions in the rule
• Most useful and often used exceptions are:
– Routine maintenance, repair and replacement
– Use of alternate fuel or raw material, if capable of
accommodating prior to 1/6/75 or allowed by PSD
permit
– Increasing operating hours or production rate (unless
restricted by permit); cannot be the result of a
physical or operational change
Step 2
PSD Pollutant Tons per Year
PM10 15
SO2 40
NOx 40
VOC (Ozone) 40
CO 100
Lead 0.6
PM2.5 10
Attainment
Areas:
Significant
increases in
PSD pollutants
are specified
in the rule
Significant Increase
STEP 3
Netting
Can the project net out of NSR/PSD?
• Netting is the sum of all creditable,
contemporaneous increases and decreases at the
source
• If net emissions increase is not significant, the
project is not major
• If net emissions increase is significant, the project
is major
Strategies
Strategies
• Avoid NSR/PSD Permitting
– Use an exemption
– Rely on netting calculations
– Take a limitation on the project, so that it is not
significant
• Obtain an NSR/PSD Permit
Strategies
• Reasons to Avoid NSR/PSD Permitting
– Time Delays
• Modeling analysis
• Application preparation
• Issuance of permit
– Additional Expense
• Application Preparation
• BACT must be installed, if cost effective
– “Cost-effectiveness” is a subjective term
Strategies
• Reasons to Avoid NSR/PSD Permitting
– Air Quality Monitoring (preconstruction) if your
current regulatory authority doesn’t allow waiver
Strategies
• Reasons to Avoid NSR/PSD Permitting
– Impacts of Modeling Analysis
• Can change the project scope
• Proximity to Class I or Class II areas (Visibility Impacts)
• Can be time consuming
Strategies
• If Avoiding Major NSR Permitting, Beware of
Pitfalls
Pitfalls
Pitfalls
• The NSR Program is extremely complicated
– There are few exemptions
– The rule can be interpreted in new, more
restrictive ways and is sometimes applied
retroactively
– The significant increase thresholds are low and
easy to exceed
Exemption Pitfalls
Pitfalls
• Using an Exemption to Avoid NSR Permitting
– Does not require performing complicated
calculations, but....
• Determining whether or not the exemption applies can
be tricky
• New interpretations of exemptions can be applied
retroactively
Pitfalls
• “Routine maintenance, repair, and
replacement” is one of the most common
exemptions
– What determines if a change is routine?
• The nature, extent, frequency, purpose, cost of work,
etc.
• There is no regulatory definition of “routine”
Pitfalls
– Nature – Will the project significantly enhance the
efficiency or capacity of the plant?
– Extent – Are there a number of major components
being repaired/replaced?
– Frequency – Are the components being
repaired/replaced original? How often is this change
made in their lifetimes? How often is the change
made to similar components? Routine for industry?
– Purpose – Will the project extend the life of the plant?
– Cost – Is the fixed capital cost, plus maintenance and
repair, greater than 20% of the replacement value?
Pitfalls
• Changes that could be considered a physical
or operational change and not “routine”
– Reducing downtime, changing catalysts, etc.
Calculation Pitfalls
Pitfalls
• Using Netting Calculations to Avoid PSD
Permitting Must be Done Correctly
Pitfalls
• Define the Scope of the Project
– The project includes all activities that are
technically or economically dependent on each
other
– All activities that are part of a single project must
be evaluated together
Pitfalls
• Determine Project-Affected Emission Units
– Any new emission unit installed as part of the
project
– Any emission unit modified as part of the project
– Any emission unit that, due to the project,
experiences:
• An increase in production or feed rate, a change in fuel
or raw material, etc.
Pitfalls
• When Establishing Baseline Actual Emissions
(BAE)
– Fugitive emissions must be included if the
emission unit is one of the 28 listed source
categories
– For emission units affected by the project that
have existed for less than two years, BAE =
Potential to emit (PTE)
Pitfalls
• Establishing Baseline Actual Emissions (BAE)
– For existing units, not realizing
• Look-back period within 5 year period for electric utility
steam generating units (unless another period more
representative of normal operations)
• Look-back period is unknown and a moving target
• The BAE must be decreased because of non-compliant
emissions or regulatory changes
• For a given pollutant, the same baseline period must be
used for all effected emission units
– Different baseline period can be used for different pollutants
Pitfalls
• Establishing Projected Actual Emissions (PAE)
– Fugitive emissions must be included if the
emission unit is one of the 28 listed source
categories
– Emissions from startups, shutdowns, and
malfunctions must be included
Pitfalls
• Contemporaneous period is a moving target
since it is based on the date actual
construction begins
– Example: You have an emissions decrease that is
four years old at the time the application is
submitted. If it takes more than a year to issue
the permit, that decrease can no longer be used
Pitfalls
• Facility must project post change actual annual
emissions for 5 years (10 years post change if
change increases unit’s PTE or capacity)
• Overestimating demand growth emissions
when making use of demand growth exclusion
• Facility must maintain records of actual annual
emissions for 5 or 10 years, and report to
regulatory authority if projection is exceeded
Pitfalls and Consequences
NSR Violations
• Administrative penalties
– Up to $37,500 per day per violation up to $320,000
• Civil penalties
– Up to $37,500 per day per violation for up to 5 years, or over $68
million dollars in total
– Injunctive relief: retroactive PSD permit with current BACT
• No statute of limitations
• No “safe harbor”, even with State agency approval
• Criminal penalties
– Usually reserved for the most serious violations, those that are willful,
or knowingly committed
– Individual liability
– A court conviction can result in fines or imprisonment
Summary
Summary
• NSR/PSD Permitting is Very Complicated, Don’t
Be Afraid to Ask for Help!
• Work with a Firm that is Knowledgeable and Has
Experience – focus on people
• Evaluate the Project
• Develop a Strategy
• Be Aware of Pitfalls
• Obtain or Avoid a Permit
• Maintain Proper Documentation
Questions?
NAQS-Environmental Experts
Contact Piyush Srivastav at:
402-310-5321 (cell)
Piyush Srivastav
Piyush@naqs.com
402-489-1111 (office)
402-310-5321 (cell)

More Related Content

What's hot

The complexities of nsr permitting ddix
The complexities of nsr permitting ddixThe complexities of nsr permitting ddix
The complexities of nsr permitting ddixAll4 Inc.
 
What YOU Need to Know About the 1-hour NAAQS Implementation Process
What YOU Need to Know About the 1-hour NAAQS Implementation ProcessWhat YOU Need to Know About the 1-hour NAAQS Implementation Process
What YOU Need to Know About the 1-hour NAAQS Implementation ProcessAll4 Inc.
 
Project Planning and Air Permit Issues
Project Planning and Air Permit IssuesProject Planning and Air Permit Issues
Project Planning and Air Permit IssuesAll4 Inc.
 
Accompanying notes for ep seminar presentation version 2 morgan mar 2013
Accompanying notes for ep seminar presentation version 2 morgan mar 2013Accompanying notes for ep seminar presentation version 2 morgan mar 2013
Accompanying notes for ep seminar presentation version 2 morgan mar 2013Andrew Morgan
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in constructionKartikeya Pandey
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summaryguest524810
 
Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsScottMadden, Inc.
 
Smart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water LossSmart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water LossBlack & Veatch
 
High Performance Buidlings for Brazil
High Performance Buidlings for BrazilHigh Performance Buidlings for Brazil
High Performance Buidlings for Brazilsekkelww
 
4. Outline Public Participation Guidelines - Baird
4. Outline Public Participation Guidelines - Baird4. Outline Public Participation Guidelines - Baird
4. Outline Public Participation Guidelines - BairdEthical Sector
 
2. EIA Process Experience to Date - Htin Aung Kyaw
2. EIA Process Experience to Date - Htin Aung Kyaw2. EIA Process Experience to Date - Htin Aung Kyaw
2. EIA Process Experience to Date - Htin Aung KyawEthical Sector
 
Stream D_John Ahmet Erkoyuncu
Stream D_John Ahmet ErkoyuncuStream D_John Ahmet Erkoyuncu
Stream D_John Ahmet ErkoyuncuBecarAsset
 
3. Reviewing EIA in Myanmar - Baird
3. Reviewing EIA in Myanmar - Baird3. Reviewing EIA in Myanmar - Baird
3. Reviewing EIA in Myanmar - BairdEthical Sector
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionBlack & Veatch
 
Intellibind Top Ten Most Violated Standards Presentation 2011 01 27 (F)
Intellibind   Top Ten Most Violated Standards Presentation   2011 01 27 (F)Intellibind   Top Ten Most Violated Standards Presentation   2011 01 27 (F)
Intellibind Top Ten Most Violated Standards Presentation 2011 01 27 (F)bluecedars2
 
Ca industrial storm water program brainslam
Ca industrial storm water program brainslamCa industrial storm water program brainslam
Ca industrial storm water program brainslamGreg Gearheart
 

What's hot (20)

The complexities of nsr permitting ddix
The complexities of nsr permitting ddixThe complexities of nsr permitting ddix
The complexities of nsr permitting ddix
 
What YOU Need to Know About the 1-hour NAAQS Implementation Process
What YOU Need to Know About the 1-hour NAAQS Implementation ProcessWhat YOU Need to Know About the 1-hour NAAQS Implementation Process
What YOU Need to Know About the 1-hour NAAQS Implementation Process
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
Project Planning and Air Permit Issues
Project Planning and Air Permit IssuesProject Planning and Air Permit Issues
Project Planning and Air Permit Issues
 
Accompanying notes for ep seminar presentation version 2 morgan mar 2013
Accompanying notes for ep seminar presentation version 2 morgan mar 2013Accompanying notes for ep seminar presentation version 2 morgan mar 2013
Accompanying notes for ep seminar presentation version 2 morgan mar 2013
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in construction
 
NS Resume S
NS  Resume SNS  Resume S
NS Resume S
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/Projects
 
Smart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water LossSmart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water Loss
 
District Standards
District StandardsDistrict Standards
District Standards
 
High Performance Buidlings for Brazil
High Performance Buidlings for BrazilHigh Performance Buidlings for Brazil
High Performance Buidlings for Brazil
 
4. Outline Public Participation Guidelines - Baird
4. Outline Public Participation Guidelines - Baird4. Outline Public Participation Guidelines - Baird
4. Outline Public Participation Guidelines - Baird
 
2. EIA Process Experience to Date - Htin Aung Kyaw
2. EIA Process Experience to Date - Htin Aung Kyaw2. EIA Process Experience to Date - Htin Aung Kyaw
2. EIA Process Experience to Date - Htin Aung Kyaw
 
Stream D_John Ahmet Erkoyuncu
Stream D_John Ahmet ErkoyuncuStream D_John Ahmet Erkoyuncu
Stream D_John Ahmet Erkoyuncu
 
3. Reviewing EIA in Myanmar - Baird
3. Reviewing EIA in Myanmar - Baird3. Reviewing EIA in Myanmar - Baird
3. Reviewing EIA in Myanmar - Baird
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization Solution
 
Intellibind Top Ten Most Violated Standards Presentation 2011 01 27 (F)
Intellibind   Top Ten Most Violated Standards Presentation   2011 01 27 (F)Intellibind   Top Ten Most Violated Standards Presentation   2011 01 27 (F)
Intellibind Top Ten Most Violated Standards Presentation 2011 01 27 (F)
 
Ca industrial storm water program brainslam
Ca industrial storm water program brainslamCa industrial storm water program brainslam
Ca industrial storm water program brainslam
 

Similar to PSD Permitting Strategies and Pitfalls

BlueScape EPA Tailoring Rule Permit Strategies 07/29/10
BlueScape EPA Tailoring Rule Permit Strategies 07/29/10BlueScape EPA Tailoring Rule Permit Strategies 07/29/10
BlueScape EPA Tailoring Rule Permit Strategies 07/29/10BlueScape
 
All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017All4 Inc.
 
"We've got to do what now?" Webinar
"We've got to do what now?" Webinar"We've got to do what now?" Webinar
"We've got to do what now?" WebinarNew Jersey Future
 
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...BlueScape
 
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Ian Carr SCMP, MCIPS
 
Techniques for SO2 Designations
Techniques for SO2 DesignationsTechniques for SO2 Designations
Techniques for SO2 DesignationsAll4 Inc.
 
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkHieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkKevin Perry
 
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...MECConference
 
IES Faculty – Part L, EPC’s & the VE (Part 1)
IES Faculty – Part L, EPC’s & the VE (Part 1)IES Faculty – Part L, EPC’s & the VE (Part 1)
IES Faculty – Part L, EPC’s & the VE (Part 1)IES VE
 
Optimisation of dewatering systems
Optimisation of dewatering systemsOptimisation of dewatering systems
Optimisation of dewatering systemsMartin Preene
 
Cld gas presentation november 4 2010
Cld gas presentation november 4 2010Cld gas presentation november 4 2010
Cld gas presentation november 4 2010EnergyIntoAction
 
Overview of LACMTA Green Construction Policy
Overview of LACMTA Green Construction PolicyOverview of LACMTA Green Construction Policy
Overview of LACMTA Green Construction Policycliban
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedEECO2
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionKeith Beattie
 
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15BlueScape
 
Energy Into Action: Multi-Residential Breakout Session
Energy Into Action: Multi-Residential Breakout SessionEnergy Into Action: Multi-Residential Breakout Session
Energy Into Action: Multi-Residential Breakout SessionEnergyIntoAction
 
Energy Into Action: Multi-Residential
Energy Into Action: Multi-ResidentialEnergy Into Action: Multi-Residential
Energy Into Action: Multi-ResidentialEnergyIntoAction
 

Similar to PSD Permitting Strategies and Pitfalls (20)

BlueScape EPA Tailoring Rule Permit Strategies 07/29/10
BlueScape EPA Tailoring Rule Permit Strategies 07/29/10BlueScape EPA Tailoring Rule Permit Strategies 07/29/10
BlueScape EPA Tailoring Rule Permit Strategies 07/29/10
 
All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017
 
"We've got to do what now?" Webinar
"We've got to do what now?" Webinar"We've got to do what now?" Webinar
"We've got to do what now?" Webinar
 
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
 
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
 
Meec introductory presentation jan 2015 copy
Meec introductory presentation jan 2015 copyMeec introductory presentation jan 2015 copy
Meec introductory presentation jan 2015 copy
 
Techniques for SO2 Designations
Techniques for SO2 DesignationsTechniques for SO2 Designations
Techniques for SO2 Designations
 
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkHieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
 
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
 
IES Faculty – Part L, EPC’s & the VE (Part 1)
IES Faculty – Part L, EPC’s & the VE (Part 1)IES Faculty – Part L, EPC’s & the VE (Part 1)
IES Faculty – Part L, EPC’s & the VE (Part 1)
 
Optimisation of dewatering systems
Optimisation of dewatering systemsOptimisation of dewatering systems
Optimisation of dewatering systems
 
CLD Gas Presentation
CLD Gas PresentationCLD Gas Presentation
CLD Gas Presentation
 
Cld gas presentation november 4 2010
Cld gas presentation november 4 2010Cld gas presentation november 4 2010
Cld gas presentation november 4 2010
 
CLD Gas Presentation
CLD Gas PresentationCLD Gas Presentation
CLD Gas Presentation
 
Overview of LACMTA Green Construction Policy
Overview of LACMTA Green Construction PolicyOverview of LACMTA Green Construction Policy
Overview of LACMTA Green Construction Policy
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
 
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
 
Energy Into Action: Multi-Residential Breakout Session
Energy Into Action: Multi-Residential Breakout SessionEnergy Into Action: Multi-Residential Breakout Session
Energy Into Action: Multi-Residential Breakout Session
 
Energy Into Action: Multi-Residential
Energy Into Action: Multi-ResidentialEnergy Into Action: Multi-Residential
Energy Into Action: Multi-Residential
 

More from Kevin Perry

Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, 2016, Overland Park
Brunetti, Rick, KDHE, Regional Air Issues Roundtable,  MECC, 2016, Overland ParkBrunetti, Rick, KDHE, Regional Air Issues Roundtable,  MECC, 2016, Overland Park
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, 2016, Overland ParkKevin Perry
 
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...Kevin Perry
 
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...Kevin Perry
 
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...Kevin Perry
 
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Kevin Perry
 
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...Kevin Perry
 
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...Kevin Perry
 
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...Kevin Perry
 
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...Kevin Perry
 
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...Kevin Perry
 
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...Kevin Perry
 
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...Kevin Perry
 
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...Kevin Perry
 
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...Kevin Perry
 
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...Kevin Perry
 
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas City
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas CityBrunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas City
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas CityKevin Perry
 
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...Kevin Perry
 
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...Kevin Perry
 
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas City
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas CityJay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas City
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas CityKevin Perry
 
Morrison, Rob, Barr Engineering, Using Mixing Zones Higher in the Watershed, ...
Morrison, Rob, Barr Engineering, Using Mixing Zones Higher in the Watershed, ...Morrison, Rob, Barr Engineering, Using Mixing Zones Higher in the Watershed, ...
Morrison, Rob, Barr Engineering, Using Mixing Zones Higher in the Watershed, ...Kevin Perry
 

More from Kevin Perry (20)

Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, 2016, Overland Park
Brunetti, Rick, KDHE, Regional Air Issues Roundtable,  MECC, 2016, Overland ParkBrunetti, Rick, KDHE, Regional Air Issues Roundtable,  MECC, 2016, Overland Park
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, 2016, Overland Park
 
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...
 
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
 
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...
 
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
 
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...
 
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
 
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...
 
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...
 
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...
 
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...
 
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...
 
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
 
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...
 
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...
 
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas City
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas CityBrunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas City
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas City
 
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...
 
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...
 
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas City
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas CityJay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas City
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas City
 
Morrison, Rob, Barr Engineering, Using Mixing Zones Higher in the Watershed, ...
Morrison, Rob, Barr Engineering, Using Mixing Zones Higher in the Watershed, ...Morrison, Rob, Barr Engineering, Using Mixing Zones Higher in the Watershed, ...
Morrison, Rob, Barr Engineering, Using Mixing Zones Higher in the Watershed, ...
 

Recently uploaded

Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENGeorgeDiamandis11
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...tanu pandey
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 

Recently uploaded (20)

Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 

PSD Permitting Strategies and Pitfalls

  • 1. Crash Course in PSD Permitting: Key Concepts, Pitfalls, and Strategies Midwest Environmental Compliance Conference May 13, 2015 Presented by Piyush Srivastav, President NAQS-Environmental Experts
  • 2. COMPANY HISTORY • NAQS was established in 2003 in Lincoln, NE • First clients were local municipal power plants • 2005 - First Fortune 500 Client • Emerged as a leader in air quality management consultancy services • By mid-2008, the majority of applications processed by the Nebraska Department of Environmental Quality (NDEQ) were submitted by NAQS • NAQS is growing to serve our expanding client base
  • 3. ORGANIZATIONAL POSITION • Our Vision: The preeminent leader in air quality, water quality, risk management plans, and climate change. • Our Purpose: Partner with clients to provide value added environmental solutions that ensure: – Regulatory Compliance – Increased Operational Flexibility – Successful Project Planning – Liability Identification, Reduction
  • 4. ORGANIZATIONAL POSITION • Our Mission: Bridge the gap between industry and regulators by engaging employees with undisputable expertise, excellent critical thinking abilities, and strong communication skills.
  • 5. SERVICES • Permitting – – Applications – Strategies – Draft Permits – Permit Reviews • Compliance Assistance • Regulatory Analysis • Emissions Inventories • Compliance Certifications • Deviation Reports • Stack Testing Assistance • Litigation Support • Training • Audits • Compliance Management • Executive Training • Risk Management Planning • GHG Inventories and Management • Strategic Project Planning • Dispersion Modeling
  • 6. SELECT CLIENTS Partnering with a spectrum of clients ranging from small municipalities to Fortune 500 Companies Cargill/Polyols ABENGOA BIOENERGY
  • 7. New Source Review (NSR) Key Concepts
  • 8. New Source Review (NSR) • New Source Review (NSR) is a preconstruction permit program – requires stationary sources of air pollution to get permits before construction can start • There are three types of NSR permitting 1. Prevention of Significant Deterioration (PSD) Permits 2. Nonattainment NSR (NANSR) Permits 3. Minor Source Permits
  • 9. New Source Review (NSR) • What triggers NSR permitting? – Construct a New “Major” stationary source – Undertake a “Major Modification” at an existing major stationary source
  • 10. New Source Review (NSR) • Definitions –Major stationary source: • One of 28 “listed” major source categories which emits, or has the potential to emit, 100 tons per year or more of any regulated NSR pollutant (including fugitive emissions) • Any stationary source (other than the listed 28) which emits, or has the potential to emit, 250 tons per year or more of a regulated NSR pollutant (excluding fugitive emissions)
  • 11. New Source Review (NSR) • Definitions –Major modification: • any physical change in or change in the method of operation of a major stationary source that would result in: – a significant emissions increase of a regulated NSR pollutant; and – a significant net emissions increase of that pollutant from the major stationary source
  • 12. PSD Permits • Prevention of Significant Deterioration (PSD) applies to new major sources or major modifications at existing sources for pollutants where the area the source is located is in attainment or unclassifiable with the National Ambient Air Quality Standards (NAAQS).
  • 13. PSD Permits • Requirements – Installation of the Best Available Control Technology (BACT) – Air Quality NAAQS Modeling Analysis – Air Quality Increment Analysis – Additional Impacts Analysis – Public Involvement
  • 14. Nonattainment NSR Permits • For new major sources or major sources making a major modification in a nonattainment area • Requirements – Installation of Lowest Achievable Emission Rate (LAER) – Emission Offsets (reduce emissions or buy credits) – Air Quality NAAQS Modeling Analysis – Air Quality Increment Analysis – Additional Impacts Analysis – Opportunity for Public Involvement
  • 15. Minor NSR Permits • For projects at stationary sources that do not require PSD or nonattainment NSR permits • Minor NSR permits often contain permit conditions to limit the sources emissions to avoid PSD or nonattainment NSR – Make sure the facility can live with the permit conditions
  • 16. NSR Applicability Physical or Operational Change? Proposed Project Emissions Increase Significant? Can Project Net Out of Major NSR? YES YES NO NO YES STEP 1 STEP 2 STEP 3 NO No Modification Project Not Major Project Not Major SUBJECT TO MAJOR NSR
  • 17. STEP 1 Physical or Operational Change • No definition in the rule • Only a few exceptions in the rule • Most useful and often used exceptions are: – Routine maintenance, repair and replacement – Use of alternate fuel or raw material, if capable of accommodating prior to 1/6/75 or allowed by PSD permit – Increasing operating hours or production rate (unless restricted by permit); cannot be the result of a physical or operational change
  • 18. Step 2 PSD Pollutant Tons per Year PM10 15 SO2 40 NOx 40 VOC (Ozone) 40 CO 100 Lead 0.6 PM2.5 10 Attainment Areas: Significant increases in PSD pollutants are specified in the rule Significant Increase
  • 19. STEP 3 Netting Can the project net out of NSR/PSD? • Netting is the sum of all creditable, contemporaneous increases and decreases at the source • If net emissions increase is not significant, the project is not major • If net emissions increase is significant, the project is major
  • 21. Strategies • Avoid NSR/PSD Permitting – Use an exemption – Rely on netting calculations – Take a limitation on the project, so that it is not significant • Obtain an NSR/PSD Permit
  • 22. Strategies • Reasons to Avoid NSR/PSD Permitting – Time Delays • Modeling analysis • Application preparation • Issuance of permit – Additional Expense • Application Preparation • BACT must be installed, if cost effective – “Cost-effectiveness” is a subjective term
  • 23. Strategies • Reasons to Avoid NSR/PSD Permitting – Air Quality Monitoring (preconstruction) if your current regulatory authority doesn’t allow waiver
  • 24. Strategies • Reasons to Avoid NSR/PSD Permitting – Impacts of Modeling Analysis • Can change the project scope • Proximity to Class I or Class II areas (Visibility Impacts) • Can be time consuming
  • 25. Strategies • If Avoiding Major NSR Permitting, Beware of Pitfalls
  • 27. Pitfalls • The NSR Program is extremely complicated – There are few exemptions – The rule can be interpreted in new, more restrictive ways and is sometimes applied retroactively – The significant increase thresholds are low and easy to exceed
  • 29. Pitfalls • Using an Exemption to Avoid NSR Permitting – Does not require performing complicated calculations, but.... • Determining whether or not the exemption applies can be tricky • New interpretations of exemptions can be applied retroactively
  • 30. Pitfalls • “Routine maintenance, repair, and replacement” is one of the most common exemptions – What determines if a change is routine? • The nature, extent, frequency, purpose, cost of work, etc. • There is no regulatory definition of “routine”
  • 31. Pitfalls – Nature – Will the project significantly enhance the efficiency or capacity of the plant? – Extent – Are there a number of major components being repaired/replaced? – Frequency – Are the components being repaired/replaced original? How often is this change made in their lifetimes? How often is the change made to similar components? Routine for industry? – Purpose – Will the project extend the life of the plant? – Cost – Is the fixed capital cost, plus maintenance and repair, greater than 20% of the replacement value?
  • 32. Pitfalls • Changes that could be considered a physical or operational change and not “routine” – Reducing downtime, changing catalysts, etc.
  • 34. Pitfalls • Using Netting Calculations to Avoid PSD Permitting Must be Done Correctly
  • 35. Pitfalls • Define the Scope of the Project – The project includes all activities that are technically or economically dependent on each other – All activities that are part of a single project must be evaluated together
  • 36. Pitfalls • Determine Project-Affected Emission Units – Any new emission unit installed as part of the project – Any emission unit modified as part of the project – Any emission unit that, due to the project, experiences: • An increase in production or feed rate, a change in fuel or raw material, etc.
  • 37. Pitfalls • When Establishing Baseline Actual Emissions (BAE) – Fugitive emissions must be included if the emission unit is one of the 28 listed source categories – For emission units affected by the project that have existed for less than two years, BAE = Potential to emit (PTE)
  • 38. Pitfalls • Establishing Baseline Actual Emissions (BAE) – For existing units, not realizing • Look-back period within 5 year period for electric utility steam generating units (unless another period more representative of normal operations) • Look-back period is unknown and a moving target • The BAE must be decreased because of non-compliant emissions or regulatory changes • For a given pollutant, the same baseline period must be used for all effected emission units – Different baseline period can be used for different pollutants
  • 39. Pitfalls • Establishing Projected Actual Emissions (PAE) – Fugitive emissions must be included if the emission unit is one of the 28 listed source categories – Emissions from startups, shutdowns, and malfunctions must be included
  • 40. Pitfalls • Contemporaneous period is a moving target since it is based on the date actual construction begins – Example: You have an emissions decrease that is four years old at the time the application is submitted. If it takes more than a year to issue the permit, that decrease can no longer be used
  • 41. Pitfalls • Facility must project post change actual annual emissions for 5 years (10 years post change if change increases unit’s PTE or capacity) • Overestimating demand growth emissions when making use of demand growth exclusion • Facility must maintain records of actual annual emissions for 5 or 10 years, and report to regulatory authority if projection is exceeded
  • 42. Pitfalls and Consequences NSR Violations • Administrative penalties – Up to $37,500 per day per violation up to $320,000 • Civil penalties – Up to $37,500 per day per violation for up to 5 years, or over $68 million dollars in total – Injunctive relief: retroactive PSD permit with current BACT • No statute of limitations • No “safe harbor”, even with State agency approval • Criminal penalties – Usually reserved for the most serious violations, those that are willful, or knowingly committed – Individual liability – A court conviction can result in fines or imprisonment
  • 44. Summary • NSR/PSD Permitting is Very Complicated, Don’t Be Afraid to Ask for Help! • Work with a Firm that is Knowledgeable and Has Experience – focus on people • Evaluate the Project • Develop a Strategy • Be Aware of Pitfalls • Obtain or Avoid a Permit • Maintain Proper Documentation