SlideShare a Scribd company logo
1 of 25
Definition, Objective and Methodology
Origin – Destination Survey
Mohammed Harsh
B.Urban Planning
Lovely Professional University
Terminologies:
 Origin is the location where a trip begins. It is described in terms of a street address, a monument (e.g.,
a well-known location, an office building, a school, etc.), a street intersection or a district. All survey
origins have been geo-coded for precision.
 Destination is the location where a trip ends. It has similar attributes as the trip origin.
 Origin-destination describes both ‘ends’ of a single trip. This term is commonly abbreviated to ‘O-D.’
 Trip, or person trip, is a single or one-directional movement of one person from one point (origin) to a
second point (destination), for a single purpose. For example, the commute from home to work
represents one trip.
 Modes describe the types of transportation services that are used by residents in the region. For the
purposes of the survey, they include: auto driver, auto passenger (as distinct from the driver), public
transit (bus or rail), Para transit, school bus, motorcycle, taxi, ferry, walking and cycling.
 Modal share is the proportion of trips by any given mode out of the total trips by all modes, for a given
time period.
 Purpose describes the reason that the trip is made. Trip purposes comprise work or work related (i.e.,
going to work or going somewhere outside one’s normal place of work to conduct business)
 Household is the basic analytical unit of the survey sample. It corresponds to a group of people,
whether related or unrelated, who live together in the same location.
Definition:
 Origin‐destination (O‐D) surveys provide a detailed picture of the trip patterns and travel
choices of a city’s or region’s residents.
 These surveys collect valuable data related to households, individuals and trips. This
information allows stakeholders to understand :
Travel patterns and characteristics
Measure trends
Provide input to travel demand model development
Forecasting, and planning for area‐wide transportation needs and services
Progress in implementing transportation policies.
Purpose:
 In a transportation study, it is often necessary to know the exact origin and destination of
the trips.
 It is not only necessary to know how many trips are made, but also group these trips with
reference to the zones of their origin and destination.
 Other information yielded by the O-D survey includes :
Land-use of the zones of origin & destination.
Household characteristics of the trip-making family.
Time of the day when journeys are made.
Trip purpose.
Mode of travel.
Objectives:
 The specific objectives to which O-D survey data can be put are :
To determine the amount of by-passable traffic that enters a town,
thus establish the need for a bypass.
To develop trip generation and trip distribution models in the
transportation planning process.
To determine the extent to which the present highway system is
adequate and to plan new facilities.
To assess the adequacy of parking facilities and to plan for future.
Preliminaries:
 The purpose for which an O-D survey is required determines the extent of preliminary
preparations for organizing the survey.
 For instance, if the survey is needed as part of an urban transportation planning process of
a larger town, it will be necessary to define the study area and sub-divide it into zones.
 The origins and destinations can then be related to these zones.
 In the study of transportation problems of towns, big or small, it is usually necessary to
define external cordon lines, which are imaginary lines at the boundary of study area.
 In big towns, it may also be necessary to select some internal cordon lines, which may be
concentric rings.
 For checking the accuracy of the survey data, it may be necessary to have screen-lines,
which are imaginary lines dividing the area into parts.
 Screen-line divides the area into 2 or more equal parts.
 More screen-lines more accurate data.
 Sometimes even some physical features are considered as a screen line.
 River,Canal,Mountains etc.
Survey Techniques:
 The following are some of the techniques available for conducting an O-D survey :
Home interview survey
Road-side interview survey
Post-card questionnaire survey
Registration number plate survey
Tags on vehicles
ROAD SIDE INTERVIEW
HOME INTERVIEW
 The National Committee on Urban Transportation, (USA) has brought out procedure
manuals, laying down the methodology for conducting O-D surveys.
 By combination of some survey methods, it is possible to economically collect O-D data for
towns of different sizes.
 Usually it is adequate to carry out only an external cordon O-D survey in towns with less
than population 5,000.
 This is because in such small towns the traffic from outside is the one which influences the
traffic pattern.
 For towns with population in the range of 5,000 – 75,000 the external-internal cordon
surveys are most appropriate.
 The external cordon is selected at the edge of urban development and internal is located at
the limits of central business district.
 Road-side interviews at the intersection of the roads with these cordon yield O-D data.
 For large cities, with population more than 75,000 , the most effective method is to
combine external cordon survey with a home-interview survey.
Survey Techniques:
Home Interview Survey:
 One of the most reliable type of surveys for collection of origin and destination data.
 Mainly focuses on travel pattern of the residents of the household and general
characteristics of the household influencing trip-making.
 The information on travel pattern includes :
Travel pattern includes number of trips made
Their origin and destination
Purpose of trip
Travel mode
Time of departure and arrival
Home
School
Play Ground
Home Interview Survey:
 The information on household characteristics includes types of dwelling unit, number of
residents, age, sex, race, vehicle ownership, number of drivers, family income and so on.
 Based on these data it is possible to relate the amount of travel to household and zonal
characteristics and develop equations for trip generation rates.
 It is impractical and unnecessary to interview all the residents of the study area.
 Since travel patterns tend to be uniform in a particular zone, it is sufficient if a sampling
procedure is employed.
 Size of sample is determined on basis of population of the study area and according to
standards. Population of study area Minimum sample size
Under 50,000 1 in 10 households
50,000 to 150,000 1 in 8 households
150,000 to 300,000 1 in 10 households
300,000 to 500,000 1 in 15 households
500,000 to 1,000,000 1 in 20 households
Over 1,000,000 1 in 25 households
Home Interview Survey:
 The information to be collected from the home-interview survey can broadly be classified
under 2 groups :
 Household information.
 Journey data.
 Household information contains :
1. Address
2. Size of household.
3. Age and sex structure of household.
4. Earning members.
5. No: of motor vehicles owned.
6. Household income etc.
 Journey data contains :
1. All journey made during the previous 24 hour period.
2. Purpose of trip.
3. Mode of travel etc.
Road-side Interview Survey:
 Road-side interview survey is one of the methods of carrying out a screen-line or cordon
survey.
 The road-side interview survey can be done either directly interviewing drivers of vehicles
at selected survey points or by issuing prepaid post cards containing questionnaire to all
or sample of the drivers.
 The survey points are selected along the junction of the cordon-line or screen-line with
the roads.
 Less than 5000 population – External cordon is sufficient.
 For dual carriageways or roads with very little traffic the traffic in both the directions is
dealt with simultaneously.
 In other cases the traffic in 2 directions will be interviewed at different times.
 If the survey covers most of the day it may be sufficient to interview traffic in one direction
only and to assume that the journeys in the opposite direction are the same as the direction
interviewed.
Post-card Questionnaire Survey:
 In this method, reply-paid questionnaires are handed over to each of the drivers or a
sample of them at the survey points and requesting them to complete the information and
return by post.
 The method avoids delay caused to the drivers by direct road-side interview method but
suffer from disadvantage that the response may not be good.
Registration Number Plate Survey:
 Registration number plate survey consists of nothing the registration numbers of vehicles
entering or leaving an area at survey points located on the cordon line.
 By matching the registration numbers of vehicles at the points of entry and exit from the
area, one is enabled to identify 2 points on the paths of the vehicle.
Tags on vehicles:
 In this method, at each point where the roads cross the cordon line, vehicles are stopped
and a tag is affixed, usually under a windscreen wiper.
 The tags for different survey stations have different shapes and/or color to identify the
survey stations.
 The vehicles are stopped again at the exit points where the tags are removed.
 The times of entering and leaving the area may be marked on the tags in order to enable
the journey times to be determined.
Accuracy of O-D Survey data:
 The data obtained from the home-interview survey is usually cross-checked with the data
obtained from the screen-line and cordon counts.
CASE STUDY
Bhavnagar – Vataman Road (Gujarat)
Gujarat Infrastructure Development Board (GIDB)
GANDHINAGAR
Survey Location:
 The survey stations were located on Bhavnagar – Vataman Road, approximately 0.5kms
from Nari Crossing towards Vataman.
 Bhavnagar – Vataman Road is a two-lane undivided state highway with paved shoulders
and carries approximately 2,825 (three day average of CVC) vehicles per day.
 This location, approximately 0.5kms from Nari Crossing towards Vataman, was chosen in
order to maximize the usefulness of the survey responses.
Time of Survey:
 A Classified Volume Count (CVC) survey was conducted, as part of the study, in order to
obtain traffic volume. The counting was started Thursday, September 1, 2005.
 Data was to have been collected for 72 hours – from 07:30 AM until 07:30 AM next day-
on all three days.
 Since the Bhavnagar – Vataman road carries a substantial amount of commercial traffic;
the roadside interviews were conducted for 24 hours on Sunday, September 4.
 Data was to have been collected for 24 hours – from 08:00 AM until 08:00 AM next day.
Selecting the Survey Sample for Origin-Destination (O-D) Survey:
 Only some of the vehicles passing by the survey station were chosen for interviews.
 Traffic constables and interviewers were used to slow down traffic and merge all vehicles
into a single lane.
 An Interviewer then directed those drivers selected for interviews over to the roadside,
while allowing all other vehicles to continue straight through. Surveyors waited for the
selected vehicles to approach in a "buffer zone".
 Up to five vehicles could be accommodated for interviews at one time.
 The original goal was to obtain a 20-percent sample of traffic.
 This was to be done by stopping five vehicles for interviews and then letting 25 vehicles
pass by, before stopping five more vehicles.
Selecting the Survey Sample for Origin-Destination (O-D) Survey:
 However, after operating the stations for a short time, it became apparent that a much
larger sample could easily be obtained without jeopardizing traffic safety.
 As soon as the vehicles previously selected for interviews had left the survey station and
merged back into traffic on road, the traffic constables and interviewers would direct the
next five vehicles over to the roadside (rather than waiting for 25 vehicles to pass by
before starting to select again).
 While these vehicles were being interviewed, all other traffic was permitted to pass by the
survey station.
 When it was time to direct more vehicles over to the survey station, the traffic constables
and interviewers would normally choose the next five vehicles.
Interview Questions:
 All drivers selected for interviews were asked these five questions:
1) Where did you begin your trip? (Origin)
2) Where will you end this trip? (Destination)
3) What is the purpose of making this trip? (For passenger vehicles only)
4) What are you carrying? (For Goods vehicles only)
5) How frequently do you travel on this road?
O-D Matrix (Bhavnagar – Vataman Road):
Key Findings:
 Maximum CAR run from Bhavnagar to Ahmadabad (21%) followed by Ahmadabad to
Bhavnagar (14%).
 Maximum LCV run from Ahmadabad to Bhavnagar (21%) followed by Surat to Bhavnagar
(9%).
 Maximum GOVERNMENT BUS run from Nari to Bhavnagar (34%) followed by Bhavnagar
to Nari (31%).
 Maximum PRIVATE BUS run from Bhavnagar to Ahmadabad (18%) followed by
Ahmadabad to Bhavnagar (17%).
 Maximum TRUCK run from Nirma to Bhavnagar (10%) followed by Bhavnagar to Nari
(8%).
 Maximum MULTI AXEL run from Ahmadabad to Bhavnagar (6%) and Amreli to Vadodara
followed by Bhavnagar to Vadodara (4%).
Sample Questionnaire:
Recreation and Highway Travel Survey (Year 2000)
Inyo & Mono County
Topaz Station US 395 and Nevada State Line
Sweetwater Station Jct. US 395 and SR 182
Sample Questionnaire:
Royal Government of Cambodia
Road Asset Management Project
Community survey activity
Origin – Destination survey

More Related Content

What's hot

Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveysDhwani Shah
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studiesAnkit Patel
 
Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )Ahmad Ali Miftah
 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 junPrathamesh Kulkarni
 
Origin and destination survey
Origin and destination surveyOrigin and destination survey
Origin and destination surveyraj balar
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume studyZawad khalil
 
Land use transportation relation
Land use  transportation relationLand use  transportation relation
Land use transportation relationSiddhi Vakharia
 
Urban Transportation system - mass transit system
Urban Transportation system - mass transit systemUrban Transportation system - mass transit system
Urban Transportation system - mass transit systemEddy Ankit Gangani
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering IGAURAV. H .TANDON
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume studyAglaia Connect
 
Traffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESTraffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESDavinderpal Singh
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySai Santosh Yakkali
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume StudyAbontee
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristicskamariya keyur
 

What's hot (20)

Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveys
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
 
Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )
 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 jun
 
Intermediate public transport (ipt)
Intermediate public transport (ipt)Intermediate public transport (ipt)
Intermediate public transport (ipt)
 
Origin and destination survey
Origin and destination surveyOrigin and destination survey
Origin and destination survey
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Land use transportation relation
Land use  transportation relationLand use  transportation relation
Land use transportation relation
 
Urban Transportation system - mass transit system
Urban Transportation system - mass transit systemUrban Transportation system - mass transit system
Urban Transportation system - mass transit system
 
Parking study
Parking studyParking study
Parking study
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering I
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
 
Trip generation
Trip generation Trip generation
Trip generation
 
Traffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESTraffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIES
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time survey
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume Study
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristics
 
Highway planning
Highway planningHighway planning
Highway planning
 

Similar to Origin – Destination survey

Traffic surveys seminar
Traffic surveys seminar Traffic surveys seminar
Traffic surveys seminar DP NITHIN
 
UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliUTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliManjurali Balya
 
origin and destination survey research papeer
origin and destination survey research papeerorigin and destination survey research papeer
origin and destination survey research papeerAdmeff Construction
 
Unit 3 i ppt
Unit 3 i pptUnit 3 i ppt
Unit 3 i pptUMASAI8
 
Highway & transportation engineering pdf
Highway & transportation engineering pdfHighway & transportation engineering pdf
Highway & transportation engineering pdfSaqib Imran
 
ATE - U-I.pptx
ATE - U-I.pptxATE - U-I.pptx
ATE - U-I.pptxCivilhod15
 
4.6 roadside surveys
4.6   roadside surveys4.6   roadside surveys
4.6 roadside surveysDurga Rai
 
ARE UBIQUITOUS TECHNOLOGIES THE FUTURE VEHICLE FOR TRANSPORTATION PLANNING : ...
ARE UBIQUITOUS TECHNOLOGIES THE FUTURE VEHICLE FOR TRANSPORTATION PLANNING : ...ARE UBIQUITOUS TECHNOLOGIES THE FUTURE VEHICLE FOR TRANSPORTATION PLANNING : ...
ARE UBIQUITOUS TECHNOLOGIES THE FUTURE VEHICLE FOR TRANSPORTATION PLANNING : ...ijasuc
 
Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Civil Zone
 
Multimodal Impact Fees - Using Advanced Modeling Tools
Multimodal Impact Fees - Using Advanced Modeling ToolsMultimodal Impact Fees - Using Advanced Modeling Tools
Multimodal Impact Fees - Using Advanced Modeling ToolsJonathan Slason
 
Are ubiquitous technologies the future vehicle for transportation planning a...
Are ubiquitous technologies the future vehicle for transportation planning  a...Are ubiquitous technologies the future vehicle for transportation planning  a...
Are ubiquitous technologies the future vehicle for transportation planning a...ijasuc
 
Mode choice between roadway and waterway
Mode choice between roadway and waterwayMode choice between roadway and waterway
Mode choice between roadway and waterwayAglaia Connect
 
Traffic studies for planning bypasses around towns
Traffic studies for planning bypasses around townsTraffic studies for planning bypasses around towns
Traffic studies for planning bypasses around townskiranchappa
 
Four-stage Sequential Planning
Four-stage Sequential PlanningFour-stage Sequential Planning
Four-stage Sequential PlanningKaranParmar386528
 
Dubuque Smarter Travel
Dubuque Smarter TravelDubuque Smarter Travel
Dubuque Smarter TravelRPO America
 

Similar to Origin – Destination survey (20)

Traffic surveys seminar
Traffic surveys seminar Traffic surveys seminar
Traffic surveys seminar
 
UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliUTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by Manjurali
 
origin and destination survey research papeer
origin and destination survey research papeerorigin and destination survey research papeer
origin and destination survey research papeer
 
Unit 3 i ppt
Unit 3 i pptUnit 3 i ppt
Unit 3 i ppt
 
Unit 3 i ppt
Unit 3 i pptUnit 3 i ppt
Unit 3 i ppt
 
Highway & transportation engineering pdf
Highway & transportation engineering pdfHighway & transportation engineering pdf
Highway & transportation engineering pdf
 
ATE - U-I.pptx
ATE - U-I.pptxATE - U-I.pptx
ATE - U-I.pptx
 
4.6 roadside surveys
4.6   roadside surveys4.6   roadside surveys
4.6 roadside surveys
 
ARE UBIQUITOUS TECHNOLOGIES THE FUTURE VEHICLE FOR TRANSPORTATION PLANNING : ...
ARE UBIQUITOUS TECHNOLOGIES THE FUTURE VEHICLE FOR TRANSPORTATION PLANNING : ...ARE UBIQUITOUS TECHNOLOGIES THE FUTURE VEHICLE FOR TRANSPORTATION PLANNING : ...
ARE UBIQUITOUS TECHNOLOGIES THE FUTURE VEHICLE FOR TRANSPORTATION PLANNING : ...
 
Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Traffic studies (transportation engineering)
Traffic studies (transportation engineering)
 
Multimodal Impact Fees - Using Advanced Modeling Tools
Multimodal Impact Fees - Using Advanced Modeling ToolsMultimodal Impact Fees - Using Advanced Modeling Tools
Multimodal Impact Fees - Using Advanced Modeling Tools
 
Multimodal Mopbility Planning Using Big Data in Toronto
Multimodal Mopbility Planning Using Big Data in TorontoMultimodal Mopbility Planning Using Big Data in Toronto
Multimodal Mopbility Planning Using Big Data in Toronto
 
ICACE_346.pdf
ICACE_346.pdfICACE_346.pdf
ICACE_346.pdf
 
Are ubiquitous technologies the future vehicle for transportation planning a...
Are ubiquitous technologies the future vehicle for transportation planning  a...Are ubiquitous technologies the future vehicle for transportation planning  a...
Are ubiquitous technologies the future vehicle for transportation planning a...
 
Mode choice between roadway and waterway
Mode choice between roadway and waterwayMode choice between roadway and waterway
Mode choice between roadway and waterway
 
Traffic studies for planning bypasses around towns
Traffic studies for planning bypasses around townsTraffic studies for planning bypasses around towns
Traffic studies for planning bypasses around towns
 
Traffic signs.pptx
Traffic signs.pptxTraffic signs.pptx
Traffic signs.pptx
 
Revealing True Human Mobility Pattern Using Smart Data
Revealing True Human Mobility Pattern Using Smart DataRevealing True Human Mobility Pattern Using Smart Data
Revealing True Human Mobility Pattern Using Smart Data
 
Four-stage Sequential Planning
Four-stage Sequential PlanningFour-stage Sequential Planning
Four-stage Sequential Planning
 
Dubuque Smarter Travel
Dubuque Smarter TravelDubuque Smarter Travel
Dubuque Smarter Travel
 

Recently uploaded

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 

Recently uploaded (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 

Origin – Destination survey

  • 1. Definition, Objective and Methodology Origin – Destination Survey Mohammed Harsh B.Urban Planning Lovely Professional University
  • 2. Terminologies:  Origin is the location where a trip begins. It is described in terms of a street address, a monument (e.g., a well-known location, an office building, a school, etc.), a street intersection or a district. All survey origins have been geo-coded for precision.  Destination is the location where a trip ends. It has similar attributes as the trip origin.  Origin-destination describes both ‘ends’ of a single trip. This term is commonly abbreviated to ‘O-D.’  Trip, or person trip, is a single or one-directional movement of one person from one point (origin) to a second point (destination), for a single purpose. For example, the commute from home to work represents one trip.  Modes describe the types of transportation services that are used by residents in the region. For the purposes of the survey, they include: auto driver, auto passenger (as distinct from the driver), public transit (bus or rail), Para transit, school bus, motorcycle, taxi, ferry, walking and cycling.  Modal share is the proportion of trips by any given mode out of the total trips by all modes, for a given time period.  Purpose describes the reason that the trip is made. Trip purposes comprise work or work related (i.e., going to work or going somewhere outside one’s normal place of work to conduct business)  Household is the basic analytical unit of the survey sample. It corresponds to a group of people, whether related or unrelated, who live together in the same location.
  • 3. Definition:  Origin‐destination (O‐D) surveys provide a detailed picture of the trip patterns and travel choices of a city’s or region’s residents.  These surveys collect valuable data related to households, individuals and trips. This information allows stakeholders to understand : Travel patterns and characteristics Measure trends Provide input to travel demand model development Forecasting, and planning for area‐wide transportation needs and services Progress in implementing transportation policies.
  • 4. Purpose:  In a transportation study, it is often necessary to know the exact origin and destination of the trips.  It is not only necessary to know how many trips are made, but also group these trips with reference to the zones of their origin and destination.  Other information yielded by the O-D survey includes : Land-use of the zones of origin & destination. Household characteristics of the trip-making family. Time of the day when journeys are made. Trip purpose. Mode of travel.
  • 5. Objectives:  The specific objectives to which O-D survey data can be put are : To determine the amount of by-passable traffic that enters a town, thus establish the need for a bypass. To develop trip generation and trip distribution models in the transportation planning process. To determine the extent to which the present highway system is adequate and to plan new facilities. To assess the adequacy of parking facilities and to plan for future.
  • 6. Preliminaries:  The purpose for which an O-D survey is required determines the extent of preliminary preparations for organizing the survey.  For instance, if the survey is needed as part of an urban transportation planning process of a larger town, it will be necessary to define the study area and sub-divide it into zones.  The origins and destinations can then be related to these zones.  In the study of transportation problems of towns, big or small, it is usually necessary to define external cordon lines, which are imaginary lines at the boundary of study area.  In big towns, it may also be necessary to select some internal cordon lines, which may be concentric rings.  For checking the accuracy of the survey data, it may be necessary to have screen-lines, which are imaginary lines dividing the area into parts.  Screen-line divides the area into 2 or more equal parts.  More screen-lines more accurate data.  Sometimes even some physical features are considered as a screen line.  River,Canal,Mountains etc.
  • 7. Survey Techniques:  The following are some of the techniques available for conducting an O-D survey : Home interview survey Road-side interview survey Post-card questionnaire survey Registration number plate survey Tags on vehicles ROAD SIDE INTERVIEW HOME INTERVIEW
  • 8.  The National Committee on Urban Transportation, (USA) has brought out procedure manuals, laying down the methodology for conducting O-D surveys.  By combination of some survey methods, it is possible to economically collect O-D data for towns of different sizes.  Usually it is adequate to carry out only an external cordon O-D survey in towns with less than population 5,000.  This is because in such small towns the traffic from outside is the one which influences the traffic pattern.  For towns with population in the range of 5,000 – 75,000 the external-internal cordon surveys are most appropriate.  The external cordon is selected at the edge of urban development and internal is located at the limits of central business district.  Road-side interviews at the intersection of the roads with these cordon yield O-D data.  For large cities, with population more than 75,000 , the most effective method is to combine external cordon survey with a home-interview survey. Survey Techniques:
  • 9. Home Interview Survey:  One of the most reliable type of surveys for collection of origin and destination data.  Mainly focuses on travel pattern of the residents of the household and general characteristics of the household influencing trip-making.  The information on travel pattern includes : Travel pattern includes number of trips made Their origin and destination Purpose of trip Travel mode Time of departure and arrival Home School Play Ground
  • 10. Home Interview Survey:  The information on household characteristics includes types of dwelling unit, number of residents, age, sex, race, vehicle ownership, number of drivers, family income and so on.  Based on these data it is possible to relate the amount of travel to household and zonal characteristics and develop equations for trip generation rates.  It is impractical and unnecessary to interview all the residents of the study area.  Since travel patterns tend to be uniform in a particular zone, it is sufficient if a sampling procedure is employed.  Size of sample is determined on basis of population of the study area and according to standards. Population of study area Minimum sample size Under 50,000 1 in 10 households 50,000 to 150,000 1 in 8 households 150,000 to 300,000 1 in 10 households 300,000 to 500,000 1 in 15 households 500,000 to 1,000,000 1 in 20 households Over 1,000,000 1 in 25 households
  • 11. Home Interview Survey:  The information to be collected from the home-interview survey can broadly be classified under 2 groups :  Household information.  Journey data.  Household information contains : 1. Address 2. Size of household. 3. Age and sex structure of household. 4. Earning members. 5. No: of motor vehicles owned. 6. Household income etc.  Journey data contains : 1. All journey made during the previous 24 hour period. 2. Purpose of trip. 3. Mode of travel etc.
  • 12. Road-side Interview Survey:  Road-side interview survey is one of the methods of carrying out a screen-line or cordon survey.  The road-side interview survey can be done either directly interviewing drivers of vehicles at selected survey points or by issuing prepaid post cards containing questionnaire to all or sample of the drivers.  The survey points are selected along the junction of the cordon-line or screen-line with the roads.  Less than 5000 population – External cordon is sufficient.  For dual carriageways or roads with very little traffic the traffic in both the directions is dealt with simultaneously.  In other cases the traffic in 2 directions will be interviewed at different times.  If the survey covers most of the day it may be sufficient to interview traffic in one direction only and to assume that the journeys in the opposite direction are the same as the direction interviewed.
  • 13. Post-card Questionnaire Survey:  In this method, reply-paid questionnaires are handed over to each of the drivers or a sample of them at the survey points and requesting them to complete the information and return by post.  The method avoids delay caused to the drivers by direct road-side interview method but suffer from disadvantage that the response may not be good. Registration Number Plate Survey:  Registration number plate survey consists of nothing the registration numbers of vehicles entering or leaving an area at survey points located on the cordon line.  By matching the registration numbers of vehicles at the points of entry and exit from the area, one is enabled to identify 2 points on the paths of the vehicle.
  • 14. Tags on vehicles:  In this method, at each point where the roads cross the cordon line, vehicles are stopped and a tag is affixed, usually under a windscreen wiper.  The tags for different survey stations have different shapes and/or color to identify the survey stations.  The vehicles are stopped again at the exit points where the tags are removed.  The times of entering and leaving the area may be marked on the tags in order to enable the journey times to be determined. Accuracy of O-D Survey data:  The data obtained from the home-interview survey is usually cross-checked with the data obtained from the screen-line and cordon counts.
  • 15. CASE STUDY Bhavnagar – Vataman Road (Gujarat) Gujarat Infrastructure Development Board (GIDB) GANDHINAGAR
  • 16. Survey Location:  The survey stations were located on Bhavnagar – Vataman Road, approximately 0.5kms from Nari Crossing towards Vataman.  Bhavnagar – Vataman Road is a two-lane undivided state highway with paved shoulders and carries approximately 2,825 (three day average of CVC) vehicles per day.  This location, approximately 0.5kms from Nari Crossing towards Vataman, was chosen in order to maximize the usefulness of the survey responses.
  • 17. Time of Survey:  A Classified Volume Count (CVC) survey was conducted, as part of the study, in order to obtain traffic volume. The counting was started Thursday, September 1, 2005.  Data was to have been collected for 72 hours – from 07:30 AM until 07:30 AM next day- on all three days.  Since the Bhavnagar – Vataman road carries a substantial amount of commercial traffic; the roadside interviews were conducted for 24 hours on Sunday, September 4.  Data was to have been collected for 24 hours – from 08:00 AM until 08:00 AM next day.
  • 18. Selecting the Survey Sample for Origin-Destination (O-D) Survey:  Only some of the vehicles passing by the survey station were chosen for interviews.  Traffic constables and interviewers were used to slow down traffic and merge all vehicles into a single lane.  An Interviewer then directed those drivers selected for interviews over to the roadside, while allowing all other vehicles to continue straight through. Surveyors waited for the selected vehicles to approach in a "buffer zone".  Up to five vehicles could be accommodated for interviews at one time.  The original goal was to obtain a 20-percent sample of traffic.  This was to be done by stopping five vehicles for interviews and then letting 25 vehicles pass by, before stopping five more vehicles.
  • 19. Selecting the Survey Sample for Origin-Destination (O-D) Survey:  However, after operating the stations for a short time, it became apparent that a much larger sample could easily be obtained without jeopardizing traffic safety.  As soon as the vehicles previously selected for interviews had left the survey station and merged back into traffic on road, the traffic constables and interviewers would direct the next five vehicles over to the roadside (rather than waiting for 25 vehicles to pass by before starting to select again).  While these vehicles were being interviewed, all other traffic was permitted to pass by the survey station.  When it was time to direct more vehicles over to the survey station, the traffic constables and interviewers would normally choose the next five vehicles.
  • 20. Interview Questions:  All drivers selected for interviews were asked these five questions: 1) Where did you begin your trip? (Origin) 2) Where will you end this trip? (Destination) 3) What is the purpose of making this trip? (For passenger vehicles only) 4) What are you carrying? (For Goods vehicles only) 5) How frequently do you travel on this road?
  • 21. O-D Matrix (Bhavnagar – Vataman Road):
  • 22. Key Findings:  Maximum CAR run from Bhavnagar to Ahmadabad (21%) followed by Ahmadabad to Bhavnagar (14%).  Maximum LCV run from Ahmadabad to Bhavnagar (21%) followed by Surat to Bhavnagar (9%).  Maximum GOVERNMENT BUS run from Nari to Bhavnagar (34%) followed by Bhavnagar to Nari (31%).  Maximum PRIVATE BUS run from Bhavnagar to Ahmadabad (18%) followed by Ahmadabad to Bhavnagar (17%).  Maximum TRUCK run from Nirma to Bhavnagar (10%) followed by Bhavnagar to Nari (8%).  Maximum MULTI AXEL run from Ahmadabad to Bhavnagar (6%) and Amreli to Vadodara followed by Bhavnagar to Vadodara (4%).
  • 23. Sample Questionnaire: Recreation and Highway Travel Survey (Year 2000) Inyo & Mono County Topaz Station US 395 and Nevada State Line Sweetwater Station Jct. US 395 and SR 182
  • 24. Sample Questionnaire: Royal Government of Cambodia Road Asset Management Project Community survey activity