BURJ KHALIFACONSTRUCTION MANAGEMENT STUDY CASE
Khaled Al shami
SUMMARY ABOUT THE PROJECT :
Dubai tower, is the tallest skyscraper in the world with height of
828m, its consisted of 164 stories in total. its construction was 6 years
long and it started on September 2004 and was accomplished in
October 2009. The tower includes residential units, offices, hotels
and residential apartments. The project was planned by Dubai’s
government with the purpose of becoming a hub for finance, trade
and tourism in the Middle East. Also, because of Dubai’s
government decision to diversity from oil based economy to service
and tourism economy.
PROJECT STAGES AND MILESTONES:
 January 2004: Excavation commences.
 February 2004: Piling starts.
 21-September 2004: Emaar contractors begin construction.
 March 2005: Structure of Burj Khalifa starts rising.
 June 2006: Level 50 is reached.
PROJECT STAGES AND MILESTONES:
 February 2007: Surpasses the Sears Tower as the building with the most floors.
 13-May 2007: Sets record for vertical concrete pumping on any building at
452 m , surpassing the 449.2 m to which concrete was pumped during the
construction of Taipei 101, while Burj Khalifa reached the 130th floor.
 21-July 2007: Surpasses Taipei 101, whose height of 509.2 m made it the
world's tallest building, and level 141 reached.
 12-August 2007: Surpasses the Sears Tower antenna, which stands 527.3 m.
 12-September 2007: At 555.3 m, becomes the world's tallest freestanding
structure, surpassing the CN Tower in Toronto, and level 150 reached.
PROJECT STAGES AND MILESTONES:
 7-April 2008: At 629 m, surpasses the KVLY-TV Mast to become the
tallest man-made structure, level 160 reached.
 17-June 2008: Emaar announces that Burj Khalifa's height is over 636
m, and that its final height will not be given until it is completed in
September 2009.
 1-September 2008: Height tops 688 m, making it the tallest man-
made structure ever built, surpassing the previous record-holder, the
Warsaw Radio Mast in Konstantynów, Poland.
 17-January 2009: Topped out at 829.8 m.
 1-October 2009: Emaar announces that the exterior of the building is
completed.
PROJECT STAGES AND MILESTONES:
 4-January 2010: Burj Khalifa's official launch ceremony is held and
Burj Khalifa is opened. Burj Dubai renamed Burj Khalifa in honor of
the President of the UAE and ruler of Abu Dhabi, Sheikh Khalifa
bin Zayed al Nahyan.
 10-March 2010 Council on Tall Buildings and Urban Habitat
(CTBUH) certifies Burj Khalifa as world's tallest building.
Time table for the project stages:
GANTT CHART FOR THE PROJECT:
PROJECT TYPE AND CONTRACTING :
Client | Emaar Properties PJSC Actual Value: 1.5bn USD
Burj Dubai & Downtown Dubai Development
Contractors | Main Contractor: Samsung Engineering & Construction
Main Contractor: BESIX
Main Contractor: Arabtec Construction L.L.C.
Consultants | Main Consultant: Skidmore, Owings and Merrill (SOM) (Architect Consultant)
Main Consultant: Turner Construction Company (Project Manager)
Country | United Arab Emirates
Category | Buildings
Project Type | Mixed Use
Project Duration | From: Q3 2004 Actual
To: Q1 2010 Actual
Status Completed
Scope | Burj Khalifa (Burj Dubai) is the tallest man-made structure ever built. The building is part of the 2 km2 development called Downtown Dubai. The mixed
use development will include residential units, offices, hotels and residential apartments. The tower is composed of three elements arranged around a
central core. As it rises from the flat desert base, each element is set back in an upward-spiraling helical pattern, decreasing the mass of the tower as it
reaches toward the sky and thereby decreasing the wind effects.
Schedule | On 4th January 2010, Sheikh Mohammed Bin Rashed Al Maktoum, the ruler of Dubai, opened the tower, and named it Burj Khalifa. The height of Burj
Khalifa is 828m.
Remark | Burj Khalifa (Burj Dubai) is the tallest man-made structure ever built.
PLANNED CONSTRUCTION DURATION AND
ACTUAL DURATION:
The original construction duration was supposed to be for 47
months, starting from Feb 2005 to Dec 2008. The actual duration
took 9 months more, the project was finished at September 2009.
There was a breakdown in construction for 4 months.
BUDGETED CONSTRUCTION COST AND
ACTUAL COST:
The initial planned cost of Dubai’s tower was 876 million dollars,
for height of 728m. however, the construction cost doubled up to
almost 1.5 billion dollar, due to multiple problems and due to major
changes in the plan, such as making the final design 100m higher
than the initial one. Also, changes in interior design.
MAIN OBSTACLES DURING CONSTRUCTION:
 One of the major obstacles was the rise in prices of raw
materials, such as iron which had increased 75% within a year.
 Adding a 100m of height to the initial design has raised the
costs as well, also due to demands of a client hotel major
changes were made in interior design.
 In 2006 the project fell behind schedule, labors were
brought from countries like India and Pakistan and were being
paid very low wages.
RISK MANAGEMENT:
 The main risks during the design procedure were :
 The building load (gravity), and the wind load. But the highest risk was the
high speed elevators.
 Since the attacks of 9/11, a new important factor is considered in
skyscrapers. Which is evacuation. Evacuation is full of challenges for such tall
structure. However, the tower has perfect evacuation system. In addition to
refuge rooms that are fire resistant and heat resistant for up to 2 hours. The
rooms are also provided with air pumps.
 Even though seismic activity is moderate in UAE, but it’s risky for tower
with more than half km of height. This was solved by designing it with a
triangular shape. The building is able to resist up to 6 Richter’s.
10. METHODS USED DURING CONSTRUCTION:
 Structure design software’s were used to simulate and analyze
the construction, (i.g : csi etabs).
 Construction Project management software was used as well, it’s
called prolog manager.
REFERENCES :
 1. project management from burj dubai to burj khalifa, Bristol
2009.
 2. Burj Khalifa mode of construction, joji mathew – slideshare.net.
 3. http://www.constructionweekonline.com/projects-112-burj-
khalifa-burj-dubai/#.Uy5IRPl_tEN
THANK YOU

More Related Content

What's hot (20)

Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
 
Burj khalifa, Dubai.
Burj khalifa, Dubai.Burj khalifa, Dubai.
Burj khalifa, Dubai.
 
Kingdom tower
Kingdom   towerKingdom   tower
Kingdom tower
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologies
 
Burj khalifa
Burj  khalifaBurj  khalifa
Burj khalifa
 
Seminar presentation Burj Khalifa
Seminar presentation Burj KhalifaSeminar presentation Burj Khalifa
Seminar presentation Burj Khalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Jeddah Tower world's coming tallest building
Jeddah Tower world's coming tallest building Jeddah Tower world's coming tallest building
Jeddah Tower world's coming tallest building
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj kalifa
Burj kalifaBurj kalifa
Burj kalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burje-khalifa
Burje-khalifaBurje-khalifa
Burje-khalifa
 
Bruj khalifa
Bruj khalifaBruj khalifa
Bruj khalifa
 
Burj Khalifa Dubai
Burj Khalifa DubaiBurj Khalifa Dubai
Burj Khalifa Dubai
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 

Similar to Burj Khalifa

Running Head Burj Khalifa .docx
Running Head  Burj Khalifa                                     .docxRunning Head  Burj Khalifa                                     .docx
Running Head Burj Khalifa .docxjoellemurphey
 
20070620 turner international-639-kb
20070620 turner international-639-kb20070620 turner international-639-kb
20070620 turner international-639-kbCameron
 
pm ppt- Mubashira Mukkaram.pptx
pm ppt- Mubashira Mukkaram.pptxpm ppt- Mubashira Mukkaram.pptx
pm ppt- Mubashira Mukkaram.pptxNimeshBaghel1
 
In the centre of Dubai stands the Burj Khalifa tower, the world�s ta.pdf
In the centre of Dubai stands the Burj Khalifa tower, the world�s ta.pdfIn the centre of Dubai stands the Burj Khalifa tower, the world�s ta.pdf
In the centre of Dubai stands the Burj Khalifa tower, the world�s ta.pdfemilemathez
 
The tallest towerr khalifa.pptx
The tallest towerr khalifa.pptxThe tallest towerr khalifa.pptx
The tallest towerr khalifa.pptxHamzahMattoo
 
7 of the Tallest Skyscrapers in the Middle East
7 of the Tallest Skyscrapers in the Middle East7 of the Tallest Skyscrapers in the Middle East
7 of the Tallest Skyscrapers in the Middle EastDr. Ehsan Bayat
 
In the centre of Dubai stands the Burj Khalifa tower, the world�s tall.pdf
In the centre of Dubai stands the Burj Khalifa tower, the world�s tall.pdfIn the centre of Dubai stands the Burj Khalifa tower, the world�s tall.pdf
In the centre of Dubai stands the Burj Khalifa tower, the world�s tall.pdfemilemathez
 
ENG PROJECT 2 ESSAY
ENG PROJECT 2 ESSAY ENG PROJECT 2 ESSAY
ENG PROJECT 2 ESSAY shensin1015
 
Aadil final presentation
Aadil final presentationAadil final presentation
Aadil final presentationAmir Amdani
 
Projects brief - Italian Interior Design - October 2008-sec
Projects brief - Italian Interior Design - October 2008-secProjects brief - Italian Interior Design - October 2008-sec
Projects brief - Italian Interior Design - October 2008-secJessica Donadio
 
Kingdom tower.traducido
Kingdom tower.traducidoKingdom tower.traducido
Kingdom tower.traducidoCleo Mamani
 
Nitinsppt 180306173746
Nitinsppt 180306173746Nitinsppt 180306173746
Nitinsppt 180306173746ssuser71113d
 
11 magnificent tallest buildings under construction in the world
11 magnificent tallest buildings under construction in the world11 magnificent tallest buildings under construction in the world
11 magnificent tallest buildings under construction in the worldSophiaJohnson29
 
The tallest buildings
The tallest buildingsThe tallest buildings
The tallest buildingssybll
 

Similar to Burj Khalifa (20)

Jeddah tower
Jeddah towerJeddah tower
Jeddah tower
 
Running Head Burj Khalifa .docx
Running Head  Burj Khalifa                                     .docxRunning Head  Burj Khalifa                                     .docx
Running Head Burj Khalifa .docx
 
20070620 turner international-639-kb
20070620 turner international-639-kb20070620 turner international-639-kb
20070620 turner international-639-kb
 
pm ppt- Mubashira Mukkaram.pptx
pm ppt- Mubashira Mukkaram.pptxpm ppt- Mubashira Mukkaram.pptx
pm ppt- Mubashira Mukkaram.pptx
 
In the centre of Dubai stands the Burj Khalifa tower, the world�s ta.pdf
In the centre of Dubai stands the Burj Khalifa tower, the world�s ta.pdfIn the centre of Dubai stands the Burj Khalifa tower, the world�s ta.pdf
In the centre of Dubai stands the Burj Khalifa tower, the world�s ta.pdf
 
project management (6).pptx
project management (6).pptxproject management (6).pptx
project management (6).pptx
 
The tallest towerr khalifa.pptx
The tallest towerr khalifa.pptxThe tallest towerr khalifa.pptx
The tallest towerr khalifa.pptx
 
7 of the Tallest Skyscrapers in the Middle East
7 of the Tallest Skyscrapers in the Middle East7 of the Tallest Skyscrapers in the Middle East
7 of the Tallest Skyscrapers in the Middle East
 
Dynamic architecture
Dynamic architectureDynamic architecture
Dynamic architecture
 
In the centre of Dubai stands the Burj Khalifa tower, the world�s tall.pdf
In the centre of Dubai stands the Burj Khalifa tower, the world�s tall.pdfIn the centre of Dubai stands the Burj Khalifa tower, the world�s tall.pdf
In the centre of Dubai stands the Burj Khalifa tower, the world�s tall.pdf
 
ENG PROJECT 2 ESSAY
ENG PROJECT 2 ESSAY ENG PROJECT 2 ESSAY
ENG PROJECT 2 ESSAY
 
Sky Scrapers
Sky ScrapersSky Scrapers
Sky Scrapers
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Aadil final presentation
Aadil final presentationAadil final presentation
Aadil final presentation
 
Projects brief - Italian Interior Design - October 2008-sec
Projects brief - Italian Interior Design - October 2008-secProjects brief - Italian Interior Design - October 2008-sec
Projects brief - Italian Interior Design - October 2008-sec
 
Kingdom tower.traducido
Kingdom tower.traducidoKingdom tower.traducido
Kingdom tower.traducido
 
Nitinsppt 180306173746
Nitinsppt 180306173746Nitinsppt 180306173746
Nitinsppt 180306173746
 
JEDDAH TOWER
JEDDAH TOWERJEDDAH TOWER
JEDDAH TOWER
 
11 magnificent tallest buildings under construction in the world
11 magnificent tallest buildings under construction in the world11 magnificent tallest buildings under construction in the world
11 magnificent tallest buildings under construction in the world
 
The tallest buildings
The tallest buildingsThe tallest buildings
The tallest buildings
 

Recently uploaded

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Recently uploaded (20)

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

Burj Khalifa

  • 1. BURJ KHALIFACONSTRUCTION MANAGEMENT STUDY CASE Khaled Al shami
  • 2. SUMMARY ABOUT THE PROJECT : Dubai tower, is the tallest skyscraper in the world with height of 828m, its consisted of 164 stories in total. its construction was 6 years long and it started on September 2004 and was accomplished in October 2009. The tower includes residential units, offices, hotels and residential apartments. The project was planned by Dubai’s government with the purpose of becoming a hub for finance, trade and tourism in the Middle East. Also, because of Dubai’s government decision to diversity from oil based economy to service and tourism economy.
  • 3. PROJECT STAGES AND MILESTONES:  January 2004: Excavation commences.  February 2004: Piling starts.  21-September 2004: Emaar contractors begin construction.  March 2005: Structure of Burj Khalifa starts rising.  June 2006: Level 50 is reached.
  • 4. PROJECT STAGES AND MILESTONES:  February 2007: Surpasses the Sears Tower as the building with the most floors.  13-May 2007: Sets record for vertical concrete pumping on any building at 452 m , surpassing the 449.2 m to which concrete was pumped during the construction of Taipei 101, while Burj Khalifa reached the 130th floor.  21-July 2007: Surpasses Taipei 101, whose height of 509.2 m made it the world's tallest building, and level 141 reached.  12-August 2007: Surpasses the Sears Tower antenna, which stands 527.3 m.  12-September 2007: At 555.3 m, becomes the world's tallest freestanding structure, surpassing the CN Tower in Toronto, and level 150 reached.
  • 5. PROJECT STAGES AND MILESTONES:  7-April 2008: At 629 m, surpasses the KVLY-TV Mast to become the tallest man-made structure, level 160 reached.  17-June 2008: Emaar announces that Burj Khalifa's height is over 636 m, and that its final height will not be given until it is completed in September 2009.  1-September 2008: Height tops 688 m, making it the tallest man- made structure ever built, surpassing the previous record-holder, the Warsaw Radio Mast in Konstantynów, Poland.  17-January 2009: Topped out at 829.8 m.  1-October 2009: Emaar announces that the exterior of the building is completed.
  • 6. PROJECT STAGES AND MILESTONES:  4-January 2010: Burj Khalifa's official launch ceremony is held and Burj Khalifa is opened. Burj Dubai renamed Burj Khalifa in honor of the President of the UAE and ruler of Abu Dhabi, Sheikh Khalifa bin Zayed al Nahyan.  10-March 2010 Council on Tall Buildings and Urban Habitat (CTBUH) certifies Burj Khalifa as world's tallest building.
  • 7. Time table for the project stages:
  • 8. GANTT CHART FOR THE PROJECT:
  • 9. PROJECT TYPE AND CONTRACTING : Client | Emaar Properties PJSC Actual Value: 1.5bn USD Burj Dubai & Downtown Dubai Development Contractors | Main Contractor: Samsung Engineering & Construction Main Contractor: BESIX Main Contractor: Arabtec Construction L.L.C. Consultants | Main Consultant: Skidmore, Owings and Merrill (SOM) (Architect Consultant) Main Consultant: Turner Construction Company (Project Manager) Country | United Arab Emirates Category | Buildings Project Type | Mixed Use Project Duration | From: Q3 2004 Actual To: Q1 2010 Actual Status Completed Scope | Burj Khalifa (Burj Dubai) is the tallest man-made structure ever built. The building is part of the 2 km2 development called Downtown Dubai. The mixed use development will include residential units, offices, hotels and residential apartments. The tower is composed of three elements arranged around a central core. As it rises from the flat desert base, each element is set back in an upward-spiraling helical pattern, decreasing the mass of the tower as it reaches toward the sky and thereby decreasing the wind effects. Schedule | On 4th January 2010, Sheikh Mohammed Bin Rashed Al Maktoum, the ruler of Dubai, opened the tower, and named it Burj Khalifa. The height of Burj Khalifa is 828m. Remark | Burj Khalifa (Burj Dubai) is the tallest man-made structure ever built.
  • 10. PLANNED CONSTRUCTION DURATION AND ACTUAL DURATION: The original construction duration was supposed to be for 47 months, starting from Feb 2005 to Dec 2008. The actual duration took 9 months more, the project was finished at September 2009. There was a breakdown in construction for 4 months.
  • 11. BUDGETED CONSTRUCTION COST AND ACTUAL COST: The initial planned cost of Dubai’s tower was 876 million dollars, for height of 728m. however, the construction cost doubled up to almost 1.5 billion dollar, due to multiple problems and due to major changes in the plan, such as making the final design 100m higher than the initial one. Also, changes in interior design.
  • 12. MAIN OBSTACLES DURING CONSTRUCTION:  One of the major obstacles was the rise in prices of raw materials, such as iron which had increased 75% within a year.  Adding a 100m of height to the initial design has raised the costs as well, also due to demands of a client hotel major changes were made in interior design.  In 2006 the project fell behind schedule, labors were brought from countries like India and Pakistan and were being paid very low wages.
  • 13. RISK MANAGEMENT:  The main risks during the design procedure were :  The building load (gravity), and the wind load. But the highest risk was the high speed elevators.  Since the attacks of 9/11, a new important factor is considered in skyscrapers. Which is evacuation. Evacuation is full of challenges for such tall structure. However, the tower has perfect evacuation system. In addition to refuge rooms that are fire resistant and heat resistant for up to 2 hours. The rooms are also provided with air pumps.  Even though seismic activity is moderate in UAE, but it’s risky for tower with more than half km of height. This was solved by designing it with a triangular shape. The building is able to resist up to 6 Richter’s.
  • 14. 10. METHODS USED DURING CONSTRUCTION:  Structure design software’s were used to simulate and analyze the construction, (i.g : csi etabs).  Construction Project management software was used as well, it’s called prolog manager.