Project Stakeholders’ Role for its Success or Failure
Riyadh, Sept., 01, 2015
Mohamed El Agroudy, CCT, PMP, RMP, TRC, ACIArb, M.ASCE
Project stakeholder management
Project stakeholder management
• Project Stakeholder Management includes the processes required to
identify the people, groups, or organizations that could impact or be
impacted by the project, to analyze stakeholder expectations and
their impact on the project, and to develop appropriate
management strategies for effectively engaging stakeholders in
project decisions and execution.
• Stakeholder management also focuses on continuous
communication with stakeholders to understand their needs and
expectations, addressing issues as they occur, managing conflicting
interests and fostering appropriate stakeholder engagement in
project decisions and activities. Stakeholder satisfaction should be
managed as a key project objective.
Project stakeholder management
(According to PMBOK 5th Edition)
• It includes four processes:
• Identify Stakeholders
• Plan Stakeholder Management
• Manage Stakeholder Engagement
• Control Stakeholder Engagement
1. Identify Stakeholders
• The process of identifying the people, groups, or
organizations that could impact or be impacted by a
decision, activity, or outcome of the project; and
analyzing and documenting relevant information
regarding their interests, involvement,
interdependencies, influence, and potential impact
on project success.
Do not exclude any concerned parties!!!
stakeholders
• Project stakeholders are persons or organizations such as customers, sponsors,
the performing organization, and the public that are actively involved in the
project, or whose interests may be positively or negatively affected by the
execution or completion of the project.
• Stakeholder analysis
- identify all potential project stakeholders
- identify the potential impact or support each stakeholder could generate
- assess haw key stakeholders are likely to respond in various situations.
• Stakeholder register
- identification information
- assessment information
- stakeholder classification
Stakeholders
Classification
• Classify to PRIORITIZE
key stakeholders and
utilize efforts. Example
of classification
models ITEMS:
1. Power = authority
2. Interest = concern
3. Influence =
involvement
4. Impact = ability to
affect planning or
execution
Se we could use,
power/interest,
power/influence,
influence/impact,
Or salience model:
power + urgency +
legitimacy
Stakeholder Analysis
Salience Model, describing classes of
stakeholder based on their:
• Power (ability to impose their will),
• Urgency (need for immediate attention), and
• Legitimacy (their involvement is appropriate).
Stakeholders
Classification
Salience model
Stakeholder Register
Details of the
Name Amgad Omar identified
Role (in project) Management Partner Investor stakeholders.
Org Performing org N/A Such as:
Country manager SponsorTitle
1. Identification
Contact Info amgad@perf.org 010-9876543
info
Country Saudi Egypt
2. Classification
Native Language Arabic Arabic
3. AssessmentOther Languages English English
informationMarketing reports Dividends InfoRequirements
Expectations Weekly, Email, Brief Pers. notification
Potential Influence High Extremely High
Phase(s) Interested in Execution & Closure Execution
Classification Internal, Supporter Internal, neutral
2.Plan Stakeholder Management
• The process of developing appropriate
management strategies to effectively engage
stakeholders throughout the project life cycle,
based on the analysis of their needs, interests, and
potential impact on project success.
Analytical Techniques
• The current engagement level of all stakeholders needs to be
compared to the planned engagement levels required for successful
project completion. Stakeholder engagement throughout the life
cycle of the project is critical to project success.
• The engagement level of the stakeholders can be classified as follows:
– Unaware. Unaware of project and potential impacts.
– Resistant. Aware of project and potential impacts and resistant to
change.
– Neutral. Aware of project yet neither supportive nor resistant.
– Supportive. Aware of project and potential impacts and
supportive to change.
– Leading. Aware of project and potential impacts and actively
engaged in ensuring the project is a success.
Analytical Techniques
– C: Current engagement.
– D: Desired engagement.
3.Manage Stakeholder Engagement
• The process of communicating and working with
stakeholders to meet their needs/expectations,
address issues as they occur, and foster appropriate
stakeholder engagement in project activities
throughout the project life cycle.
Change Log
• A change log is used to document changes that occur
during a project.
• These changes—and their impact on the project in
terms of time, cost, and risk—are communicated to
the appropriate stakeholders.
Communication methods
• Interactive communications
• Push communications
• Pull communications
(the project manager decides what, how, and when communication methods are
to be used in the project)
Interpersonal Skills
• The project manager applies interpersonal
skills to manage stakeholders’ expectations.
For example:
– Building trust,
– Resolving conflict,
– Active listening, and
– Overcoming resistance to change.
Management Skills
• The project manager applies management
skills to coordinate and harmonize the group
toward accomplishing the project objectives.
For example:
– Facilitate consensus toward project objectives,
– Influence people to support the project,
– Negotiate agreements to satisfy the project needs,
and
– Modify organizational behavior to accept the
project outcomes.
Issue Log
• Issue log or action-item log can be used to document and
monitor the resolution of issues.
• An issue is clarified and stated in a way that it can be resolved.
• An owner is assigned and a target date is usually established
for closure.
• Unresolved issues can be a major source of conflict and
project delays.
Integrate/Unify perspective
4.Control Stakeholder Engagement
• The process of monitoring overall project
stakeholder relationships and adjusting strategies
and plans for engaging stakeholders.
Information Management Systems
• An information management system provides a standard
tool for the project manager to capture, store, and
distribute information to stakeholders about the project
cost, schedule progress, and performance.
• It also allows the project manager to consolidate reports
from several systems and facilitate report distribution to
the project stakeholders. Examples of distribution formats
may include table reporting, spreadsheet analysis, and
presentations.
• Graphical capabilities can be used to create visual
representations of project performance information.
Project Success Depends on Stakeholder Role
Project Success Depends on Stakeholder Role

More Related Content

What's hot

Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder ManagementNur Al Fata
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder managementGeorge Stamos
 
An Introduction to Project Management
An Introduction to Project Management An Introduction to Project Management
An Introduction to Project Management Krishna Kant
 
Role and Responsibilities of Project Manager
Role and Responsibilities of Project ManagerRole and Responsibilities of Project Manager
Role and Responsibilities of Project Managerkanti choudhary
 
Project Stakeholder Management [read-only] [compatibility mode]
Project Stakeholder Management [read-only] [compatibility mode]Project Stakeholder Management [read-only] [compatibility mode]
Project Stakeholder Management [read-only] [compatibility mode]Astute Trainers and Consultants
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
How to do Stakeholder Analysis
How to do Stakeholder AnalysisHow to do Stakeholder Analysis
How to do Stakeholder AnalysisAberdeen CES
 
Project stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiProject stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiNelson Mandela Anyomi
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementKaustubh Gupta
 

What's hot (20)

Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
Stakeholder Engagement vs Stakeholder Management
Stakeholder Engagement vs Stakeholder ManagementStakeholder Engagement vs Stakeholder Management
Stakeholder Engagement vs Stakeholder Management
 
An Introduction to Project Management
An Introduction to Project Management An Introduction to Project Management
An Introduction to Project Management
 
Project Stakeholder Management
Project Stakeholder ManagementProject Stakeholder Management
Project Stakeholder Management
 
Project governance
Project governanceProject governance
Project governance
 
Role and Responsibilities of Project Manager
Role and Responsibilities of Project ManagerRole and Responsibilities of Project Manager
Role and Responsibilities of Project Manager
 
Project Stakeholder Management [read-only] [compatibility mode]
Project Stakeholder Management [read-only] [compatibility mode]Project Stakeholder Management [read-only] [compatibility mode]
Project Stakeholder Management [read-only] [compatibility mode]
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
How to do Stakeholder Analysis
How to do Stakeholder AnalysisHow to do Stakeholder Analysis
How to do Stakeholder Analysis
 
Pmp in summary
Pmp in summaryPmp in summary
Pmp in summary
 
Project stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiProject stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela Anyomi
 
Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 

Similar to Project Success Depends on Stakeholder Role

Lec-13-PM-F21 (1).pptxdoneanddustedreadytouse
Lec-13-PM-F21 (1).pptxdoneanddustedreadytouseLec-13-PM-F21 (1).pptxdoneanddustedreadytouse
Lec-13-PM-F21 (1).pptxdoneanddustedreadytousefakharmahtab
 
Topic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdfTopic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdfHuyNguyen657394
 
Project stakeholder management
Project stakeholder managementProject stakeholder management
Project stakeholder managementSaad Al Jabri
 
Stakeholder management in Project Management
Stakeholder management in Project ManagementStakeholder management in Project Management
Stakeholder management in Project ManagementMITSDEDistance
 
10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.pptItcHcm1
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management NotesHaris Hassan
 
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge AreaOnline PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge AreaGlobalSkillup
 
Project Management Basics Stakeholder Management.docx
Project Management Basics Stakeholder Management.docxProject Management Basics Stakeholder Management.docx
Project Management Basics Stakeholder Management.docxwkyra78
 
Day 0 Introduction to PM
Day 0   Introduction to PMDay 0   Introduction to PM
Day 0 Introduction to PMJoyce Wong
 
Stakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptxStakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptxUmairZaman13
 
Trends in stakeholder management shruti prashant
Trends in stakeholder management shruti prashantTrends in stakeholder management shruti prashant
Trends in stakeholder management shruti prashantGuneet Singh
 
Project Management Foundations Series Course 103 - Project Stakeholder Manage...
Project Management Foundations Series Course 103 - Project Stakeholder Manage...Project Management Foundations Series Course 103 - Project Stakeholder Manage...
Project Management Foundations Series Course 103 - Project Stakeholder Manage...Think For A Change
 
Project management stakeholder feb 2018
Project management  stakeholder feb 2018Project management  stakeholder feb 2018
Project management stakeholder feb 2018Malcolm Peart
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsMichael Punzo
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsMichael Punzo
 

Similar to Project Success Depends on Stakeholder Role (20)

Lec-13-PM-F21 (1).pptxdoneanddustedreadytouse
Lec-13-PM-F21 (1).pptxdoneanddustedreadytouseLec-13-PM-F21 (1).pptxdoneanddustedreadytouse
Lec-13-PM-F21 (1).pptxdoneanddustedreadytouse
 
Topic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdfTopic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdf
 
12-PMP Training - Stakeholder Management
12-PMP Training - Stakeholder Management 12-PMP Training - Stakeholder Management
12-PMP Training - Stakeholder Management
 
Project stakeholder management
Project stakeholder managementProject stakeholder management
Project stakeholder management
 
Project stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK SixthProject stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK Sixth
 
Stakeholder management in Project Management
Stakeholder management in Project ManagementStakeholder management in Project Management
Stakeholder management in Project Management
 
10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management Notes
 
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge AreaOnline PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
 
1113 PPT.pptx
1113 PPT.pptx1113 PPT.pptx
1113 PPT.pptx
 
Project Management Basics Stakeholder Management.docx
Project Management Basics Stakeholder Management.docxProject Management Basics Stakeholder Management.docx
Project Management Basics Stakeholder Management.docx
 
Day 0 Introduction to PM
Day 0   Introduction to PMDay 0   Introduction to PM
Day 0 Introduction to PM
 
Stakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptxStakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptx
 
Trends in stakeholder management shruti prashant
Trends in stakeholder management shruti prashantTrends in stakeholder management shruti prashant
Trends in stakeholder management shruti prashant
 
ICT 4109.pdf
ICT 4109.pdfICT 4109.pdf
ICT 4109.pdf
 
Project Management Foundations Series Course 103 - Project Stakeholder Manage...
Project Management Foundations Series Course 103 - Project Stakeholder Manage...Project Management Foundations Series Course 103 - Project Stakeholder Manage...
Project Management Foundations Series Course 103 - Project Stakeholder Manage...
 
Project Management 09
Project Management 09Project Management 09
Project Management 09
 
Project management stakeholder feb 2018
Project management  stakeholder feb 2018Project management  stakeholder feb 2018
Project management stakeholder feb 2018
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
 

Recently uploaded

Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Alex Marques
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Smisbafathima9940
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 

Recently uploaded (20)

Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 

Project Success Depends on Stakeholder Role

  • 1. Project Stakeholders’ Role for its Success or Failure Riyadh, Sept., 01, 2015 Mohamed El Agroudy, CCT, PMP, RMP, TRC, ACIArb, M.ASCE
  • 3. Project stakeholder management • Project Stakeholder Management includes the processes required to identify the people, groups, or organizations that could impact or be impacted by the project, to analyze stakeholder expectations and their impact on the project, and to develop appropriate management strategies for effectively engaging stakeholders in project decisions and execution. • Stakeholder management also focuses on continuous communication with stakeholders to understand their needs and expectations, addressing issues as they occur, managing conflicting interests and fostering appropriate stakeholder engagement in project decisions and activities. Stakeholder satisfaction should be managed as a key project objective.
  • 4. Project stakeholder management (According to PMBOK 5th Edition) • It includes four processes: • Identify Stakeholders • Plan Stakeholder Management • Manage Stakeholder Engagement • Control Stakeholder Engagement
  • 5. 1. Identify Stakeholders • The process of identifying the people, groups, or organizations that could impact or be impacted by a decision, activity, or outcome of the project; and analyzing and documenting relevant information regarding their interests, involvement, interdependencies, influence, and potential impact on project success.
  • 6. Do not exclude any concerned parties!!!
  • 7.
  • 8.
  • 9. stakeholders • Project stakeholders are persons or organizations such as customers, sponsors, the performing organization, and the public that are actively involved in the project, or whose interests may be positively or negatively affected by the execution or completion of the project. • Stakeholder analysis - identify all potential project stakeholders - identify the potential impact or support each stakeholder could generate - assess haw key stakeholders are likely to respond in various situations. • Stakeholder register - identification information - assessment information - stakeholder classification
  • 10. Stakeholders Classification • Classify to PRIORITIZE key stakeholders and utilize efforts. Example of classification models ITEMS: 1. Power = authority 2. Interest = concern 3. Influence = involvement 4. Impact = ability to affect planning or execution Se we could use, power/interest, power/influence, influence/impact, Or salience model: power + urgency + legitimacy
  • 11.
  • 12. Stakeholder Analysis Salience Model, describing classes of stakeholder based on their: • Power (ability to impose their will), • Urgency (need for immediate attention), and • Legitimacy (their involvement is appropriate).
  • 14. Stakeholder Register Details of the Name Amgad Omar identified Role (in project) Management Partner Investor stakeholders. Org Performing org N/A Such as: Country manager SponsorTitle 1. Identification Contact Info amgad@perf.org 010-9876543 info Country Saudi Egypt 2. Classification Native Language Arabic Arabic 3. AssessmentOther Languages English English informationMarketing reports Dividends InfoRequirements Expectations Weekly, Email, Brief Pers. notification Potential Influence High Extremely High Phase(s) Interested in Execution & Closure Execution Classification Internal, Supporter Internal, neutral
  • 15. 2.Plan Stakeholder Management • The process of developing appropriate management strategies to effectively engage stakeholders throughout the project life cycle, based on the analysis of their needs, interests, and potential impact on project success.
  • 16. Analytical Techniques • The current engagement level of all stakeholders needs to be compared to the planned engagement levels required for successful project completion. Stakeholder engagement throughout the life cycle of the project is critical to project success. • The engagement level of the stakeholders can be classified as follows: – Unaware. Unaware of project and potential impacts. – Resistant. Aware of project and potential impacts and resistant to change. – Neutral. Aware of project yet neither supportive nor resistant. – Supportive. Aware of project and potential impacts and supportive to change. – Leading. Aware of project and potential impacts and actively engaged in ensuring the project is a success.
  • 17. Analytical Techniques – C: Current engagement. – D: Desired engagement.
  • 18. 3.Manage Stakeholder Engagement • The process of communicating and working with stakeholders to meet their needs/expectations, address issues as they occur, and foster appropriate stakeholder engagement in project activities throughout the project life cycle.
  • 19. Change Log • A change log is used to document changes that occur during a project. • These changes—and their impact on the project in terms of time, cost, and risk—are communicated to the appropriate stakeholders.
  • 20. Communication methods • Interactive communications • Push communications • Pull communications (the project manager decides what, how, and when communication methods are to be used in the project)
  • 21. Interpersonal Skills • The project manager applies interpersonal skills to manage stakeholders’ expectations. For example: – Building trust, – Resolving conflict, – Active listening, and – Overcoming resistance to change.
  • 22. Management Skills • The project manager applies management skills to coordinate and harmonize the group toward accomplishing the project objectives. For example: – Facilitate consensus toward project objectives, – Influence people to support the project, – Negotiate agreements to satisfy the project needs, and – Modify organizational behavior to accept the project outcomes.
  • 23. Issue Log • Issue log or action-item log can be used to document and monitor the resolution of issues. • An issue is clarified and stated in a way that it can be resolved. • An owner is assigned and a target date is usually established for closure. • Unresolved issues can be a major source of conflict and project delays.
  • 25. 4.Control Stakeholder Engagement • The process of monitoring overall project stakeholder relationships and adjusting strategies and plans for engaging stakeholders.
  • 26.
  • 27. Information Management Systems • An information management system provides a standard tool for the project manager to capture, store, and distribute information to stakeholders about the project cost, schedule progress, and performance. • It also allows the project manager to consolidate reports from several systems and facilitate report distribution to the project stakeholders. Examples of distribution formats may include table reporting, spreadsheet analysis, and presentations. • Graphical capabilities can be used to create visual representations of project performance information.