Standard Issue
    Management Plan
    This document will outline the process by which the training strategy
    and plan and the communications plan will be developed and provide
    an analysis of shared inputs.




                   Get more great templates at
                   http://www.kudospower.com




                                                          Lori Enos
                                                       Kudos Power



@
Standard Issue Management Plan                                                          2




PURPOSE .............................................................................................................................................................................. 4

COMMON SOURCES OF ISSUES ............................................................................................................................... 4

ISSUES, RISKS, AND SCOPE CHANGES ............................................................................................................... 4

CATEGORIES ...................................................................................................................................................................... 5

ISSUE MANAGEMENT ROLES .................................................................................................................................... 5

ANALYSIS ............................................................................................................................................................................ 6

PROCESS .............................................................................................................................................................................. 6




Courtesy of KUDOS Power                                           Visit us at http://www.kudospower.com to obtain an editable version of this document
Standard Issue Management Plan                                 3




                          Revision and Approval Logs
                                           Revision Log


    Version         Date          Author                                 Change Description

   1.0         09/02/09     L. Enos                Document created for KUDOS Power




Once this document has been approved, all changes other than minor wordsmithing must be approved by the
original approvers.
                                           Approval Log
      Approved          Date
       Version        Approved                  Approver Role                                      Approver




Courtesy of KUDOS Power               Visit us at http://www.kudospower.com to obtain an editable version of this document
Standard Issue Management Plan                                 4




Purpose
Throughout the lifecycle of a project, unplanned events or unexpected problems will arise that need to
be resolved in order to complete the project. If not resolved, an issue will impact any one, or a
combination of project cost, delivery date, or quality of deliverable. In an extreme instance, an issue
can prevent the completion of the project.

The purpose of the issues management plan is to:
   • Provide a means of recording issues as they arise or for recording highly probably risks.
   • Analyze the issue to determine what the problem is, how it will impact the project, what the
      resolution for the issue is, and what the timeframe for resolving the issue is.
   • Provide a means of tracking issues so that they are all closed out before final delivery of the
      project.


 Common Sources of Issues
Common sources of issues include:
  • Management (faulty assumptions, strategies, approaches)
  • Staff (lack of appropriate skills and/or experience)
  • Environment (inadequate support or infrastructure)
  • User relations (active user involvement is vital)
  • Credibility (unrealistic expectations that can not be met)
  • Productivity (inability to meet realistic deadlines)
  • Lack of quality associated with deliverables
  • Deliverables or defined processes not meeting stated objectives



Issues, Risks, and Scope Changes
A key difference between a risk and an issue is that risks have the potential to impact a project, but an
impact has the certainty to impact the project.

Some issues may require formal changes to the scope of the project in order for the issue to be
resolved. In the event that a formal change to the scope is required, a scope change request (SCR)
must be submitted.




Courtesy of KUDOS Power               Visit us at http://www.kudospower.com to obtain an editable version of this document
Standard Issue Management Plan                                 5




Categories
All identified issues will be categorized as to which functional area of the project will be impacted by
the issue and which aspect of the project the issue will impact:

Functional Areas                                               Project Aspect
Project Management                                             Requirements
Development                                                    Benefits
Hardware                                                       Schedule
Software                                                       Budget
Process                                                        Deliverable
                                                               Scope
                                                               Issues
                                                               Supplier
                                                               Acceptance
                                                               Communication
                                                               Resources



Issue Management Roles
All project team members and stakeholders have the responsibility to be aware of the issue
management plan and to clearly identify project issues:

Issue Originator
Any team member or stakeholder can identify an issue and log it on the issues and risk log. The risk
originator is specifically responsible for:
    • Identifying the issue and providing as much information as possible.
    • Documenting the issue on the issues and risk log.
    • Assigning the issue to the Project Manager for review.

The Project Manager
The Project Manager is responsible for reviewing all assigned issues and recording and monitoring the
progress of all issues. The PM is specifically responsible for:
   • Reviewing all submitted issues.
   • Monitoring the progress of all issues.
   • Reviewing the initial analysis performed by the functional team.
   • Determining which issues should be closed out.
   • Assigning issues to team members for action.
   • Scheduling work on issues.
   • Reporting issues to the steering committee.

Champion and / or Steering Committee
The champion and /or the steering committee are responsible for any issues that cannot be resolved
by the project team or that the project team needs assistance in resolving. Specific responsibilities
include:
    • Resource acquisition, as appropriate
    • Settling disputes between stakeholders




Courtesy of KUDOS Power               Visit us at http://www.kudospower.com to obtain an editable version of this document
Standard Issue Management Plan                                 6




Analysis
All issues must undergo a PIRT analysis before an action plan for resolving the issue can be reviewed
by the project manager and action items assigned. The PIRT analysis consists of:
     Problem: What is the problem? This should be a concise, but thorough assessment of the project.
     Impact: What is the impact to the project? This should include the impact of the problem on both
     the project.
     Resolution: What is the proposed solution? (Note that there will be a separate field for actual
     resolution)
     Timeframe: When must this issue be resolved? In determining the timeframe for resolution, the
     team must assess the stage of the work to be done, any dependent requirements, and the amount
     of work to be done.


Process
    1. Record Issue
             All issues encountered during the project should be logged on the issues log so that a
             record is maintained of the actions taken.
             It is the responsibility of all team members to log team members and provide as much
             information as possible to ensure a timely resolution.
             All raised issues must comply with the PIRT criteria (Problem, Impact, Resolution,
             Timeframe). Although the person raising the issue may not have all the required
             information, they should record as much information as possible to allow a thorough
             analysis to be done.
    2. Analyze Issue
             The Project Manager is responsible for analyzing and monitoring the issue. No issues
             will be analyzed unless they have been recorded on the log.
             Analyzing the issue entails discussing the issue with appropriate members of the team,
             and recording the results in the Issue Log.
             In conducting the analysis, the project manager may also consult with others to satisfy
             that the issue is valid.
    3. Determine Action Plan
             The project manager then works with the team to define the action items necessary to
             resolve the issue and agrees on these actions and their resolution dates with those who
             are assigned to resolve the issue. In some cases this may involve invoking a change
             request, via the Change Request process.
             Responses to actions will be reviewed by the Project Manager and may cause further
             actions to be required. It is the responsibility of the Project Manager to ensure that it is
             clear at all times what action is to be taken and who has the responsibility for managing
             the item. This information is recorded in the Issue Log.
    4. Resolve Issue
             The individuals to whom action items are assigned are responsible for following up and
             ensuring the issue is resolved within the agreed timeframe.
    5. Monitor Issues
             Issues must be reviewed as a regular item in the weekly status/review meeting. During
             the weekly meeting only the relevant issues will be discussed.
             The p must follow up on overdue issues.
             There will be cases where resolving an issues requires a change to high level scope,
             delivery date or cost. In these cases the issue may require generating a Change

Courtesy of KUDOS Power               Visit us at http://www.kudospower.com to obtain an editable version of this document
Standard Issue Management Plan                                 7



             Request for consideration prior to implementation action being taken (see Change
             Request Process).
             As a result of completed actions or other reviews, the project manager must update the
             status of the issue.
    6. Escalation of Issues
             Escalation of an Issue will happen in several ways depending on the circumstances:
                 • If the issue is not resolved by the resolution date, it will be presented for
                     resolution to the higher decision making team/body.
                 • An issue may be escalated to the project team at any time if it becomes clear
                     that the issue has implications for the program as a whole. This may occur at
                     the outset if the project manager recognizes that the issue has implications
                     across the program, or at any later point.
                 • The project manager may also involve the Key Stakeholders and/or Project
                     Sponsor at any time if she/he is unable to resolve the issue within his/her own
                     span of authority although the issue remains at project level.
                 • When issues are escalated to the Key Stakeholders and/or Project Sponsor,
                     sufficient research and recommended resolutions must be documented along
                     with the issue to enable the body to make an informed decision




Courtesy of KUDOS Power             Visit us at http://www.kudospower.com to obtain an editable version of this document

More Related Content

What's hot

Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio ManagementAnand Subramaniam
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardJavid Hamdard
 
Program management - Fundamentals
Program management   - FundamentalsProgram management   - Fundamentals
Program management - FundamentalsJulen Mohanty
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure ReportCheryl Burcham
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)Dilawar Abbas
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management MethodologyMohammed Al-Taee
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management FrameworkRobert Kelly
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio ManagementAnand Subramaniam
 
Project communication management
Project communication managementProject communication management
Project communication managementSaad Al Jabri
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPTbletindia
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management FundamentalsNishant Munjal
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Agus Suhanto
 
Standard For Program Management Changes
Standard For Program Management ChangesStandard For Program Management Changes
Standard For Program Management Changesgryasam
 
Agile - Scrum Presentation
Agile - Scrum PresentationAgile - Scrum Presentation
Agile - Scrum Presentationgihanlsw
 
The Project Management Office - Effectiveness and Delivering Value
The Project Management Office - Effectiveness and Delivering ValueThe Project Management Office - Effectiveness and Delivering Value
The Project Management Office - Effectiveness and Delivering ValueMatthew Hillhouse
 

What's hot (20)

Project Management Basics
Project Management BasicsProject Management Basics
Project Management Basics
 
Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio Management
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid Hamdard
 
Program management - Fundamentals
Program management   - FundamentalsProgram management   - Fundamentals
Program management - Fundamentals
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure Report
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management Methodology
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio Management
 
Project communication management
Project communication managementProject communication management
Project communication management
 
An introduction to Critical Chain Project Management (CCPM)
An introduction to Critical Chain Project Management (CCPM)An introduction to Critical Chain Project Management (CCPM)
An introduction to Critical Chain Project Management (CCPM)
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6
 
Standard For Program Management Changes
Standard For Program Management ChangesStandard For Program Management Changes
Standard For Program Management Changes
 
Agile - Scrum Presentation
Agile - Scrum PresentationAgile - Scrum Presentation
Agile - Scrum Presentation
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
The Project Management Office - Effectiveness and Delivering Value
The Project Management Office - Effectiveness and Delivering ValueThe Project Management Office - Effectiveness and Delivering Value
The Project Management Office - Effectiveness and Delivering Value
 

Similar to Issue Management Plan

Issue management procedure
Issue management procedureIssue management procedure
Issue management procedureBIRHANASRAT
 
The funkiest PRINCE2 Processes revision guide on the internet
The funkiest PRINCE2 Processes revision guide on the internetThe funkiest PRINCE2 Processes revision guide on the internet
The funkiest PRINCE2 Processes revision guide on the internetKnowledge Train
 
Project and project management
Project and project managementProject and project management
Project and project managementwodato
 
Project assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expectedProject assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expectedTerje Sæbø
 
Role andresponsiblities in project management
Role andresponsiblities in project managementRole andresponsiblities in project management
Role andresponsiblities in project managementim8home85
 
Paul Capello Cerner Health Conference
Paul Capello Cerner Health ConferencePaul Capello Cerner Health Conference
Paul Capello Cerner Health Conferencetigcap
 
Paul Capello CHC 2010 Final
Paul Capello CHC 2010 FinalPaul Capello CHC 2010 Final
Paul Capello CHC 2010 Finaltigcap
 
Organizational influences and project life cycle
Organizational influences and project life cycleOrganizational influences and project life cycle
Organizational influences and project life cycleAli Adil
 
CMS and Website 2.0 Project [Step.1]
CMS and Website 2.0 Project [Step.1]CMS and Website 2.0 Project [Step.1]
CMS and Website 2.0 Project [Step.1]Daniel Newman
 
Project management unit 5(1)
Project management unit 5(1)Project management unit 5(1)
Project management unit 5(1)Rintu Das
 
The project will be deemed successful when all the objectives have been met
The project will be deemed successful when all the objectives have been metThe project will be deemed successful when all the objectives have been met
The project will be deemed successful when all the objectives have been metMike Grabill, PMP
 
Project Management1
Project Management1Project Management1
Project Management1ibsslideshow
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 
Project management slide show
Project management slide showProject management slide show
Project management slide showTanvir Anwar
 

Similar to Issue Management Plan (20)

Issue management procedure
Issue management procedureIssue management procedure
Issue management procedure
 
The funkiest PRINCE2 Processes revision guide on the internet
The funkiest PRINCE2 Processes revision guide on the internetThe funkiest PRINCE2 Processes revision guide on the internet
The funkiest PRINCE2 Processes revision guide on the internet
 
Project and project management
Project and project managementProject and project management
Project and project management
 
Project assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expectedProject assurance - make sure your projects delivers as expected
Project assurance - make sure your projects delivers as expected
 
5 scope
5 scope5 scope
5 scope
 
Role andresponsiblities in project management
Role andresponsiblities in project managementRole andresponsiblities in project management
Role andresponsiblities in project management
 
Paul Capello Cerner Health Conference
Paul Capello Cerner Health ConferencePaul Capello Cerner Health Conference
Paul Capello Cerner Health Conference
 
Paul Capello CHC 2010 Final
Paul Capello CHC 2010 FinalPaul Capello CHC 2010 Final
Paul Capello CHC 2010 Final
 
Organizational influences and project life cycle
Organizational influences and project life cycleOrganizational influences and project life cycle
Organizational influences and project life cycle
 
CMS and Website 2.0 Project [Step.1]
CMS and Website 2.0 Project [Step.1]CMS and Website 2.0 Project [Step.1]
CMS and Website 2.0 Project [Step.1]
 
Pmp study-notes
Pmp study-notesPmp study-notes
Pmp study-notes
 
Charter template 17.01.15
Charter template 17.01.15Charter template 17.01.15
Charter template 17.01.15
 
MonitoringFrameWork
MonitoringFrameWorkMonitoringFrameWork
MonitoringFrameWork
 
Project management unit 5(1)
Project management unit 5(1)Project management unit 5(1)
Project management unit 5(1)
 
The project will be deemed successful when all the objectives have been met
The project will be deemed successful when all the objectives have been metThe project will be deemed successful when all the objectives have been met
The project will be deemed successful when all the objectives have been met
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
Project Management1
Project Management1Project Management1
Project Management1
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
 

Recently uploaded

Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 

Recently uploaded (20)

Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 

Issue Management Plan

  • 1. Standard Issue Management Plan This document will outline the process by which the training strategy and plan and the communications plan will be developed and provide an analysis of shared inputs. Get more great templates at http://www.kudospower.com Lori Enos Kudos Power @
  • 2. Standard Issue Management Plan 2 PURPOSE .............................................................................................................................................................................. 4 COMMON SOURCES OF ISSUES ............................................................................................................................... 4 ISSUES, RISKS, AND SCOPE CHANGES ............................................................................................................... 4 CATEGORIES ...................................................................................................................................................................... 5 ISSUE MANAGEMENT ROLES .................................................................................................................................... 5 ANALYSIS ............................................................................................................................................................................ 6 PROCESS .............................................................................................................................................................................. 6 Courtesy of KUDOS Power Visit us at http://www.kudospower.com to obtain an editable version of this document
  • 3. Standard Issue Management Plan 3 Revision and Approval Logs Revision Log Version Date Author Change Description 1.0 09/02/09 L. Enos Document created for KUDOS Power Once this document has been approved, all changes other than minor wordsmithing must be approved by the original approvers. Approval Log Approved Date Version Approved Approver Role Approver Courtesy of KUDOS Power Visit us at http://www.kudospower.com to obtain an editable version of this document
  • 4. Standard Issue Management Plan 4 Purpose Throughout the lifecycle of a project, unplanned events or unexpected problems will arise that need to be resolved in order to complete the project. If not resolved, an issue will impact any one, or a combination of project cost, delivery date, or quality of deliverable. In an extreme instance, an issue can prevent the completion of the project. The purpose of the issues management plan is to: • Provide a means of recording issues as they arise or for recording highly probably risks. • Analyze the issue to determine what the problem is, how it will impact the project, what the resolution for the issue is, and what the timeframe for resolving the issue is. • Provide a means of tracking issues so that they are all closed out before final delivery of the project. Common Sources of Issues Common sources of issues include: • Management (faulty assumptions, strategies, approaches) • Staff (lack of appropriate skills and/or experience) • Environment (inadequate support or infrastructure) • User relations (active user involvement is vital) • Credibility (unrealistic expectations that can not be met) • Productivity (inability to meet realistic deadlines) • Lack of quality associated with deliverables • Deliverables or defined processes not meeting stated objectives Issues, Risks, and Scope Changes A key difference between a risk and an issue is that risks have the potential to impact a project, but an impact has the certainty to impact the project. Some issues may require formal changes to the scope of the project in order for the issue to be resolved. In the event that a formal change to the scope is required, a scope change request (SCR) must be submitted. Courtesy of KUDOS Power Visit us at http://www.kudospower.com to obtain an editable version of this document
  • 5. Standard Issue Management Plan 5 Categories All identified issues will be categorized as to which functional area of the project will be impacted by the issue and which aspect of the project the issue will impact: Functional Areas Project Aspect Project Management Requirements Development Benefits Hardware Schedule Software Budget Process Deliverable Scope Issues Supplier Acceptance Communication Resources Issue Management Roles All project team members and stakeholders have the responsibility to be aware of the issue management plan and to clearly identify project issues: Issue Originator Any team member or stakeholder can identify an issue and log it on the issues and risk log. The risk originator is specifically responsible for: • Identifying the issue and providing as much information as possible. • Documenting the issue on the issues and risk log. • Assigning the issue to the Project Manager for review. The Project Manager The Project Manager is responsible for reviewing all assigned issues and recording and monitoring the progress of all issues. The PM is specifically responsible for: • Reviewing all submitted issues. • Monitoring the progress of all issues. • Reviewing the initial analysis performed by the functional team. • Determining which issues should be closed out. • Assigning issues to team members for action. • Scheduling work on issues. • Reporting issues to the steering committee. Champion and / or Steering Committee The champion and /or the steering committee are responsible for any issues that cannot be resolved by the project team or that the project team needs assistance in resolving. Specific responsibilities include: • Resource acquisition, as appropriate • Settling disputes between stakeholders Courtesy of KUDOS Power Visit us at http://www.kudospower.com to obtain an editable version of this document
  • 6. Standard Issue Management Plan 6 Analysis All issues must undergo a PIRT analysis before an action plan for resolving the issue can be reviewed by the project manager and action items assigned. The PIRT analysis consists of: Problem: What is the problem? This should be a concise, but thorough assessment of the project. Impact: What is the impact to the project? This should include the impact of the problem on both the project. Resolution: What is the proposed solution? (Note that there will be a separate field for actual resolution) Timeframe: When must this issue be resolved? In determining the timeframe for resolution, the team must assess the stage of the work to be done, any dependent requirements, and the amount of work to be done. Process 1. Record Issue All issues encountered during the project should be logged on the issues log so that a record is maintained of the actions taken. It is the responsibility of all team members to log team members and provide as much information as possible to ensure a timely resolution. All raised issues must comply with the PIRT criteria (Problem, Impact, Resolution, Timeframe). Although the person raising the issue may not have all the required information, they should record as much information as possible to allow a thorough analysis to be done. 2. Analyze Issue The Project Manager is responsible for analyzing and monitoring the issue. No issues will be analyzed unless they have been recorded on the log. Analyzing the issue entails discussing the issue with appropriate members of the team, and recording the results in the Issue Log. In conducting the analysis, the project manager may also consult with others to satisfy that the issue is valid. 3. Determine Action Plan The project manager then works with the team to define the action items necessary to resolve the issue and agrees on these actions and their resolution dates with those who are assigned to resolve the issue. In some cases this may involve invoking a change request, via the Change Request process. Responses to actions will be reviewed by the Project Manager and may cause further actions to be required. It is the responsibility of the Project Manager to ensure that it is clear at all times what action is to be taken and who has the responsibility for managing the item. This information is recorded in the Issue Log. 4. Resolve Issue The individuals to whom action items are assigned are responsible for following up and ensuring the issue is resolved within the agreed timeframe. 5. Monitor Issues Issues must be reviewed as a regular item in the weekly status/review meeting. During the weekly meeting only the relevant issues will be discussed. The p must follow up on overdue issues. There will be cases where resolving an issues requires a change to high level scope, delivery date or cost. In these cases the issue may require generating a Change Courtesy of KUDOS Power Visit us at http://www.kudospower.com to obtain an editable version of this document
  • 7. Standard Issue Management Plan 7 Request for consideration prior to implementation action being taken (see Change Request Process). As a result of completed actions or other reviews, the project manager must update the status of the issue. 6. Escalation of Issues Escalation of an Issue will happen in several ways depending on the circumstances: • If the issue is not resolved by the resolution date, it will be presented for resolution to the higher decision making team/body. • An issue may be escalated to the project team at any time if it becomes clear that the issue has implications for the program as a whole. This may occur at the outset if the project manager recognizes that the issue has implications across the program, or at any later point. • The project manager may also involve the Key Stakeholders and/or Project Sponsor at any time if she/he is unable to resolve the issue within his/her own span of authority although the issue remains at project level. • When issues are escalated to the Key Stakeholders and/or Project Sponsor, sufficient research and recommended resolutions must be documented along with the issue to enable the body to make an informed decision Courtesy of KUDOS Power Visit us at http://www.kudospower.com to obtain an editable version of this document